Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17283A3926 October 2017NRC Design Bases Assurance Inspection Report 05000483/2017007 and Notice of ViolationSafe Shutdown
Ultimate heat sink
Stroke time
Commercial Grade Dedication
Internal Flooding
Probabilistic Risk Assessment
Significance Determination Process
Open Phase Condition
Foreign Material Exclusion
Large early release frequency
Scaffolding
ML16258A04314 September 2016Response to Notice of Violation (NRC Inspection Report 05000483/2016002)Condition Adverse to Quality
IR 05000483/201600212 August 2016NRC Integrated Inspection Report 05000483/2016002 and Notice of ViolationBoric Acid
Fitness for Duty
High winds
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Hydrostatic
Past operability
Enforcement Discretion
Nondestructive Examination
VT-2
Functionality Assessment
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Earthquake
Maintenance Rule Program
Liquid penetrant
Fire Protection Program
Dissimilar Metal Weld
GOTHIC
Operability Assessment
ML16225A57712 August 2016NRC Integrated Inspection Report 05000483/2016002 and Notice of ViolationBoric Acid
Fitness for Duty
High winds
High Radiation Area
Ultimate heat sink
Hydrostatic
Past operability
Enforcement Discretion
Nondestructive Examination
VT-2
Functionality Assessment
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Foreign Material Exclusion
Earthquake
Maintenance Rule Program
Liquid penetrant
Fire Protection Program
ULNRC-05826, ULNRC-05826: Response to Notice of Violation: EA-11-178 Inspection Report No. 50-483/20114042 December 2011ULNRC-05826: Response to Notice of Violation: EA-11-178 Inspection Report No. 50-483/2011404
ML0821808515 August 2008IR 05000483-08-003, on 3/25 - 6/24/08, Callaway Plant, Operability Evaluations, Postmaintenance Testing, Surveillance Testing, and Identification and Resolution of ProblemsHigh Radiation Area
Mission time
Stroke time
Internal Flooding
Probabilistic Risk Assessment
Coatings
Temporary Modification
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Design basis earthquake
Large early release frequency
Maintenance Rule Program
Scaffolding
ML08115037320 March 2008Notice of Violation for EA-07-280
ML03171087920 June 2003EA-03-060 - Final Significance Determination for a White Finding and Notice of Violation (NRC IR 05000483-03-008; Callaway Plant)Significance Determination Process
Preliminary White Finding
ML0210000569 April 2002Final Significance Determination for a White Finding and Notice of Violation - NRC IR 05000483/2002-007 - Callaway PlantCondition Adverse to Quality
Significance Determination Process
Preliminary White Finding