Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23318A178 | 13 November 2023 | FAQ 23-03- Turkey Point IE01 | Power change |
05000251/LER-2017-001 | 7 November 2017 | Manual Reactor Trip Due to Lowering Steam Generator Level Caused by Loss of Flow Regulating Valve Positioner Control LER 17-001-00 for Turkey Point, Unit 4, Regarding Manual Reactor Trip Due to Lowering Steam Generator Level Caused by Loss of Flow Regulating Valve Positioner Control | High winds |
05000250/LER-2017-001 | 16 May 2017 | Loss of 3A 4kV Vital Bus Results in Reactor Trip, Safety System Actuations and Loss of Safety Injection Function LER 17-001-00 for Turkey Point, Unit 3, Regarding Loss of 3A 4kV Vital Bus Results in Reactor Trip, Safety System Actuations, and Loss of Safety Injection Function | Arc flash Foreign Material Exclusion |
L-2017-090, LER Special Report Regarding Accident Monitoring Instrumentation | 11 May 2017 | LER Special Report Regarding Accident Monitoring Instrumentation | Grab sample |
05000250/LER-2016-001 | 7 April 2016 | Loose Breaker Control Power Fuse Caused 3B Emergency Containment Cooler to be Inoperable Longer Than Allowed LER 16-001-00 for Turkey Point, Unit 3 Regarding Loose Breaker Control Power Fuse Caused the 3B Emergency Containment Cooler to be Inoperable Longer Than Allowed | Mission time |
05000250/LER-2015-001 | 19 January 2016 | Diesel Generator Start Resulting From Switchyard Protective Relay Actuation LER 15-001-00 for Turkey Point, Unit 3 Regarding Diesel Generator Start Resulting from Switchyard Protective Relay Actuation | |
L-2015-217, Turkey, Unit 3 - Special Report Regarding Accident Monitoring Instrumentation | 27 August 2015 | Turkey, Unit 3 - Special Report Regarding Accident Monitoring Instrumentation | |
L-2014-139, Special Report Regarding Accident Monitoring Instrumentation | 14 May 2014 | Special Report Regarding Accident Monitoring Instrumentation | Grab sample |
L-2009-293, Special Report - Accident Monitoring Instrumentation | 15 December 2009 | Special Report - Accident Monitoring Instrumentation | |
L-2009-155, LER 09-02-00 for Turkey Point, Unit 3 MSIV Drain Line Leak Causes Technical Specification Required Shutdown; Failure to Perform PMT Causes Inoperable MSIV | 2 July 2009 | LER 09-02-00 for Turkey Point, Unit 3 MSIV Drain Line Leak Causes Technical Specification Required Shutdown; Failure to Perform PMT Causes Inoperable MSIV | Safe Shutdown Time of Discovery Nondestructive Examination Significance Determination Process |
ML090640445 | 6 October 2008 | Enclosure 11 - Case Study 7: Turkey Point NCV on TS 3/4.4.10, Structural Integrity (Applicability of Sr'S 'And Actions) - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf | Boric Acid Liquid penetrant Pressure Boundary Leakage Through-Wall Leak |
ML18227D394 | 25 August 1978 | 08/25/1978 Letter Attached Report of Abnormal Indications from Metal Impact Monitoring System, Which Occurred During Unit Cooldown for Refueling | |
ML18228A481 | 4 April 1978 | 04/04/1978 Letter Response to Request for Additional Information on System Disturbance of May 16, 1977 | |
L-78-104, Transmitting Evaluation Report of Abnormal Indications from Metal Impact Monitoring System, Turkey Point Unit No. 4. | 23 March 1978 | Transmitting Evaluation Report of Abnormal Indications from Metal Impact Monitoring System, Turkey Point Unit No. 4. | |
ML18227D451 | 30 September 1977 | 09/30/1977 Letter Report of Abnormal Indications from Metal Impact Monitoring System | |
ML18227A510 | 6 September 1977 | LER 1977-251-07 for Turkey Point, Unit 4 - Pressurizer Heatup Rate | |
L-77-191, 06/23/1977 Letter Request to Amend Appendix a of Facility Operating Licenses. Proposal Submitted to Satisfy Commitment Made in Reportable Occurrence Report 250-77-5 of 05/02/1977 | 23 June 1977 | 06/23/1977 Letter Request to Amend Appendix a of Facility Operating Licenses. Proposal Submitted to Satisfy Commitment Made in Reportable Occurrence Report 250-77-5 of 05/02/1977 | |
ML18227B248 | 23 June 1977 | 06/23/1977 Letter Proposed Amendment to Appendix a of Facility Operating Licenses, Concerning Analysis Performed by Applicant'S NSSS Vendor Results Related to Reactor Core Thermal Power Output | |
ML18227B249 | 23 June 1977 | 06/23/1977 Letter Proposed Amendment to Appendix a of Facility Operating Licenses, Concerning Analysis Performed by Applicant'S NSSS Vendor Results Related to Reactor Core Thermal Power Output | |
ML18227A424 | 2 May 1977 | Submit Licensee Event Report of Turkey Point Unit 4, in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification, Occurrence on 4/18/1977 for Nominal Power | |
ML18227A425 | 7 February 1977 | Submit Licensee Event Report of Turkey Point Unit 4, in Accordance with Technical Specification 6.9.2 to Provide 30-day Notification, Occurrence on 1/8/1977 for Bfd Relays | |
ML18227D287 | 14 January 1977 | Submit Personal Radiation Exposure Report in Accordance with the Requirements of 10 CFR 20.405 | |
ML18227D288 | 14 January 1977 | Submit Personal Radiation Exposure Report in Accordance with the Requirements of 10 CFR 20.405 | |
ML18227A428 | 20 October 1976 | Submit Licensee Event Report of Turkey Point Unit 3, in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification, Occurrence on 10/6/1976 for Boron Injection Tank | |
ML18227A426 | 6 October 1976 | Referring Licensee Event Report Submitted on 8/25/1976 with Occurrence Date of 7/26/1976. in the Report, Reportable Occurrence Report No 250-72-2 Should Be Changed to 250-76-2. Attached Corrected Report | |
ML18227A427 | 25 August 1976 | Submit Licensee Event Report of Turkey Point Unit 4, in Accordance with Technical Specification 6.9.2 to Provide 30-day Notification, Occurrence on 7/26/1976 for Malfunction of 4B Starting Transformer Breaker | |
ML18227A429 | 19 August 1976 | Submit Licensee Event Report of Turkey Point Unit 4, in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification, Occurrence on 8/5/1976 for ECCS Analysis | |
ML18227A431 | 25 June 1976 | Letter Transmitting Licensee Event Report, Low Boron Concentration Occurred in Unit 4 on 6/12/1976 in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification | Boric Acid |
ML18227A433 | 25 June 1976 | Letter Transmitting Licensee Event Report, Low Boron Concentration, Occurred in Unit 4 on 6/11/1976 in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification | Boric Acid |
ML18227A430 | 25 June 1976 | Letter Transmitting Licensee Event Report, Low Boron Concentration Occurred in Unit 4 on 6/12/1976 in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification | Boric Acid |
ML18227A432 | 25 June 1976 | Letter Transmitting Licensee Event Report, Low Boron Concentration Occurred in Unit 4 on 6/11/1976 in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification | Boric Acid |
ML18227A435 | 4 June 1976 | Transmitting Letter to Correct Report Sent on 5/27/1976. Line 2 of Description Words Steam Generator 4 Needs to Be Corrected to Steam Generator 4C Attached Corrected Page 1 | |
ML18227D354 | 4 June 1976 | Correction to Licensee Event Report Which Occurred on 5/17/1976 by Correcting Steam Generator 4 to Steam Generator 4C on Event Description | |
ML18227A434 | 27 May 1976 | Letter Transmitting Licensee Event Report, Steam Generator Tube Support Plate, Occurred in Unit 4 on 5/17/1976 in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification | |
ML18227A436 | 27 May 1976 | Letter Transmitting Licensee Event Report, Steam Generator Tube Support Plate, in Unit 4 Occurred on 5/17/1976 in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification | |
ML18227A438 | 26 February 1976 | Letter Transmitting Licensee Event Report, Low Level in Refueling Water Storage Tank in Unit 4 Occurred on 2/14/1976 in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification | |
ML18227A439 | 26 February 1976 | Letter Transmitting Licensee Event Report, Low Level in Refueling Water Storage Tank in Unit 4 Occurred on 2/14/1976 in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification | |
ML18227A440 | 25 February 1976 | Letter Transmitting Licensee Event Report, High Setpoint for Overtemperature Delta-T Reactor Trip Channel II in Unit 4 Occurred on 1/30/1976 in Accordance with Technical Specification 6.9.2 to Provide 30-day Notification | |
ML18227A441 | 22 December 1975 | Letter Reporting Abnormal Occurrence of Low Boron Concentration in Unit 4 Boron Injection Tank on 12/12/1975 | |
ML18227B022 | 7 July 1975 | Reporting Unusual Event No. 251-75-1 of Revised ECCS Analysis, for Value for Peak Clad Temperature Is in Error |