NLS2023005, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2022 | 19 January 2023 | Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2022 | |
NLS2022042, 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report | 7 October 2022 | 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report | Packing leak |
NLS2022003, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2021 | 20 January 2022 | Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2021 | |
ML19262G904 | 8 November 2019 | Staff Assessment of Flood Hazard Integrated Assessment (Public) | Safe Shutdown Unanalyzed Condition Hydrostatic FLEX Fukushima Dai-Ichi Backfit |
ML18184A273 | 18 July 2018 | Staff Review of Mitigation Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter (CAC No. MF7819; EPID L-2016-JLD-0006) | Safe Shutdown Earthquake FLEX Fukushima Dai-Ichi |
NLS2018003, Submittal of Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2017 | 15 January 2018 | Submittal of Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2017 | |
ML17244A281 | 8 May 2017 | 16C4384-RPT-005, Rev 005, 50.54(f) NTTF 2.1 Seismic High Frequency Confirmation. | Probabilistic Risk Assessment Fukushima Dai-Ichi Seismically rugged Earthquake |
NLS2016070, Completion of Required Action by NRC Order EA-12-049 - Mitigation Strategies for Beyond-Design-Basis External Events | 4 January 2017 | Completion of Required Action by NRC Order EA-12-049 - Mitigation Strategies for Beyond-Design-Basis External Events | Safe Shutdown High winds Shutdown Margin Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Emergency Lighting Functionality Assessment FLEX Tornado Generated Missile Fukushima Dai-Ichi Design basis earthquake Spent Fuel Pool Instrumentation Frazil ice B.5.b Mitigating Strategies Earthquake |
NLS2016066, Completion of Required Action by NRC Order EA-12-051 - Reliable Spent Fuel Pool Instrumentation | 20 December 2016 | Completion of Required Action by NRC Order EA-12-051 - Reliable Spent Fuel Pool Instrumentation | Spent Fuel Pool Instrumentation |
ML16351A247 | 12 December 2016 | Review of SIA Calculation 1601004.301, Cooper High Pressure RHRSW Thinning Evaluation Per Code Case N-513 | |
NLS2016058, 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report of Evaluations for 08/01/2014 - 07/31/2016 | 7 October 2016 | 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report of Evaluations for 08/01/2014 - 07/31/2016 | Internal Flooding Operator Manual Action Time Critical Operator Action Fuel cladding |
NLS2016021, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR - Cooper Nuclear Station Cycle 30 (Non-Proprietary) | 21 April 2016 | Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR - Cooper Nuclear Station Cycle 30 (Non-Proprietary) | Safety Limit Minimum Critical Power Ratio Fuel cladding |
NLS2015128, Submittal of 10 CFR 71.95 Report Involving Energysolutions Certificate of Compliance No. 9168 | 29 October 2015 | Submittal of 10 CFR 71.95 Report Involving Energysolutions Certificate of Compliance No. 9168 | |
ML15259A342 | 24 August 2015 | 10 CFR 71.95 Report Evaluation Form; Submitted by Fenok, Erwin Resin Solutions, North Anna Power Stations, Et Al | |
ML15006A234 | 11 February 2015 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents) | Loop seal Mission time Tornado Missile FLEX Fukushima Dai-Ichi Design basis earthquake Earthquake Hardened vent Scaffolding |
NLS2014074, Submittal of 10 CFR 71.95 Report Involving Areva Certificate of Compliance No. 9233 | 30 July 2014 | Submittal of 10 CFR 71.95 Report Involving Areva Certificate of Compliance No. 9233 | |
NLS2014044, and ISFSI - Thirty-Day Notification Pursuant to 10 CFR 72.212, Conditions of General License Issued Under Section 72.210 | 13 May 2014 | and ISFSI - Thirty-Day Notification Pursuant to 10 CFR 72.212, Conditions of General License Issued Under Section 72.210 | |
NLS2012124, Enclosure to NLS2012124, Cooper Nuclear Station Flooding Walkdown Report | 26 November 2012 | Enclosure to NLS2012124, Cooper Nuclear Station Flooding Walkdown Report | Safe Shutdown Unanalyzed Condition High winds Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake Scaffolding |
NLS2012085, CFR 50.59(d)(2) Summary Report Covering Time Period from August 1, 2012 to July 31, 2012 | 10 October 2012 | CFR 50.59(d)(2) Summary Report Covering Time Period from August 1, 2012 to July 31, 2012 | Anticipated operational occurrence Fuel cladding |
NLS2012089, Submittal of Nuclear Material Transaction Report | 29 August 2012 | Submittal of Nuclear Material Transaction Report | |
ML121600029 | 11 June 2012 | Review of 60-day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near Term Task Force Review of Fukushima Dai-ichi Accident | Fukushima Dai-Ichi Earthquake |
ML112700069 | 26 September 2011 | Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants | Shutdown Margin Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Channel-control blade interference Scram Discharge Volume Earthquake |
NLS2009099, SAMA Meteorological Anomaly Related to the Cooper Nuclear Station License Renewal Application | 7 December 2009 | SAMA Meteorological Anomaly Related to the Cooper Nuclear Station License Renewal Application | |
NLS2008106, Submittal of Program for Maintenance of Irradiated Fuel | 23 December 2008 | Submittal of Program for Maintenance of Irradiated Fuel | Decommissioning Funding Plan |
NLS2008096, Corrected Semiannual Fitness for Duty Program Performance Report for the Period of January 1, 2008 Through June 30, 2008 | 22 October 2008 | Corrected Semiannual Fitness for Duty Program Performance Report for the Period of January 1, 2008 Through June 30, 2008 | Fitness for Duty |
NLS2008059, Submittal of Revised Root Cause Investigation - Diesel Generator Amphenol Connector | 21 July 2008 | Submittal of Revised Root Cause Investigation - Diesel Generator Amphenol Connector | Fitness for Duty Condition Adverse to Quality Preliminary White Finding Loctite Locktite |
NLS2008033, Response to Request for Additional Information for Question I.2 Regarding License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power Uprate | 12 March 2008 | Response to Request for Additional Information for Question I.2 Regarding License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power Uprate | |
NLS2008019, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power Uprate | 6 March 2008 | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power Uprate | Fire Barrier Operator Manual Action Fire Protection Program Scaffolding |
ML091750299 | 1 January 2008 | Lr - NPPD 2008 Integrated Resource Plan | |
NLS2006090, Core Operating Limits Report, Cycle 24, Revision 0 | 5 November 2006 | Core Operating Limits Report, Cycle 24, Revision 0 | |
NLS2006084, CFR 50.59(d)(2) Summary Report | 12 October 2006 | CFR 50.59(d)(2) Summary Report | Safety Limit Minimum Critical Power Ratio Safe Shutdown Earthquake Seismically rugged Turbine Missile Fuel cladding |
NLS2005107, Reporting of Changes and Errors in ECCS Evaluation Models Cooper Nuclear Station | 28 December 2005 | Reporting of Changes and Errors in ECCS Evaluation Models Cooper Nuclear Station | |
ML052090158 | 2 August 2005 | 2004 External Stakeholder Response; 2004 Reactor Oversight Process External Survey - Attachment | Fitness for Duty Enforcement Discretion Probabilistic Risk Assessment Condition Adverse to Quality Significance Determination Process Large early release frequency Systematic Assessment of Licensee Performance Earthquake Maintenance Rule Program Pressure Boundary Leakage Backfit Power change Siren |
ML052270073 | 18 April 2005 | Event Notification Report for April 18, 2005 | Boric Acid Fitness for Duty Reactor Vessel Water Level Packing leak Stolen Troxler Moisture Density Gauge |
ML072700849 | 31 January 2005 | Caldon Experience in Nuclear Feedwater Flow Measurement | Power change |
NLS2004117, 1OCFR50.59(d)(2) Summary Report | 14 October 2004 | 1OCFR50.59(d)(2) Summary Report | Ultimate heat sink Feedwater Controller Failure |
NLS2004105, Initial Actions Summary Report and Response to NRC Generic Letter 2003-01, Control Room Habitability. | 30 September 2004 | Initial Actions Summary Report and Response to NRC Generic Letter 2003-01, Control Room Habitability. | Safe Shutdown |
ML061980215 | 6 August 2004 | CNS Assessment of Survivability of the Service Water Pumps When Gland Waste Water Was Lost | Coast down |
ML062220576 | 27 July 2004 | Johnston Pump Company Letter to Mr. Kent Sutton | Hydrostatic |
ML061980153 | 16 July 2004 | Excerpts from Historic Work Orders | |
ML053220461 | 14 June 2004 | Power Reactor Status Report for 6/14/04 | |
ML061860734 | 11 May 2004 | Comments Concerning Loss of Gland Water to the Service Water Pumps at Cooper Nuclear Station | |
ML061860731 | 6 May 2004 | Comments Concerning Loss of Gland Water to the Service Water Pumps at Cooper Nuclear Station | |
ML061870194 | 30 April 2004 | Excerpt from Missouri Nuclear Accident Plan | |
ML061980109 | 17 March 2004 | CNS Roots Cause Investigation - Service Water Gland Water Valve Mis-positioning Event, SCR 2004-0077 | |
ML061980101 | 10 March 2004 | CNS Clearance Order, Section SWB-1-4324147 SW-STNR-B | |
ML062630408 | 1 March 2004 | PSEG Nuclear, LLC Salem/Hope Creek Safety Culture Assessment | Boric Acid Stroke time Scaffolding |
ML061980089 | 18 February 2004 | CNS Notification 10294449 | Unanalyzed Condition |
ML061980096 | 18 February 2004 | CNS Notification 10295020 | Unanalyzed Condition |
ML061980074 | 11 February 2004 | CNS Notification 10295021 | Unanalyzed Condition |