3F1099-01, LAR 253,rev 0 to License DPR-72,incorprating Requirements from Biological Opinion Issued by Natl Marine Fisheries Svc | 12 October 1999 | LAR 253,rev 0 to License DPR-72,incorprating Requirements from Biological Opinion Issued by Natl Marine Fisheries Svc | |
3F0999-07, Application for Amend to License DPR-72,to Change ITS Proposed in LAR 239,rev 0,increasing Licensed Capacity for Spent Fuel Assembly Storage in SFP & Revise Configuration for Storage of Fresh Fuel.Proprietary Encl Withheld | 16 September 1999 | Application for Amend to License DPR-72,to Change ITS Proposed in LAR 239,rev 0,increasing Licensed Capacity for Spent Fuel Assembly Storage in SFP & Revise Configuration for Storage of Fresh Fuel.Proprietary Encl Withheld | Boric Acid Safe Shutdown Earthquake Finite Element Analysis Control of Heavy Loads |
3F0999-06, Rev 1 to LAR 249,dtd 990505,application for Amend to License DPR-72,revising Once Through Steam Generator Tube Surveillance Program | 2 September 1999 | Rev 1 to LAR 249,dtd 990505,application for Amend to License DPR-72,revising Once Through Steam Generator Tube Surveillance Program | |
3F0799-07, LAR 222,Rev 2 for Amend to License DPR-72,proposing Changes to ITS for CREVS & to VFTP & Correcting Typo in ITS Section 5.6.2.12 | 8 July 1999 | LAR 222,Rev 2 for Amend to License DPR-72,proposing Changes to ITS for CREVS & to VFTP & Correcting Typo in ITS Section 5.6.2.12 | |
3F0599-15, Rev 0 to LAR 250 to License DPR-72,changing CR-3 ITS Section 3.3.8, EDG Lops, SR 3.3.8.1 by Revising Note for Surveillance & Deleting Note for Frequency.Conforming ITS Bases Changes,Encl | 17 May 1999 | Rev 0 to LAR 250 to License DPR-72,changing CR-3 ITS Section 3.3.8, EDG Lops, SR 3.3.8.1 by Revising Note for Surveillance & Deleting Note for Frequency.Conforming ITS Bases Changes,Encl | |
3F0599-16, Rev 0 to LAR 251 to License DPR-72,revising CR-3 ITS Administrative Controls Section 5.8, High Radiation Area. Util Requests NRC Approval by June 30,2000 | 10 May 1999 | Rev 0 to LAR 251 to License DPR-72,revising CR-3 ITS Administrative Controls Section 5.8, High Radiation Area. Util Requests NRC Approval by June 30,2000 | High Radiation Area |
3F0599-01, Rev 1 to LAR 241 for Amend to License DPR-72,revising Wording for SR 3.5.2.5 to Be More Consistent with NUREG-1430,rev 1 & Clarifying Process of Valve Position Verification | 7 May 1999 | Rev 1 to LAR 241 for Amend to License DPR-72,revising Wording for SR 3.5.2.5 to Be More Consistent with NUREG-1430,rev 1 & Clarifying Process of Valve Position Verification | |
3F0599-02, Rev 0 to LAR 249 to License DPR-72,proposing Alternate Repair Criteria for Axial Tube End crack-like Indications in Upper & Lower Tubesheets of Otsgs.B&Wog Proprietary Topical Rept BAW-2346P,Rev 0 Encl.Rept Withheld,Per 10CFR2.790 | 5 May 1999 | Rev 0 to LAR 249 to License DPR-72,proposing Alternate Repair Criteria for Axial Tube End crack-like Indications in Upper & Lower Tubesheets of Otsgs.B&Wog Proprietary Topical Rept BAW-2346P,Rev 0 Encl.Rept Withheld,Per 10CFR2.790 | Probabilistic Risk Assessment Finite Element Analysis Stress corrosion cracking Eddy Current Testing Affidavit Operational leakage |
3F0399-01, Rev 1 to LAR 235 to License DPR-72,proposing Repair Roll Process for CR-3 OTSG tubes.Non-proprietary Rev 1 to BAW-2342 & Proprietary Rev 1 to BAW-2342P Repts Encl. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) | 18 March 1999 | Rev 1 to LAR 235 to License DPR-72,proposing Repair Roll Process for CR-3 OTSG tubes.Non-proprietary Rev 1 to BAW-2342 & Proprietary Rev 1 to BAW-2342P Repts Encl. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) | Stress corrosion cracking Affidavit Eddy-Current Testing |
3F0199-04, LAR 243,Rev 0 to License DPR-72,requesting one-time Rev of ITS to Extend Insp Interval for OTSG Tubes to Coincide with Planned Operating Cycle.Rev 0 to Calculation M-99-0017 & Rev 0 to Calculation AES-C-3543-1 Encl | 27 January 1999 | LAR 243,Rev 0 to License DPR-72,requesting one-time Rev of ITS to Extend Insp Interval for OTSG Tubes to Coincide with Planned Operating Cycle.Rev 0 to Calculation M-99-0017 & Rev 0 to Calculation AES-C-3543-1 Encl | Stress corrosion cracking Operational leakage |
3F1198-06, LAR 244,rev 0,for License DPR-72,proposing Changes to Improved TS LCO 3.9.3 to Allow Both Doors in Personnel Air Locks & Single Door in Oeh to Be Open During Refueling Operations | 30 November 1998 | LAR 244,rev 0,for License DPR-72,proposing Changes to Improved TS LCO 3.9.3 to Allow Both Doors in Personnel Air Locks & Single Door in Oeh to Be Open During Refueling Operations | |
3F1198-01, Application for Amend to License DPR-72,consisting of LAR 240,re Addition of safety-related diesel-driven Emergency Feedwater Pump.Overview of Proposed Mods Presented to NRC on 980921.Addl Info on post-mod Testing Will Be Sent by 990129 | 24 November 1998 | Application for Amend to License DPR-72,consisting of LAR 240,re Addition of safety-related diesel-driven Emergency Feedwater Pump.Overview of Proposed Mods Presented to NRC on 980921.Addl Info on post-mod Testing Will Be Sent by 990129 | Safe Shutdown Seismically rugged Maintenance Rule Program Fuel cladding |
3F1198-13, LAR 221,rev 2 to License DPR-72,revising Improved Tech Spec (ITS) 5.7.2 by Changing Type of Structural Integrity Assessment Required from Probabilistic to Deterministic.Rev of LAR 221 Due to Latest Guidance in Draft RG DG-1074 | 17 November 1998 | LAR 221,rev 2 to License DPR-72,revising Improved Tech Spec (ITS) 5.7.2 by Changing Type of Structural Integrity Assessment Required from Probabilistic to Deterministic.Rev of LAR 221 Due to Latest Guidance in Draft RG DG-1074 | |
3F1098-15, Rev 0 to LAR 245 to License DPR-72,to Change Methodology for Sf Pool B Criticality Analysis.Change Is Necessary Due to Boraflex Degradation in Sf Pool B.Proposed Revs to USAR, TS & Holtec Rept,Encl | 30 October 1998 | Rev 0 to LAR 245 to License DPR-72,to Change Methodology for Sf Pool B Criticality Analysis.Change Is Necessary Due to Boraflex Degradation in Sf Pool B.Proposed Revs to USAR, TS & Holtec Rept,Encl | Tornado Generated Missile |
3F1098-02, Application for Amend to License DPR-72,revising Improved Tech Specs (ITS) by Deleting Note Re Number of Required Channels for Degrees of Subcooling Function & Subdividing Core Exit Temp Into Two New Functions in ITS Table 3.3.17-1 | 30 October 1998 | Application for Amend to License DPR-72,revising Improved Tech Specs (ITS) by Deleting Note Re Number of Required Channels for Degrees of Subcooling Function & Subdividing Core Exit Temp Into Two New Functions in ITS Table 3.3.17-1 | Manual Operator Action |
3F1098-04, Application for Amend to License DPR-72,revising Improved Tech Specs (ITS) Sections 5.6.2.19,ITS Section 3.4.11,Bases 3.4.11 & 3.4.3 Re PTLR & LTOP Limits | 30 October 1998 | Application for Amend to License DPR-72,revising Improved Tech Specs (ITS) Sections 5.6.2.19,ITS Section 3.4.11,Bases 3.4.11 & 3.4.3 Re PTLR & LTOP Limits | Anticipated operational occurrence Hydrostatic Pressure and Temperature Limits Report |
3F1098-01, Application for Amend to License DPR-72,revising Plant FSAR, Improved Tech Specs (ITS) & ITS Bases to Resolve USQ Re Leaving Valves DHV-34 & DHV-35 Normally Closed | 16 October 1998 | Application for Amend to License DPR-72,revising Plant FSAR, Improved Tech Specs (ITS) & ITS Bases to Resolve USQ Re Leaving Valves DHV-34 & DHV-35 Normally Closed | Hot Short Safe Shutdown Stroke time Probabilistic Risk Assessment |
ML20154C153 | 30 September 1998 | LAR 238 to License DPR-72,correcting RCS Leakage Detection Capability of RB Atmosphere Gaseous Radioactivity Monitor Described in ITS Bases & FSAR | Safe Shutdown Earthquake Earthquake Pressure Boundary Leakage Pressure boundary leak |
3F0898-01, LAR 235,rev 0 to License DPR-72,proposing New Repair Process for Plant Otsgs.Technical Basis for Repair Roll Process Proposed by LAR Is Contained in BAW-2303P,Rev 3 | 31 August 1998 | LAR 235,rev 0 to License DPR-72,proposing New Repair Process for Plant Otsgs.Technical Basis for Repair Roll Process Proposed by LAR Is Contained in BAW-2303P,Rev 3 | Stress corrosion cracking Eddy-Current Testing |
3F0898-04, LAR 234,Rev 0 to License DPR-72,adding Three Addl Reg Guide 1.97 Type a Category 1 post-accident Monitoring Instrumentation Variables & One Type B Category 1 PAM Instrumentation Variable to Improved TS Table 3.3.17-1 | 31 August 1998 | LAR 234,Rev 0 to License DPR-72,adding Three Addl Reg Guide 1.97 Type a Category 1 post-accident Monitoring Instrumentation Variables & One Type B Category 1 PAM Instrumentation Variable to Improved TS Table 3.3.17-1 | Post Accident Monitoring Manual Operator Action |
3F0798-15, Application for Amend to License DPR-72,changing Improved TS for CREVS & Ventilation Filter Test Program.Control Room Habitability Rept,Ts Pages & Commitments Encl | 30 July 1998 | Application for Amend to License DPR-72,changing Improved TS for CREVS & Ventilation Filter Test Program.Control Room Habitability Rept,Ts Pages & Commitments Encl | |
3F0698-28, Application for Amend to License DPR-72,exigent LAR 228,rev 0,proposing one-time Exigent License Amend to Allow Operation W/Number of Indications Previously Identified as Tube End Anomalies & Multiple Tube End Anomalies in OTSG | 18 June 1998 | Application for Amend to License DPR-72,exigent LAR 228,rev 0,proposing one-time Exigent License Amend to Allow Operation W/Number of Indications Previously Identified as Tube End Anomalies & Multiple Tube End Anomalies in OTSG | Enforcement Discretion Eddy Current Testing Operational leakage |
3F0598-01, Application for Amend to License DPR-72,proposing Changes to FSAR to Include Description of Use of GL 87-11, Relaxation in Arbitrary Intermediate Pipe Rupture Requirements & NUREG/CR-2913,as Part of Licensing & Design Basis | 28 May 1998 | Application for Amend to License DPR-72,proposing Changes to FSAR to Include Description of Use of GL 87-11, Relaxation in Arbitrary Intermediate Pipe Rupture Requirements & NUREG/CR-2913,as Part of Licensing & Design Basis | Safe Shutdown Post Accident Monitoring |
3F0598-09, License Amend Request 231,Rev 1 to License DPR-72,providing Addl Clarification to Improved Tech Specs 5.2.1, Onsite & Offsite Organizations | 22 May 1998 | License Amend Request 231,Rev 1 to License DPR-72,providing Addl Clarification to Improved Tech Specs 5.2.1, Onsite & Offsite Organizations | |
3F0498-06, LAR 232,Rev 0 to License DPR-72,changing Scope & Frequency of Volumetric & Surface Insps for CR-3 Reactor Coolant Pump Motor Flywheels | 28 April 1998 | LAR 232,Rev 0 to License DPR-72,changing Scope & Frequency of Volumetric & Surface Insps for CR-3 Reactor Coolant Pump Motor Flywheels | Unanalyzed Condition Non-Destructive Examination Overspeed trip |
3F0498-02, Application for Amend to License DPR-72,clarifying Improved Tech Specs 5.7.2, Special Repts, to State That Complete Results of OTSG Tube Inservice Insp Shall Be Submitted to NRC 90 Days After Startup (Breaker Closure) | 23 April 1998 | Application for Amend to License DPR-72,clarifying Improved Tech Specs 5.7.2, Special Repts, to State That Complete Results of OTSG Tube Inservice Insp Shall Be Submitted to NRC 90 Days After Startup (Breaker Closure) | Stress corrosion cracking |
3F0398-17, Rev 0 to LAR 231 to License DPR-72,proposing Editoral Changes to Improved Tech Specs Safety Limits & Administrative Controls to Replace Listed Titles W/Position of Chief Nuclear Officer | 20 March 1998 | Rev 0 to LAR 231 to License DPR-72,proposing Editoral Changes to Improved Tech Specs Safety Limits & Administrative Controls to Replace Listed Titles W/Position of Chief Nuclear Officer | |
3F0398-07, Rev 0 to LAR 227 to License DPR-72,requesting Editorial Change to Improved Tech Specs 5.6.2.8.c Re Reactor Coolant Pump Motor Flywheel Insp | 20 March 1998 | Rev 0 to LAR 227 to License DPR-72,requesting Editorial Change to Improved Tech Specs 5.6.2.8.c Re Reactor Coolant Pump Motor Flywheel Insp | Overspeed trip |
3F1297-19, Application for Amend to License DPR-72,proposing Changes to Improved TSs for CREVS & to Vftp.List of Commitments,Summary of Changes,Reason & Justification for Request,Control Room post-accident Dose Calculations & Analysis Also Encl | 5 December 1997 | Application for Amend to License DPR-72,proposing Changes to Improved TSs for CREVS & to Vftp.List of Commitments,Summary of Changes,Reason & Justification for Request,Control Room post-accident Dose Calculations & Analysis Also Encl | |
3F1297-11, Application for Amend to License DPR-72,revising Description of Starting Logic for RB Recirculation Sys Fan Coolers to Ensure That Only One RB Fan Starts on Es RB Isolation & Cooling Signal | 5 December 1997 | Application for Amend to License DPR-72,revising Description of Starting Logic for RB Recirculation Sys Fan Coolers to Ensure That Only One RB Fan Starts on Es RB Isolation & Cooling Signal | Ultimate heat sink |
ML20212F267 | 31 October 1997 | LAR 214,rev 0 to License DPR-72,proposing Changes to Improved TS & Bases Pages Re Decay Heat Removal Requirements in Mode 4.List of Commitments Also Encl | Post Accident Monitoring Pressure boundary leak Unidentified leakage Operational leakage |
3F1097-32, Application for Amend to License DPR-72,addressing Methodology for post-LOCA Boron Precipitation Prevention. Revised Framatome Technologies,Inc Document 51-5000519-02, Boron Dilution by RCS Hot Leg Injection, Encl | 31 October 1997 | Application for Amend to License DPR-72,addressing Methodology for post-LOCA Boron Precipitation Prevention. Revised Framatome Technologies,Inc Document 51-5000519-02, Boron Dilution by RCS Hot Leg Injection, Encl | Boric Acid Enforcement Discretion |
3F1097-08, Rev 1 to License Amend Request 220,supersedes 970626 Application,Removing Portion of License Condition 2.C.(5) Which Requires Installation & Testing of Flow Indicators in ECCS for Boron Dilution.Description of Changes Encl | 31 October 1997 | Rev 1 to License Amend Request 220,supersedes 970626 Application,Removing Portion of License Condition 2.C.(5) Which Requires Installation & Testing of Flow Indicators in ECCS for Boron Dilution.Description of Changes Encl | Maintenance Rule Program |
3F1097-04, Application for LAR 217,Rev 0 to DPR-72,addessing Rev to Description of Electrical Controls for Operating Reactor Bldg Recirculation Sys fan/cooler,AHF-1C,as Discussed in FSAR & Improved TS Bases | 4 October 1997 | Application for LAR 217,Rev 0 to DPR-72,addessing Rev to Description of Electrical Controls for Operating Reactor Bldg Recirculation Sys fan/cooler,AHF-1C,as Discussed in FSAR & Improved TS Bases | |
3F1097-21, Application for LAR 221,Rev 0 to License DPR-72,adding Methodology to Monitor Indication Growth in Group of Tubes within Crystal River Unit 3 B Otsg.Ts Pages,Encl | 1 October 1997 | Application for LAR 221,Rev 0 to License DPR-72,adding Methodology to Monitor Indication Growth in Group of Tubes within Crystal River Unit 3 B Otsg.Ts Pages,Encl | Stress corrosion cracking |
3F0997-16, Application for Amend to License DPR-72,revising EDG Protective Relaying Scheme,As Described in FSAR Chapter 8 | 12 September 1997 | Application for Amend to License DPR-72,revising EDG Protective Relaying Scheme,As Described in FSAR Chapter 8 | Safe Shutdown Fuel cladding Overspeed trip |
3F0997-25, TS Change Request Notice 213,Suppl 1 to License DPR-72, Proposing New Improved TS 3.4.11 Re Low Temp Overpressure Protection Sys | 12 September 1997 | TS Change Request Notice 213,Suppl 1 to License DPR-72, Proposing New Improved TS 3.4.11 Re Low Temp Overpressure Protection Sys | |
3F0997-14, Application for Amend to License,Consisting of License Amend Request 218,addressing Analysis Rev for Makeup Sys Letdown Line Failure Accident as Discussed in FSAR | 9 September 1997 | Application for Amend to License,Consisting of License Amend Request 218,addressing Analysis Rev for Makeup Sys Letdown Line Failure Accident as Discussed in FSAR | Manual Operator Action |
3F0897-25, Application for LAR 216 Proposing Amend to License DPR-72, to Change Design Basis of EDG Air Handling Sys | 26 August 1997 | Application for LAR 216 Proposing Amend to License DPR-72, to Change Design Basis of EDG Air Handling Sys | |
3F0897-22, Application for Amend to License DPR-72,TS Change Request Notice 215,extending Frequency of EDG Surveillances During Period of Time CR-3 EDGs Are Being Modified | 4 August 1997 | Application for Amend to License DPR-72,TS Change Request Notice 215,extending Frequency of EDG Surveillances During Period of Time CR-3 EDGs Are Being Modified | Power Uprate |
3F0797-21, TS Change Request 209,Rev 1 for License DPR-72,adding EDG Kilowatt Indication to post-accident Monitoring Instrumentation to Support CR-3 Restart Issue of EDG Load Mgt | 29 July 1997 | TS Change Request 209,Rev 1 for License DPR-72,adding EDG Kilowatt Indication to post-accident Monitoring Instrumentation to Support CR-3 Restart Issue of EDG Load Mgt | Manual Operator Action |
3F0797-10, TS Change Request Notice 213,rev 0 to License DPR-72, Establishing Requirements for Low Temperature Overpressure Protection Sys | 18 July 1997 | TS Change Request Notice 213,rev 0 to License DPR-72, Establishing Requirements for Low Temperature Overpressure Protection Sys | Anticipated operational occurrence |
3F0697-08, Application for Amend to License DPR-72,removing Wording for Requirement Re Installation & Testing of Flow Indicators | 26 June 1997 | Application for Amend to License DPR-72,removing Wording for Requirement Re Installation & Testing of Flow Indicators | |
3F0697-10, TS Change Request 210 to License DPR-72,supporting Operation W/Hardware Changes Primarily Involving Efw,Hpi,Emergency Feedwater Initiation & Control Sys & Edgs,As Well as Associated Licensing & Design Bases Changes | 14 June 1997 | TS Change Request 210 to License DPR-72,supporting Operation W/Hardware Changes Primarily Involving Efw,Hpi,Emergency Feedwater Initiation & Control Sys & Edgs,As Well as Associated Licensing & Design Bases Changes | Mission time Post Accident Monitoring Overspeed trip Manual Operator Action |
3F0597-21, TS Change Request 212,Rev 1 Replacing Prescriptive Requirements of 10CFR50,App J,Option a w/performance-based Approach to Leakage Testing Contained in 10CFR50,App J, Option B | 1 May 1997 | TS Change Request 212,Rev 1 Replacing Prescriptive Requirements of 10CFR50,App J,Option a w/performance-based Approach to Leakage Testing Contained in 10CFR50,App J, Option B | |
3F0397-16, Application for Amend to License DPR-72 Re Once Through SG Tube Surveillance Program | 27 March 1997 | Application for Amend to License DPR-72 Re Once Through SG Tube Surveillance Program | |
3F0297-09, TS Change Request 212 to License DPR-72,adopting 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water- Cooled Reactors, Option B | 17 February 1997 | TS Change Request 212 to License DPR-72,adopting 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water- Cooled Reactors, Option B | Exemption Request |
ML20134L300 | 10 February 1997 | Application for Amends to Licenses DPR-38,DPR-47 & DPR-55, Revising TS to Reduce Allowable RB Vol Leakage Rate Per Day Limit to Permit Relaxation of Certain Requirements for Operability of Prvs Sys | |
3F0996-05, Application for Amend to License DPR-72,consisting of Change Request 209,Rev 0,proposing Listed Changes to CR-3 post- Accident Monitoring Instrumentation TS | 27 September 1996 | Application for Amend to License DPR-72,consisting of Change Request 209,Rev 0,proposing Listed Changes to CR-3 post- Accident Monitoring Instrumentation TS | Affidavit Manual Operator Action |
ML20129E738 | 27 September 1996 | Application for Amend to License DPR-72,proposing Changes to CR-3 post-accident Monitoring Instrumentation | Affidavit Manual Operator Action |