Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20260H23925 August 2020Transmittal of the Accepted Version of the Topical Report MUAP-07001, Revision 7, the Advanced Accumulator
ML20055F97624 June 2020US-APWR - Accumulator Topical Report - Final Letter
ML20069A9583 March 2020Mitsubishi Heavy Industries, Ltd - Request to Suspend Safety Review of US-APWR Design Certification Application
ML20031D3434 February 2020United States - Advanced Pressurized Water Reactor Design Certification Safety Evaluation with No Open Items for Chapters 18, Human Factors Engineering and 8 Electric Power
ML19219A22219 August 2019Letter - Memo - US-APWR Design Certification Application - Safety Evaluation with No Open Items for US-APWR Design Certification Safety Evaluation Chapter 8, Electric Power
ML19219A22318 August 2019Memo - US-APWR Design Certification Application - Safety Evaluation with No Open Items for US-APWR Design Certification Safety Evaluation Chapter 8, Electric Power
ML19176A08029 July 2019Letter - U. S. Advanced Pressurized Water Reactor Design Certification Safety Evaluation with No Open Items for Chapter 18, Human Factors Engineering
ML19154A12229 July 2019Letter - United States - Advanced Pressurized Water Reactor Advanced Topical Report Safety Evaluation for Topical Report MUAP-07001, Revision 7, the Advanced Accumulator
ML19219A14229 July 2019Mitsubishi Heavy Industries, Ltd. Submittal of Supplemental Response to US-APWR DCD RAI No. 1097-8499 (SRP 07.01)
ML19176A08117 July 2019Memo - Us - Apwr Design Certification Application - Safety Evaluation with No Open Items for Chapter 18, Human Factors
ML18331A15816 November 2018Mhl'S Response to US-APWR DCD RAI No. 1100-9574 (SRP 08.02)Fire Barrier
Open Phase Condition
ML18212A23925 July 2018Mhi'S Review Results for Topical Report Safety Evaluation for MUAP-07001-P, Revision 6, the Advanced Accumulator.
ML18131A21621 June 2018United States - Advanced Pressurized Water Reactor Advanced Topical Report Safety Evaluation for Topical Report MUAP-07001-P, Revision 6, the Advanced Accumulator - Letter
ML18178A26318 May 2018Transmittal of the Topical Report MUAP-07001, Revision 7, the Advanced Accumulator.
ML18121A13126 April 2018Mhi'S Response to Nrc'S Request for Additional Information 1099
ML18109A03713 April 2018Mitsubishi Heavy Industries, Ltd. Change in Signature Authority
ML18037A6741 February 2018Submittal of Mhi'S Response to Nrc'S Request for Additional Information 1098-9305
ML11004007128 December 2010Mhi'S Responses to US-APWR DCD RAI No. 660-5134 Revision 2 (SRP 03.07.02)Earthquake
ML11012005228 December 2010Transmittal of US-APWR DCD Chapter 15.6.5 SBLOCA Markups
ML11004012728 December 2010Mhi'S Responses to US-APWR DCD RAI No. 657-5135 Revision 2 (SRP 03.08.05)Finite Element Analysis
Earthquake
ML11004013628 December 2010Mhi'S Responses to US-APWR DCD RAI No. 659-5133 Revision 2 (SRP 03.07.01)
ML11004014328 December 2010Mhi'S Response to US-APWR DCD RAI No. 671-5126 Revision 0 (SRP Section 07.04)Safe Shutdown
ML11004014828 December 2010Mhi'S Responses to US-APWR DCD RAI No.670-4773 Revision 2 (SRP 09.04.05)Time of Discovery
ML11004015528 December 2010Mhi'S Responses to US-APWR DCD RAI No. 658-5130 Revision 2 (SRP 03.08.04)
ML11007027228 December 2010Mhi'S Outputs Related to US-APWR DCD RAI No. 636-4732
ML11010035928 December 2010Revision to Mhi'S RAI Responses on US-APWR DCD Chapter 15.6.5 SBLOCALoop seal
ML11010036128 December 2010Mhi'S Responses to US-APWR DCD RAI No. 662-5131 Revision 2 (SRP 03.08.03)Earthquake
ML11010036328 December 2010Mhi'S Responses to US-APWR DCD RAI No. 661-5129 Revision 2 (SRP 03.08.01)Safe Shutdown Earthquake
Finite Element Analysis
Earthquake
ML11012005328 December 2010Technical Report MUAP-10023, Initial Type Test Result of Class 1E Gas Turbine Generator System
ML11025077028 December 2010Transmittal of the Technical Report Summary of Seismic and Accident Load Combinations for Primary Components and Piping (MUAP-090002)Incorporated by reference
ML11026050228 December 2010Transmittal of the Technical Report Structural Design Criteria for US-APWR Access Building (MUAP-1 0024), Revision 0
ML10364020427 December 2010Mhi'S Responses to US-APWR DCD RAI No. 669-5219 Revision 2 (SRP 19.0)Safe Shutdown
Probabilistic Risk Assessment
ML10364020327 December 2010Mhi'S Responses to US-APWR DCD RAI No. 668-5180 Revision 2 (SRP 19.0)Probabilistic Risk Assessment
ML10362063522 December 2010Mhi'S Revised Response to US-APWR DCD RAI No.399-2992 Revision 0 (SRP 16 TS Section 3.4)Anticipated operational occurrence
Surveillance Frequency Control Program
ML10362063422 December 2010Mhi'S Response to US-APWR DCD RAI No.673-5085 Revision 3 (SRP 14.03.12)Emergency Lighting
ML10362062822 December 2010Mhi'S Response to US-APWR DCD RAI No. 665-5220 Revision 0 (SRP 07-14)
ML10342042422 December 2010US-APWR Spm Letter