Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20100M35726 February 1996Forwards Proprietary Documentation of Algebraic for of GE Critical Power Correlation.Ge Requests Concurrence Recognizing Attachment as Legal Documentation of GEXL & GEXL-PLUS Critical Quality Correlations
ML20099F5854 August 1992Clarifies Statement Made in NRC Safety Evaluation of Rept NEDE-31758P-A, GE Marathon Control Rod Assembly, W/ Regards to Stress Limit Used by Ge.Nrc Concurrence W/ Clarification Requested by 920930
ML20235S95125 February 1989Responds to NRC Bulletin 88-010, Test Program. Recommends That Temp Test Be Permitted as Alternate to Millivolt Drop/ Pole Resistance
ML20235L15617 January 1989Forwards Endorsements 141 & 142 to Nelia Policy NF-1, Endorsements 44 & 45 to Maelu Policy MF-95 & Endorsements 5 to Nelia Policy NW-1 & Maelu Policy MW-66
ML20207S5006 March 1987Forwards Technical Evaluation Repts for Domestic Mark III Plants (Grand Gulf,Clinton,River Bend & Perry) & Gessar Ii. Inserts to Be Included in Section 6.2.1.8 of Draft Sser 2 for Clinton,River Bend & Perry Plants Also Encl
ML20207M67417 November 1986FOIA Request for GESSAR-II Chapters on Human Factors & Engineering & GESSAR-II Probabilistic Safety Study
ML20211K81717 June 1986Proposes Final Design Approval (Fda) Conditions 3-6 Be Treated as Interface Items & Removed from Amend 2 to FDA-1. Action on Condition 1 Should Be Taken by Nrc,Not GE
ML20155G09725 April 1986Forwards Nonproprietary & Proprietery Amend 21 to Gessar II,238 Nuclear Island. Amend Responds to NRC Proposed Severe Accident Policy Statement.Proprietary Amend Withheld (Ref 10CFR2.790)
ML20209H42630 October 1985Forwards marked-up Proprietary Review of BWR/6 Std Plant Pra:Vol 2:Seismic Events...Analysis in Response to 851009 Request.Technical Error Identified on Encl Pages 6/3 & 6/4. Review Withheld
ML20135B7605 September 1985Ack Receipt of 850806 Memo Re ACRS Severe Accident Review. NRR Ltr to ACRS Endorsed.Acrs Review Completion Expected by Sept or Oct 1985 Meeting
ML20133N98912 August 1985Forwards Proprietary Suppl 1 to Draft Gessar II Amend Supporting Leak-Before-Break. Submittal Based on Recommendations of NUREG-1061,Vol 3 for leak-before-break Mechanistic Methodology.Suppl Withheld (Ref 10CFR2.790)
ML20129B73925 June 1985Advises of Review of Proposed SERs for Proprietary Info,Per 850618 Request.Page 3 of Ref 3, Table 2:Conditional Consequences Predicted by GE for Internally Initiated Events... Classified as Proprietary
ML20126B89810 June 1985Forwards Info Re Resolution of Open Item Concerning Clutter on GE Emergency Response Info Sys.Ge Will Display Changes Recommended by Human Factors Consultant,Anacapa Sciences,Inc & NRC
ML20128Q6736 June 1985FOIA Request for GG Sherwood to Hl Thompson on Review of Leak-Before-Break on Gessar II Docket
ML20117K0769 May 1985Forwards Anacapa Technical Rept TR-550-1, Human Factors & Performance Evaluations of Emergency Response Info Sys. Rept Should Resolve Questions Raised by NRC Re Amount of Info Contained in Gessar Displays.W/O EnclFailure to Scram
ML20117H5247 May 1985Permits NRC to Reproduce,Furnish to Third Parties & Make Public Rept NEDC-30885, Generic Emergency Response Info Sys (Basic Rtad) Software Validation
ML20154A6792 May 1985Forwards NUREG/CR-4135 P, Review of BWR/6 Std Plant PRA: Vol-1 Internal Events,Core Damage Frequency. Task 12 of GESSAR-II Review Project Complete
ML20116M0941 May 1985Submits Supplemental Info Re Concerning Addendum 1 to NEDO-10466, Power Generation Control Complex (Pgcc) Fire Suppression Licensing Topical Rept. Establishment of Halon Concentration Requirement for Control Room Discussed
ML20116E59626 April 1985Forwards Proprietary Updated Draft Gessar II Amend Supporting Leak-Before-Break. Submittal for Carbon Steel Piping Scheduled for 850618.Rept Withheld (Ref 10CFR2.790)
ML20117J58017 April 1985Forwards NEDC-30885, Generic Emergency Response Info Sys (Basic Rtad) Software Validation, Re Program to Evaluate & Test Integrated Software,Data Bases & Command Files Associated W/Emergency Response Info Sys
ML20126C4484 April 1985Advises of Preparations to Update & Resubmit Draft Amend Supporting leak-before-break Approach to Achieve Consistency W/Vol 3 of NUREG-1061
ML20113A8504 April 1985Forwards Application Fees for Amends 10 & 11 to Gessar II Topical Rept NEDE-24011-P-A-6
ML20108F25028 February 1985Forwards Addendum 1 to NEDO-10466, Power Generation Control Complex Design Criteria & Safety Evaluation. Addl Halon Concentration & Soak Time Option for Fire Suppression Sys Documented.Fee Paid
ML20107G0478 February 1985Provides Supplemental Info Re Capability of Ultimate Plant Protection Sys.Capability of Sys to Provide Makeup to Suppression Pool Discussed
ML20106H7165 February 1985Forwards Comments on R&D Assoc Rept Re Potential Design Mods.Response to Issues Identified in Sser 3 on Seismic Events Relative to Pool Bypass Sequences Encl.Proprietary Info Withheld (Ref 10CFR2.790).W/affidavit
ML20101G33520 December 1984Submits Addl Info Re Gessar II Spds,Per NRC Request.Info Re Display Clutter & Reliability Analysis Submitted
ML20101D40610 December 1984Forwards Rev 21 to App a of Response 3.84 Re Gessar, Concerning Calculations & Assumptions for Auxiliary & Control Bldg Sliding Stability Analysis
ML20100R6903 December 1984Forwards Proprietary Containment Pressure Carrying Capability Study & Responses to Informal Questions on Design Mods.Encls Withheld (Ref 10CFR2.790)Probabilistic Risk Assessment
ML20093M5714 October 1984Informs of Necessity to Close Portions of ACRS Subcommittee on GESSAR-II Meetings to Accommodate Discussions of GE Proprietary Info
ML20095D06520 August 1984Forwards Draft Amend to Gessar II Sections 1G.12 & 1G.21,in Response to 10CFR50.34(f),Items (1)(xii) & (2)(ix) Re Evaluation of Alternate Hydrogen Control Sys (HCS) & HCS Preliminary Design,RespectivelySafe Shutdown
ML20095F04410 August 1984Requests Exemption to Revise 10CFR170 License Fee Schedule Re Gessar II Review.Exemption to Schedule Appropriate Since Review of Gessar II Design Committed Under Regulations & Policies in Existence in Early 1982Probabilistic Risk Assessment
ML20107K8956 August 1984Appeals Denial of FOIA Request for PRA for GESSAR-II,NRC Reviews of PRA & Identification of Reviewing Organizations & Contract Details.Complete Disclosure or Justification for Deletion of Minor Portions of Document RequestedProbabilistic Risk Assessment
ML20106C7756 August 1984Appeals Denial of FOIA Request for Documents Re PRA for GESSAR-II Standardized Plant DesignProbabilistic Risk Assessment
ML20093F55613 July 1984Forwards Info Re Nuclear Island/Balance of Plant Interfaces, Including Interface Assumptions in PRA & Documentation of Gessar II Design Evolution,Per DC Scaletti 840607 Memo Re Closure Activities for Severe Accident ReviewReactor Vessel Water Level
Loop seal
Fire Barrier
Tornado Missile
Post Accident Monitoring
Probabilistic Risk Assessment
Scram Discharge Volume
Earthquake
Turbine Missile
Fire Protection Program
Backfit
Power change
Flow Induced Vibration
Failure to Scram
ML20093F52913 July 1984Forwards NEDO-30670, Resolution of Applicable Unresolved Safety Issues & Generic Issues for Gessar II, Providing Technical Resolution of Issues
ML20090E13712 July 1984Forwards Gessar II External Event Risk, Providing Qualitative Assessment of Risk from Hurricanes,Tornados, External Floods,Aircraft Strike & Hazardous Matls,Per NRC 840607 Request
ML20090E25611 July 1984Forwards Containment Structural Analysis Plan to Support Conclusions Reached in App G to PRA on Containment Failure Mode & Pressure,Per 840626-27 MeetingsProbabilistic Risk Assessment
ML20094B4455 July 1984Informs of Difficulty in Obtaining Scheduling Info Re Ge/Nrc Meetings Concerning GESSAR-II.All Applicant/Nrc Meetings Should Be Announced 10 Days in Advance by Posting Notices in PDR & Including Notices in NRC Tapes
ML20092K07621 June 1984Forwards Proprietary, Evaluation of Proposed Mods to Gessar II Design, in Response to NRC 840413 Request for Addl Info Re Severe Accident Review.Affidavit Requesting Info Be Withheld (Ref 10CFR2.790) Also Encl.Rept WithheldProbabilistic Risk Assessment
ML20091J8954 June 1984Requests That NRC Schedule No Further Meetings W/Ge Re Gessar II Until Public Attendance Can Be Accommodated by Acceptable Proprietary Nondisclosure Form.Form Offered at 840524 Meeting Covered Matl Beyond Info Learned by Author
ML20091R67730 May 1984Forwards Response to Commitment in SER,NUREG-0979,Section 7.2.2.2 Re Design Verification Testing of Optical Isolators
ML20197G74630 May 1984Forwards Response to Vendor Commitment in SER (NUREG-0979), Section 7.2.2.2 Re Design Verification Testing of Optical Isolators.Individual Failure of Card or Component Can at Most,Affect Only Equipment within Same Chamber
ML20091J87414 May 1984Requests Help in Expediting Attendance at Future GE-NRC Meetings Re Gessar.Ge Nondisclosure Form Overly Restrictive & Caused Inconvenience During 840501 Meeting.Std Nondisclosure Form Should Be Devised.W/O Encl
ML20084F07820 April 1984Forwards Proprietary Responses to 840126 Request for Addl Info Re Severe Accident Review & Rationale for Treatment of Fire & Flood Event Uncertainty Analysis.Affidavit Encl. Response & Rationale Withheld (Ref 10CFR2.790)
ML20084F05120 April 1984Forwards Proprietary Responses to NRC Request for Addl Info Re Severe Accident Portion of GE Gessar II Submittal.Encl Withheld (Ref 10CFR2.790)
ML20084E89420 April 1984Responds to Co Thomas 840413 Request for Addl Info Re Severe Accident Review.Design Mods Will Be Evaluated Per NUREG/CR-3385, Measures of Risk Importance & Applications. Draft Rept Expected by Mid AprProbabilistic Risk Assessment
ML20084M44717 April 1984Requests Assistance in Obtaining Permit to Attend GE-NRC Meetings Re Accident Source Term Evaluation for Gessar PRA Considered Proprietary.Disclosure Form Would Prohibit Divulging Any Info Discussed in Meetings
ML20099J7335 April 1984Appeals Denial of FOIA Request for Info Re GESAR-II PRAProbabilistic Risk Assessment
ML20112F88929 March 1984FOIA Request for Documents Re 840209,22,28 & 0320 Meetings Between NRC & GE & Correspondence Concerning GESSAR-II
ML20105D28329 March 1984FOIA Request for Three Categories of Documents Re NRC Meetings W/Ge on 840209,22,28 & 0320 Concerning Facility