Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217A993 | 30 September 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data | |
ML20211B597 | 31 July 1999 | Cycle 20 Voltage-Based Repair Criteria 90-Day Rept | Stress corrosion cracking |
ML20196H862 | 30 June 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept | High Radiation Area Power change |
ML20196F408 | 23 June 1999 | Revised Pages 71,72 & 298 to Rev 7 of NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units | Shutdown Margin |
ML20202J771 | 4 February 1999 | Simulator Certification Rept for Prairie Island Plant Simulation Facility,1998 Annual Rept | Boric Acid Shutdown Margin Feedwater Heater Fuel cladding Loss of condenser vacuum |
ML20202G376 | 31 January 1999 | Non-proprietary Rev 7 to NSPNAD-8102-NP, Prairie Island Nuclear Power Plant Reload SE Methods for Application to PI Units | Boric Acid Shutdown Margin Stroke time Feedwater Heater Rod Drop Event Fuel cladding Negative Flux Rate Trip |
ML20196D734 | 20 November 1998 | Third Quarter 1998 & Oct 1998 Data Rept for Prairie Island Isfsi | |
ML20198P057 | 3 September 1998 | Rev 1 to 95T047, Back-up Compressed Air Supply for Cooling Water Strainer Backwash Valve Actuator | Safe Shutdown Temporary Modification |
ML20236R648 | 15 July 1998 | Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at PINGP Unit 2 - Preliminary Summary Rept | Non-Destructive Examination Liquid penetrant |
ML20247E267 | 5 May 1998 | Rev 0 to Pingp,Units 1 & 2,Pressure & Temp Limits Rept (Effective Until 35 Efpy) | Pressure and Temperature Limits Report |
ML20216H034 | 31 March 1998 | Cycle-19 Voltage Based TSP Alternate Repair Criteria 90-Day Rept | Nondestructive Examination |
ML20217D204 | 13 March 1998 | Rev 1 to 28723-A, Intake Canal Liquefaction Analysis Rept for Pingp,Welch,Mn | Finite Element Analysis Earthquake |
ML20236P980 | 12 March 1998 | Rev 0 to 97FP02-DOC-01, Compliance Review of 10CFR50,App R, Section Iii.O RCP Lube Oil Collection Sys | Safe Shutdown Safe Shutdown Earthquake Exemption Request Fire Protection Program |
ML20216D091 | 6 March 1998 | Rev 0 to Prairie Island Generating Plant,Units 1 & 2, Pressure & Temp Limits Rept | Pressure and Temperature Limits Report |
ML20216D117 | 28 February 1998 | Non-proprietary Final,Rev 2 to Prairie Island,Units 1 & 2, COMS Setpoint Analysis | Stroke time |
ML20236Q002 | 28 February 1998 | Final Rept, Prairie Island Fire IPEEE Technical Assessment | Hot Short Safe Shutdown Fire Barrier Emergency Lighting Fire Protection Program |
ML20198N840 | 6 January 1998 | Non-proprietary Version of Prairie Island Unit 1 Cycle 19 Thimble Deletion Study | |
ML20212B794 | 20 October 1997 | Final Rept for Maximum Allowable Primary to Secondary Leak Rate Using | |
ML20141F277 | 30 June 1997 | Non-proprietary Rept NSPNAD-97002, Slb Methodology | Boric Acid Shutdown Margin |
ML20141A979 | 7 March 1997 | F Ultrasonic Exam Rept (3rd 10yr) | |
ML20141A991 | 7 March 1997 | Rev 1 to Prairie Island Unit 2 45 F Ultrasonic Exam Rept (3rd 10yr) | |
ML20135A945 | 28 February 1997 | Spent Fuel Pool Dilution Analysis | Boric Acid Safe Shutdown Earthquake Spent Fuel Pool Instrumentation |
ML20135A948 | 28 February 1997 | NSP Prairie Island Units 1 & 2 Spent Fuel Rack Criticality Analysis Using Soluble Boron Credit | |
ML20136F392 | 28 February 1997 | Response to NRC Addl Info Request | Design basis earthquake Earthquake |
ML20138G779 | 18 December 1996 | Rev 20 to Operational QA Plan | Safe Shutdown Boric Acid Offsite Dose Calculation Manual Fire Barrier Coatings Nondestructive Examination Emergency Lighting Condition Adverse to Quality Scram Discharge Volume Process Control Program Eddy Current Testing Liquid penetrant Fire Protection Program Fire Watch Scaffolding |
ML20132F295 | 12 December 1996 | Rev 0 to NSPLMI-96001, Prairie Island Nuclear Generating Plant Ipeee | |
ML20115E892 | 31 December 1995 | FERC Form 1:Annual Rept of Major Electric Utils,Licensees & Others for NSP (Minnesota) & (Wisconsin) | |
ML20094P035 | 20 November 1995 | NSP PINGP Units 1 & 2 USNRC USI A-46 Resolution Seismic Evaluation Rept | Safe Shutdown Safe Shutdown Earthquake Operating Basis Earthquake Seismically rugged Local Leak Rate Testing Earthquake Scaffolding Wrench tight |
ML20094P045 | 15 November 1995 | Rev 0 of Vol I of VI of NSP PINGP Units 1 & 2 USNRC USI A-46 Resolution Ssel & Relay Evaluation Rept | Safe Shutdown Shutdown Margin Safe Shutdown Earthquake Seismically rugged Design basis earthquake Earthquake Commercial Grade |
ML20199A025 | 31 March 1995 | Firezone R Single & Multi-Conductor High Temperature 600 Volt,14 AWG-4/0 Awg Specification | |
ML20078N953 | 26 January 1995 | Simulator Certification Rept for Prairie Island Plant Simlation Facility 1994 Annual Rept | Boric Acid Shutdown Margin Emergency Lighting Feedwater Heater Fuel cladding Overspeed trip Loss of condenser vacuum |
ML20058M841 | 18 August 1993 | Plant,Sbo/Esu Project, Design Rept, Rev 2 | Safe Shutdown Fire Barrier Tornado Missile Safe Shutdown Earthquake Tornado Generated Missile Design basis earthquake Earthquake Commercial Grade Overspeed trip |
ML20056H045 | 30 April 1993 | Transient Power Distribution Methodology | |
ML20045C184 | 28 February 1993 | Criticality Analysis of Prairie Island,Units 1 & 2 Fresh & Spent Fuel Racks. | |
ML20248L408 | 1 September 1992 | Annual Rept Review of Meteorological Data 1991 Monticello & Prairie Island Stations | Offsite Dose Calculation Manual Met Tower |
ML20092A667 | 14 January 1992 | App B Suppl to Generic Licensing Topical Rept EDR-1, Summary of Plant Specific Crane Data Supplied by Ederer Inc for NSP Co Praire Island Nuclear Generating Plant Units 1 & 2 Auxiliary Bldg Crane | |
ML20086T563 | 20 December 1991 | Rev 1 to Prairie Island Nuclear Generating Plant Station Blackout/Electrical Safeguards Upgrade Project | |
ML20092A679 | 18 December 1991 | Design Criteria for Lifting Sys for TN-40 Dry Storage Cask at Praire Island | Control of Heavy Loads |
ML20067B721 | 28 February 1991 | Revised Prairie Island Large Break LOCA Calculation Using WCAP-10924,Vol 1,Addenda 4 Model Changes | |
ML20067C930 | 1 February 1991 | Simulator Certification Rept for Prairie Island Plant Simulation Facility | Boric Acid Shutdown Margin Probabilistic Risk Assessment Emergency Lighting Fuel cladding Loss of condenser vacuum |
ML20058J888 | 15 October 1990 | Design Rept for Facility Station Blackout/Electrical Safeguards Upgrade Project | Safe Shutdown Fire Barrier Tornado Missile Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Emergency Lighting Tornado Generated Missile Design basis earthquake Earthquake Commercial Grade Turbine Missile Backfit Exit Sign Overspeed trip |
ML20011D699 | 12 December 1989 | Addendum 1 to, Sacm Diesel Generator Qualification Rept. | Anticipated operational occurrence |
ML20248D649 | 29 September 1989 | Rev 0 to Societe Alsacienne De Consts Mecaniques De Mulhouse Diesel Generator Qualification Rept | Safe Shutdown Overspeed trip |
ML20245L289 | 25 May 1989 | Used Molded Case Circuit Breakers Installed in Safety- Related Applications, Addendum 1 to Safety Evaluation 252 | Safe Shutdown |
ML20245G771 | 28 April 1989 | Untraceable Molded Case Circuit Breakers Installed in Safety-Related Application, Safety Evaluation 265 | Safe Shutdown |
ML20248J888 | 31 March 1989 | Criticality Analysis of Prairie Island Units 1 & 2 Fuel Racks | |
ML20245L263 | 11 November 1988 | Used Molded Case Circuit Breakers Installed in Safety- Related Applications, Safety Evaluation 252 | Safe Shutdown Emergency Lighting Design basis earthquake |
ML20154Q898 | 21 September 1988 | Criteria for Determining Justification for Continued Operation When Encountering Major Discrepancies in 'As-Built' Safety-Related Equipment | Earthquake |
ML20151Q220 | 31 August 1988 | Demonstration of Conformance of Prairie Island Units 1 & 2 to App K & 10CFR50.46 for Large Break Locas | |
ML20150F277 | 30 June 1988 | Rev 1 to Safety Evaluation of Increased Fq & Fdeltah |