Category:Report
MONTHYEARRS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML19301A5052019-08-13013 August 2019 JAF-CALC-NBI-00205 Setpoint Calculation for Vessel Lo-Lo Lvl Primary Containment Isolation Function (02-3LT-57A,B and 02-3STU-258A,B) ML18019A2692018-02-12012 February 2018 Flood Hazard Mitigation Strategies Assessment JAFP-17-0085, High Frequency Confirmation Report for March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1, Seismic2017-08-30030 August 2017 High Frequency Confirmation Report for March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1, Seismic JAFP-17-0084, Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2017-08-29029 August 2017 Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) JAFP-17-0078, Focused Evaluation Summary Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2017-07-27027 July 2017 Focused Evaluation Summary Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident JAFP-17-0054, James a FitzPatrick - Submittal of Stress Analysis Summary for the 24-10-130 Weld Overlay2017-05-25025 May 2017 James a FitzPatrick - Submittal of Stress Analysis Summary for the 24-10-130 Weld Overlay ML17110A2742017-04-20020 April 2017 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI Division 1 ML16043A4112016-02-18018 February 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review JAFP-15-0129, Submittal of 10 CFR 71.95 Report Involving 8-120B Cask2015-11-0606 November 2015 Submittal of 10 CFR 71.95 Report Involving 8-120B Cask JAFP-15-0036, J.A. Fitzpatrick Flood Hazard Reevaluation Report - Response to NRC Request for Information Per 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fuskushima Dai-2015-03-12012 March 2015 J.A. Fitzpatrick Flood Hazard Reevaluation Report - Response to NRC Request for Information Per 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fuskushima Dai-ichi ML15007A0902015-02-12012 February 2015 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents) ML15007A1502015-01-0707 January 2015 Seismic Walkdown Report Update - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident. JAFP-15-0007, Seismic Walkdown Report Update - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid2015-01-0707 January 2015 Seismic Walkdown Report Update - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident. JAFP-14-0143, Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.2014-12-30030 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The. JAFP-14-0094, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models2014-08-0101 August 2014 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14073A1552014-04-0101 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14007A6812014-02-21021 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14043A4282014-02-15015 February 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for James A. FitzPatrick Nuclear Power Plant, TAC Nos.: MF1077 ML13247A0362013-08-20020 August 2013 Letter from R. Dale Roberts 10 CFR 71.95 Report on the 8-120B Cask ML13273A6912013-08-20020 August 2013 Redacted - Letter from R. Dale Roberts 10 CFR 71.95 Report on the 8-120B Cask JAFP-13-0096, James a FitzPatrick Nuclear Power Plant, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models2013-08-0101 August 2013 James a FitzPatrick Nuclear Power Plant, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models JAFP-13-0035, Response to Request for Additional Information on Core for Plate Rim Hold Down Bolting, Plant Specific Analysis and Inspection Plan, License Renewal Commitment 232013-04-17017 April 2013 Response to Request for Additional Information on Core for Plate Rim Hold Down Bolting, Plant Specific Analysis and Inspection Plan, License Renewal Commitment #23 JAFP-12-0134, FitzPatrick - Seismic Walkdown Report, Response to NRC Request for Information Per 10 CFR 50.54 (F) Re the Seismic Aspect of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-27027 November 2012 FitzPatrick - Seismic Walkdown Report, Response to NRC Request for Information Per 10 CFR 50.54 (F) Re the Seismic Aspect of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML12342A1402012-11-27027 November 2012 Seismic Walkdown Report, Response to NRC Request for Information Per 10 CFR 50.54 (F) Re the Seismic Aspect of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident JAFP-12-0135, Flooding Walkdown Report - Entergys Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-27027 November 2012 Flooding Walkdown Report - Entergys Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident JAFP-12-0134, Engineering Report, JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 32012-11-21021 November 2012 Engineering Report, JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 3 JAFP-12-0134, Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 3, Attachment C, Pages 74 Through 5732012-11-21021 November 2012 Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 3, Attachment C, Pages 74 Through 573 ML12342A1392012-11-21021 November 2012 Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 3, Attachment C, Pages 74 Through 573 ML12342A1382012-11-21021 November 2012 Engineering Report, JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 3 ML12342A1422012-11-21021 November 2012 Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 2 of 3, Attachment C, Pages 551 Through 573 JAFP-12-0134, Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 2 of 3, Attachment C, Pages 283 Through 5732012-11-21021 November 2012 Engineering Report JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 2 of 3, Attachment C, Pages 283 Through 573 JAFP-12-0122, Core Plate Rim Hold Down Bolting, Plant Specific Analysis and Inspection Plan, License Renewal Commitment 232012-09-28028 September 2012 Core Plate Rim Hold Down Bolting, Plant Specific Analysis and Inspection Plan, License Renewal Commitment #23 ML13163A2662012-05-18018 May 2012 from Bhalchandra Vaidya to Samson Lee: G20120172, 2.206 Petition ML13162A6272012-02-20020 February 2012 Summary of R1 Containment Vents ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants ML1125101872011-09-0808 September 2011 NRC Investigation Report Nos. 1-2009-041, 1-2010-019, and 1-2010-031 ML1024601002010-09-0202 September 2010 Enclosure 2, RA-ENO-EP1-10-135, Response to NRC Supplemental RAIs 1, 4, 5, and 6 for James a FitzPatrick Cycle 20 SLMCPR Submittal ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants JAFP-09-0091, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models2009-07-31031 July 2009 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models JAFP-09-0056, Summary of Plant and Independent Spent Fuel Storage Installation Changes, Tests, and Experiments for 2007 and 2008 as Required by 10 CFR 50.59 and 10 CFR 72.482009-05-11011 May 2009 Summary of Plant and Independent Spent Fuel Storage Installation Changes, Tests, and Experiments for 2007 and 2008 as Required by 10 CFR 50.59 and 10 CFR 72.48 JAFP-08-0131, Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2C2008-12-0404 December 2008 Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2C ML0835903392008-12-0404 December 2008 Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2C JAFP-08-0131, Enclosure 3, Structural Integrity Associates, Inc. Calculation 0800769.316 Reconciliation of Recirculation Inlet N2 Nozzle-to-Safe End Weld Overlay Repair with Nozzle Stress Report2008-12-0303 December 2008 Enclosure 3, Structural Integrity Associates, Inc. Calculation 0800769.316 Reconciliation of Recirculation Inlet N2 Nozzle-to-Safe End Weld Overlay Repair with Nozzle Stress Report ML0831006632008-11-19019 November 2008 Request for Additional Information Third 10-Year Interval Inservice Inspection Program Plan Relief Request RR-CRV-01 JAFP-08-0103, Certificate of Compliance Not Met During Receipt of Low-Level Radioactive Waste Shipment at Barnwell, Sc Disposal Facility2008-10-0202 October 2008 Certificate of Compliance Not Met During Receipt of Low-Level Radioactive Waste Shipment at Barnwell, Sc Disposal Facility ML0810102772008-09-0808 September 2008 Renewed Facility Operating License No. DPR-59 / Appendix C - Additional Conditions ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 2021-01-04
[Table view] Category:Miscellaneous
MONTHYEARML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML18019A2692018-02-12012 February 2018 Flood Hazard Mitigation Strategies Assessment JAFP-17-0084, Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2017-08-29029 August 2017 Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML17110A2742017-04-20020 April 2017 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI Division 1 ML16043A4112016-02-18018 February 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review JAFP-15-0129, Submittal of 10 CFR 71.95 Report Involving 8-120B Cask2015-11-0606 November 2015 Submittal of 10 CFR 71.95 Report Involving 8-120B Cask ML15007A0902015-02-12012 February 2015 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents) JAFP-14-0143, Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.2014-12-30030 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The. JAFP-14-0094, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models2014-08-0101 August 2014 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models ML14073A1552014-04-0101 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML13247A0362013-08-20020 August 2013 Letter from R. Dale Roberts 10 CFR 71.95 Report on the 8-120B Cask ML13273A6912013-08-20020 August 2013 Redacted - Letter from R. Dale Roberts 10 CFR 71.95 Report on the 8-120B Cask JAFP-13-0096, James a FitzPatrick Nuclear Power Plant, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models2013-08-0101 August 2013 James a FitzPatrick Nuclear Power Plant, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models JAFP-12-0135, Flooding Walkdown Report - Entergys Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-27027 November 2012 Flooding Walkdown Report - Entergys Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML13162A6272012-02-20020 February 2012 Summary of R1 Containment Vents ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants ML1125101872011-09-0808 September 2011 NRC Investigation Report Nos. 1-2009-041, 1-2010-019, and 1-2010-031 ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants JAFP-09-0091, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models2009-07-31031 July 2009 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models JAFP-09-0056, Summary of Plant and Independent Spent Fuel Storage Installation Changes, Tests, and Experiments for 2007 and 2008 as Required by 10 CFR 50.59 and 10 CFR 72.482009-05-11011 May 2009 Summary of Plant and Independent Spent Fuel Storage Installation Changes, Tests, and Experiments for 2007 and 2008 as Required by 10 CFR 50.59 and 10 CFR 72.48 ML0831006632008-11-19019 November 2008 Request for Additional Information Third 10-Year Interval Inservice Inspection Program Plan Relief Request RR-CRV-01 JAFP-08-0103, Certificate of Compliance Not Met During Receipt of Low-Level Radioactive Waste Shipment at Barnwell, Sc Disposal Facility2008-10-0202 October 2008 Certificate of Compliance Not Met During Receipt of Low-Level Radioactive Waste Shipment at Barnwell, Sc Disposal Facility ML0810102772008-09-0808 September 2008 Renewed Facility Operating License No. DPR-59 / Appendix C - Additional Conditions ML0805905802008-02-15015 February 2008 List of Requesters Fitzpatrick ML0805905792008-02-14014 February 2008 Foia/Pa Cases Received from 02/12/07 to 02/12/08 ML0711601862007-05-21021 May 2007 Biological Assessment for Species Under the Jurisdiction of the U.S. Fish and Wildlife Service - James A. FitzPatrick Nuclear Power Plant License Renewal Review ML0710004922007-03-26026 March 2007 Usfws Threatened and Endangered Species System (Tess) - New York ENOC-07-00002, Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 20062007-02-28028 February 2007 Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006 JAFP-07-0013, License Renewal Application, Amendment 4, Response to Request for Additional Information2007-01-29029 January 2007 License Renewal Application, Amendment 4, Response to Request for Additional Information ML0704704712007-01-0101 January 2007 Great Lakes St. Lawrence Seaway - Ballast Water ML0704704322007-01-0101 January 2007 Oswego Industrial Directory JAFP-06-0179, JAFNPP - Site Audit Requests - (24) November and December 2006 Monthly Discharge Monitoring Reports2006-12-21021 December 2006 JAFNPP - Site Audit Requests - (24) November and December 2006 Monthly Discharge Monitoring Reports ENOC-06-00018, Stations - Fitness-for-Duty Program Performance Report for the Period January 2006 - June 20062006-08-29029 August 2006 Stations - Fitness-for-Duty Program Performance Report for the Period January 2006 - June 2006 CNRO-2006-00034, Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee2006-07-13013 July 2006 Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee BVY 06-016, Entergy Nuclear Northeast - Fitness-for-Duty Program Performance Report for the Period July 2005 - December 20052006-02-27027 February 2006 Entergy Nuclear Northeast - Fitness-for-Duty Program Performance Report for the Period July 2005 - December 2005 ML0704704112006-01-0101 January 2006 Fws Hydroelectric Licensing BVY 05-089, Entergy Nuclear Northeast - Proof of Financial Protection2005-09-28028 September 2005 Entergy Nuclear Northeast - Proof of Financial Protection ML0636201702005-09-27027 September 2005 JAFNPP Er Ref 8-5 FHA User Guidelines BVY 05-078, Fitness-for-Duty Program Performance Report for the Period January - June 20052005-08-29029 August 2005 Fitness-for-Duty Program Performance Report for the Period January - June 2005 JAFP-05-0126, Annual Report - Errors in Emergency Core Cooling System (ECCS) Evaluation Models2005-08-17017 August 2005 Annual Report - Errors in Emergency Core Cooling System (ECCS) Evaluation Models BVY 05-018, Fitness-for-Duty Program Performance Report for the Period July - December 20042005-02-28028 February 2005 Fitness-for-Duty Program Performance Report for the Period July - December 2004 ML0727008492005-01-31031 January 2005 Caldon Experience in Nuclear Feedwater Flow Measurement JAFP-04-0159, Entergy Nuclear Operations, Inc., NRC Generic Letter 2003-01, Control Room Habitability, Initial Summary Actions Report2004-09-27027 September 2004 Entergy Nuclear Operations, Inc., NRC Generic Letter 2003-01, Control Room Habitability, Initial Summary Actions Report ML0703905852004-09-0101 September 2004 International Joint Commission, 12th Biennial Report Great Lakes Water Quality ML0636201442004-01-31031 January 2004 JAFNPP Er Ref 8-16, DOE Eia Annual Energy Outlook 2004 BVY 03-069, Fitness-for-Duty Program Performance Report for Period January - June 20032003-08-18018 August 2003 Fitness-for-Duty Program Performance Report for Period January - June 2003 ML0701602032003-05-30030 May 2003 JAFNPP - SEIS Web Reference - Mills Et Al 2003 JPN-03-004, Fitness-for-Duty Program Performance Report for the Period July - December 20022003-02-26026 February 2003 Fitness-for-Duty Program Performance Report for the Period July - December 2002 JPN-02-024, Fitness-for-Duty Program Performance Report for the Period January - June 20022002-08-15015 August 2002 Fitness-for-Duty Program Performance Report for the Period January - June 2002 ML0702303602002-08-13013 August 2002 JAFNPP Condition Reports Bird Deaths 2020-10-23
[Table view] |