PNO-III-87-081, on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other Plants11 June 1987PNO-III-87-081:on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other PlantsEarthquake
PNO-III-87-060A, on 870427,reactor Entered 72 H Tech Spec Action Statement.Caused by Inoperable Shutdown Condenser Inlet Valve 1B.Licensee Plans to Reduce Power from 98% on 870429 & Complete Permanent Shutdown on 87043028 April 1987PNO-III-87-060A:on 870427,reactor Entered 72 H Tech Spec Action Statement.Caused by Inoperable Shutdown Condenser Inlet Valve 1B.Licensee Plans to Reduce Power from 98% on 870429 & Complete Permanent Shutdown on 870430
PNO-III-87-060, on 870424,util Authorized Permanent Shutdown of Plant Due to Economic Reasons.Plant Will Be Put in Cold Shutdown Mode within Next 2 Wks.No Organizational Changes Will Be Made But Plant Staff Will Be Reduced27 April 1987PNO-III-87-060:on 870424,util Authorized Permanent Shutdown of Plant Due to Economic Reasons.Plant Will Be Put in Cold Shutdown Mode within Next 2 Wks.No Organizational Changes Will Be Made But Plant Staff Will Be Reduced
PNO-III-86-071, on 860719,lightning Struck Main Transmission Line Immediately Adjacent to Plant,Resulting in Loss of All Offsite Power.Both Diesel Generators Automatically Started, Picking Up All Vital Loads as Designed.Power Restored21 July 1986PNO-III-86-071:on 860719,lightning Struck Main Transmission Line Immediately Adjacent to Plant,Resulting in Loss of All Offsite Power.Both Diesel Generators Automatically Started, Picking Up All Vital Loads as Designed.Power Restored
PNO-III-86-070, on 860716,small Drip Wise Leak Observed on 8- Inch Suction Line to DHR Pump,Following Reactor Trip. Insulation Removed.Leak Due to Two Cracks Immediately Adjacent to Test Plug Weld18 July 1986PNO-III-86-070:on 860716,small Drip Wise Leak Observed on 8- Inch Suction Line to DHR Pump,Following Reactor Trip. Insulation Removed.Leak Due to Two Cracks Immediately Adjacent to Test Plug Weld
PNO-III-86-061, on 860622,reactor Tripped as Result of Signal Showing MSIV Not Fully Open.Caused by Failed Relay in MSIV Circuitry Giving Incorrect Indication.Relay Replaced & Tested23 June 1986PNO-III-86-061:on 860622,reactor Tripped as Result of Signal Showing MSIV Not Fully Open.Caused by Failed Relay in MSIV Circuitry Giving Incorrect Indication.Relay Replaced & TestedReactor Vessel Water Level
PNO-III-86-043, on 860510,containment Smoke Alarm Received in Control Room Re Smoke in Forced Circulating Pump Room 1B. Caused by Oil Used on Bypass Valve Dripping on Heated Pipe Insulation.Insulation Replaced12 May 1986PNO-III-86-043:on 860510,containment Smoke Alarm Received in Control Room Re Smoke in Forced Circulating Pump Room 1B. Caused by Oil Used on Bypass Valve Dripping on Heated Pipe Insulation.Insulation Replaced
PNO-III-86-018, on 860307,reactor Automatically Tripped While in Process of Shutting Down for Scheduled 5-wk Maint & Refueling Outage.Caused When One Rod Failed to Fully Insert. Rod Manually Inserted.Breaker B Replaced10 March 1986PNO-III-86-018:on 860307,reactor Automatically Tripped While in Process of Shutting Down for Scheduled 5-wk Maint & Refueling Outage.Caused When One Rod Failed to Fully Insert. Rod Manually Inserted.Breaker B Replaced
PNO-III-86-007, on 860125,unit Manually Shut Down.Caused by Excessive Seal Leakage on CRD 13.Unit Taken to Cold Shutdown to Permit Removal & Replacement of CRD Mechanism.Restart of Unit Expected by 86013127 January 1986PNO-III-86-007:on 860125,unit Manually Shut Down.Caused by Excessive Seal Leakage on CRD 13.Unit Taken to Cold Shutdown to Permit Removal & Replacement of CRD Mechanism.Restart of Unit Expected by 860131Hydrostatic
PNO-III-85-092A, on 851023,unit Shut Down Due to High Neutron Flux During Startup.Insp Team Concluded That Reactor Sys Equipment Functioned Acceptably.Electronic Circuit Cards Replaced24 October 1985PNO-III-85-092A:on 851023,unit Shut Down Due to High Neutron Flux During Startup.Insp Team Concluded That Reactor Sys Equipment Functioned Acceptably.Electronic Circuit Cards Replaced
PNO-III-85-092, on 851023,reactor Failed to Trip Automatically Following High Flux Alarm.Cause Undetermined. Reactor Shut Down Pending Results of Investigation23 October 1985PNO-III-85-092:on 851023,reactor Failed to Trip Automatically Following High Flux Alarm.Cause Undetermined. Reactor Shut Down Pending Results of Investigation
PNO-III-85-091, on 851022,loss of Offsite Power Occurred Due to Inadvertent Opening of Circuit Breaker in Switchyard. Caused by Personnel Winterizing Equipment.Accumulator Repressurized & Circuit Breaker Closed22 October 1985PNO-III-85-091:on 851022,loss of Offsite Power Occurred Due to Inadvertent Opening of Circuit Breaker in Switchyard. Caused by Personnel Winterizing Equipment.Accumulator Repressurized & Circuit Breaker Closed
PNO-III-82-064, on 820702,radioactive Water from Condensate Water Sys Escaped Through Failed Gasket Ground Glass Sight in Condensate Demineralizer Room.Water Flowed Into Turbine Bldg,Sump & to Outside Environ.Investigation Underway2 July 1982PNO-III-82-064:on 820702,radioactive Water from Condensate Water Sys Escaped Through Failed Gasket Ground Glass Sight in Condensate Demineralizer Room.Water Flowed Into Turbine Bldg,Sump & to Outside Environ.Investigation Underway
ML20151U63619 May 1977PNO-77-087:on 770515,licensee Identified Two Failed Fuel Bundles with Parts of Fuel Rods Missing.Pieces Found Resting on Top of Adjacent Fuel Bundle.Licensee Developing Procedure for Recovery of Pieces on Top of Core.No Press Release Made