Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217P635 | 29 September 1999 | Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML20207H762 | 28 June 1999 | Pressure Temp Limits Rept (Ptlr) | Hydrostatic Pressure and Temperature Limits Report |
ML20207H756 | 28 June 1999 | Pressure Temp Limits Rept (Ptlr) | Hydrostatic Pressure and Temperature Limits Report |
ML20204H994 | 3 March 1999 | Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations | Safe Shutdown Boric Acid High Radiation Area Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Overexposure Affidavit Depleted uranium |
ML20207H767 | 5 October 1998 | Rv Weld Chemistry & Initial Rt Ndt | |
ML20236U475 | 23 July 1998 | SG Eddy Current Insp Rept Cycle 7 Refueling Outage (B2R07) | Hydrostatic |
ML20198J564 | 7 January 1998 | Unit 2 Pressure & Temp Limits Rept | Hydrostatic Pressure and Temperature Limits Report |
ML20198J553 | 7 January 1998 | Unit 1 Pressure & Temp Limits Rept | Hydrostatic Pressure and Temperature Limits Report |
ML20198J520 | 7 January 1998 | Pressure Temp Limits Rept (Ptlr) | Hydrostatic Pressure and Temperature Limits Report |
ML20198J506 | 7 January 1998 | Pressure Temp Limits Rept (Ptlr) | Hydrostatic Pressure and Temperature Limits Report |
ML20198P659 | 31 December 1997 | .0 Volt IPC Full Cycle Operation Technical Basis Supplement to 'Braidwood Unit 1 Cycle 7 Interim Plugging Criteria Rept,Aug 1997.' | |
ML20199E880 | 3 November 1997 | Revised Byron Unit 2 Pressure Temperature Limits Rept (PTLR) | Hydrostatic Pressure and Temperature Limits Report |
ML20199E875 | 3 November 1997 | Revised Byron Unit 1 Pressure Temperature Limits Rept (Ptlr) | Hydrostatic Pressure and Temperature Limits Report |
ML20210P861 | 31 August 1997 | Cycle 7 Interim Plugging Criteria Rept | |
ML20217G617 | 22 July 1997 | Operability Assessment Process Form | |
ML20141K018 | 21 May 1997 | Pressure & Temp Limits Rept | Hydrostatic Pressure and Temperature Limits Report |
ML20141K024 | 21 May 1997 | Pressure & Temp Limits Rept | Hydrostatic Pressure and Temperature Limits Report |
ML20141K037 | 21 May 1997 | Pressure & Temp Limits Rept | Hydrostatic Pressure and Temperature Limits Report |
ML20141K043 | 21 May 1997 | Pressure & Temp Limits Rept | Hydrostatic Pressure and Temperature Limits Report |
ML20148P881 | 16 May 1997 | Spent Fuel Rack Criticality Analysis Using Soluble B Credit | Boric Acid Safe Shutdown Earthquake Earthquake |
ML20141F714 | 15 May 1997 | Operability Assessment Process Form | |
ML20141G636 | 15 May 1997 | Interim Plugging Criteria Return to Power Rept | |
ML20138H000 | 28 April 1997 | Locked Tube Tts Circumferential Indication Root Cause Determination Evaluation | |
ML20134M313 | 13 November 1996 | Revised SG Tube Rupture Analysis for Byron/Braidwood | |
ML20134N313 | 31 October 1996 | Sys Design Description for Containment Spray | Safe Shutdown Boric Acid Ultimate heat sink Safe Shutdown Earthquake Coatings Operating Basis Earthquake Earthquake |
ML20134N801 | 31 October 1996 | Spent Fuel Rack Criticality Analysis W/Credit for Soluble Boron | |
ML20129F892 | 30 September 1996 | Circumferential Indication Summary Rept | |
ML20129G388 | 31 August 1996 | Unit-1 EOC 7B Interim Plugging Criteria Rept | |
ML20116H146 | 1 August 1996 | Cycle Length Assessment Rept Addendum | Nondestructive Examination |
ML20113B095 | 30 June 1996 | Interim Plugging Criteria Return to Power Rept | |
ML20112B852 | 17 May 1996 | Cycle Length Assessment Rept Suppl | |
ML20117J049 | 8 May 1996 | At&T Round Cell Nuclear Util User'S Council Charter | |
ML20106G589 | 30 April 1996 | Training Dept Braidwood Simulator 1996 Certification Rept | |
ML20101E765 | 31 March 1996 | Unit - 1 EOC 7A Interim Plugging Criteria Rept | |
ML20100R737 | 29 February 1996 | Cycle 6 Interim Plugging Criteria 90 Day Rept | |
ML20095G069 | 31 December 1995 | Interim Plugging Criteria Return to Power Rept | |
ML20094K610 | 30 November 1995 | Interim Plugging Criteria Return to Power Rept | |
ML20093G717 | 12 October 1995 | Rev 0 to PSA-B-95-18, RELAP5M3 Comparison of Model Boiler 2 MSLB from Hzp Test | |
ML20093G882 | 11 October 1995 | Rev 0 to PSA-B-95-17, Calculation of Byron 1/Braidwood 1 D4 SG Tube Support Plate Loads w/RELAP5M3 | |
ML20092A973 | 1 September 1995 | Independent Verification of Byron/Braidwood D4 SG Tube Support Plate Differential Pressures During Mslb | |
ML20091M871 | 25 August 1995 | Rept of Independent Assessment of Calculation of TSP Forces | |
ML20084V210 | 9 June 1995 | Interim Plugging Criteria 90 Day Rept | Boric Acid |
ML20078P155 | 6 February 1995 | Probability of Detection by Bobbin Insp | |
ML20078G835 | 25 January 1995 | Probability of Detection by Bobbin Insp | |
ML20078F186 | 20 January 1995 | Refuel Outage B1R05 RHR HX Nozzles Ultrasonic Indication Summary | |
ML20078G943 | 19 January 1995 | EOC 6 Interim Plugging Criteria Rept | Nondestructive Examination |
ML20078R116 | 15 November 1994 | Non-proprieatry NFSR-0090, Response to Nuclear Regulatory Staff Request for Addl Info on VIPRE/WRB-2 DNBR Thermal Limit for Westinghouse 17x17 Ofa & Vantage 5 Fuel | B.5.b Mitigating Strategies Flow Induced Vibration |
ML20077N013 | 30 September 1994 | Rev 2 Evacuation Time Estimates within Plume Exposure Pathway Emergency Planning Zone for Braidwood Nuclear Generating Station | |
ML20149H159 | 30 June 1994 | Spent Fuel Rack Criticality Analysis Considering Boraflex Gaps & Shrinkage | Shutdown Margin |
ML20106G596 | 2 June 1993 | Simulator Malfunction Cause & Effects | Safe Shutdown Boric Acid Fire Barrier Nuclear Accident Reporting System |