Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217K976 | 14 October 1999 | Amend 234 to License DPR-56,changing TS in Response to 990301 Application & Suppls ,1001 & 06,to Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Monitoring Sys | Shutdown Margin High Radiation Area Abnormal operational transient Scram Discharge Volume Fuel cladding Power change Coast down |
ML20217B426 | 5 October 1999 | Amend 233 to License DPR-56,changing Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Repts | Reactor Vessel Water Level |
ML20216H689 | 24 September 1999 | Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively, Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by TSs SR 3.9.1.1 | |
ML20211D547 | 23 August 1999 | Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Correct Typo & Editorial Errors Introduced in TSs by Previous Amends | |
ML20205K737 | 7 April 1999 | Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively, Consisting of Changes to TS SRs Re Secondary Containment Doors in Response to 980204 Application,As Revised by | |
ML20155C601 | 26 October 1998 | Amend 226 to License DPR-44,revising TSs for Safety Limit MCPR from Current Value of 1.11 to 1.10 for Two Recirculation Loop Operation & from 1.13 to 1.12 for Single Recirculation Loop Operation | Reactor Vessel Water Level |
ML20154J226 | 5 October 1998 | Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Delete Requirements for Functional Testing of SRVs During Each Unit Startup | |
ML20154H469 | 5 October 1998 | Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Permit Incorporation of EOC-RPT Sys at Plant,Units 2 & 3 | Shutdown Margin Post Accident Monitoring Scram Discharge Volume Pressure Boundary Leakage Coast down |
ML20154G655 | 1 October 1998 | Amends 223 & 227 to Licenses DPR-44 & DPR-56,respectively, Revising Plant,Units 2 & 3 TSs to Exclude MSIV Leakage from Total Type B & Type C Local Leak Rate Test Results | |
ML20153B958 | 14 September 1998 | Amend 9 to License DPR-12,adding Requirements for Control of Effluents & Annual Reporting Per 10CFR50.36a | |
ML20238F261 | 24 August 1998 | Amend 222 to License DPR-44,revising Pbaps,Unit 2 TSs to Support Mod P00271,which Would Replace SRMs & IRMs W/Wrnms, During Forthcoming Outage 2R12,scheduled for Early Oct 1998 | Shutdown Margin High Radiation Area Post Accident Monitoring Scram Discharge Volume Fuel cladding Power change Coast down |
ML20212G826 | 24 October 1997 | Amends 221 & 226 to Licenses DPR-44 & DPR-56,respectively, Changing TSs to Eliminate Inconsistency Between ECCS Operability Requirements & Autostart & Protective Trip Bypass of EDGs on ECCS Initiation Signal | Offsite Circuit |
ML20217J557 | 9 October 1997 | Amend 225 to License DPR-56,revising MCPR Safety Limit in Section 2.1 of TSs from 1.07 to 1.11 for Two Recirculation Loops in Operation | Reactor Vessel Water Level |
ML20217D810 | 30 September 1997 | Amend 224 to License DPR-56,revises TS to Support PBAPS Mod P00271,which Would Replace Source Range & Intermediate Range Monitors W/Wide Range Neutron Monitoring System | Shutdown Margin Post Accident Monitoring Scram Discharge Volume Fuel cladding Power change Coast down |
ML20216G532 | 4 September 1997 | Amends 220 & 223 to Licenses DPR-44 & DPR-56,respectively, Revising TS to Extend Replacement Frequency for Inflatable Seat Seals for Primary Containment Purge & Vent Valves to 96 Months | |
ML20217M796 | 19 August 1997 | Amends 219 & 222 to Licenses DPR-44 & DPR-56,respectively, Extending APRM Flow Bias Instrumentation Surveillance Interval from 18 Months to 24 Months | Scram Discharge Volume |
ML20135B385 | 19 February 1997 | Amends 218 & 221 to Licenses DPR-44 & DPR-56,respectively, Changing Min Allowable Charging Water Header Pressure from Value 955 Psig to Value of 940 Psig in TS 3.10.8 | Shutdown Margin |
ML20062C040 | 16 October 1978 | Amend 48 to License DPR-44,revising Tech Specs to Permit Plant Operation W/New 8x8R Reload Fuel for Cycle 4 | Shutdown Margin Hydrostatic Abnormal operational transient Scram Discharge Volume Fast acting solenoid valve Overtravel Fuel cladding |
ML20062B055 | 10 October 1978 | Amend 47 to License DPR-56,changing Tech Specs Re Fire Protection & Administrative Controls | Shutdown Margin High Radiation Area Fire Barrier |
ML20062B052 | 10 October 1978 | Amend 47 to License DPR-44,changing Tech Specs Re Instrumentation That Initiates or Controls Core & Containment Cooling Sys,Administrative Controls & safety-related Snubbers | Shutdown Margin High Radiation Area Fire Barrier |
ML20062B862 | 3 October 1978 | Amend 46 to License DPR56,changing Tech Specs Re Surveillance of Suppression Pool Temp Logging,Controlled Bypass Heatup Line on HPCI Steam Supply & Identification of Valves to Reflect Plant Unique Designation | |
ML20062B848 | 3 October 1978 | Amend 46 to License DPR-44,changing Tech Specs Re Surveillance of Suppression Pool Temp Logging,Controlled Bypass Heatup Line on HPCI Steam Supply & Identification of Valves to Reflect Plant Unique Designation | |
ML20210Q339 | 25 October 1973 | Amend 1 to License DPR-44 & Amend to License DPR-56, Reflecting Change in Corporate Structure at Pse&G | Safe Shutdown Fire Protection Program |