|
---|
Category:Letter
MONTHYEARML24261C0092024-09-16016 September 2024 Kairos Power LLC - Charlotte Office Address ML24155A0612024-06-0303 June 2024 Kairos Power LLC, Presentation Materials for the Kairos Power Meeting with the Nuclear Regulatory Commission on the Hermes Foundation Design ML24150A2442024-05-29029 May 2024 Kairos Power, LLC - Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes 2 Preliminary Safety Analysis Report, Chapters 2, 3, 5, 9, and 13 ML24150A2172024-05-28028 May 2024 Kairos Power, LLC - Request for Documents Related to Non-Power Security ML24136A2542024-05-15015 May 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 9 ML24109A2952024-04-16016 April 2024 Kairos Power, LLC - Slides to Support April 22, 2024, Public Meeting About Hermes Physical Security ML23268A0092023-11-0303 November 2023 Kairos Power, LLC - Approval of Kairos Power Safeguards Information Protection Plan ML23102A2392023-04-11011 April 2023 Kairos Power LLC, Presentation Materials for Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes Preliminary Safety Analysis Report Section 12.9 and Chapter 13 ML23089A3872023-03-30030 March 2023 Kairos Power LLC, Submittal of the Environmental Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1 ML23062A7342023-03-13013 March 2023 Transmittal Letter for Final Safety Evaluation of Graphite Material Qualification for the KP-FHR ML23062A7302023-03-13013 March 2023 Transmittal Letter for Final Safety Evaluation of Metallic Material Qualification for the KP-FHR ML22181B0542022-06-30030 June 2022 Kairos Power, LLC - Transmittal of Changes to Construction Permit Application - PSAR Chapter 7 ML22181B1582022-06-30030 June 2022 Kairos Power LLC, Transmittal of Changes to Construction Permit Application ML22181B1752022-06-30030 June 2022 Kairos Power, LLC - Transmittal of Changes to Construction Permit Application - PSAR Chapter 4 ML22181B1122022-06-27027 June 2022 Kairos Power, LLC - Transmittal of Changes to Construction Permit Application - PSAR Chapter 3 ML21342A2412021-12-0808 December 2021 Kairos Power LLC, Presentation Materials for the December 14, 2021 Pre-Submittal Meeting on the Atlas Fuel Fabrication Facility Application ML20188A1112020-07-13013 July 2020 Verification Letter for Kairos Power LLC PDC Topical Report ML20014E6422020-02-0606 February 2020 Kairos Power, LLC Online Reference Portal Information Access Agreement ML20029E9302020-01-29029 January 2020 Withholding Proprietary Information from Public Disclosure - Kairos Power LLC Topical Report Submittal, Scaling Methodology for the Kairos Power Testing Program (Revision 1) ML19336B2702019-12-0909 December 2019 Withholding Proprietary Information from Public Disclosure - Kairos Power, LLC Topical Report Submittal, Reactor Coolant for the Kairos Power Fluoride Salt-Cooled, High Temperature Reactor ML19310E8702019-11-0606 November 2019 Withholding Proprietary Information from Public Disclosure - Kairos Power Regulatory Engagement Plan ML19303C1592019-11-0404 November 2019 Withholding Proprietary Information from Public Disclosure -Presentation Materials for Kairos Power Pre-Application Engagement Plans ML19304C4652019-11-0404 November 2019 Withholding Proprietary Information from Public Disclosure - Presentation Slides for Kairos Nuclear Fuel Overview ML19297E4342019-10-25025 October 2019 Withholding Proprietary Information from Public Disclosure - Presentation Materials for Kairos Power Pre-Submittal Meeting on Risk-Informed Performance-Based Licensing Basis Development Topical Report ML19297G2502019-10-25025 October 2019 Withholding Proprietary Information from Public Disclosure -Presentation Slides for Kairos Power High Temperature Materials Overview ML19294A1102019-10-25025 October 2019 Withholding Proprietary Information from Public Disclosure - Presentation Materials for Kairos Power Pre-Submittal Meeting on Reactor Coolant and Scaling Methodology Topical Reports ML19294A0942019-10-25025 October 2019 Withholding Proprietary Information from Disclosure- Presentation Materials for Kairos Power Pre-submittal Meeting on Principal Design Criteria and Regulatory Gap Analysis ML19284D7672019-10-23023 October 2019 Kairos Power LLC - Acceptance of KP-FHR Risk-Informed performance-Based Licensing Basis Development Methodology Topical Report (CAC No. 000431) ML19275E2812019-10-21021 October 2019 Withholding Proprietary Information from Public Disclosure - Presentation Materials for Kairos Power Pre-Submittal Meeting on Fuel Performance and Discussion of Fuel Qualification Plan ML19267A2202019-09-30030 September 2019 Withholding Proprietary Information from Public Disclosure - Kairos Power, LLC Topical Report Submittal, Regulatory Analysis for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor ML19255H2342019-09-17017 September 2019 Confirmation of Revision to Kairos Power LLC Regulatory Analysis for the Kairos Power Fluoride Salt-Cooled, High Temperature Reactor Topical Report (CAC No. 000431) ML19221B5852019-08-0909 August 2019 Kairos Power, LLC - Acceptance of Reactor Coolant for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report (CAC No. 000431) ML19189A2972019-07-15015 July 2019 Withholding Proprietary Information from Public Disclosure - Kairos Power LLC Topical Report Submittal, Principal Design Criteria for the Kairos Power Fluoride Salt-Cooled, High Temperature Reactor ML19184A2382019-07-0808 July 2019 Confirmation of Revision to Kairos Power LLC, Principal Design Criteria for the Kairos Power Fluoride Salt-Cooled, High Temperature Reactor Topical Report (CAC No. 000431) ML19150A2752019-06-0505 June 2019 Acceptance for Review of Kairos Power LLC, Scaling Methodology for the Kairos Power Testing Program Topical Report (CAC No. 000431) ML19059A3772019-03-0606 March 2019 Acceptance for Review of Kairos Power LLC, Regulatory Analysis for the Fluoride Salt-Cooled, High Temperature Reactor Topical Report (CAC No. 000431) ML19059A3552019-03-0606 March 2019 Acceptance for Review of Kairos Power LLC, Principal Design Criteria for the Kairos Power Fluoride Salt-Cooled, High Temperature Reactor Topical Report (CAC No. 000431) 2024-09-16
[Table view] Category:Proprietary Information Review
MONTHYEARML20029E9302020-01-29029 January 2020 Withholding Proprietary Information from Public Disclosure - Kairos Power LLC Topical Report Submittal, Scaling Methodology for the Kairos Power Testing Program (Revision 1) ML19303C1592019-11-0404 November 2019 Withholding Proprietary Information from Public Disclosure -Presentation Materials for Kairos Power Pre-Application Engagement Plans ML19297G2502019-10-25025 October 2019 Withholding Proprietary Information from Public Disclosure -Presentation Slides for Kairos Power High Temperature Materials Overview ML19297E4342019-10-25025 October 2019 Withholding Proprietary Information from Public Disclosure - Presentation Materials for Kairos Power Pre-Submittal Meeting on Risk-Informed Performance-Based Licensing Basis Development Topical Report ML19294A1102019-10-25025 October 2019 Withholding Proprietary Information from Public Disclosure - Presentation Materials for Kairos Power Pre-Submittal Meeting on Reactor Coolant and Scaling Methodology Topical Reports ML19294A0942019-10-25025 October 2019 Withholding Proprietary Information from Disclosure- Presentation Materials for Kairos Power Pre-submittal Meeting on Principal Design Criteria and Regulatory Gap Analysis 2020-01-29
[Table view] |
Text
November 4, 2019 Peter Hastings Vice President, Regulatory Affairs and Quality Kairos Power LLC 707 W Tower Ave Alameda, CA 94501
SUBJECT:
WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE -PRESENTATION MATERIALS FOR KAIROS POWER PRE-APPLICATION ENGAGEMENT PLANS
Dear Mr. Hastings:
On April 2, 2019, Kairos Power, LLC (Kairos), submitted an affidavit to the U.S. Nuclear Regulatory Commission (NRC), available through the NRC Agencywide Documents Access and Management System at Accession (ADAMS) No. ML18277A331, requesting that the agency withhold the information contained in the following document from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding:
Presentation Materials for Kairos Power Pre-Application Engagement Plans The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
- a. The information sought to be withheld from public disclosure is owned and has been held in confidence by Kairos.
- b. The information is of a type customarily held in confidence by Kairos and not customarily disclosed to the public. Kairos has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitute Kairos policy and provide the rational basis required.
- c. The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR 2.390, it is to be received in confidence by the Commission.
- d. This information is not readily available in public sources.
- e. Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Kairos, because it would enhance the ability of competitors to provide similar products and services by reducing their expenditure of resources using similar project methods, equipment, testing approach, contractors, or licensing approaches. This information is the result of considerable expense to Kairos and has great value in that it will assist Kairos in providing products and services to new, expanding markets not currently served by the company.
P. Hastings 2
- f. The information could reveal or could be used to infer price information, cost information, budget levels, or commercial strategies of Kairos.
- g. Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Kairos of a competitive advantage.
- h. Unrestricted disclosure would jeopardize the position of Kairos in the world market, and thereby give a market advantage to the competition in those countries.
The NRC staff has reviewed the affidavit and the subject material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, has determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, NRC staff agrees to withhold this document in its entirety from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
While the NRC staff has agreed to broadly withhold and protect the submitted information based on its preliminary nature and use to support pre-application interactions, the NRC staff is not acknowledging that all information withheld is proprietary. The NRC staff is only acknowledging that preparation of more specific redactions within a public version of the document would be of no value to the public due to the extent of the proprietary information included. When requesting the withholding of information in future submittals, Kairos should discuss expectations for more specific redactions and preparation of public versions of submittals with the NRC staff. Kairos should also consider the requirements in 10 CFR 2.390 and guidance in LIC-204, Handling Requests to Withhold Proprietary Information from Public Disclosure (ADAMS Accession No. ML062200530) when preparing documents containing proprietary information.
Withholding the submittals from public inspection will not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, the NRC may send copies of the information to its consultants working in this area. The NRC will ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, Kairos should promptly notify the NRC. Kairos also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes Kairos information.
P. Hastings 3 In all review situations, the NRC will follow applicable laws, regulations, and policies in conducting its review, including the NRCs policies on notifying the owner of information in advance of any public disclosure.
If you have any questions about this matter, please contact me at (301) 415-8189 or via email at luissette.candelario@nrc.gov.
Sincerely,
/RA/
Luissette Candelario, Project Manager Advanced Reactor Licensing Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Project No. 99902069
P. Hastings 4
SUBJECT:
WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE
- PRESENTATION MATERIALS FOR KAIROS POWER PRE-APPLICATION ENGAGEMENT PLANS. DATED November 4, 2019 DISTRIBUTION:
Public BBeasley LCandelario SMagruder OMikula RidsNrrDanu Resource RidsNrrDanuUArl Resource RidsOgcMailCenter Resource ADAMS ACCESSION No.: ML19303C159 *via email NRR-106 OFFICE NRR/DANU NRR/DANU NRR/DANU NAME LCandelario* SMagruder BBeasley DATE 10/24/2019 11/1/2019 11/4/2019 OFFICIAL RECORD COPY