Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000097/1989001 | 12 May 1989 | Forwards Safety Insp Repts 50-097/89-01 & 50-157/89-01 on 890425-26.Weakness Identified in Area of Documentation | |
IR 05000072/1988001 | 28 October 1988 | Ack Receipt of 880804 & 25 Ltrs Informing NRC of Steps Taken to Correct Violations & Deviations Noted in Insp Repts 50-072/88-01 & 50-407/88-01 & Order.Concludes That W/ Exception of Violation 5.c,violations Did Not Occur | |
ML20147D042 | 29 February 1988 | Requests That Recipient Resubmit Proposal to Convert to Low Enriched U Fuel to Meet 10CFR50.64(6)(2) or (3) Requirements by 880327.Identical Ltrs Sent to Listed Dockets | |
ML20206C606 | 8 April 1987 | Ack Receipt of & Payment of $3,000 for Civil Penalty Imposed on 870313.Corrective Actions Described in Will Be Examined During Future Insps | |
ML20212P185 | 11 March 1987 | Responds to 870309 10CFR2.206 Petition for Commission Review of Director'S Decision DD-87-2.Time Period for Commission Review Expired & Decision Became Final Agency Action on 870310.Served on 870312 | |
ML20136G379 | 18 November 1985 | Discusses Actions Re Claims of Alleged Inadequacies in Containment Leak Rate Tests Performed at LWR Plants.Matter Will Not Be Considered Further | |
ML20126E431 | 25 March 1985 | Responds to FOIA Request for Records Re FIN B-0489, Containment Leak Rate Testing Program & Quadrex Corp/Nrc Contracts.Forwards Documents Re FIN B-0489.Documents Also Available in Pdr.No Documents Re Quadrex Subj to Request | |
ML20128P309 | 4 December 1984 | Responds to 841126 & 27 Telcon Requests for Listed Info. Diagram of Mark II Containment Encl.S&W Will Forward Correct Diagram of Surry Containment.Experimental Data for Decay Heat Curve Does Not Exist.W/O Encl | Earthquake |
ML20128P269 | 20 November 1984 | Forwards Diagrams Illustrating Core Concrete Interaction, Based on Corcon Calculations for Facility.Concrete Consists of Limestone | |
ML20128P233 | 14 November 1984 | Forwards Microfiche of EPRI Mar 1980 Revised Rept NSAC-1, Analysis of TMI-2 Accident. Version Out of Print.W/O Encl | |
NUREG-0850, Forwards Vol 1 to NUREG-0850, Preliminary Assessment of Core Melt Accidents at Zion & Indian Point Nuclear Power Plants & Strategies for Mitigating Effects. Vol 1 Only Vol Available at Present | 14 August 1984 | Forwards Vol 1 to NUREG-0850, Preliminary Assessment of Core Melt Accidents at Zion & Indian Point Nuclear Power Plants & Strategies for Mitigating Effects. Vol 1 Only Vol Available at Present | |
ML20128N936 | 14 August 1984 | Forwards Vol 1 to NUREG-0850, Preliminary Assessment of Core Melt Accidents at Zion & Indian Point Nuclear Power Plants & Strategies for Mitigating Effects. Vol 1 Only Vol Available at Present | |
NUREG/CR-3028, Forwards NUREG/CR-3028, Review of Limerick Generating Station PRA & Vols 1 & 2 to NUREG/CR-0027, Proceedings of Intl Meeting on Thermal Nuclear Reactor Safety. Advises That NUREG/CR-3300 Not Published.W/O Encls | 31 May 1984 | Forwards NUREG/CR-3028, Review of Limerick Generating Station PRA & Vols 1 & 2 to NUREG/CR-0027, Proceedings of Intl Meeting on Thermal Nuclear Reactor Safety. Advises That NUREG/CR-3300 Not Published.W/O Encls | |
ML20128N385 | 31 May 1984 | Forwards NUREG/CR-3028, Review of Limerick Generating Station PRA & Vols 1 & 2 to NUREG/CR-0027, Proceedings of Intl Meeting on Thermal Nuclear Reactor Safety. Advises That NUREG/CR-3300 Not Published.W/O Encls | |
ML20210E676 | 23 March 1984 | Forwards Region V Evaluation of Emergency Preparedness Concerns Expressed in 831104,1209 & s Included in Latest Plant Sser | |
NUREG/CR-1250, Forwards Vols 1 & 2 to NUREG/CR-1250, TMI - Rogovin Rept | 18 March 1984 | Forwards Vols 1 & 2 to NUREG/CR-1250, TMI - Rogovin Rept | |
ML20128N200 | 18 March 1984 | Forwards Vols 1 & 2 to NUREG/CR-1250, TMI - Rogovin Rept | |
ML20210E689 | 30 December 1983 | Ack Providing Addl Data Re Concern About Method of Notifying Population in Case of Flood.Siren Concern Being Addressed.Fema Ltr Addressing Items Identified in Initial Encl | |
ML20128M700 | 1 November 1983 | Forwards Draft Vols I-III to BMI-2104 Re Ongoing Source Term Reassessment Study.W/O Encls | |
ML20128M731 | 12 September 1983 | Forwards Draft Vols I-III of BMI-2104 Re Ongoing Source Term Reassessment Study.W/O Encls | |
ML20128M760 | 12 September 1983 | Forwards Draft Vols I-III of BMI-2104 Re Ongoing Source Term Reassessment Study.W/O Encls | |
ML20128M774 | 12 September 1983 | Forwards Draft Vols I-III of BMI-2104 Re Ongoing Source Term Reassessment Study.W/O Encls | |
ML20128M795 | 9 September 1983 | Forwards Draft Vols I-III of BMI-2104 Re Ongoing Source Term Reassessment Study.W/O Encls | |
ML20128M798 | 12 August 1983 | Forwards Draft Vols I-III of BMI-2104 Re Ongoing Source Term Reassessment Study.W/O Encls | |
ML20128M819 | 12 August 1983 | Forwards Draft Vols I-III of BMI-2104 Re Ongoing Source Term Reassessment Study.W/O Encls | |
ML20054L388 | 16 June 1982 | Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl | |
ML20137G472 | 23 June 1971 | Advises That Presence & Irradiation of Explosives in Reactor Must Be Evaluated Due to Potential for Damage to Reactor. Evaluation Requested Establishing Operating Restrictions,Max Quantity of Explosives Allowed in Facility & Form | |
ML20235C920 | 28 August 1968 | Requests Nm Newmark Consulting Engineering Svcs Provide Listed Svcs,Including Analyses of Engineering Factors Included in Proposed Design to Minimize Damage from Seismically Induced Ground Motion for Proposed Plant Const | |
ML20151W976 | 14 February 1967 | Requests Listed Svc for Commission Per Conditions of Contract AT(49-5)2667 Re Proposed Const of PWR by PG&E at Diablo Canyon Site,Including Rept on Analyses of Engineering Factors by 670415 | Safe Shutdown Earthquake |
ML20234D959 | 9 November 1964 | Forwards Repts Released Re Proposed Nuclear Power Plant at Bodega Head,Ca in Accordance W/Telcon.Util Has Withdrawn Application for CP on Project.W/O Encls | |
ML20235A380 | 23 September 1964 | Forwards 640916 Amend 9 to License Application for Proposed Nuclear Reactor at Bodega Bay,Ca.W/O Encl | |
ML20239A437 | 6 August 1964 | Confirms Telcons W/Eg Case Re Preparations for ACRS 640824 Meeting Re Bodega Bay Reactor.Aec Has Understanding That Rept Re Seismic Aspects of PG&E Application Will Be Furnished at 640810 Meeting in Chicago,Il.Guide Encl | |
ML20234C065 | 24 July 1964 | Forwards 640720 Amend 8 to PG&E Application to Construct Reactor at Bodega Head & Informs of ACRS Meeting on 640824 to Discuss Amend.W/O Amend | |
ML20234B298 | 8 June 1964 | Forwards Background Info on High Energy Physics Program & Proposed Stanford Linear Electron Accelerator Project, 1961 Rept to Joint Committee on Atomic Energy,Per Re Const of Reactor at Bodega Head.W/O Encl | Earthquake |
ML20234B192 | 20 May 1964 | Forwards AEC to PG&E Re Bodega Head Case.Several Members of ACRS Will Be Present at Meeting at Anl on Fri, Which May Include Kv Steinbrugge | |
ML20234B207 | 18 May 1964 | Confirms 640522 Meeting at Anl to Discuss Bodega Head Case, Per Telcons Last Wk.Ltr Being Prepared to Send to PG&E Re Questions Worked Out W/Acrs Members | |
ML20234E813 | 3 April 1964 | Forwards Amend 7 to Util Application for License for Bodega Bay Atomic Park.W/O Encl | |
ML20234D951 | 3 April 1964 | Forwards Amend 7 to Util Application for License to Unit 1 for Bodega Bay Atomic Park.W/O Encl | |
ML20235C483 | 24 March 1964 | Forwards PG&E Amend 6 to Application Re Earthquake Deign Criteria for Proposed Bodega Head Reactor,Superseding Amend 4.Rept on Adequacy of Amend Criteria Will Be Discussed at ACRS May 1964 Meeting.W/O Encl | Earthquake |
ML20235C522 | 24 March 1964 | Forwards PG&E Amend 6 to Application Re Earthquake Design Criteria for Proposed Bodega Bay Reactor,Superseding Amend 4.Rept on Adequacy of Amend Criteria Will Be Discussed at ACRS May 1964 Meeting.W/O Encl | Earthquake |
ML20235B206 | 27 January 1964 | Forwards USGS Dec 1963 Rept Entitled Engineering Geology of Proposed Nuclear Power Plant Site on Bodega Head,Sonoma County,Ca for Review.Will Contact to Schedule Meeting.W/O Encl | |
ML20235B252 | 24 January 1964 | Forwards Amend 5 Filed by PG&E Consisting of Bodega Head Site Repts for Review.Will Contact to Discuss Rept.W/O Encl | |
ML20235B270 | 24 January 1964 | Forwards Amend 5 Filed by PG&E Consisting of Bodega Head Site Repts for Review.Will Contact.W/O Encl | |
ML20235B136 | 21 January 1964 | Forwards USGS Dec 1963 Rept Entitled Engineering Geology of Proposed Power Plant Site on Bodega Head,Sonoma County,Ca. Will Contact to Schedule Meeting.W/O Encl | |
ML20234A976 | 4 September 1963 | Advises That Anyone Inquiring About Proposed Plant Should Be Informed That Recipient Serving as Consultant to AEC to Assist in Evaluation of Structural Design,Per | |
ML20234C073 | 15 August 1963 | Forwards Amend 4 to Facility License Application from PG&E for Proposed Nuclear Power Reactor at Bodega Bay,Ca.W/O Encl | |
ML20234B730 | 15 August 1963 | Forwards Amend 4 to Facility License Application from PG&E for Proposed Nuclear Power Reactor at Bodega Bay,Ca.W/O Encl | |
ML20234C930 | 26 July 1963 | Informs That Effect of Operation of Proposed Reactor on Marine Environ of Bodega Head Being Given Careful Consideration,Per | |
ML20234C973 | 11 July 1963 | Forwards Us Bureau of Commercial Fisheries Review of Effects of Reactor Operations on Marine Environ at Bodega Bay,Per Re ACRS Rept on PG&E Plant.Util Will Continue Oceanographic Studies for at Least One Annual Cycle | |
ML20234F452 | 10 July 1963 | Responds to to Chairman Seaborg Re Proposed Const of Nuclear Power Reactor at Bodega Head.Pamphlet Describing Procedures Re Licensing of Power Reactors by AEC Encl.W/O Encl |