Category:Letter
MONTHYEARML20260H2392020-08-25025 August 2020 Transmittal of the Accepted Version of the Topical Report MUAP-07001, Revision 7, the Advanced Accumulator ML20055F9762020-06-24024 June 2020 US-APWR - Accumulator Topical Report - Final Letter ML20069A9582020-03-0303 March 2020 Mitsubishi Heavy Industries, Ltd - Request to Suspend Safety Review of US-APWR Design Certification Application ML20031D3432020-02-0404 February 2020 United States - Advanced Pressurized Water Reactor Design Certification Safety Evaluation with No Open Items for Chapters 18, Human Factors Engineering and 8 Electric Power ML19219A2222019-08-19019 August 2019 Letter - Memo - US-APWR Design Certification Application - Safety Evaluation with No Open Items for US-APWR Design Certification Safety Evaluation Chapter 8, Electric Power ML19219A2232019-08-18018 August 2019 Memo - US-APWR Design Certification Application - Safety Evaluation with No Open Items for US-APWR Design Certification Safety Evaluation Chapter 8, Electric Power ML19176A0802019-07-29029 July 2019 Letter - U. S. Advanced Pressurized Water Reactor Design Certification Safety Evaluation with No Open Items for Chapter 18, Human Factors Engineering ML19154A1222019-07-29029 July 2019 Letter - United States - Advanced Pressurized Water Reactor Advanced Topical Report Safety Evaluation for Topical Report MUAP-07001, Revision 7, the Advanced Accumulator ML19219A1422019-07-29029 July 2019 Mitsubishi Heavy Industries, Ltd. Submittal of Supplemental Response to US-APWR DCD RAI No. 1097-8499 (SRP 07.01) ML19176A0812019-07-17017 July 2019 Memo - Us - Apwr Design Certification Application - Safety Evaluation with No Open Items for Chapter 18, Human Factors ML18331A1582018-11-16016 November 2018 Mhl'S Response to US-APWR DCD RAI No. 1100-9574 (SRP 08.02) ML18212A2392018-07-25025 July 2018 Mhi'S Review Results for Topical Report Safety Evaluation for MUAP-07001-P, Revision 6, the Advanced Accumulator. ML18131A2162018-06-21021 June 2018 United States - Advanced Pressurized Water Reactor Advanced Topical Report Safety Evaluation for Topical Report MUAP-07001-P, Revision 6, the Advanced Accumulator - Letter ML18178A2632018-05-18018 May 2018 Transmittal of the Topical Report MUAP-07001, Revision 7, the Advanced Accumulator. ML18121A1312018-04-26026 April 2018 Mhi'S Response to Nrc'S Request for Additional Information 1099 ML18109A0372018-04-13013 April 2018 Mitsubishi Heavy Industries, Ltd. Change in Signature Authority ML18037A6742018-02-0101 February 2018 Submittal of Mhi'S Response to Nrc'S Request for Additional Information 1098-9305 ML1100400712010-12-28028 December 2010 Mhi'S Responses to US-APWR DCD RAI No. 660-5134 Revision 2 (SRP 03.07.02) ML1101200522010-12-28028 December 2010 Transmittal of US-APWR DCD Chapter 15.6.5 SBLOCA Markups ML1100401272010-12-28028 December 2010 Mhi'S Responses to US-APWR DCD RAI No. 657-5135 Revision 2 (SRP 03.08.05) ML1100401362010-12-28028 December 2010 Mhi'S Responses to US-APWR DCD RAI No. 659-5133 Revision 2 (SRP 03.07.01) ML1100401432010-12-28028 December 2010 Mhi'S Response to US-APWR DCD RAI No. 671-5126 Revision 0 (SRP Section 07.04) ML1100401482010-12-28028 December 2010 Mhi'S Responses to US-APWR DCD RAI No.670-4773 Revision 2 (SRP 09.04.05) ML1100401552010-12-28028 December 2010 Mhi'S Responses to US-APWR DCD RAI No. 658-5130 Revision 2 (SRP 03.08.04) ML1100702722010-12-28028 December 2010 Mhi'S Outputs Related to US-APWR DCD RAI No. 636-4732 ML1101003592010-12-28028 December 2010 Revision to Mhi'S RAI Responses on US-APWR DCD Chapter 15.6.5 SBLOCA ML1101003612010-12-28028 December 2010 Mhi'S Responses to US-APWR DCD RAI No. 662-5131 Revision 2 (SRP 03.08.03) ML1101003632010-12-28028 December 2010 Mhi'S Responses to US-APWR DCD RAI No. 661-5129 Revision 2 (SRP 03.08.01) ML1101200532010-12-28028 December 2010 Technical Report MUAP-10023, Initial Type Test Result of Class 1E Gas Turbine Generator System ML1102507702010-12-28028 December 2010 Transmittal of the Technical Report Summary of Seismic and Accident Load Combinations for Primary Components and Piping (MUAP-090002) ML1102605022010-12-28028 December 2010 Transmittal of the Technical Report Structural Design Criteria for US-APWR Access Building (MUAP-1 0024), Revision 0 ML1036402042010-12-27027 December 2010 Mhi'S Responses to US-APWR DCD RAI No. 669-5219 Revision 2 (SRP 19.0) ML1036402032010-12-27027 December 2010 Mhi'S Responses to US-APWR DCD RAI No. 668-5180 Revision 2 (SRP 19.0) ML1036206352010-12-22022 December 2010 Mhi'S Revised Response to US-APWR DCD RAI No.399-2992 Revision 0 (SRP 16 TS Section 3.4) ML1036206342010-12-22022 December 2010 Mhi'S Response to US-APWR DCD RAI No.673-5085 Revision 3 (SRP 14.03.12) ML1036206282010-12-22022 December 2010 Mhi'S Response to US-APWR DCD RAI No. 665-5220 Revision 0 (SRP 07-14) ML1034204242010-12-22022 December 2010 US-APWR Spm Letter 2020-08-25
[Table view] Category:Memoranda
MONTHYEARML19219A2222019-08-19019 August 2019 Letter - Memo - US-APWR Design Certification Application - Safety Evaluation with No Open Items for US-APWR Design Certification Safety Evaluation Chapter 8, Electric Power ML19219A2232019-08-18018 August 2019 Memo - US-APWR Design Certification Application - Safety Evaluation with No Open Items for US-APWR Design Certification Safety Evaluation Chapter 8, Electric Power ML19176A0812019-07-17017 July 2019 Memo - Us - Apwr Design Certification Application - Safety Evaluation with No Open Items for Chapter 18, Human Factors ML18131A2152018-06-21021 June 2018 US-APWR Design Certification Application - Safety Evaluation with No Open Items for Topical Report MUAP-070001, Revision 6, the Advanced Accumulator, Memorandum 2019-08-19
[Table view] Category:NRO Safety Evaluation Report (SER)-Delayed
MONTHYEARML19219A2222019-08-19019 August 2019 Letter - Memo - US-APWR Design Certification Application - Safety Evaluation with No Open Items for US-APWR Design Certification Safety Evaluation Chapter 8, Electric Power ML19219A2232019-08-18018 August 2019 Memo - US-APWR Design Certification Application - Safety Evaluation with No Open Items for US-APWR Design Certification Safety Evaluation Chapter 8, Electric Power ML19176A0802019-07-29029 July 2019 Letter - U. S. Advanced Pressurized Water Reactor Design Certification Safety Evaluation with No Open Items for Chapter 18, Human Factors Engineering ML19176A0812019-07-17017 July 2019 Memo - Us - Apwr Design Certification Application - Safety Evaluation with No Open Items for Chapter 18, Human Factors 2019-08-19
[Table view] |
Text
August 18, 2019 MEMORANDUM TO: Scott Moore, Executive Director Advisory Committee on Reactor Safeguards FROM: Anna H. Bradford, Acting Director /RA/
Division of Licensing, Siting, and Environmental Analysis Office of New Reactors
SUBJECT:
US-APWR DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR US-APWR DESIGN CERTIFICATION SAFETY EVALUATION CHAPTER 8 - ELECTRIC POWER By letter dated December 31, 2007 (Agencywide Document Access and Management System (ADAMS) Accession No. ML08063A314), as supplemented by letters dated March 27, 2008 (ADAMS Accession No. ML080920634), and April 16, 2008 (ADAMS Accession No. ML081090182), Mitsubishi Heavy Industries, Ltd. (MHI) submitted an application to the U.S. Nuclear Regulatory Commission (NRC) for a standard design certification of the United States - Advanced Pressurized Water Reactor (US-APWR), pursuant to Title 10 of the Code of Federal Regulations Part 52, Licenses, Certifications, and Approvals for Nuclear Power Plants.
Based on its review, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its safety evaluation with no open items for Chapter 8, Electric Power, of the Design Certification Document. The safety evaluation is being provided to support an ACRS Subcommittee meeting scheduled for September 19, 2019. The ACRS full committee meeting will be held after the subcommittee meeting.
A review of the safety evaluation for any information exempt from public disclosure has not yet been performed. The NRC will withhold the safety evaluation from public disclosure to allow MHI the opportunity to perform a proprietary and factual content review. Therefore, the staff requests that the ACRS withhold the safety evaluation from public disclosure until it has been determined what information can be publicly released in ADAMS. The safety evaluation is available in ADAMS under Accession No. ML19155A293. The staff will inform the ACRS when MHI has finished its review for proprietary information.
Docket No.52-021 CONTACTS: George F. Wunder, NRO/DLSE 301-415-1494
ML19219A217 (Package)
ML19219A223 (Memo)
ML19155A293 (SE) NRO-002 OFFICE PM:NRO/DLSE LA:NRO/DLSE BC:NRO/DLSE AD:NRO/DLSE NAME GWunder SGreen JPaige ABradford DATE 6/26/19 8/8/19 8/15/19 8/18/2019