Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RS-23-073, Request for Partial Site Release | 7 June 2023 | Request for Partial Site Release | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits | 30 June 2022 | Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits | Mururoa |
ML22014A005 | 13 January 2022 | COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements | Exemption Request Pandemic Coronavirus COVID-19 |
RS-21-005, Request for License Amendment to Revise Degraded Voltage Relay Allowable Values | 20 January 2021 | Request for License Amendment to Revise Degraded Voltage Relay Allowable Values | Safe Shutdown Reactor Vessel Water Level Anticipated operational occurrence Surveillance Frequency Control Program Fuel cladding Grace period |
RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping | 4 January 2021 | Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping | Nondestructive Examination |
ML20303A175 | 23 October 2020 | Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting | |
U-604712, Submittal of the Snubber Program Plan for the Fourth 10-Year Interval | 24 June 2020 | Submittal of the Snubber Program Plan for the Fourth 10-Year Interval | Safe Shutdown |
ML19228A023 | 15 August 2019 | Proposed Alternative to Utilize Code Case N-879 | |
ML18360A485 | 14 December 2018 | Attachment 17: Inconsistencies Between FLEX SE and Choice Letter Assumptions | Ultimate heat sink Emergency Lighting FLEX |
ML18360A479 | 14 December 2018 | Attachment 11: Procedures and Training Material on Maintaining RPV Pressure Low | Safe Shutdown Boric Acid Ultimate heat sink Hydrostatic Met Tower FLEX Scram Discharge Volume B.5.b Mitigating Strategies Pressure boundary leak Backfit |
ML18360A484 | 14 December 2018 | Attachment 16: Graph of RPV Water Level | |
ML18360A483 | 14 December 2018 | Attachment 15: FLEX and Cross-tie Training Material | FLEX |
ML18360A482 | 14 December 2018 | Attachment 14: CPS Procedure 4200.01 C002, DC Load Shedding During a 580, Rev 5a | Emergency Lighting |
ML18360A481 | 14 December 2018 | Attachment 13: Simulator Exercise Guide SE-JIT-42, Loss of AC, Loss of SDC and Lowering RPV Level, Rev 1 | Time to boil Scram Discharge Volume |
ML18360A480 | 14 December 2018 | Attachment 12: Time Validation - Performance of Division 3 DG to Division 2 Bus Cross-tie | |
ML18360A478 | 14 December 2018 | Attachment 10: HEP Evaluation Related to Shutdown Cooling Isolation | |
ML18360A477 | 14 December 2018 | Attachment 9: Procedures on Shutdown Cooling Isolation | Hot Short Safe Shutdown Shutdown Margin Stroke time Water Inventory Control Hydrostatic Power change Coast down |
ML18360A476 | 14 December 2018 | Attachment 8: 2017 Training Material on Diesel Generator Air Start Flow Plow | Safe Shutdown |
ML18360A475 | 14 December 2018 | Attachment 7: Time Validation - Performance of SBO and Starting of Division 2 Diesel Generator | Safe Shutdown |
ML18360A474 | 14 December 2018 | Attachment 6: CPS Shift Manager Surveys Regarding ELAP Scenarios | |
ML18360A473 | 14 December 2018 | Attachment 5: Senior Reactor Operator Surveys | Time to boil FLEX |
ML18360A472 | 14 December 2018 | Attachment 4: Training Material on Diesel Generator Malfunctions | |
ML18360A471 | 14 December 2018 | Attachment 3: EC 626319, Battery Coping Time Evaluation to Support Inadvertent Isolation of Div. II Air Start Receiver Valves | Battery sizing |
ML18360A470 | 14 December 2018 | Attachment 2: Response to NRC Questions and Documentation Requests | Ultimate heat sink Mission time Operator Manual Action FLEX |
ML18360A469 | 14 December 2018 | Attachment 1: Summary of Exelon Position | Safe Shutdown Time to boil Probabilistic Risk Assessment FLEX Significance Determination Process Job Performance Measure Spent Fuel Pool Instrumentation Preliminary White Finding |
RS-15-320, Revised Final Integrated Plan Document - Mitigating Strategies NRC Order, EA-12-049 | 14 December 2015 | Revised Final Integrated Plan Document - Mitigating Strategies NRC Order, EA-12-049 | High winds Ultimate heat sink Mission time Time to boil Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Functionality Assessment FLEX Fukushima Dai-Ichi Design basis earthquake Spent Fuel Pool Instrumentation Time Critical Operator Action B.5.b Mitigating Strategies Earthquake Fuel cladding |
RS-15-269, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors | 23 October 2015 | Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors | |
ML15062A115 | 22 December 2014 | International Atomic Energy Agency (Iaea), Operational Safety Review Team (Osart) Mission to Clinton Report - 11- 28 August 2014 | Boric Acid High winds High Radiation Area Fire Barrier Probabilistic Risk Assessment Coatings Temporary Modification FLEX Fukushima Dai-Ichi Foreign Material Exclusion Severe Accident Management Guideline B.5.b Mitigating Strategies Earthquake Scaffolding |
RS-14-312, Supplemental Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report | 3 November 2014 | Supplemental Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report | Fukushima Dai-Ichi |
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | 24 September 2014 | Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | Through-Wall Leak |
ML14164A298 | 26 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident | Unanalyzed Condition Hydrostatic Fukushima Dai-Ichi Earthquake |
ML14176A961 | 24 June 2014 | Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 | Fire Barrier Coatings Foreign Material Exclusion |
RS-14-112, Reports Associated with Results of Post-Irradiation Examination (Pie) of Global Nuclear Fuel (Gnf) GE14i Isotope Test Assembly (ITA) | 27 March 2014 | Reports Associated with Results of Post-Irradiation Examination (Pie) of Global Nuclear Fuel (Gnf) GE14i Isotope Test Assembly (ITA) | |
ML13338A656 | 9 December 2013 | Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Clinton Power Station, Unit 1, TAC No.: MF0901 | Safe Shutdown High winds Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Internal Flooding Hydrostatic Operating Basis Earthquake Emergency Lighting FLEX Fukushima Dai-Ichi Design basis earthquake Frazil ice Earthquake |
IR 05000461/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000456/2013202 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
ML13008A219 | 31 January 2013 | U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000454/2013202 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000289/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000272/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000254/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000277/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000219/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000352/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000373/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000237/2013202 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
ML12340A349 | 27 November 2012 | 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklists, C-1 Through C-143 | |
RS-12-165, 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklists, C-1 Through C-143 | 27 November 2012 | 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklists, C-1 Through C-143 | |
ML12340A347 | 30 October 2012 | 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Report | Safe Shutdown Unanalyzed Condition Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Operating Basis Earthquake Arc flash Emergency Lighting Finite Element Analysis Fukushima Dai-Ichi Design basis earthquake Frazil ice Earthquake Scaffolding Weak link |
ML12340A348 | 30 October 2012 | 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklist, C-286 Through F-14 | Fukushima Dai-Ichi Scaffolding |