Text
U41I IOI 1UU I imlrrlJ I.ULIIIolaUaio UVeIVIeW i
Notification:
10295020 Notfichtion 10295020 Description SW PUMP D LOW BRG WATER Reported by MJSTASK 03:05:1 Start date 02/11/2004 Start time
- 03. :05:18
,Priority CM FunctLocation SORT Equipment Order Assembly MaintPlanGroup CAP CAP/N' Mayf. Start Date Mayf. Start time 00:00:00
. V ~ S t' 7 ALARM 8
Notification ty7 NotifictnDate End date End timne pe CR K
Condition Report 02/11/2004 02/17/2004
.16 :30:0.0 e
00:00:00 AUT Tel.
Malf. End date Maif. End.time
UZIntIZUUO,.
IIPU:. Notitication overview 1 SL;*S;HVWI.
Uopy 4
Page Z Notification:
10295020 02/11/2004 03:05:18 btcuser (BTCUSER)
DESCRIPTION OF CONDITION:
SW PUMP D LOW BRG WATER ALARM WAS RECIEVED AFTER SECURING D SW PUMP.
GLAND WATER FLOWS AND PRESSURES WERE NORMAL WHEN CHECKED SEVERAL MINUTES AFTER THE ALARM HAD COME IN AND CLEARED.
ALARM SHOULD NOT HAVE COME IN REQUIREMENT NOT MET:
ALARM ON LOW BEARING FLOW WHEN SECURING PUMP METHOD OF DISCOVERY:
CONTROL ROOM ALARM IMMEDIATE ACTIONS TAKEN:
CHECKED GLAND WATER FLOW AND PRESSURE-NO OTHER ACTION REQUIRED-ALARM CLEARED ON IT'S OWN AFTER SEVERAL SECONDS RECOMMENDATIONS:
INVESTIGATE AND OR TREND PROBLEM LOCATION OF EVIDENCE:
SW PUMP ROOM FUNCTIONAL LOCATION (IF KNOWN):
CNS-SW-P"-D EQUIPMENT (IF KNOWN):
REPORTED BY:
MJSTASK WORK CENTER:
OPSCREW SUBMITTED BY:
mjstask SUPERVISOR:
BCROW DEFICIENCY TAG:
NONE
UZI1tIZUU4 NlPPLI: Notitication overview I
.SCSClHWI Copy 4
Page 3 Notification: 10295020 IS THIS AN EQUIPMENT ISSUE?
[X]
- YES, CONTACT THE SENIOR REACTOR OPERATOR (SRO)
IN'THE WORK CONTROL CENTER (WCC)
OR THE CONTROL ROOM.
U ]NO IF THE CONDITION IS EXPECTED TO BE INCLUDED IN THE CORRECTIVE ACTION PROGRAM, INDICATE IF YOU WOULD LIKE TO EVALUATE THE ACTIONS TO BE TAKEN FOR THE CONDITION?
[ )
YES
[X)
NO ADDITIONAL COMMENTS:
02/11/2004 10:15:20 Jerry. J.
Long (JJLONG)
Task ACTIVITY TAGD NONE Partner System Status TSCO Task REVIEW OPRV Partner System Status TSCO 02/11/2004 08;:37:23 Peter J.
Donahue (PJDONAH)
OPERATIONS REVIEW OF NOTIFICATION Is the condition an immediate nuclear or personnel safety concern?
[
]
YES -
Immediately notify Shift Manager X
X NO Is the condition reportable or-potentially reportable per 10CFR20, I0CFR26.73, 10CFR50.72, 10CFR50.73, or I1OCFR73.71 (reference Procedure 2.0.5 and NUREG 1022).?
[
I YES - Immediately notify Shift Manager
[X)
NO Does the condition affect or potentially affect any of "the SSC(s) described in Attachment 4? Also consider generic concerns and common mode
'failures, when applicable.
For :significant programmatic issues, determine if a basis for Reasonable Assurance of: Safety per Procedure 0.5.BCO is required.
X I YES -
Immediately.notify.shift Manager
[I NO.-
NOT IN SCOPE OPERABILITY*VERIFICATION
L-VU/V]t;;J' I
IuLEEILVaLupu+ UVIV W
IrdU Notification: 10295020 Does the condition call the,SSC(s) performance into question?
[ X ]
NO-Basis: Alarm cleared. Flow before and after the alarm was check and determined to be adequate. Alarm could have been the result of a pressure spike from securing a pump.
[
]
YES - Declare SSC(s) inoperable and document a basis for Reasonable Assurance of Safety if TRM oriODAM LCO 3.0.3 is entered
]
YES - Document a reasonable *expectation of OPERABILITY on the Notification AND Perform INFORMATION GATHERING Does the condition call the SSC(s) qualification into question?
[ X J NO - Basis: See performance answer.
[
I YES - Declare SSC(s) inoperable and document a basis for Reasonable Assurance of Safety if TRM or ODAM LCO 3.0.3 is entered
[
]
YES - Document a reasonable expectation of OPERABILITY on the Notification AND Perform INFORMATION GATHERING Does the condition describe.an existing but previously unanalyzed condition or accident?
[X)
NO
[
]
YEs -
Declare SSC(s)inoperable and document a basis for Reasonable Assurance of Safety if TRM or.ODAM LCO 3.0.3 is entered YES Document a reasonable expectation of OPERABILITY on the Notification AND Perform INFORMATION GATHERING Task REVIEW WCCR CONCUR WITH OPS REVIEW
'Partner Systein Status, TSCO Task REVIEW CAP WI -
EQUIP TREND Partner System Status TSCO 02/11/2004 09:04:13 Ronnie Deatz (RCDEATZ)
WI -
EQUIP TREND Task REVIEW SCRN TREND Partner System ýStatus TSCO Task REVIEW LIC NOT REPORTABLE Partner Syste*n Status TsCO 02/17/2004 13.:43:11 Coy L. Blair (CLBLAIR)
.r
- U *E1 6t~fl4*
ISIflA~
=
rifl~.
n in,.
U -... US a
ran...
'J0.I4=I M
".*L1I=
IJI l
I IMUIMII Notification: 10295020
- V*Vll
- W
- l, 7
-U-Partner System Status Task Partner System Status Item detail Text Object parz Damage Cause of damage Cause text
.REVIEW MRUL EXPORTCIC=SW-FIS-361D TSCO TSSC ACTIVITY.TAGR NONE TSCO 0001 MO00 DISC METH N/A SW, PUMP Assembly Error class End of report