MONTHYEARRS-23-073, Request for Partial Site Release2023-06-0707 June 2023 Request for Partial Site Release NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits ML22014A0052022-01-13013 January 2022 COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements RS-21-005, Request for License Amendment to Revise Degraded Voltage Relay Allowable Values2021-01-20020 January 2021 Request for License Amendment to Revise Degraded Voltage Relay Allowable Values RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting U-604712, Submittal of the Snubber Program Plan for the Fourth 10-Year Interval2020-06-24024 June 2020 Submittal of the Snubber Program Plan for the Fourth 10-Year Interval ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 ML18360A4722018-12-14014 December 2018 Attachment 4: Training Material on Diesel Generator Malfunctions ML18360A4712018-12-14014 December 2018 Attachment 3: EC 626319, Battery Coping Time Evaluation to Support Inadvertent Isolation of Div. II Air Start Receiver Valves ML18360A4692018-12-14014 December 2018 Attachment 1: Summary of Exelon Position ML18360A4702018-12-14014 December 2018 Attachment 2: Response to NRC Questions and Documentation Requests ML18360A4852018-12-14014 December 2018 Attachment 17: Inconsistencies Between FLEX SE and Choice Letter Assumptions ML18360A4842018-12-14014 December 2018 Attachment 16: Graph of RPV Water Level ML18360A4832018-12-14014 December 2018 Attachment 15: FLEX and Cross-tie Training Material ML18360A4732018-12-14014 December 2018 Attachment 5: Senior Reactor Operator Surveys ML18360A4742018-12-14014 December 2018 Attachment 6: CPS Shift Manager Surveys Regarding ELAP Scenarios ML18360A4752018-12-14014 December 2018 Attachment 7: Time Validation - Performance of SBO and Starting of Division 2 Diesel Generator ML18360A4822018-12-14014 December 2018 Attachment 14: CPS Procedure 4200.01 C002, DC Load Shedding During a 580, Rev 5a ML18360A4812018-12-14014 December 2018 Attachment 13: Simulator Exercise Guide SE-JIT-42, Loss of AC, Loss of SDC and Lowering RPV Level, Rev 1 ML18360A4802018-12-14014 December 2018 Attachment 12: Time Validation - Performance of Division 3 DG to Division 2 Bus Cross-tie ML18360A4792018-12-14014 December 2018 Attachment 11: Procedures and Training Material on Maintaining RPV Pressure Low ML18360A4782018-12-14014 December 2018 Attachment 10: HEP Evaluation Related to Shutdown Cooling Isolation ML18360A4772018-12-14014 December 2018 Attachment 9: Procedures on Shutdown Cooling Isolation ML18360A4762018-12-14014 December 2018 Attachment 8: 2017 Training Material on Diesel Generator Air Start Flow Plow RS-15-320, Revised Final Integrated Plan Document - Mitigating Strategies NRC Order, EA-12-0492015-12-14014 December 2015 Revised Final Integrated Plan Document - Mitigating Strategies NRC Order, EA-12-049 RS-15-269, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2015-10-23023 October 2015 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML15062A1152014-12-22022 December 2014 International Atomic Energy Agency (Iaea), Operational Safety Review Team (Osart) Mission to Clinton Report - 11- 28 August 2014 RS-14-312, Supplemental Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report2014-11-0303 November 2014 Supplemental Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14164A2982014-06-26026 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 RS-14-112, Reports Associated with Results of Post-Irradiation Examination (Pie) of Global Nuclear Fuel (Gnf) GE14i Isotope Test Assembly (ITA)2014-03-27027 March 2014 Reports Associated with Results of Post-Irradiation Examination (Pie) of Global Nuclear Fuel (Gnf) GE14i Isotope Test Assembly (ITA) ML13338A6562013-12-0909 December 2013 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Clinton Power Station, Unit 1, TAC No.: MF0901 IR 05000352/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000219/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000277/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000254/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000272/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000289/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000373/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000237/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000461/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000454/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML13008A2192013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000456/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML12340A3492012-11-27027 November 2012 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklists, C-1 Through C-143 RS-12-165, 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklists, C-1 Through C-1432012-11-27027 November 2012 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklists, C-1 Through C-143 RS-12-165, 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklist, C-286 Through F-142012-10-30030 October 2012 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklist, C-286 Through F-14 ML12340A3482012-10-30030 October 2012 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Checklist, C-286 Through F-14 2023-06-07
[Table view] Category:Miscellaneous
MONTHYEARRS-23-073, Request for Partial Site Release2023-06-0707 June 2023 Request for Partial Site Release ML22014A0052022-01-13013 January 2022 COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML18360A4852018-12-14014 December 2018 Attachment 17: Inconsistencies Between FLEX SE and Choice Letter Assumptions ML18360A4842018-12-14014 December 2018 Attachment 16: Graph of RPV Water Level ML18360A4832018-12-14014 December 2018 Attachment 15: FLEX and Cross-tie Training Material ML18360A4822018-12-14014 December 2018 Attachment 14: CPS Procedure 4200.01 C002, DC Load Shedding During a 580, Rev 5a ML18360A4812018-12-14014 December 2018 Attachment 13: Simulator Exercise Guide SE-JIT-42, Loss of AC, Loss of SDC and Lowering RPV Level, Rev 1 ML18360A4802018-12-14014 December 2018 Attachment 12: Time Validation - Performance of Division 3 DG to Division 2 Bus Cross-tie ML18360A4792018-12-14014 December 2018 Attachment 11: Procedures and Training Material on Maintaining RPV Pressure Low ML18360A4782018-12-14014 December 2018 Attachment 10: HEP Evaluation Related to Shutdown Cooling Isolation ML18360A4772018-12-14014 December 2018 Attachment 9: Procedures on Shutdown Cooling Isolation ML18360A4762018-12-14014 December 2018 Attachment 8: 2017 Training Material on Diesel Generator Air Start Flow Plow ML18360A4752018-12-14014 December 2018 Attachment 7: Time Validation - Performance of SBO and Starting of Division 2 Diesel Generator ML18360A4742018-12-14014 December 2018 Attachment 6: CPS Shift Manager Surveys Regarding ELAP Scenarios ML18360A4732018-12-14014 December 2018 Attachment 5: Senior Reactor Operator Surveys ML18360A4722018-12-14014 December 2018 Attachment 4: Training Material on Diesel Generator Malfunctions ML18360A4712018-12-14014 December 2018 Attachment 3: EC 626319, Battery Coping Time Evaluation to Support Inadvertent Isolation of Div. II Air Start Receiver Valves ML18360A4702018-12-14014 December 2018 Attachment 2: Response to NRC Questions and Documentation Requests ML18360A4692018-12-14014 December 2018 Attachment 1: Summary of Exelon Position RS-15-269, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2015-10-23023 October 2015 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML15062A1152014-12-22022 December 2014 International Atomic Energy Agency (Iaea), Operational Safety Review Team (Osart) Mission to Clinton Report - 11- 28 August 2014 ML14164A2982014-06-26026 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident IR 05000352/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000456/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML13008A2192013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000454/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000461/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000237/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000373/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000219/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000277/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000254/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000272/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000289/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML12178A2152012-08-0202 August 2012 Closeout of Bulletin 2011-01 Migrating Strategies. ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants RS-11-131, Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 30-Day Report for Fuel Type GE142011-08-10010 August 2011 Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 30-Day Report for Fuel Type GE14 ML1108712502011-03-24024 March 2011 BWR Vessel and Internals Inspection Summaries for Spring 2010 Outages RS-08-068, Additional Information Supporting the Request for License Amendment to Revise Local Power Range Monitor Calibration Frequency2008-05-16016 May 2008 Additional Information Supporting the Request for License Amendment to Revise Local Power Range Monitor Calibration Frequency U-603719, Annual Occupational Radiation Exposure Report for Clinton Power Station2005-03-21021 March 2005 Annual Occupational Radiation Exposure Report for Clinton Power Station ML0727008492005-01-31031 January 2005 Caldon Experience in Nuclear Feedwater Flow Measurement ML0309006042003-03-19019 March 2003 Additional Information Regarding Notice of Proposed Amendments to Trust Agreement to Implement Assignment of Decommissioning Trust Funds for Amergen Energy Company, LLC ML0303506252003-01-23023 January 2003 Request for NRC Written Consent to Proposed Amendments to Trust Agreement to Implement Assignment of Decommissioning Trust Funds for Amergen Energy Company, LLC RS-02-137, Power Uprate Ascension Test Report2002-08-0101 August 2002 Power Uprate Ascension Test Report 2023-06-07
[Table view] |
Text
ATTACHMENT 14 CPS Procedure 4200.01 C002, "DC Load Shedding During a 580," Rev 5a
CPS 4200.01C002 DC LOAD SHEDDING DURING A SBO SCOPE OF REVISION:
- Page: 6 0 Specific Rev. 5a [Jeans] Editorial IR 01351102/IER L2 12-27
-Clarify that this load shedding procedure may be utilized on less severe ev~nts than a full station black out.
I CONTINUOUS USE I
ORIGINATOR: Lee Anderson CLASS CODE: SNNNl SQR: Kevin Zipprich APPROVAL DATE: 01/14/2013 CURRENT CHANGES TO GENERAL REVISION Change# Date List of Affected Pages 0 5a 11/18/13 1,2 8
8 0
Rev. 5a Page 1 of 6
CPS 4200.01C002 DC LOAD SHEDDING DURING A SBO Started: Date: Time:
0 NOTE This procedure may be used in part or in whole for events less severe than a full Station Black Out..
DC LOAD SHEDDING Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of the start of the SBO:
Perform DC Load Shedding on the battery busses which do not have 4160V Bus power available (Div 3 ,may still have Bus lCl powered):
Initial Battery lA (Div 1) Page 3 :
Battery lB (Div 2) Page 4:
Battery lC (Div 3) Page 5:
Battery lD (Div 4) Page 5:
As needed to support extended events, perform DC Load Shedding on the BOP battery busses which do not have 6900V Bus power available:
BOP Battery lE (supplied by.6900V lA bus) Page 6:
BOP Battery lF (supplied by 6900V lB bus) Page 6:
CO:MMENTS/DISCREPANCIES Performed by:
(Print Name) (Initials) (Date)
P.erformed by:
(Print Name) (Initials) (Date)
Performed by:
(Print Name) (Initials) (Date)
REVIEW AND APPROVAL SMngt:
Title Signature Date Rev. 5a Page 2 of 6
CPS 4200.01C002 DC LOAD SHED LIST BATTERY lA (DIV 1)
~ At DC MCC lA (1DC13E), AB 781' East, open the following *circuit breakers:
MCC/Cubicle Ckt Load Effected Initial ,,..
lA-llA 7 Emerg Ltg Cab 164, 1LL64E
[Erner/Exit lights in AB, FB, and SB]
NOTE Opening' circuit #13 for the Div 1 DG Control Panel will prevent starting of the DG.
This circuit should be re-energized as necessary to support DG recovery efforts.
1A-11A 13 DG lA Control Pnl, 1PL12JA 1A-12A 18 Opt Isol Cab, 1PL56JA & 1PL56JB
[Computer Points]
1A-12A
[Transient Test interface modules in NSPS]
1A-12A 30 Control Panel 1H13-P601,
~osition for 1E12-R611A/R612A. R609A/B NOTE Opening circuit #32 for the RHR logic will prevent starting of the Div 1 ECCS when the bus 'is re-energized.
\_
This circuit should be re-energized as necessary to support RPV level recovery efforts.
1A-12A 32. Control Panel 1H13-P661, RHR A Control Power
[Disables 'A' Half of RHR]
1A-12A 33 Control Panel 1H13-P661, RPS A Control Power
[Disables 'A' Half of RPS]
1A-12A 36 Control Pnl, 1G36-P002
[RWCU]
Rev. 5a Page 3 of 6
CPS 4200.01C002 DC LOAD SHED LIST BATTERY lB (DIV 2)
At DC MCC lB (1DC14E), AB 781' West, open the following circuit breakers:
MCC/Cubicle Ckt Load Effected Initial 1B-4A 10 Emergency Ltg Cab #188, 1LL88E
[Erner/Exit lights in MCR and CB]
NOTE Opening circuit #14 for the Div 2 DG Control Panel will prevent starting of the DG.
This circuit should be re-energized as necessary to support DG recovery efforts.
1B-4A 14 DG lB Control Pnl, 1PL12JB 1B-4A 15 Emergency Ltg Cab #165, 1LL65E
[Erner/Exit lights in RW]
1B-4A 16 Emergency Ltg Cab #166, 1LL66E]
[Erner/Exit lights in CB 1B-5A 17 6.9KV Swgr lB (1AP05EA),
RR Pump lB Brk 3B Control Power 1B-5A 18 125V DC Dist Pnl 7A (Power to FP Dist Pnls) 1B-5A 20 Control Panel l*H13-P8 51, Various Annunciators
[VC, VD, VH, VG, VP, VQ, VX, VY]
1B-5A 22. Opt Isol Cab 1PL57JA & 1PL57JB, Various Computer Points 1B-5A 24 Control Panel 1H13-P851, Various Annunciators
[AP, CC, CM, CY/MC, DC, DO, FC, FP, HG, IA/$A, LO, MS, RE/RF, SF, SM, SX]
1B-5A 26 Control Panel 1H13-P662, NSPS Control Power
[Transient Test interface modules in NSPS]
Battery lB (Div 2) breakers continued on next page.
Rev. 5a Page 4 of 6
CPS 4200.01C002 DC LOAD SHED LIST BATTERY 1B (DIV 2) (cont'd)*
MCC/Cubicle Ckt Load Effected Initial 1B-5A 30 Control Panel 1H13-P601, Position for 1E12-R611B/612B, R608A/B NOTE Opening circuit #32 for the RHR logic will prevent starting of the Div 2 ECCS when the bus is re-energized.
This circuit should be re-energized as necessary to support RPV level recovery efforts.
1B-5A 32 Control Panel 1Hl3-P662, RHR B Control Power
[Disables 'B' Half of RHR]
BATTERY lC (DIV 3)
At NSPS Power Distribution Panel C (C71-P001C),
CB 781' Div 3 Switchgear Room, open the following circuit breaker:
Panel Ckt Load Effected Initial C71-P001C 9 Power & Start Up Range Neutron & Rad Mon H13-P671 BATTERY lD (DIV 4)
At DC MCC 10 (1DC15E), CB 781' Div 4 NSPS Inv Room, open the following circuit breaker:
MCC/Cubicle Ckt Load Effected Initial 1D-3A 1 Emergency Lighting Cabinet 163 (1LL163E)
[Erner/Exit lights in CNMT]
Rev. 5a Page 5 of 6
CPS 4200.01C002 DC LOAD SHED LIST BATTERY lE (BOP)
At DC MCC lE. (1DC16E), Distribution Panel Cubicle 4A and 5A open the following circuit breakers:
MCC/Cubicle Ckt Load Effected Initial 1E-4A 16 RPS Solenoid Power Inverter 1C71-S004A 1E-5A 17 125V DC Dist Panel RW-G (1DC19E) 1E-5A 18 125V DC Dist Panel RW-B (1DC18E) 1E-5A 19 125V DC Dist Panel RW-M (1DC20E)
(!) 1E-5A 22 RWCU Pumps lA And lC Control Power
(!) 1E-5A 23 Junction Box EH (lMPOlKB)
(Alterrex Excitation System) 1E-5A 24 RFPT lB Term Box EH (1PL75JB) 1E-5A 25 MP Transformer lA (1MP04EA) 1E-5A 26 RFPT lA Term Box EH (1PL75JA) 1E-5A 27 MP Transformer lC (1MP04EC) 1E-5A 29 1TG03K, Turning Gear Permissive BATTERY lF (BOP)
At DC MCC lF (1DC17E), Distribution Panel Cubicle 4A and 5A, open the following circuit breakers:
MCC/Cubicle Ckt Load Effected Initial 1F-4A 16 Emergency Lighting Cabinet #162 1F-5A 18 RPS Solenoid Power Inverter 1C71-S004B 1F-5A 19 125V DC Dist Panel CB-B (1DC21E) 1F-5A 20 125V DC Dist Panel TB-B (1DC23E) 1F-5A 21 125V DC Dist Panel CB-M (1DC22E) 1F-5A 27 MP Transformer lB (1MP04EB) 1F-5A 28 MP Transformer 10 (1MP04ED)
(!) 1F-5A 29 RWCU Pump lB Control Power 1F-5A 30- Exciter Cubicle 1MP05S Rev. 5a Page 6 of 6