Kairos Power, LLC - Transmittal of Changes to Construction Permit Application - PSAR Chapter 7
ML22181B054
Person / Time
Site: 99902069, Hermes  File:Kairos Power icon.png
Issue date: 06/30/2022
From: Hastings P
Kairos Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML22181B053 List:
References
KP-NRC-2206-013
Download: ML22181B054 (2)


Text

KP-NRC-2206-013 Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 June 30, 2022 Docket No. 50-7513 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Kairos Power LLC Transmittal of Changes to Construction Permit Application - PSAR Chapter 7

References:

1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), September 29, 2021 (ML21272A376))
2. Audit Plan, Nuclear Regulatory Commission, Kairos Power LLC - Hermes Construction Permit Preliminary Safety Analysis Report Chapter 6, Section 6.3 Audit Plan, February 12, 2022 (ML22039A226)

In September 2021, Kairos Power submitted a Preliminary Safety Analysis Report (PSAR) (Reference 1) as part of the Construction Permit Application (CPA) for the Hermes non-power reactor. This letter transmits changes to the pages of the PSAR to address NRC feedback received on PSAR Chapter 7 in the PSAR Section 6.3 audit (Reference 2). Changes to the pages of the PSAR are provided in Enclosure 1.

Kairos Power requests NRC review of these changes as part of the continued review of the Hermes CPA.

If you have any questions or need any additional information, please contact Delaney Simmons at simmons@kairospower.com or (605) 838-5132, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on June 30, 2022 Sincerely, Peter Hastings, PE Vice President, Regulatory Affairs and Quality

Enclosure:

Changes to PSAR Chapter 7

KP-NRC-2206-013 Page 2 xc (w/enclosure):

William Kennedy, Acting Chief, NRR Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, NRR Advanced Reactor Licensing Branch