ML24029A17430 January 2024Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion
ML23317A07114 November 2023NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides)
ML23255A10411 August 2023Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout
ML23055A2712 March 2023March 2, 2023, Preapplication Meeting to Discuss Planned Amendments to Adopt TSTF-505 and 10 CFR 50.69 (EPID L-2023-LRM-0007) - SlidesSafe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Probabilistic Risk Assessment
FLEX
Large early release frequency
ML21314A44710 November 2021Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection IntervalMoisture barrier
ML21194A18213 July 2021and Quad Cities Nuclear Generating Stations 2020 Annual Assessment Meeting SlidesCoronavirus
ML20261G73216 September 2020Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55aIncorporated by reference
Exemption Request
ML20238B85725 August 2020Quad 2019 Hq Online EOC SlidesCoronavirus
ML20178A42030 June 2020NEI Slides for June 30, 2020, Public Meeting on COVID-19 ResponseExemption Request
Pandemic
Coronavirus
ML20170B02123 June 2020NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) InspectionsBoric Acid
Weld Overlay
Nondestructive Examination
Pandemic
Coronavirus
COVID-19
Pressure Boundary Leakage
ML20169A55916 June 2020Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1)Pandemic
Coronavirus
ML20163A65516 June 20206-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator InspectionsPandemic
Coronavirus
ML19318F95120 November 2019Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit FrequencyGrace period
ML19161A2574 June 2019BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019Incorporated by reference
ML19151A66031 May 2019BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019Incorporated by reference
ML19022A20023 January 2019Request for Use of ASME Code Case N-879 for Exelon Nuclear Power PlantsLoop seal
ML18347B31419 December 2018Bwrvip/Asme Relief Request Discussion December 19, 2018
ML18334A21630 November 2018Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018GOTHIC
ML18319A12719 November 2018Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation AreasHigh Radiation Area
Deep Dose Equivalent
ML18054B35927 February 2018Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli
ML17142A23825 May 2017OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner BurnsProbabilistic Risk Assessment
Operator Manual Action
FLEX
Significance Determination Process
ML16314E48114 November 2016Part 37 Applicability to Reactor Vessels and Associated Structures, Systems, and Components While in Safstor Awaiting Active Decommissioning Activities - November 14, 2016
ML16189A43312 July 2016July 12, 2016, Public Meeting with NRC - Exelon Decommissioning Licensing Action Submittal PlanOffsite Dose Calculation Manual
FLEX
Exemption Request
ML16077A15622 March 2016Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards
ML16075A32916 March 2016OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for OperationsAnticipated operational occurrence
Enforcement Discretion
Probabilistic Risk Assessment
Significance Determination Process
Open Phase Condition
Risk-Informed Steering Committee
Fuel cladding
Generic Issues Program
Backfit
RS-14-238, Transmittal of Proprietary Meeting Slides25 August 2014Transmittal of Proprietary Meeting Slides
ML14167A41217 June 2014NRC Slides for Quad Cities 2013 EOC Public MeetingOpen House
ML14232A78519 May 2014Fuel Transition License Amendment Request Pre-Submittal Update Meeting
ML12164A59612 June 2012Annual Assessment Meeting SlidesFukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Earthquake
Hardened vent
ML12087014027 March 2012Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR
ML1203301249 February 2012Handout for Public Meeting on February 9, 2012 (Slides)
ML1109602875 April 2011Quad Cities Nuclear Power Station 2010 End-of-Cycle Assessment Presentation (Short)
ML10168008215 June 2010Annual Assessment Meeting, Reactor Oversight Program - 2009, Slides
ML09198036320 August 2009Summary of Licensing Counterparts Meeting with Exelon Generation Company, to Discuss Licensing Practices and ProcessesCyber Security
ML0911802147 April 2009NRC End-of-Cycle Meeting Slides
ML0911802257 April 2009NRC - Quad Cities Annual Assessment Meeting Slides
ML0812007842 June 2008Meeting Slides, Nrc/Exelon Licensing Counterparts Meeting.
ML08144050622 May 2008EOC Summary Meeting Slides
ML07117047418 April 2007EOC Meeting Slides
ML07082001222 March 2007Extended Power Uprate (EPU) Meeting, Handouts from March 22, 2007, Meeting
ML07051013916 February 20072007 Emergency Preparedness and Incident Response Public Meeting: Status of the EP Threat Based Project, 2/16/07B.5.b Mitigating Strategies
ML05193031530 June 2005June 30, 2005, Closed Meeting Handouts
ML05137017712 May 2005Attachment 3 - Licensee Presentation (Ginna, Perry, Peach Bottom, LaSalle, and Quad Cities) - Public Meeting Summary on FAQ Appeal Meeting May 12, 2005
ML0512903264 May 2005Presentation Slides for Meeting Quad Cities Steam Dryer ReplacementFinite Element Analysis
Flow Induced Vibration
ML05108003911 April 200504/11-13/2005 Meeting Presentation for Steam Dryer Design Technical MeetingFinite Element Analysis
ML04300028719 October 2004Presentation from 10/19/2004 Meeting with Exelon Nuclear, Quad Cities Unit 1 Steam Dryer Instrumentation and Refined Acoustic Model
ML04273026023 September 2004Meeting Presentation, Extended Power Uprate (EPU) Vibration Assessment and Vulnerability ReviewReactor Vessel Water Level
Non-Destructive Examination
ML04121028027 April 2004Public Meeting Slides, Quad Cities 2003 End-of-Cycle Assessment
ML04098052411 March 2004March 11, 2004 - RIC 2004 Presentation - T11 - Christopher Crane - Emergent Technical TopicsFlow Induced Vibration
ML04098053311 March 2004RIC 2004 Presentation - T11 - Alexander Marion - Emergent Technical TopicsBoric Acid
Through Wall Leak