L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative | 24 January 2024 | 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative | |
L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs | 24 January 2024 | License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs | |
L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency | 8 December 2023 | CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency | Scaffolding |
L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 6 December 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 | 10 November 2023 | Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 | |
L-23-052, Submittal of the Updated Safety Analysis Report, Revision 23 | 27 October 2023 | Submittal of the Updated Safety Analysis Report, Revision 23 | |
L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD | 12 September 2023 | Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD | High winds Grab sample Grace period |
L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 12 September 2023 | Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | |
L-23-172, Quality Assurance Program Manual | 31 August 2023 | Quality Assurance Program Manual | Offsite Dose Calculation Manual Nondestructive Examination Temporary Modification Condition Adverse to Quality Aging Management Process Control Program License Renewal Pandemic Grace period |
L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications | 7 August 2023 | License Amendment Request to Remove the Table of Contents from the Technical Specifications | Shutdown Margin High Radiation Area Water Inventory Control Post Accident Monitoring Hydrostatic Scram Discharge Volume |
L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 7 August 2023 | Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | Cyber Security Safeguards Contingency Plan Fire Protection Program |
L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative | 19 July 2023 | 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative | |
L-23-146, License Renewal Application for the Perry Nuclear Power Plant | 3 July 2023 | License Renewal Application for the Perry Nuclear Power Plant | |
L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models | 22 June 2023 | 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models | |
L-23-051, Plan, Nineteenth Inservice Inspection Summary Report | 22 June 2023 | Plan, Nineteenth Inservice Inspection Summary Report | |
L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener | 5 June 2023 | License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener | Surveillance Frequency Control Program Offsite Circuit |
L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations | 23 May 2023 | Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations | |
L-23-065, Annual Financial Report | 22 May 2023 | Annual Financial Report | |
L-23-122, Annual Radiological Environmental Operating Report | 26 April 2023 | Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Grace period |
L-23-121, Annual Radiological Effluent Release Report | 26 April 2023 | Annual Radiological Effluent Release Report | Offsite Dose Calculation Manual Hydrostatic Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Fuel cladding |
L-23-061, Submittal of the Decommissioning Funding Status Reports | 31 March 2023 | Submittal of the Decommissioning Funding Status Reports | Decommissioning Funding Plan |
L-23-049, Core Operating Limits Report for Operating Cycle 20 | 30 March 2023 | Core Operating Limits Report for Operating Cycle 20 | |
L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments | 29 March 2023 | and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments | Tornado Missile |
L-23-066, Annual Notification of Property Insurance Coverage | 21 March 2023 | Annual Notification of Property Insurance Coverage | |
L-23-085, 1 to Emergency Plan | 10 March 2023 | 1 to Emergency Plan | Safe Shutdown Fitness for Duty Health Physics Network Offsite Dose Calculation Manual Hydrostatic Operating Basis Earthquake Emergency Lighting Severe Accident Management Guideline Earthquake Deep Dose Equivalent Fuel cladding Minimum staff Fire Protection Program |
L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee | 20 February 2023 | Energy Harbor Nuclear Corp Retrospective Premium Guarantee | |
L-23-017, Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 19 | 31 January 2023 | Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 19 | |
L-22-271, Emergency Plan | 20 December 2022 | Emergency Plan | Safe Shutdown Unanalyzed Condition Time of Discovery High winds Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Severe Accident Management Guideline Earthquake Fuel cladding Pressure Boundary Leakage Grace period Power change |
L-22-272, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023) | 16 December 2022 | Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023) | Hydrostatic Exemption Request Earthquake |
L-22-263, Spent Fuel Storage Cask Registration | 12 December 2022 | Spent Fuel Storage Cask Registration | |
L-22-254, Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22 | 18 November 2022 | Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22 | Safe Shutdown Unanalyzed Condition Time of Discovery High winds Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Severe Accident Management Guideline Earthquake Fuel cladding Pressure Boundary Leakage Grace period Power change |
L-22-250, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 19 | 8 November 2022 | Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 19 | |
L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 18 October 2022 | Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Reactor Vessel Water Level Water Inventory Control Surveillance Frequency Control Program |
L-22-201, Submittal of Evacuation Time Estimates | 12 September 2022 | Submittal of Evacuation Time Estimates | Pandemic Coronavirus |
L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual | 9 August 2022 | Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual | Offsite Dose Calculation Manual Nondestructive Examination Temporary Modification Condition Adverse to Quality Aging Management Process Control Program License Renewal Pandemic Grace period |
L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 5 August 2022 | Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Reactor Vessel Water Level Water Inventory Control Surveillance Frequency Control Program |
L-22-171, Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 | 14 July 2022 | Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 | Weld Overlay |
L-22-099, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis | 1 June 2022 | Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis | Unanalyzed Condition Shutdown Margin High Radiation Area Tornado Missile Hydrostatic |
L-22-110, Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement | 28 April 2022 | Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement | |
L-22-104, Annual Radiological Environmental Operating Report | 28 April 2022 | Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
L-22-105, Annual Radiological Effluent Release Report | 27 April 2022 | Annual Radiological Effluent Release Report | Offsite Dose Calculation Manual Hydrostatic Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Fuel cladding |
L-22-082, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations | 23 March 2022 | Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations | |
L-22-056, Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage | 22 March 2022 | Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage | |
L-22-073, Submittal of the Decommissioning Funding Status Report for Perry Nuclear Power Plant | 16 March 2022 | Submittal of the Decommissioning Funding Status Report for Perry Nuclear Power Plant | |
L-22-052, Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines | 16 March 2022 | Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines | Safe Shutdown |
L-22-023, Retrospective Premium Guarantee | 17 February 2022 | Retrospective Premium Guarantee | |
L-21-282, Proposed Inservice Inspection Alternative IR-063 | 5 January 2022 | Proposed Inservice Inspection Alternative IR-063 | Time of Discovery Weld Overlay Subsequent License Renewal Power Uprate |
L-21-280, 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements | 5 January 2022 | 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements | |
L-21-259, 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing | 28 December 2021 | 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing | Incorporated by reference |
L-21-287, Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter) | 20 December 2021 | Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter) | |