|
---|
Category:Letter
MONTHYEARML20260H2392020-08-25025 August 2020 Transmittal of the Accepted Version of the Topical Report MUAP-07001, Revision 7, the Advanced Accumulator ML20055F9762020-06-24024 June 2020 US-APWR - Accumulator Topical Report - Final Letter ML20069A9582020-03-0303 March 2020 Mitsubishi Heavy Industries, Ltd - Request to Suspend Safety Review of US-APWR Design Certification Application ML20031D3432020-02-0404 February 2020 United States - Advanced Pressurized Water Reactor Design Certification Safety Evaluation with No Open Items for Chapters 18, Human Factors Engineering and 8 Electric Power ML19219A2222019-08-19019 August 2019 Letter - Memo - US-APWR Design Certification Application - Safety Evaluation with No Open Items for US-APWR Design Certification Safety Evaluation Chapter 8, Electric Power ML19219A2232019-08-18018 August 2019 Memo - US-APWR Design Certification Application - Safety Evaluation with No Open Items for US-APWR Design Certification Safety Evaluation Chapter 8, Electric Power ML19176A0802019-07-29029 July 2019 Letter - U. S. Advanced Pressurized Water Reactor Design Certification Safety Evaluation with No Open Items for Chapter 18, Human Factors Engineering ML19154A1222019-07-29029 July 2019 Letter - United States - Advanced Pressurized Water Reactor Advanced Topical Report Safety Evaluation for Topical Report MUAP-07001, Revision 7, the Advanced Accumulator ML19219A1422019-07-29029 July 2019 Mitsubishi Heavy Industries, Ltd. Submittal of Supplemental Response to US-APWR DCD RAI No. 1097-8499 (SRP 07.01) ML19176A0812019-07-17017 July 2019 Memo - Us - Apwr Design Certification Application - Safety Evaluation with No Open Items for Chapter 18, Human Factors ML18331A1582018-11-16016 November 2018 Mhl'S Response to US-APWR DCD RAI No. 1100-9574 (SRP 08.02) ML18212A2392018-07-25025 July 2018 Mhi'S Review Results for Topical Report Safety Evaluation for MUAP-07001-P, Revision 6, the Advanced Accumulator. ML18131A2162018-06-21021 June 2018 United States - Advanced Pressurized Water Reactor Advanced Topical Report Safety Evaluation for Topical Report MUAP-07001-P, Revision 6, the Advanced Accumulator - Letter ML18178A2632018-05-18018 May 2018 Transmittal of the Topical Report MUAP-07001, Revision 7, the Advanced Accumulator. ML18121A1312018-04-26026 April 2018 Mhi'S Response to Nrc'S Request for Additional Information 1099 ML18109A0372018-04-13013 April 2018 Mitsubishi Heavy Industries, Ltd. Change in Signature Authority ML18037A6742018-02-0101 February 2018 Submittal of Mhi'S Response to Nrc'S Request for Additional Information 1098-9305 ML1100400712010-12-28028 December 2010 Mhi'S Responses to US-APWR DCD RAI No. 660-5134 Revision 2 (SRP 03.07.02) ML1101200522010-12-28028 December 2010 Transmittal of US-APWR DCD Chapter 15.6.5 SBLOCA Markups ML1100401272010-12-28028 December 2010 Mhi'S Responses to US-APWR DCD RAI No. 657-5135 Revision 2 (SRP 03.08.05) ML1100401362010-12-28028 December 2010 Mhi'S Responses to US-APWR DCD RAI No. 659-5133 Revision 2 (SRP 03.07.01) ML1100401432010-12-28028 December 2010 Mhi'S Response to US-APWR DCD RAI No. 671-5126 Revision 0 (SRP Section 07.04) ML1100401482010-12-28028 December 2010 Mhi'S Responses to US-APWR DCD RAI No.670-4773 Revision 2 (SRP 09.04.05) ML1100401552010-12-28028 December 2010 Mhi'S Responses to US-APWR DCD RAI No. 658-5130 Revision 2 (SRP 03.08.04) ML1100702722010-12-28028 December 2010 Mhi'S Outputs Related to US-APWR DCD RAI No. 636-4732 ML1101003592010-12-28028 December 2010 Revision to Mhi'S RAI Responses on US-APWR DCD Chapter 15.6.5 SBLOCA ML1101003612010-12-28028 December 2010 Mhi'S Responses to US-APWR DCD RAI No. 662-5131 Revision 2 (SRP 03.08.03) ML1101003632010-12-28028 December 2010 Mhi'S Responses to US-APWR DCD RAI No. 661-5129 Revision 2 (SRP 03.08.01) ML1101200532010-12-28028 December 2010 Technical Report MUAP-10023, Initial Type Test Result of Class 1E Gas Turbine Generator System ML1102507702010-12-28028 December 2010 Transmittal of the Technical Report Summary of Seismic and Accident Load Combinations for Primary Components and Piping (MUAP-090002) ML1102605022010-12-28028 December 2010 Transmittal of the Technical Report Structural Design Criteria for US-APWR Access Building (MUAP-1 0024), Revision 0 ML1036402042010-12-27027 December 2010 Mhi'S Responses to US-APWR DCD RAI No. 669-5219 Revision 2 (SRP 19.0) ML1036402032010-12-27027 December 2010 Mhi'S Responses to US-APWR DCD RAI No. 668-5180 Revision 2 (SRP 19.0) ML1036206352010-12-22022 December 2010 Mhi'S Revised Response to US-APWR DCD RAI No.399-2992 Revision 0 (SRP 16 TS Section 3.4) ML1036206342010-12-22022 December 2010 Mhi'S Response to US-APWR DCD RAI No.673-5085 Revision 3 (SRP 14.03.12) ML1036206282010-12-22022 December 2010 Mhi'S Response to US-APWR DCD RAI No. 665-5220 Revision 0 (SRP 07-14) ML1034204242010-12-22022 December 2010 US-APWR Spm Letter 2020-08-25
[Table view] |
Text
A MITSUBISHI HEAVY INDUSTRIES, LTD.
16-5, KONAN 2-CHOME, MINATO-KU TOKYO, JAPAN December 28, 2010 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attention: Mr. Jeffrey A. Ciocco Docket No.52-021 MHI Ref: UAP-HF-10359
Subject:
Transmittal of the Technical Report "Structural Design Criteria for US-APWR Access Building" (MUAP-1 0024), Revision 0 With this letter, Mitsubishi Heavy Industries, Ltd. ("MHI") transmits to the U.S. Nuclear Regulatory Commission ("NRC") the technical report "Structural Design Criteria for US-APWR Access Building" (MUAP-10024), Revision 0.
This Report supplements the material provided in the "Design Control Document for the US-APWR" ("DCD"). This Report is being submitted electronically in compact disc (CD).
Please contact Dr. C. Keith Paulson, Senior Technical Manager, Mitsubishi Nuclear Energy Systems, Inc. if the NRC has questions concerning any aspect of this submittal. His contact information is provided below.
Sincerely, Yoshiki Ogata, General Manager-APWR Promoting Department Mitsubishi Heavy Industries, LTD.
Enclosure:
- 1. CD: "Structural Design Criteria for US-APWR Access Building" (Non-Public Version &
Public Version)
The files contained in CD are listed in Attachment 1 hereto.
CC : J. A. Ciocco C. K. Paulson
Contact Information C. Keith Paulson, Senior Technical Manager Mitsubishi Nuclear Energy Systems, Inc.
300 Oxford Drive, Suite 301 Monroeville, PA 15146 E-mail: ck-paulson@mnes-us.com Telephone: (412) 373-6466
ATTACHMENT 1 FILES CONTAINED IN CD 1 CD 1: "Structural Design Criteria for US-APWR Access Building" Contents of CD File Name Size Sensitivity Level MUAP-10024(R0)_Public.pdf 261kB SRI-Excluded MUAP-1 0024(RO)_Non-Public.pdf 674kB SRI-Included