MONTHYEARIR 05000333/20230042024-02-0707 February 2024 Integrated Inspection Report 05000333/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200012/2023001 ML24037A0102024-02-0606 February 2024 Requalification Program Inspection ML24018A0012024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000333/2024010) and Request for Information ML24004A2302024-01-0808 January 2024 Project Manager Reassignment ML23356A0832024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0058 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines JAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications IR 05000333/20234012023-12-0808 December 2023 Cybersecurity Inspection Report 05000333/2023401 (Cover Letter Only) JAFP-23-0069, Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements RS-23-126, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) JAFP-23-0057, and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation JAFP-23-0064, Emergency Plan Document Revision2023-11-15015 November 2023 Emergency Plan Document Revision JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use IR 05000333/20230032023-11-13013 November 2023 Integrated Inspection Report 05000333/2023003 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000333/20230102023-10-26026 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000333/2023010 JAFP-23-0059, Registration of Spent Fuel Cask Use2023-10-24024 October 2023 Registration of Spent Fuel Cask Use IR 05000333/20233012023-10-19019 October 2023 Initial Operator Licensing Examination Report 05000333/2023301 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans IR 05000333/20230052023-08-31031 August 2023 Updated Inspection Plan for James A. FitzPatrick Nuclear Power Plant (Report 05000333/2023005) JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023 Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0050, Physical Security Plan, Revision 242023-08-31031 August 2023 Physical Security Plan, Revision 24 JAFP-23-0047, Correction to the 2022 Annual Radioactive Effluent Release Report2023-08-30030 August 2023 Correction to the 2022 Annual Radioactive Effluent Release Report ML23228A1342023-08-16016 August 2023 Licensed Operator Positive Fitness-For-Duty Test IR 05000333/20230022023-08-0707 August 2023 Integrated Inspection Report 05000333/2023002 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0043, 10 CFR 50.46 Annual Report2023-07-31031 July 2023 10 CFR 50.46 Annual Report JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2023-07-28028 July 2023 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance ML23208A1622023-07-27027 July 2023 Operator Licensing Examination Approval IR 05000333/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000333/2023402 IR 05000333/20230112023-07-25025 July 2023 Post-Approval Site Inspection for License Renewal - Phase 4 Inspection Report 05000333/2023011 IR 05000333/20235012023-07-20020 July 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000333/2023501 ML23191A0502023-07-0505 July 2023 Notification of Use of Radioactive Materials Design Package USA/9168/B(U)-96 JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation2023-06-28028 June 2023 License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation IR 05000333/20234202023-06-26026 June 2023 Security Baseline Inspection Report 05000333 2023420 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23164A0322023-06-13013 June 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000333/2023010 ML23152A0042023-06-0101 June 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000333/2023401 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling JAFP-23-0025, 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Annual Radiological Environmental Operating Report IR 05000333/20230012023-05-0303 May 2023 Integrated Inspection Report 05000333/2023001 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI JAFP-23-0023, 2022 Annual Radioactive Effluent Release Report2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report IR 05000333/20230122023-04-13013 April 2023 Quadrennial Fire Protection Inspection Report 05000333/2023012 ML23095A3722023-04-0505 April 2023 2023 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations JAFP-23-0010, 2022 REIRS Transmittal of NRC Form 52023-03-20020 March 2023 2022 REIRS Transmittal of NRC Form 5 IR 05000333/20220042023-03-20020 March 2023 Integrated Inspection Report 05000333/2022004 2024-02-07
[Table view] Category:Report
MONTHYEARRS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20309A5052020-11-0303 November 2020 Inspector Notes Cover Sheet ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML19301A5052019-08-13013 August 2019 JAF-CALC-NBI-00205 Setpoint Calculation for Vessel Lo-Lo Lvl Primary Containment Isolation Function (02-3LT-57A,B and 02-3STU-258A,B) NL-18-0506, Failure to Observe the Certificate of Compliance Condition of the 8-120B Cask Pre-Shipment Leak Test2018-04-16016 April 2018 Failure to Observe the Certificate of Compliance Condition of the 8-120B Cask Pre-Shipment Leak Test ML18019A2692018-02-12012 February 2018 Flood Hazard Mitigation Strategies Assessment JAFP-17-0085, High Frequency Confirmation Report for March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1, Seismic2017-08-30030 August 2017 High Frequency Confirmation Report for March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1, Seismic JAFP-17-0084, Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2017-08-29029 August 2017 Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) JAFP-17-0078, Focused Evaluation Summary Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2017-07-27027 July 2017 Focused Evaluation Summary Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident JAFP-17-0054, James a FitzPatrick - Submittal of Stress Analysis Summary for the 24-10-130 Weld Overlay2017-05-25025 May 2017 James a FitzPatrick - Submittal of Stress Analysis Summary for the 24-10-130 Weld Overlay ML17110A2742017-04-20020 April 2017 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI Division 1 ML16043A4112016-02-18018 February 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review ML16028A2952016-01-29029 January 2016 10 CFR 71.95 Notification Associated with the Failure to Observe Certificate of Compliance Condition of the 8-120B Secondary Lid Test Port Configuration PLA-7414, Redacted - Susquehanna, Units 1 and 2 - Submittal of 10 CFR 71.95 Report Regarding Energy Solutions 8-120B Cask Certificate of Compliance 91682015-11-19019 November 2015 Redacted - Susquehanna, Units 1 and 2 - Submittal of 10 CFR 71.95 Report Regarding Energy Solutions 8-120B Cask Certificate of Compliance 9168 ML15321A4542015-11-13013 November 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Cask JAFP-15-0129, Submittal of 10 CFR 71.95 Report Involving 8-120B Cask2015-11-0606 November 2015 Submittal of 10 CFR 71.95 Report Involving 8-120B Cask NL-15-2010, E.I. Hatch - Submits 10 CFR 71.95 Report on Non-Conformance Involving Radwaste Cask 8-120B2015-11-0202 November 2015 E.I. Hatch - Submits 10 CFR 71.95 Report on Non-Conformance Involving Radwaste Cask 8-120B NLS2015128, Submittal of 10 CFR 71.95 Report Involving Energysolutions Certificate of Compliance No. 91682015-10-29029 October 2015 Submittal of 10 CFR 71.95 Report Involving Energysolutions Certificate of Compliance No. 9168 ZS-2015-0156, Zionsolutions, LLC - Submittal of 10 CFR 71.95 Report on the 8-120B Cask2015-10-26026 October 2015 Zionsolutions, LLC - Submittal of 10 CFR 71.95 Report on the 8-120B Cask ML15313A1642015-10-0808 October 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Cask DCL-15-102, 10 CFR 71.95 Report Regarding Energy Solutions' Model 8-120B Shipping Cask2015-08-24024 August 2015 10 CFR 71.95 Report Regarding Energy Solutions' Model 8-120B Shipping Cask ML15259A3422015-08-24024 August 2015 10 CFR 71.95 Report Evaluation Form; Submitted by Fenok, Erwin Resin Solutions, North Anna Power Stations, Et Al NL-15-1461, Submittal of 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B2015-08-21021 August 2015 Submittal of 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B PLA-7374, Submittal of 10 CFR71.95 Report Regarding Energy Solutions 8-120B Cask Certificate of Compliance 91682015-08-20020 August 2015 Submittal of 10 CFR71.95 Report Regarding Energy Solutions 8-120B Cask Certificate of Compliance 9168 NRC-15-0085, Submittal of 10 CFR 71.95 Report on the 8-120B Shipping Cask2015-08-19019 August 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Shipping Cask ZS-2015-0131, Zionsolutions, LLC - Submittal of10 CFR 71.95 Report on the 8-120B Cask2015-08-18018 August 2015 Zionsolutions, LLC - Submittal of10 CFR 71.95 Report on the 8-120B Cask ML15246A1452015-08-11011 August 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Cask NLS2015091, 10 CFR 71.95 Report Involving Energysolutions Certificate of Compliance No. 91682015-07-28028 July 2015 10 CFR 71.95 Report Involving Energysolutions Certificate of Compliance No. 9168 JAFP-15-0036, J.A. Fitzpatrick Flood Hazard Reevaluation Report - Response to NRC Request for Information Per 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fuskushima Dai-2015-03-12012 March 2015 J.A. Fitzpatrick Flood Hazard Reevaluation Report - Response to NRC Request for Information Per 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fuskushima Dai-ichi ML15007A0902015-02-12012 February 2015 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents) JAFP-15-0007, Seismic Walkdown Report Update - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid2015-01-0707 January 2015 Seismic Walkdown Report Update - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident. ML15007A1502015-01-0707 January 2015 Seismic Walkdown Report Update - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident. JAFP-14-0143, Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.2014-12-30030 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The. ZS-2014-0271, Zionsolutions' 10 CFR 71.95 Report of Non-Compliance with Certificate of Compliance No. 9168, Revision No. 20 - Cask 8-120B2014-08-18018 August 2014 Zionsolutions' 10 CFR 71.95 Report of Non-Compliance with Certificate of Compliance No. 9168, Revision No. 20 - Cask 8-120B JAFP-14-0094, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models2014-08-0101 August 2014 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14073A1552014-04-0101 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14007A6812014-02-21021 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14043A4282014-02-15015 February 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for James A. FitzPatrick Nuclear Power Plant, TAC Nos.: MF1077 ML14087A0992013-10-17017 October 2013 10 CFR 71.95 Report - 8-120B Cask Certificate of Compliance Noncompliance Due to an Inadequate Vendor Leak Test Procedure NL-13-133, 10 CFR 71.95 Report on Failure to Observe Certificate of Compliance Conditions for Radwaste Model 8-120B Cask Vent Port Leak Test Hold Time2013-10-0202 October 2013 10 CFR 71.95 Report on Failure to Observe Certificate of Compliance Conditions for Radwaste Model 8-120B Cask Vent Port Leak Test Hold Time DCL-13-094, and Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions' Model 8-120B Shipping Cask2013-09-30030 September 2013 and Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions' Model 8-120B Shipping Cask L-2013-258, 10 CFR 71.95 - Cask 8-120B - 60 Day Report2013-09-16016 September 2013 10 CFR 71.95 - Cask 8-120B - 60 Day Report NRC-13-0052, CFR 71.95 Report - Failure to Observe Certificate of Compliance Conditions for the 8-120B Vent Port Leak Test Hold Time2013-09-0909 September 2013 CFR 71.95 Report - Failure to Observe Certificate of Compliance Conditions for the 8-120B Vent Port Leak Test Hold Time NL-13-1898, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B2013-08-30030 August 2013 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B ML13247A0362013-08-20020 August 2013 Letter from R. Dale Roberts 10 CFR 71.95 Report on the 8-120B Cask ML13273A6912013-08-20020 August 2013 Redacted - Letter from R. Dale Roberts 10 CFR 71.95 Report on the 8-120B Cask JAFP-13-0096, James a FitzPatrick Nuclear Power Plant, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models2013-08-0101 August 2013 James a FitzPatrick Nuclear Power Plant, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models JAFP-13-0035, Response to Request for Additional Information on Core for Plate Rim Hold Down Bolting, Plant Specific Analysis and Inspection Plan, License Renewal Commitment 232013-04-17017 April 2013 Response to Request for Additional Information on Core for Plate Rim Hold Down Bolting, Plant Specific Analysis and Inspection Plan, License Renewal Commitment #23 JAFP-12-0135, Flooding Walkdown Report - Entergys Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-27027 November 2012 Flooding Walkdown Report - Entergys Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident 2021-01-04
[Table view] Category:Miscellaneous
MONTHYEARML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting NL-18-0506, Failure to Observe the Certificate of Compliance Condition of the 8-120B Cask Pre-Shipment Leak Test2018-04-16016 April 2018 Failure to Observe the Certificate of Compliance Condition of the 8-120B Cask Pre-Shipment Leak Test ML18019A2692018-02-12012 February 2018 Flood Hazard Mitigation Strategies Assessment JAFP-17-0084, Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2017-08-29029 August 2017 Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML17110A2742017-04-20020 April 2017 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI Division 1 ML16043A4112016-02-18018 February 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review ML16028A2952016-01-29029 January 2016 10 CFR 71.95 Notification Associated with the Failure to Observe Certificate of Compliance Condition of the 8-120B Secondary Lid Test Port Configuration PLA-7414, Redacted - Susquehanna, Units 1 and 2 - Submittal of 10 CFR 71.95 Report Regarding Energy Solutions 8-120B Cask Certificate of Compliance 91682015-11-19019 November 2015 Redacted - Susquehanna, Units 1 and 2 - Submittal of 10 CFR 71.95 Report Regarding Energy Solutions 8-120B Cask Certificate of Compliance 9168 ML15321A4542015-11-13013 November 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Cask JAFP-15-0129, Submittal of 10 CFR 71.95 Report Involving 8-120B Cask2015-11-0606 November 2015 Submittal of 10 CFR 71.95 Report Involving 8-120B Cask NLS2015128, Submittal of 10 CFR 71.95 Report Involving Energysolutions Certificate of Compliance No. 91682015-10-29029 October 2015 Submittal of 10 CFR 71.95 Report Involving Energysolutions Certificate of Compliance No. 9168 ZS-2015-0156, Zionsolutions, LLC - Submittal of 10 CFR 71.95 Report on the 8-120B Cask2015-10-26026 October 2015 Zionsolutions, LLC - Submittal of 10 CFR 71.95 Report on the 8-120B Cask ML15313A1642015-10-0808 October 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Cask DCL-15-102, 10 CFR 71.95 Report Regarding Energy Solutions' Model 8-120B Shipping Cask2015-08-24024 August 2015 10 CFR 71.95 Report Regarding Energy Solutions' Model 8-120B Shipping Cask ML15259A3422015-08-24024 August 2015 10 CFR 71.95 Report Evaluation Form; Submitted by Fenok, Erwin Resin Solutions, North Anna Power Stations, Et Al NL-15-1461, Submittal of 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B2015-08-21021 August 2015 Submittal of 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B PLA-7374, Submittal of 10 CFR71.95 Report Regarding Energy Solutions 8-120B Cask Certificate of Compliance 91682015-08-20020 August 2015 Submittal of 10 CFR71.95 Report Regarding Energy Solutions 8-120B Cask Certificate of Compliance 9168 NRC-15-0085, Submittal of 10 CFR 71.95 Report on the 8-120B Shipping Cask2015-08-19019 August 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Shipping Cask ZS-2015-0131, Zionsolutions, LLC - Submittal of10 CFR 71.95 Report on the 8-120B Cask2015-08-18018 August 2015 Zionsolutions, LLC - Submittal of10 CFR 71.95 Report on the 8-120B Cask ML15246A1452015-08-11011 August 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Cask ML15007A0902015-02-12012 February 2015 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents) JAFP-14-0143, Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.2014-12-30030 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The. ZS-2014-0271, Zionsolutions' 10 CFR 71.95 Report of Non-Compliance with Certificate of Compliance No. 9168, Revision No. 20 - Cask 8-120B2014-08-18018 August 2014 Zionsolutions' 10 CFR 71.95 Report of Non-Compliance with Certificate of Compliance No. 9168, Revision No. 20 - Cask 8-120B JAFP-14-0094, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models2014-08-0101 August 2014 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models ML14073A1552014-04-0101 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident NL-13-133, 10 CFR 71.95 Report on Failure to Observe Certificate of Compliance Conditions for Radwaste Model 8-120B Cask Vent Port Leak Test Hold Time2013-10-0202 October 2013 10 CFR 71.95 Report on Failure to Observe Certificate of Compliance Conditions for Radwaste Model 8-120B Cask Vent Port Leak Test Hold Time DCL-13-094, and Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions' Model 8-120B Shipping Cask2013-09-30030 September 2013 and Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions' Model 8-120B Shipping Cask L-2013-258, 10 CFR 71.95 - Cask 8-120B - 60 Day Report2013-09-16016 September 2013 10 CFR 71.95 - Cask 8-120B - 60 Day Report NRC-13-0052, CFR 71.95 Report - Failure to Observe Certificate of Compliance Conditions for the 8-120B Vent Port Leak Test Hold Time2013-09-0909 September 2013 CFR 71.95 Report - Failure to Observe Certificate of Compliance Conditions for the 8-120B Vent Port Leak Test Hold Time NL-13-1898, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B2013-08-30030 August 2013 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B ML13273A6912013-08-20020 August 2013 Redacted - Letter from R. Dale Roberts 10 CFR 71.95 Report on the 8-120B Cask ML13247A0362013-08-20020 August 2013 Letter from R. Dale Roberts 10 CFR 71.95 Report on the 8-120B Cask JAFP-13-0096, James a FitzPatrick Nuclear Power Plant, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models2013-08-0101 August 2013 James a FitzPatrick Nuclear Power Plant, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models JAFP-12-0135, Flooding Walkdown Report - Entergys Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-27027 November 2012 Flooding Walkdown Report - Entergys Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML13162A6272012-02-20020 February 2012 Summary of R1 Containment Vents ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants ML1125101872011-09-0808 September 2011 NRC Investigation Report Nos. 1-2009-041, 1-2010-019, and 1-2010-031 ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants JAFP-09-0091, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models2009-07-31031 July 2009 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models JAFP-09-0056, Summary of Plant and Independent Spent Fuel Storage Installation Changes, Tests, and Experiments for 2007 and 2008 as Required by 10 CFR 50.59 and 10 CFR 72.482009-05-11011 May 2009 Summary of Plant and Independent Spent Fuel Storage Installation Changes, Tests, and Experiments for 2007 and 2008 as Required by 10 CFR 50.59 and 10 CFR 72.48 ML0831006632008-11-19019 November 2008 Request for Additional Information Third 10-Year Interval Inservice Inspection Program Plan Relief Request RR-CRV-01 JAFP-08-0103, Certificate of Compliance Not Met During Receipt of Low-Level Radioactive Waste Shipment at Barnwell, Sc Disposal Facility2008-10-0202 October 2008 Certificate of Compliance Not Met During Receipt of Low-Level Radioactive Waste Shipment at Barnwell, Sc Disposal Facility ML0810102772008-09-0808 September 2008 Renewed Facility Operating License No. DPR-59 / Appendix C - Additional Conditions ML0805905802008-02-15015 February 2008 List of Requesters Fitzpatrick ML0805905792008-02-14014 February 2008 Foia/Pa Cases Received from 02/12/07 to 02/12/08 ML0711601862007-05-21021 May 2007 Biological Assessment for Species Under the Jurisdiction of the U.S. Fish and Wildlife Service - James A. FitzPatrick Nuclear Power Plant License Renewal Review ML0710004922007-03-26026 March 2007 Usfws Threatened and Endangered Species System (Tess) - New York ENOC-07-00002, Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 20062007-02-28028 February 2007 Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006 JAFP-07-0013, License Renewal Application, Amendment 4, Response to Request for Additional Information2007-01-29029 January 2007 License Renewal Application, Amendment 4, Response to Request for Additional Information ML0704704712007-01-0101 January 2007 Great Lakes St. Lawrence Seaway - Ballast Water 2020-10-23
[Table view] |
Text
Studsvik Via UPS August 20, 2013 E-1 30823-L Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852 ATTN: Document Control Desk Mr. Mark Lombard, Director Division of Spent Fuel Storage & Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Re: 10 CFR 71.95 Report on the 8-120B Cask
Dear Mr. Lombard:
Studsvik Processing Facility Erwin, LLC (SPFE) hereby submits the attached report as required by 10 CFR 71.95(a)(3) for instances in which the conditions of approval in the Certificate of Compliance for the 8-120B Cask (CoC #9168) may not have been observed in making certain shipments. The attached report contains the certificate holder's (EnergySolutions) input received August 14, 2013.
As stated in the certificate holder's letter, the circumstances described in this report, even though written by EnergySolutions, are applicable to SPFE as a licensed user of the cask.
SPFE makes between 20 and 50 annual shipments in the 8-120B Cask. SPFE has consistently followed the then applicable Air Pressure Drop Test procedure (TR-TP-002) for each shipment. SPFE will continue to follow the latest revision to this procedure which currently includes the 60 minute pressure test of the vent port as part of pre-shipment testing.
If you have any questions regarding this submittal, please contact me at 423-722-1975.
Sincerely, R. Dale Roberts Director Studsvik Processing Facility Erwin Attachments: EnergySolutions letter dated August 14, 2013 Report by ES: "Failure to Observe Certificate of Compliance Conditions for the 8-120B Vent Port Leak Test Hold Time" cc: Mr. H. Stevens f\J* \652,*
Mr. J. DiCamillo Mr. James D. Harris, EnergySolutions Studsvik Processing Facility Erwin, LLC: 151 T.C. Runnion Rd, Erwin, TN. 37650 Phone: 423-735-6300 Fax: 423-743-0794 www.studsvik.com
ENERGYSOLUTIONS August 14, 2013
Dear Valued Customer:
In late May, 2013, an 8-120B cask user discovered a discrepancy between EnergySolutions' air pressure drop test procedure TR-TP-002 and the 8-120B Safety Analysis Report (SAR). EnergySolutions' air pressure drop test procedure TR-TP-002 described a 20-minute hold time for the pre-shipment leak test of the cask vent port. The 8-120B SAR, however, specifies a hold time of 60 minutes for the test; therefore the conditions of approval in the Certificate of Compliance may not necessarily have been observed in making shipments. TR-TP-002 is the basis for leak tests on all EnergySolutionsshipments, as well as the suggested procedure content for most shipments. Based on a review performed by EnergySolutions of past revisions of CoCs, SARs and cask handling procedures, it appears that this discrepancy has existed for approximately 12 years, spanning approximately 88 cask users and approximately 1,400 shipments.
EnergySolutionshas completed its review of the event and developed our report in accordance with 10 CFR 71.95(a)(3). Additionally, EnergySolutions approached the NRC the week of August 4, 2013, with a proposal to make a single notification on behalf of all our cask users. The initial discussion led EnergySolutionsto believe that the NRC would grant this request. However, in recent discussions with the NRC, they informed us that each licensee must file their own report as required by 10 CFR 71.95.
EnergySolutions filed the attached report containing the information required by 10 CFR 71.95 on August 14, 2013. In the report, EnergySolutions describes the cause of the discrepancy and provides an analysis demonstrating there is no safety significance. We expect that the information required for individual users to make their own notifications is contained in this report. Because the discrepancy spans over 12 years, we understand from the NRC that they do not expect a detailed review of shipments and specific instances of non-compliance to be identified as part of each licensee's 10 CFR 71.95(a)(3) report. Reference to this report in individual user reports would be appropriate if you so choose.
We sincerely apologize for any inconvenience this issue may have caused within in your organization.
Our corrective actions as a result of this issue are intended to prevent recurrence of similar issues and to ensure the highest quality of products and services that we provide.
For additional details, please contact Phillip Thomas at phthomas@energysolutions.com or 803-541-5044.
Sincerely, Js Harris V.P. and General Manager, Cask Logistics Logistics, Processing and Disposal EnergySolutions, LLC
Attachment:
Letter and Report to NRC on 8-120B Cask cc: Tony Didgeon Mark Lewis Dan Shrum 740 Osborn Road . Barnwell, South Carolina 29812 803.259.1781 . Fax 803.259.1477
ENERGYSOLUTIONS August 14, 2013 CD13-0232 Mark Lombard, Director Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington DC 20555-0001 ATTN: Document Control Desk
Subject:
10 CFR 71.95 Report on the 8-120B Cask
Dear Mr. Lombard:
EnergySolutions hereby submits the attached report providing the information required by 10 CFR 71.95(a)(3) for instances in which the conditions of approval in the Certificate of Compliance for the 8-120B Cask (Certificate of Compliance #9168) may not have been observed in making certain shipments. The circumstances described in this report are applicable to all licensed users of the cask.
If you have any questions regarding this submittal, please contact me at 801-649-2109.
- Sincer, Daniel B. Shrum Senior Vice President, Regulatory Affairs EnergySolutions
Attachment:
Failure to Observe Certificate of Compliance Conditions for the 8-120B Vent Port Leak Test Hold Time cc: Michele Sampson, Chief Thermal and Containment Branch Pierre M. Saverot Licensing Branch 423 West 300 South, Suite 200 - Salt Lake City, LIT B4101 www.energysolutions.com
ENERGYSOLUTIONS Failure to Observe Certificate of Compliance Conditions for the 8-120B Vent Port Leak Test Hold Time August 14, 2013
- 1) Abstract This report provides the information required by 10 CFR 71.95(a)(3) for instances in which the conditions of approval in the Certificate of Compliance for the 8-120B Cask (Certificate of Compliance #9168) may not have been observed in making certain shipments. The circumstances described in this report are applicable to all licensed users of the cask.
EnergySolutions' air pressure drop test procedure TR-TP-002 describes a 20-minute hold time for the pre-shipment leak test of the cask vent port. The 8-120B Safety Analysis Report (SAR), however, specifies a hold time of 60 minutes for the leak test of the vent port; therefore the conditions of approval in the Certificate of Compliance may not necessarily have been observed in making shipments. TR-TP-002 is the basis for leak tests on all EnergySolutions shipments, as well as the suggested procedure content for most shipments by our authorized users.'
The 8-120B CoC requires the package to be prepared for shipment and operated in accordance with Chapter 7 of the SAR, and tested and maintained in accordance with Chapter 8 of the SAR. TR-TP-002 captures the applicable SAR requirements and provides further detail for the development of a shipper's operating procedure. Recently, an 8-120B cask user identified the hold time discrepancy between TR-TP-002 and the SAR (i.e., 20 versus 60 minutes). Based on a review of past revisions of CoCs, SARs, and cask handling procedures, it appears that this discrepancy has existed for approximately 12 years, spanning approximately 88 cask users and approximately 1,400 shipments.
Upon notification and after confirmation of the discrepancy, EnergySolutions revised TR-TP-002 to incorporate the SAR required 60-minute vent port leak test. This change to TR-TP-002 was communicated to all EnergySolutions registered cask users on June 13, 2013. The SAR requires pre-shipment leak testing of the vent port only when the port has been opened since the preceding vent port leak test. EnergySolutions issued a notice to registered cask users on July 2, 2013 to clarify this issue. Operation of a package vent port is infrequent. However some vent ports mayhave been opened during the past 12 years; and therefore the pre-shipment leak testing would have been required.
The licensing basis for the pre-shipment leak tests for all three of the 8-120B lid containment seals is a pressure drop calculation for the largest of the three seals (the primary lid seal).
The required hold time is therefore conservative for the two seals with smaller test volumes.
Because of the small size of the vent port seal test volume, EnergySolutionshas determined that the 20-minute hold time meets the same criterion by which the 60-minute hold time was derived for the larger primary lid seal. In fact, in the case of the vent port leak test, the 20-minute hold time provides substantial margin for detecting any leakage from the vent port. It therefore follows that there is no safety significance associated with the condition.
Since registered users of the 8-120B package are licensees, these licensees would normally prepare and issue an approved procedure to control their pre-shipment activities.
ENERGYSOLUTIONS Furthermore, there is no continuing safety concern as new lids are required to be used after August 31, 2013 with different testing procedures.
Due to the long timeframc over which this condition has existed, the large number of 8-120B cask users, the many shipments that have occurred, the difficulty of determining which if any shipments may have been out of compliance, and the finding of no significant safety impact, EnergySolutions hereby submits this notification to summarize the issue as it applies to all 8-120B users. Because of the imminent rollout of new lids and related test procedures, no further corrective actions by certificate users are necessary to address this leak test procedure.
- 2) Narrative Description of the Event a) Status of Components All 8-120B components are operating normally.
b) Dates of Occurrences February 2001 to present.
c) Cause of Error Discrepancy between EnergySolutions air pressure drop test procedure TR-TP-002 and Chapter 8 of the 8-120B SAR.
d) Failure Mode, Mechanism, and Effects Not applicable; no 8-120B packaging components have failed.
e) Systems or Secondary Functions Affected Not applicable.
f) Method of Discovery of the Error The condition was identified by an 8-120B cask user.
- 3) Assessment of Safety Consequences There is no safety consequence of performing the pre-shipment leak test of the 8-120B cask vent port using a 20-minute hold time versus the 60-minute hold time that is required by the 8-120B CoC. The required hold time varies in proportion to the test volume if the test pressure and acceptance criterion remain unchanged. Larger test volumes require longer hold times. The test volume includes the free volume of the space to be tested and the volume of the test manifold. For the original subject 8-120B lids, Section 4.4 of the July 2012 SAR Addendum shows the calculation basis for a 60-minute hold time. Only one calculation was presented for the large primary lid containment seal. Since the other seals have smaller test volumes, a 60-minute hold time was conservatively specified for all seals, including the vent port.
ENERCYSOLUTIONS The SAR test volume for the primary containment seal was 103.2 cc. For the pre-shipment vent port leak test, there is no safety impact from a 20-minute hold time provided that the test volume is less than or equal to the 20/60 times the primary containment seal test chamber volume, or (20/60)* 103.2 = 34.4 cc. The vent port test volume is equal to the combined volume of the test manifold (10 cc) plus a very small residual volume inside the vent port, which is less than 34.4 cc. Therefore, pre-shipment leak tests of the vent port performed using a 20-minute hold time are adequate to demonstrate compliance with maximum leak rate acceptance criteria, and there is no safety consequence from testing vent ports for 20 minutes instead of 60 minutes.
- 4) Planned Corrective Actions As noted above, upon notification and after confirmation of the discrepancy, EnergySolutions revised TR-TP-002 to incorporate the SAR required 60-minute vent port leak test and notified registered cask users of the change.
Beginning September 1,2013, the 8-120B fleet will ship with a new lid design, authorized in the latest revision of the CoC. 2 Thereafter, the 8-120B cask may no longer be used with the old seals that were authorized in Revision No. 17 of the 8-120B CoC. Shipments with the new lids will be required to use the seals authorized in Revision 19 of the CoC. The EnergySolutions air pressure drop test procedure TR-TP-002 is being revised and reissued based on the requirements of Revision 19 of the 8-120B CoC. These revisions are reviewed and approved by the EnergySolutions Cask Licensing Manager to assure that they are compliant with the requirements of the CoC.
EnergySolutions also has initiated a lifecycle procedure for managing Type B casks to assure that CoC requirements flow through the design, fabrication, and operational phases. This is a new procedure that also would identify existing inconsistencies and prevent future inconsistencies between the SAR and operating procedures. The procedure will be effective August 19, 2013.
The error in incorporating the revised 60-minute vent port leak rate criteria into TR-TP-002 raises a question as to whether there are other similar errors involving the flow-down of requirements into operating procedures. Accordingly, EnergySolutions plans to conduct a review of the 8-120B and other EnergySolutions Type B packagings to verify that CoC and SAR requirements have been accurately translated into the prescribed operating procedures.
If any such discrepancies are found, EnergySolutions will expand the scope of these reviews as necessary.
- 5) Previous Similar Events Involving the 8-120B No previous similar events have been identified.
2 No shipments have been made using the new lids to date.
ENERGYSOLUTIONS
- 6) Contact for Additional Information Dan Shrum EnergySolutions Senior Vice President, Regulatory Affairs (801) 649-2109
- 7) Extent of Exposure of Individuals to Radiation or Radioactive Materials None.
RAD PROTECTION 02:42:31 p.m. 08-20-2013 1/1 3153496799 1E ntergyEntergy Entergy Nuclear Northeast Nuclear Operations. Inc.
James A. FitzPatrick NPP IJIILI& o P.O. Box 110 Lycoming, NY 13093 August 20, 2013 JRP-13-009 U.S. Nuclear Regulatory Commission Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Washington, DC 20555 Gentlemen:
Pursuant to the requirements of 10 CFR 71.17, Entergy Nuclear Operations, as holder of License No. DPR-59, wishes to register as a user of the EnergySolutions 10-160B package.
Package identification number for this cask is USA19204/B(U)F-96, NRC Docket No. 71-9204.
It is requested that future information for this package be forwarded to the following individual:
R. Thomas Phelps Name Sr. HP/Chemistry Specialist Title James A. FitzPatrick, NPP Organization P.O. Box 110, Lycoming. NY 13093 Organization's Address Sincerely, R. Thomas Phelps Sr. HP/Chemistry Specialist cc: EnergySolutions Document Control Suite 100, Center Point 11 100 Center Point Circle Columbia, SC 29210
.=153496799 RAD PROTECTION 02:42:31 p.m. 08-20-2013 1/1 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
James A. FitzPatrck NPP wd--
WP.O. nte Box 110 Lycoming, NY 13093 August 20, 2013 JRP-13-009 U.S. Nuclear Regulatory Commission Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Washington, DC 20555 Gentlemen:
Pursuant to the requirements of 10 CFR 71.17, Entergy Nuclear Operations, as holder of License No. DPR-59, wishes to register as a user of the EnergySolutions 10-160B package.
Package identification number for this cask is USA/9204/B(U)F-96, NRC Docket No. 71-9204.
It is requested that future information for this package be forwarded to the following individual:
R. Thomas Phelps Name Sr. HP/Chemistry Specialist Title James A. FitzPatrick, NPP Organization P.O. Box 110, Lycoming, NY 13093 Organization's Address Sincerely, R. Thomas Phelps Sr. HP/Chemistry Specialist cc: EnergySolutions Document Control Suite 100, Center Point II 100 Center Point Circle Columbia, SC 29210