Quarter | Site | Title | |
---|---|---|---|
05000461/FIN-2018050-02 | 2018Q2 | Clinton | Failure to Promptly Identifya Condition Adverse to Quality |
05000461/FIN-2018050-01 | 2018Q2 | Clinton | Failure to Follow Multiple Procedure |
05000461/FIN-2018050-03 | 2018Q2 | Clinton | Equipment Operator Rounds Points Inadequate Acceptance Criteria |
05000397/FIN-2017008-01 | 2017Q1 | Columbia | Operators Fail To Follow Reactor Scram Procedure |
05000397/FIN-2017008-02 | 2017Q1 | Columbia | Operators Fail To Follow Procedure Causes RCIC Overspeed Trip |
05000397/FIN-2017008-03 | 2017Q1 | Columbia | Inadequate Corrective Actions Causes Failure of HPCS Restricting Orifice Gasket |
05000397/FIN-2016009-02 | 2017Q1 | Columbia | Failure to Conduct Adequate Surveys of a Solid Radwaste Shipment |
05000397/FIN-2016009-01 | 2017Q1 | Columbia | Shipment of a Type B Quantity of Radioactive Material in a Type A Package |
05000397/FIN-2016009-03 | 2017Q1 | Columbia | Failure to Label or Provide Written Information for Items Stored in the Spent Fuel Pool |
05000397/FIN-2016009-04 | 2017Q1 | Columbia | Failure to Provide an Accurate Shipping Manifest |
05000397/FIN-2016009-05 | 2017Q1 | Columbia | Failure of the QA program to assure compliance with 10 CFR 61.55 and 10 CFR 61.56 |
05000397/FIN-2016009-07 | 2017Q1 | Columbia | Failure to Follow Procedure and Perform a Root Cause Evaluation to Assess the Causes of a Radwaste Shipping Event |
05000397/FIN-2016009-08 | 2017Q1 | Columbia | Failure to Transfer Byproduct Material to a Disposal Facility in Accordance with the Terms of the Facilitys License |
05000397/FIN-2016009-09 | 2017Q1 | Columbia | Failure to Minimize Void Spaces in a Radioactive Waste Package |
05000397/FIN-2016009-06 | 2017Q1 | Columbia | Failure to Update the Final Safety Analysis Report with Changes to Radioactive Waste Processing |
05000458/FIN-2015010-04 | 2016Q1 | River Bend | Failure to Accomplish an Operability Determination In Accordance With Procedures |
05000458/FIN-2015010-05 | 2016Q1 | River Bend | Failure to Identify and Correct an Adverse Condition in a Timely Manner |
05000458/FIN-2016009-01 | 2016Q1 | River Bend | Failure to Follow Procedure While Installing Jumpers for Shutdown Cooling |
05000458/FIN-2016009-04 | 2016Q1 | River Bend | Failure to Adequately Assess Risk During Motor Generator Set Unavailability |
05000440/FIN-2016008-02 | 2016Q1 | Perry | Failure to Provide Instructions to Completely Vent Reference Legs |
05000440/FIN-2016008-03 | 2016Q1 | Perry | Hardcard Development Failed to Follow Procedure Change Process |
05000440/FIN-2016008-04 | 2016Q1 | Perry | Failure to Maintain Traceability of Safety Related Fuses |
05000458/FIN-2015010-03 | 2016Q1 | River Bend | Failure to Identify and Correct Circuit Breaker Failure Mechanism |
05000458/FIN-2016009-03 | 2016Q1 | River Bend | Failure to Implement Corrective Actions to Prevent the Recurrence of a Reactor Scram Due to Grid Disturbances |
05000458/FIN-2016009-02 | 2016Q1 | River Bend | Failure to Establish Adequate Procedural Guidance |
05000440/FIN-2016008-01 | 2016Q1 | Perry | Coincidence Logic to Preclude Spurious Trips of the Offsite Power Source |
05000458/FIN-2015010-02 | 2016Q1 | River Bend | Failure to Adequately Assess Risk During Chiller Unavailability |
05000458/FIN-2015010-01 | 2016Q1 | River Bend | Technical Specification Allowed Outage Time During Loss of Non-Technical Specification Supported Systems |
05000269/FIN-2016008-01 | 2015Q4 | Oconee | Potential lack of adequacy of the licensees maintenance program to detect substantial degradation of cables and their connections used on Oconee large oil filled stationary transformers |
05000336/FIN-2015012-01 | 2015Q4 | Millstone | Failure to Implement Procedural Guidance During a Loss of RCS Inventory |
05000336/FIN-2015012-02 | 2015Q4 | Millstone | Failure of the STA to Support the Crew During a Plant Cooldown |
05000336/FIN-2015012-03 | 2015Q4 | Millstone | Procedure Failed to Direct Adequate Venting of SDC System |
05000483/FIN-2015009-01 | 2015Q4 | Callaway | Failure to Verify the Suitability of the Design of the Reverse-Engineered Replacement Controller Cards for the Auxiliary Feedwater Flow Control Valves |
05000483/FIN-2015009-02 | 2015Q4 | Callaway | Failure to Have an Adequate Procedure for Calibration of the Auxiliary Feedwater Pump Flow Control Valve Potentiometer |
05000483/FIN-2015009-03 | 2015Q4 | Callaway | Failure to Have an Adequate Post-Maintenance Test for Setting the Motor-Driven Auxiliary Feedwater Flow Control Valve Modutronics Potentiometer |
05000483/FIN-2015009-04 | 2015Q4 | Callaway | Two Examples of a Failure to Properly Designate the Significance Level of Callaway Action Requests. |
05000483/FIN-2015009-05 | 2015Q4 | Callaway | Failure to Determine the Cause and Take Corrective Action to Preclude Repetition for the Inadequate Design of Auxiliary Feedwater Flow Control Valve Modutronics Cards. |
05000483/FIN-2015009-06 | 2015Q4 | Callaway | Failure to Have an Adequate Procedure for Testing the Torque and Thrust Values for the Auxiliary Feedwater Pump Flow Control Valves |
05000483/FIN-2015009-07 | 2015Q4 | Callaway | Failure to Identify and Correct Additional Undersized Components on Auxiliary Feedwater System Flow Control Valve Modified Modutronics Controller Cards |
05000338/FIN-2015405-01 | 2015Q3 | North Anna | Security |
05000338/FIN-2015405-02 | 2015Q3 | North Anna | Security |
05000285/FIN-2015011-01 | 2015Q3 | Fort Calhoun | Failure to Ensure the Suitability of Replacement Materials during the Design Review Process |
05000285/FIN-2015011-02 | 2015Q3 | Fort Calhoun | Failure to Establish a Technical Basis for Operability of the Auxiliary Feedwater System |
05000285/FIN-2015011-03 | 2015Q3 | Fort Calhoun | Failure to Correct a Non-Conforming Condition Associated with Auxiliary Feedwater Valves |
05000458/FIN-2015009-04 | 2015Q2 | River Bend | Failure to Identify High Reactor Water Level as a Condition Adverse to Quality |
05000458/FIN-2015009-05 | 2015Q2 | River Bend | Failure of the Plant-Referenced Simulator to Demonstrate Expected Plant Response |
05000286/FIN-2015010-01 | 2015Q2 | Indian Point | Failure to Correct a Degraded Condition of Fire Protection System Solenoid Valve SOV-230-1 |
05000458/FIN-2015009-02 | 2015Q2 | River Bend | Failure to Establish Adequate Procedures to Perform Maintenance on Equipment that can Affect Safety-Related Equipment |
05000458/FIN-2015009-03 | 2015Q2 | River Bend | Failure to Provide Adequate Procedures for Post-scram Recovery |
05000458/FIN-2015009-06 | 2015Q2 | River Bend | Failure to Identify and Classify Operator Workarounds that Impacted Scram Recovery Actions |