Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20100M357 | 26 February 1996 | Forwards Proprietary Documentation of Algebraic for of GE Critical Power Correlation.Ge Requests Concurrence Recognizing Attachment as Legal Documentation of GEXL & GEXL-PLUS Critical Quality Correlations | |
ML20099F585 | 4 August 1992 | Clarifies Statement Made in NRC Safety Evaluation of Rept NEDE-31758P-A, GE Marathon Control Rod Assembly, W/ Regards to Stress Limit Used by Ge.Nrc Concurrence W/ Clarification Requested by 920930 | |
ML20235S951 | 25 February 1989 | Responds to NRC Bulletin 88-010, Test Program. Recommends That Temp Test Be Permitted as Alternate to Millivolt Drop/ Pole Resistance | |
ML20235L156 | 17 January 1989 | Forwards Endorsements 141 & 142 to Nelia Policy NF-1, Endorsements 44 & 45 to Maelu Policy MF-95 & Endorsements 5 to Nelia Policy NW-1 & Maelu Policy MW-66 | |
ML20207S500 | 6 March 1987 | Forwards Technical Evaluation Repts for Domestic Mark III Plants (Grand Gulf,Clinton,River Bend & Perry) & Gessar Ii. Inserts to Be Included in Section 6.2.1.8 of Draft Sser 2 for Clinton,River Bend & Perry Plants Also Encl | |
ML20207M674 | 17 November 1986 | FOIA Request for GESSAR-II Chapters on Human Factors & Engineering & GESSAR-II Probabilistic Safety Study | |
ML20211K817 | 17 June 1986 | Proposes Final Design Approval (Fda) Conditions 3-6 Be Treated as Interface Items & Removed from Amend 2 to FDA-1. Action on Condition 1 Should Be Taken by Nrc,Not GE | |
ML20155G097 | 25 April 1986 | Forwards Nonproprietary & Proprietery Amend 21 to Gessar II,238 Nuclear Island. Amend Responds to NRC Proposed Severe Accident Policy Statement.Proprietary Amend Withheld (Ref 10CFR2.790) | |
ML20209H426 | 30 October 1985 | Forwards marked-up Proprietary Review of BWR/6 Std Plant Pra:Vol 2:Seismic Events...Analysis in Response to 851009 Request.Technical Error Identified on Encl Pages 6/3 & 6/4. Review Withheld | |
ML20135B760 | 5 September 1985 | Ack Receipt of 850806 Memo Re ACRS Severe Accident Review. NRR Ltr to ACRS Endorsed.Acrs Review Completion Expected by Sept or Oct 1985 Meeting | |
ML20133N989 | 12 August 1985 | Forwards Proprietary Suppl 1 to Draft Gessar II Amend Supporting Leak-Before-Break. Submittal Based on Recommendations of NUREG-1061,Vol 3 for leak-before-break Mechanistic Methodology.Suppl Withheld (Ref 10CFR2.790) | |
ML20129B739 | 25 June 1985 | Advises of Review of Proposed SERs for Proprietary Info,Per 850618 Request.Page 3 of Ref 3, Table 2:Conditional Consequences Predicted by GE for Internally Initiated Events... Classified as Proprietary | |
ML20126B898 | 10 June 1985 | Forwards Info Re Resolution of Open Item Concerning Clutter on GE Emergency Response Info Sys.Ge Will Display Changes Recommended by Human Factors Consultant,Anacapa Sciences,Inc & NRC | |
ML20128Q673 | 6 June 1985 | FOIA Request for GG Sherwood to Hl Thompson on Review of Leak-Before-Break on Gessar II Docket | |
ML20117K076 | 9 May 1985 | Forwards Anacapa Technical Rept TR-550-1, Human Factors & Performance Evaluations of Emergency Response Info Sys. Rept Should Resolve Questions Raised by NRC Re Amount of Info Contained in Gessar Displays.W/O Encl | Failure to Scram |
ML20117H524 | 7 May 1985 | Permits NRC to Reproduce,Furnish to Third Parties & Make Public Rept NEDC-30885, Generic Emergency Response Info Sys (Basic Rtad) Software Validation | |
ML20154A679 | 2 May 1985 | Forwards NUREG/CR-4135 P, Review of BWR/6 Std Plant PRA: Vol-1 Internal Events,Core Damage Frequency. Task 12 of GESSAR-II Review Project Complete | |
ML20116M094 | 1 May 1985 | Submits Supplemental Info Re Concerning Addendum 1 to NEDO-10466, Power Generation Control Complex (Pgcc) Fire Suppression Licensing Topical Rept. Establishment of Halon Concentration Requirement for Control Room Discussed | |
ML20116E596 | 26 April 1985 | Forwards Proprietary Updated Draft Gessar II Amend Supporting Leak-Before-Break. Submittal for Carbon Steel Piping Scheduled for 850618.Rept Withheld (Ref 10CFR2.790) | |
ML20117J580 | 17 April 1985 | Forwards NEDC-30885, Generic Emergency Response Info Sys (Basic Rtad) Software Validation, Re Program to Evaluate & Test Integrated Software,Data Bases & Command Files Associated W/Emergency Response Info Sys | |
ML20126C448 | 4 April 1985 | Advises of Preparations to Update & Resubmit Draft Amend Supporting leak-before-break Approach to Achieve Consistency W/Vol 3 of NUREG-1061 | |
ML20113A850 | 4 April 1985 | Forwards Application Fees for Amends 10 & 11 to Gessar II Topical Rept NEDE-24011-P-A-6 | |
ML20108F250 | 28 February 1985 | Forwards Addendum 1 to NEDO-10466, Power Generation Control Complex Design Criteria & Safety Evaluation. Addl Halon Concentration & Soak Time Option for Fire Suppression Sys Documented.Fee Paid | |
ML20107G047 | 8 February 1985 | Provides Supplemental Info Re Capability of Ultimate Plant Protection Sys.Capability of Sys to Provide Makeup to Suppression Pool Discussed | |
ML20106H716 | 5 February 1985 | Forwards Comments on R&D Assoc Rept Re Potential Design Mods.Response to Issues Identified in Sser 3 on Seismic Events Relative to Pool Bypass Sequences Encl.Proprietary Info Withheld (Ref 10CFR2.790).W/affidavit | |
ML20101G335 | 20 December 1984 | Submits Addl Info Re Gessar II Spds,Per NRC Request.Info Re Display Clutter & Reliability Analysis Submitted | |
ML20101D406 | 10 December 1984 | Forwards Rev 21 to App a of Response 3.84 Re Gessar, Concerning Calculations & Assumptions for Auxiliary & Control Bldg Sliding Stability Analysis | |
ML20100R690 | 3 December 1984 | Forwards Proprietary Containment Pressure Carrying Capability Study & Responses to Informal Questions on Design Mods.Encls Withheld (Ref 10CFR2.790) | Probabilistic Risk Assessment |
ML20093M571 | 4 October 1984 | Informs of Necessity to Close Portions of ACRS Subcommittee on GESSAR-II Meetings to Accommodate Discussions of GE Proprietary Info | |
ML20095D065 | 20 August 1984 | Forwards Draft Amend to Gessar II Sections 1G.12 & 1G.21,in Response to 10CFR50.34(f),Items (1)(xii) & (2)(ix) Re Evaluation of Alternate Hydrogen Control Sys (HCS) & HCS Preliminary Design,Respectively | Safe Shutdown |
ML20095F044 | 10 August 1984 | Requests Exemption to Revise 10CFR170 License Fee Schedule Re Gessar II Review.Exemption to Schedule Appropriate Since Review of Gessar II Design Committed Under Regulations & Policies in Existence in Early 1982 | Probabilistic Risk Assessment |
ML20107K895 | 6 August 1984 | Appeals Denial of FOIA Request for PRA for GESSAR-II,NRC Reviews of PRA & Identification of Reviewing Organizations & Contract Details.Complete Disclosure or Justification for Deletion of Minor Portions of Document Requested | Probabilistic Risk Assessment |
ML20106C775 | 6 August 1984 | Appeals Denial of FOIA Request for Documents Re PRA for GESSAR-II Standardized Plant Design | Probabilistic Risk Assessment |
ML20093F556 | 13 July 1984 | Forwards Info Re Nuclear Island/Balance of Plant Interfaces, Including Interface Assumptions in PRA & Documentation of Gessar II Design Evolution,Per DC Scaletti 840607 Memo Re Closure Activities for Severe Accident Review | Reactor Vessel Water Level Loop seal Fire Barrier Tornado Missile Post Accident Monitoring Probabilistic Risk Assessment Scram Discharge Volume Earthquake Turbine Missile Fire Protection Program Backfit Power change Flow Induced Vibration Failure to Scram |
ML20093F529 | 13 July 1984 | Forwards NEDO-30670, Resolution of Applicable Unresolved Safety Issues & Generic Issues for Gessar II, Providing Technical Resolution of Issues | |
ML20090E137 | 12 July 1984 | Forwards Gessar II External Event Risk, Providing Qualitative Assessment of Risk from Hurricanes,Tornados, External Floods,Aircraft Strike & Hazardous Matls,Per NRC 840607 Request | |
ML20090E256 | 11 July 1984 | Forwards Containment Structural Analysis Plan to Support Conclusions Reached in App G to PRA on Containment Failure Mode & Pressure,Per 840626-27 Meetings | Probabilistic Risk Assessment |
ML20094B445 | 5 July 1984 | Informs of Difficulty in Obtaining Scheduling Info Re Ge/Nrc Meetings Concerning GESSAR-II.All Applicant/Nrc Meetings Should Be Announced 10 Days in Advance by Posting Notices in PDR & Including Notices in NRC Tapes | |
ML20092K076 | 21 June 1984 | Forwards Proprietary, Evaluation of Proposed Mods to Gessar II Design, in Response to NRC 840413 Request for Addl Info Re Severe Accident Review.Affidavit Requesting Info Be Withheld (Ref 10CFR2.790) Also Encl.Rept Withheld | Probabilistic Risk Assessment |
ML20091J895 | 4 June 1984 | Requests That NRC Schedule No Further Meetings W/Ge Re Gessar II Until Public Attendance Can Be Accommodated by Acceptable Proprietary Nondisclosure Form.Form Offered at 840524 Meeting Covered Matl Beyond Info Learned by Author | |
ML20091R677 | 30 May 1984 | Forwards Response to Commitment in SER,NUREG-0979,Section 7.2.2.2 Re Design Verification Testing of Optical Isolators | |
ML20197G746 | 30 May 1984 | Forwards Response to Vendor Commitment in SER (NUREG-0979), Section 7.2.2.2 Re Design Verification Testing of Optical Isolators.Individual Failure of Card or Component Can at Most,Affect Only Equipment within Same Chamber | |
ML20091J874 | 14 May 1984 | Requests Help in Expediting Attendance at Future GE-NRC Meetings Re Gessar.Ge Nondisclosure Form Overly Restrictive & Caused Inconvenience During 840501 Meeting.Std Nondisclosure Form Should Be Devised.W/O Encl | |
ML20084F078 | 20 April 1984 | Forwards Proprietary Responses to 840126 Request for Addl Info Re Severe Accident Review & Rationale for Treatment of Fire & Flood Event Uncertainty Analysis.Affidavit Encl. Response & Rationale Withheld (Ref 10CFR2.790) | |
ML20084F051 | 20 April 1984 | Forwards Proprietary Responses to NRC Request for Addl Info Re Severe Accident Portion of GE Gessar II Submittal.Encl Withheld (Ref 10CFR2.790) | |
ML20084E894 | 20 April 1984 | Responds to Co Thomas 840413 Request for Addl Info Re Severe Accident Review.Design Mods Will Be Evaluated Per NUREG/CR-3385, Measures of Risk Importance & Applications. Draft Rept Expected by Mid Apr | Probabilistic Risk Assessment |
ML20084M447 | 17 April 1984 | Requests Assistance in Obtaining Permit to Attend GE-NRC Meetings Re Accident Source Term Evaluation for Gessar PRA Considered Proprietary.Disclosure Form Would Prohibit Divulging Any Info Discussed in Meetings | |
ML20099J733 | 5 April 1984 | Appeals Denial of FOIA Request for Info Re GESAR-II PRA | Probabilistic Risk Assessment |
ML20112F889 | 29 March 1984 | FOIA Request for Documents Re 840209,22,28 & 0320 Meetings Between NRC & GE & Correspondence Concerning GESSAR-II | |
ML20105D283 | 29 March 1984 | FOIA Request for Three Categories of Documents Re NRC Meetings W/Ge on 840209,22,28 & 0320 Concerning Facility |