ML23226A005 | 26 September 2023 | Issuance of Amendment No. 287 Supplement to Spent Fuel Pool Criticality Safety Analysis | |
ML23123A279 | 2 May 2023 | License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits and Exemption Request for Use of M5 Cladding | Safe Shutdown Boric Acid Loop seal Hydrostatic Exemption Request Fuel cladding |
ML23013A224 | 13 January 2023 | Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure Temperature Limitation Figures | Stroke time Hydrostatic |
ML22362A102 | 28 December 2022 | Proposed License Amendment Request to Supplement Spent Fuel Pool Criticality Safety Analysis | Fuel cladding |
ML22146A027 | 25 May 2022 | Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant. | Shutdown Margin Packing leak Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Process Control Program Pressure Boundary Leakage |
ML22096A221 | 6 April 2022 | Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | Time of Discovery Shutdown Margin Reactor Vessel Water Level Incorporated by reference Surveillance Frequency Control Program Offsite Circuit |
ML21294A338 | 21 October 2021 | Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . | Fuel cladding |
ML21053A342 | 22 February 2021 | Proposed License Amendment Request to Clarify Shutdown Bank Technical Specification Requirements and Add Alternative Control Rod Position Monitoring Requirements | Shutdown Margin Anticipated operational occurrence Surveillance Frequency Control Program |
ML20343A243 | 8 December 2020 | Proposed License Amendment Request Revise Reactor Core Safety Limit to Reflect WCAP-17642-P-A, Revision 1 | Anticipated operational occurrence Fuel cladding |
ML20343A259 | 8 December 2020 | Supplement to Proposed License Amendment Request to Revise the Millstone Unit 2 Technical Specifications for Steam Generator Frequency | Nondestructive Examination |
ML20324A703 | 19 November 2020 | Proposed License Amendment Request Measurement Uncertainty Recapture Power Uprate | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Offsite Dose Calculation Manual Anticipated operational occurrence Safe Shutdown Earthquake Weld Overlay Internal Flooding Hydrostatic Coatings Reserve Station Service Transformer Emergency Lighting Incorporated by reference FLEX Design basis earthquake Operability Determination Time Critical Operator Action Fuel cladding Through-Wall Leakage Fire Protection Program Flow Induced Vibration Coast down GOTHIC Power Uprate Stretch Power Uprate Measurement Uncertainty Recapture Affidavit |
ML20310A324 | 5 November 2020 | Proposed License Amendment Request, Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss of Coolant Accident (LBLOCA) | Shutdown Margin Coatings Fuel cladding |
ML20282A594 | 8 October 2020 | Proposed License Amendment Request to Revise the Millstone Unit 2 Technical Specifications for Steam Generator Inspection Frequency | Non-Destructive Examination Anticipated operational occurrence Nondestructive Examination Locked High Radiation Area |
ML20224A457 | 11 August 2020 | Connecticut. Inc. Millstone Power Station Unit 3, Proposed License Amendment Request for a One-Time Extension of the Millstone Unit 3 Steam Generator Inspections | Anticipated operational occurrence Pandemic Coronavirus COVID-19 |
ML20121A217 | 30 April 2020 | Proposed Technical Specifications Change Battery Surveillance Requirements | Surveillance Frequency Control Program |
ML20105A078 | 14 April 2020 | Supplement to License Amendment Request to Revise TS 3.8.1.1, A.C. Sources - Operating, to Support Maintenance and Replacement of the 'A' Reserve Station Service Transformer and 345 Kv South Bus Switchyard Components | Reserve Station Service Transformer Offsite Circuit |
ML20065K976 | 3 March 2020 | License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation | Anticipated operational occurrence Probabilistic Risk Assessment Incorporated by reference Fuel cladding |
ML20063L823 | 3 March 2020 | License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation | Anticipated operational occurrence Probabilistic Risk Assessment Incorporated by reference Fuel cladding |
ML19353A022 | 17 December 2019 | License Amendment Request to Revise TS 6.25, Pre-Stressed Concrete Containment Tendon Surveillance Program | Incorporated by reference Fuel cladding |
ML19304A294 | 22 October 2019 | Supplement to Proposed License Amendment Request to Revise TS 3.8.1.1, A.C. Sources - Operating, to Support Maintenance and Replacement of the Millstone Unit 3 'A' Reserve Station Service Transformer and 345 Kv South Bus Switchyard Componen | Safe Shutdown High winds Ultimate heat sink Mission time Anticipated operational occurrence Internal Flooding Probabilistic Risk Assessment Reserve Station Service Transformer FLEX Large early release frequency Time Critical Operator Action Offsite Circuit |
ML19217A208 | 30 July 2019 | Proposed License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals | Boric Acid High winds Mission time Internal Flooding Probabilistic Risk Assessment FLEX Large early release frequency Moisture barrier Maintenance Rule Program Turbine Missile |
ML19109A100 | 11 April 2019 | Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month. | Safe Shutdown Surveillance Frequency Control Program Recently irradiated fuel |
ML19023A427 | 17 January 2019 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Safe Shutdown High winds Loop seal Mission time Internal Flooding Probabilistic Risk Assessment Large early release frequency Fire Protection Program |
ML18128A049 | 3 May 2018 | License Amendment Request Regarding Proposed Technical Specifications Changes for Spent Fuel Storage and New Fuel Storage | Boric Acid Time of Discovery Coatings Aging Management Surveillance Frequency Control Program Spent Fuel Pool Instrumentation Through-Wall Leak Power change |
ML18100A055 | 4 April 2018 | License Amendment Request to Revise Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels | Surveillance Frequency Control Program Recently irradiated fuel |
ML17284A179 | 4 October 2017 | Proposed License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals | Safe Shutdown High winds Mission time Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Large early release frequency Moisture barrier Earthquake |
ML17171A232 | 15 June 2017 | License Amendment Request to Revise the Company Name | Safe Shutdown Cyber Security Fire Protection Program |
ML17018A000 | 7 February 2017 | Issuance of Amendment Technical Specification Surveillance Requirement 4.1.3.1.2 for Control Element Assembly 39 | Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Power change Downpower |
ML16354A424 | 14 December 2016 | License Amendment Request to Revise Technical Specification Surveillance Requirement 4.1.3.1.2 for Control Element Assembly 39 for the Remainder of Cycle 24 | Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Power change Downpower |
ML16159A259 | 6 September 2016 | Enclosure 1 Millstone Power Station, Unit No. 1 Issuance of Amendment Administrative Changes and Corrections to the Technical Specifications | Offsite Dose Calculation Manual Fire Protection Program |
ML16153A026 | 25 May 2016 | Proposed License Amendment Request Realistic Large Break Loss of Coolant Accident Analysis | Fuel cladding |
ML16153A027 | 25 May 2016 | ANP-3316(NP), Revision 0, Millstone, Unit 2, M5 Upgrade, Realistic Large Break Loca Analysis Licensing Report. | Boric Acid Fuel cladding |
ML16153A234 | 23 May 2016 | Supplement to License Amendment Request for Administrative Changes to the Permanently Defueled Technical Specifications | |
ML16034A358 | 26 January 2016 | License Amendment Request, Spent Fuel Pool Heat Load Analysis | Ultimate heat sink Probabilistic Risk Assessment Control of Heavy Loads Fuel cladding |
ML16029A168 | 25 January 2016 | License Amendment Request to Revise ECCS TS 3/4.5.2 and FSAR Chapter 14 to Remove Charging | Boric Acid Stroke time Probabilistic Risk Assessment |
ML15246A117 | 31 August 2015 | Supplement to License Amendment Request to Revise TS 6.19, Containment Leakage Testing Program | |
ML15246A118 | 31 August 2015 | License Amendment Request to Revise Technical Specification 5.6.3, Fuel Storage Capacity | |
ML15246A124 | 27 August 2015 | Connecticut, Inc. Millstone Power Station Unit 2 Supplement to License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3 | Surveillance Frequency Control Program |
ML15183A022 | 30 June 2015 | License Amendment Request for Removal of Severe Line Outage Detection from the Offsite Power System | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment Reserve Station Service Transformer Emergency Lighting Liquid penetrant Pressure Boundary Leakage Offsite Circuit Downpower |
ML15134A244 | 8 May 2015 | License Amendment Request to Adopt Dominion Core Design and Safety Analysis Methods and to Address the Issues Identified in Westinghouse Documents NSAL-09-5, Rev. 1, NSAL-15-1, and 06-IC-03 | Shutdown Margin Surveillance Frequency Control Program Fuel cladding |
ML15065A334 | 26 February 2015 | Changes to Technical Specification Bases | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Non-Destructive Examination Grab sample Stroke time Anticipated operational occurrence Hydrostatic Reserve Station Service Transformer Operating Basis Earthquake Missed surveillance Surveillance Frequency Control Program Operability Determination Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Power change Downpower Unidentified leakage |
ML15021A128 | 15 January 2015 | Proposed License Amendment Requests to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation | Loop seal Stroke time Surveillance Frequency Control Program Fuel cladding |
ML14310A187 | 31 October 2014 | License Amendment Request to Revise the Final Safety Analysis Report - Examination Requirements for ANSI B31.1.0 Piping Welds | Nondestructive Examination Dissimilar Metal Weld |
ML14301A112 | 22 October 2014 | License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3 | Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Grab sample Stroke time Internal Flooding Probabilistic Risk Assessment Incorporated by reference Surveillance Frequency Control Program Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Power change |
ML14188B189 | 30 June 2014 | License Amendment Request to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B & 6C. | Safe Shutdown Stroke time Recently irradiated fuel |
ML14133A009 | 8 May 2014 | License Amendment Request, Implementation and Engineered WCAP-15376, Reactor Trip System Instrumentation Test Times and Engineered Safety Feature Actuation System Instrumentation Test and Completion Times | High winds Anticipated operational occurrence Internal Flooding Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Earthquake Maintenance Rule Program Turbine Missile Recently irradiated fuel |
ML14093A028 | 28 March 2014 | License Amendment Request for Administrative Changes to the Permanently Defueled Technical Specifications | Offsite Dose Calculation Manual Fire Barrier Fire Protection Program |
ML14093A026 | 28 March 2014 | License Amendment Request for Administrative Changes and Corrections to the Technical Specifications | Offsite Dose Calculation Manual Process Control Program |
ML14093A027 | 28 March 2014 | License Amendment Request for Administrative Changes and Corrections to the Technical Specifications | Shutdown Margin Offsite Dose Calculation Manual Nondestructive Examination |
ML14070A346 | 6 March 2014 | Changes to Technical Specification Bases | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Non-Destructive Examination Grab sample Stroke time Anticipated operational occurrence Hydrostatic Reserve Station Service Transformer Operating Basis Earthquake Missed surveillance Operability Determination Earthquake Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Power change Downpower Unidentified leakage |