 Issue dateTitleTopic
ML17261A85413 January 1989Discusses 890110-11 Meetings Re Nozzle Sizing Study.Most Accurate Sizing Obtained by Collecting Data of Edge Diffracted Waves from Geometric Extremities of Flaw
ML20245G90426 May 1988Responds to Questions Re Decommissioning Costs Incurred by Plants Having Only Operated Approx 60 H at 5% of Full Power
ML19324A11119 May 1988Forwards Memo Describing Results of Testing of Plant Bolting Matls Under FIN A-3866,Task Assignment 12
ML20151C7412 May 1988Forwards Comments Resulting from Review of Shoreham Scenario.No Major Deficiencies Noted
ML19324B2702 March 1988Forwards Rept on Metallurgical Evaluation of Five Bolts Obtained from Farley Plant.Bolts Found Acceptable
ML20235E59030 June 1987Forwards Assessment of Shoreham Nuclear Power Station Secondary Containment Severe Accident Mitigation Capability, Final Ltr Rept.Rept Provides Results of Analyses,Per Rl Palla Request
ML20215K63312 June 1987Forwards Considerations Re Certain Aspects of Severe Accident Mitigation Afforded by Operation of Shoreham at Reduced Power, Final Ltr Rept. Calculations Address Loss of Injection,Atws & Large Break LOCA Accident Sequences
ML20207R75710 March 1987Forwards Technical Evaluation Rept Input for South Texas Initial Plant Test Program Through FSAR Amend 56,Feb 1987 Sser & & Beaver Valley Unit 2 Initial Plant Test Program Through FSAR Amend 15 & Nov 1986 Sser
ML20207S5006 March 1987Forwards Technical Evaluation Repts for Domestic Mark III Plants (Grand Gulf,Clinton,River Bend & Perry) & Gessar Ii. Inserts to Be Included in Section 6.2.1.8 of Draft Sser 2 for Clinton,River Bend & Perry Plants Also Encl
ML20195F86531 October 1986Forwards Request for Addl Info Re MSIV Operability at Facility,Based on Initial Review of Util Rept Entitled, Final Rept 10CFR50.55(e) MSIV Actuators, Forwarded by Util
ML20206H32110 September 1986Forwards Summary Repts from 860811-14 Visit to Kewaunee Nuclear Station & 851002-03 Visit to Cooper Nuclear Station Re Generic Issue 83 on Control Room Habitability
ML20206J6008 August 1986Advises That NUREG-0956 Support Calculations Using ORNL Trends Code to Evaluate Influence of Containment Chemistry or Retention of Hi Can Also Provide Useful Info for General NUREG-1150 Issue Paper,Per Telcon Discussion
ML20206H11323 June 1986Submits DHEAT2 Parametric Calculations for Plant,Per 860620 Discussions.Calculations Run Assuming Any Steam Spike Would Develop Too Slowly to Contribute to DCH Peak Pressure
ML20214E17225 February 1986Ack Receipt of 860210 & 21 Ltrs Accepting Task Orders 3 & 4 Under FIN A-3552 & Task Order 5,respectively.Orders Include Work at Palisades & LaSalle Stations & Mod Review at Davis-Besse.Modified Task Order 4 Under FIN A-3550 Encl
ML20206J25224 January 1986Forwards Early Draft of Executive Summary from Analysis of Station Blackout Accidents for Bellefonte PWR, Per Request. Initial Draft of Rept Scheduled to Be Completed by 860315
ML20206J36815 January 1986Discusses Latest Calculations of Molecular Iodine (I2) & Organic Iodide (CH3I) Scrubbing During TC1 Sequence from Draft Plant Rept
ML20136F47731 December 1985Forwards PNL-5718, Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept
ML20206J40313 December 1985Summarizes Preliminary Scoping Calculations for Molecular Iodine (I2) Scrubbing in BWR Pressure Suppression Pools. Calculations Made for Most Recent TC1 Sequence in Draft Plant Rept
ML20138K79617 October 1985Forwards PNL-5336, Review of Design Review & Quality Revalidation Rept for Tdi Diesel Generators at Shoreham Nuclear Power Station Unit 1, Technical Evaluation Rept
ML20133A31427 September 1985Forwards Review of Section 4.7 of Technical Evaluation Rept PNL-5600, Review of Resolution of Known Problems in Engine Components for Tdi Emergency Diesel Generators, Reflecting Views Re Crankshafts for 16-cylinder Engines
ML20128H73727 June 1985Forwards Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept
ML20141N29829 May 1985Requests Listed Addl Info Re S&W 1982 Rept, Ultimate Pressure Capacity of Shoreham Primary Containment
ML20126E87224 May 1985Forwards PNL-5200-3, Review of Emergency Diesel Generator Engine & Auxiliary Module Wiring & Terminations, Dtd May 1985
ML20133N77227 March 1985Forwards Info Telecopied on 850325 Re Locational Distribution of Three Fission Product Species for Surry V Sequence & Time Dependent Release for Fission Product Groups for Peach Bottom
ML20214F51013 March 1985Forwards List of Questions Re Plant Pra,Per 850512 Telcon. Statement of Work, Review of PRA for Seabrook Nuclear Power Plant, EnclProbabilistic Risk Assessment
ML20133N34620 February 1985Discusses Review of March Results for Surry & Peach Bottom Sequences,In Order to Quantify Expected Noble Gas Releases. March Model Appropriate for Behavior of Noble GasesHydrostatic
ML20134A10120 February 1985Submits Results of Noble Gas Release Sequences Using March Code for Facilities
ML20111A62920 December 1984Forwards PNL-5342, Review & Evaluation of Tdi Diesel Engine Reliability & Operability - Shoreham Nuclear Power Station Unit 1
ML20114A98517 December 1984Forwards Draft Rept Covering Phase II of Diesel Generator Failure Investigation Review
ML20128P3405 December 1984Submits Rept for Task 1 Per M Silberberg 841116 Memo Re Concerns Re Lanthanum Releases in BMI-2104.Discusses Discrepancies in Corcon Calculations,Presents Revised Tables 6.14 & 7.16 & Recommends Reanalyses
ML20138N69718 September 1984Forwards Repts Re Irradiation,Decontamination & DBA Testing, Per Request of Y Korobov of Carboline CoBoric Acid
Coatings
ML20134E1592 August 1984Forwards Brief Summary Rept on Leakage Characteristics of Nuclear Containment Hatches During Severe Accident. Draft of Complete Rept Will Be Mailed Later in AugFinite Element Analysis
ML20127B92220 July 1984Forwards PNL-5201, Review & Evaluation of Tdi Diesel Engine Reliability & Operability - Grand Gulf Nuclear Station, Unit 1Shutdown Margin
ML20128Q36612 June 1984Submits Revised Schedule for Facility PRA Review.Draft Rept Due 841015.Final Rept Due 2 Months After Receipt of Appropriate NRC Comments
ML20127B7095 June 1984Submits New Schedule for PRA Review.Draft Rept Will Be Completed by 840831 Pending Priority Requirements of GESSAR-II PRA
ML20127B88821 May 1984Comments on May 1984 Draft Tdi Diesel Generator Owners Group Program Plan.Full Insp of One Engine to Owners Group Spec Recommended
ML20128Q4097 May 1984Requests Participation of K Shiu to Review Facility PRA for Successful Completion of Program.Delays Caused by Extra Time Devoted to Review of flood-initiator & Lack of Response to Q-1 Questions from Util
ML20093G4822 May 1984Provides Summary of Battelle Subcontract W/Tdi to Evaluate Special Silicon carbide-impregnated Cylinder Liners & Piston Rings.Task Does Not Involve Dependability Tests of Tdi Engines.No Apparent Conflict Found
ML20113A0204 April 1984Forwards Requests for Addl Info Developed During Review of FSAR Chapter 14 Re Initial Plant Test Program.Review Conducted Through Amend 4.Listing of Items Requiring Resolution EnclSafe Shutdown
Ultimate heat sink
ML20117C9423 April 1984Forwards Proposed Radiological Source Term Input for Facility.Encl Amended to Reflect NRC Suggested Changes
ML20093C52830 March 1984Forwards Audit of Susquehanna Unit 2 Tech Specs, Technical Evaluation Rept
ML17320A9716 March 1984Forwards First Round Questions Following Evaluation of Exxon Rept, Steam Tube Rupture Incident at Prairie Island Unit 1, PTSPWR2 Vs Data,Preliminary Benchmark Analysis.
ML17320A9745 March 1984Forwards First Round Questions on Exxon Methodology Rept for PTSPWR2.Rept Lacks Specific Details Re Biases in Initial Conditions & Boundary Conditions
ML20128N65722 February 1984Comments on Draft Vols IV-VI of BMI-2104,presented at Peer Review 840126 & 27 Meetings.Comments Concern Completed Calculations for Sequoyah Ice Condenser Plant,Recalculated Surry Results & Completed Calculations for Zion Plant
ML19306A01510 February 1984Summarizes 840206-07 Visit to Nevada Test Site Hydrogen Burn Facility to Inspect Condition of Equipment & Cable/Splice Samples After Series of Hydrogen Burn Tests Conducted by Epri.No Indication of External Damage to Equipment Noted
ML17320A97322 November 1983Forwards First Round Questions on Mods to Exxon Draft Repts, PTSPWR2 Mods for St Lucie Unit 1 & Description of Exxon Plant Transient Simulation Model for Pwrs.
ML20128Q84617 October 1983Advises That Proposal Entitled, Review of PRA for Shoreham Nuclear Power Plant, Sent Under Separate Cover.Total Level of Effort for Comprehensive PRA Review Will Decrease Due to Mature & Stable DocumentationProbabilistic Risk Assessment
ML17320A97230 September 1983Forwards First Round Questions on Exxon Plant Transient Code,Based on Review of Proprietary Rept, Description of Exxon Nuclear Plant Transient Simulation Model for Pwrs.
ML20080B56312 August 1983Forwards Draft Preliminary Review of Limerick Generating Station Severe Accident Risk Assessment,Vol I:Core Melt Frequency. Rept Satisfies Milestone for Task 1 of Project 3 Under FIN A-3393Fire Barrier
Probabilistic Risk Assessment
Earthquake
ML20211D59711 April 1983Forwards Summary of Independent Development of Finite Element Models & Determination of Natural Frequencies for Piping Problems in Containment Spray Discharge Line & Accumulator Loop 4