Quarter | Site | Title | |
---|---|---|---|
05000416/FIN-2018002-02 | 2018Q2 | Grand Gulf | Failure to Follow ASME Requirements for Maintaining Inservice Inspection (ISI) Cycles and Perform ASME Required Inservice Inspections within the Scheduled ISI Cycle |
05000287/FIN-2018002-01 | 2018Q2 | Oconee | Failure to Perform ISI General Visual Examinations of Containment Moisture Barrier Associated with Containment Liner Leak Chase Test Connection Piping |
05000272/FIN-2017004-01 | 2017Q4 | Salem | Non-conformance with the Containment Thermal Insulation System was not Identified and Corrected |
05000446/FIN-2017002-02 | 2017Q2 | Comanche Peak | Inadequate Operability Evaluation for Safety - related Pipe Supports |
05000275/FIN-2017002-01 | 2017Q2 | Diablo Canyon | Inadequate Expansion Scope of Risk - Informed Welds |
05000250/FIN-2017002-01 | 2017Q2 | Turkey Point | Failure to Perform 100 Percent General Visual Examinations of Containment Moisture Barriers Associated with Containment Liner Leak Chase Test Connections |
05000373/FIN-2017001-01 | 2017Q1 | LaSalle | nadequate Controls for ASME Code VT 3 Internal Examination of Pumps and Valves |
05000456/FIN-2016004-01 | 2016Q4 | Braidwood | Inadequate Control of Welding During FW System Pipe Replacement |
05000282/FIN-2016004-01 | 2016Q4 | Prairie Island | Baffle Former Bolting Acceptance Criteria |
05000369/FIN-2016002-01 | 2016Q2 | Mcguire McGuire | Failure to Perform General Visual Examinations of Containment Moisture Barriers Associated with Containment Liner Leak Chase Test Connections |
05000461/FIN-2016002-04 | 2016Q2 | Clinton | Inadequate Ultrasonic Examination for Service Water System Pipe Repaired |
05000461/FIN-2016002-05 | 2016Q2 | Clinton | Lack of Acceptance Criteria for Containment Visual Examinations |
05000272/FIN-2016002-01 | 2016Q2 | Salem | Baffle-Former Bolts with Identified Anomalies |
05000461/FIN-2016002-06 | 2016Q2 | Clinton | Failure to Perform Surface Examination Prior to Weld Repair of a Reactor Water Cleanup System Pipe |
05000528/FIN-2016002-01 | 2016Q2 | Palo Verde | Leakage From Reactor Coolant Pump 2B Discharge Pipe Instrument Nozzle |
05000287/FIN-2016002-01 | 2016Q2 | Oconee | Failure to Perform ISI General Visual Examinations of Containment Moisture Barrier |
05000321/FIN-2016010-02 | 2016Q2 | Hatch | Failure to Identify N2E Nozzle Weld Through-Wall Flaw |
05000321/FIN-2016010-01 | 2016Q2 | Hatch | Inaccurate Information Provided Regarding N2E Nozzle Weld Overlay |
05000247/FIN-2016001-01 | 2016Q1 | Indian Point | Baffle-Former Bolts with Identified Anomalies |
05000321/FIN-2016001-01 | 2016Q1 | Hatch | Reactor Coolant System N2E Weld Flaw |
05000317/FIN-2016001-01 | 2016Q1 | Calvert Cliffs | Issue of concern Regarding Characterization and Acceptance of a Relevant Indication in Pressurizer to Nozzle Dissimilar Metal Weld |
05000325/FIN-2016001-01 | 2016Q1 | Brunswick | ASME Section IX Weld Procedure Qualification |
05000390/FIN-2015004-01 | 2015Q4 | Watts Bar | Failure to Perform ISI General Visual Examination of Containment Moisture Barrier Associated with Containment Liner Leak-chase Test Connection Threaded Pipe Plugs |
05000275/FIN-2015004-02 | 2015Q4 | Diablo Canyon | Failure to Identify a Cause and Implement Actions to Prevent Recurrence of a Significant Condition Adverse to Quality |
05000301/FIN-2015004-02 | 2015Q4 | Point Beach | Inadequate Evaluation of Non-Conforming Auxiliary Feedwater System Pipe Defects |
05000255/FIN-2015004-01 | 2015Q4 | Palisades | Inadequate Dye Penetrant Examination of Pipe Lug Welds |
05000445/FIN-2015005-01 | 2015Q4 | Comanche Peak | Incorrect Visual Resolution Requirements in Augmented Dissimilar Metal Weld Visual Examination Procedures |
05000306/FIN-2015004-01 | 2015Q4 | Prairie Island | Failure to Meet ANSI N14.6 Section 5.3.1 Requirements |
05000454/FIN-2015004-01 | 2015Q4 | Byron | Inaccurate Technical Basis for Operability Evaluation of Reactor Head Flange Damage |
05000285/FIN-2015002-02 | 2015Q2 | Fort Calhoun | Failure to Perform a Valid 40-Month Inservice Test |
05000285/FIN-2015002-03 | 2015Q2 | Fort Calhoun | Failure to Establish Adequate Work Instructions to Clean and Inspect the Reactor Vessel Head |
05000285/FIN-2015002-04 | 2015Q2 | Fort Calhoun | Failure to Incorporate Vendor Manual Recommendations for Conducting Preventative Maintenance on the Reactor Vessel Head Vent Valve |
05000285/FIN-2015002-05 | 2015Q2 | Fort Calhoun | Failure to Promptly Identify and Correct a Condition Adverse to Quality Involving a Spent Fuel Pool Cooling Vent Valve Leak |
05000285/FIN-2015002-06 | 2015Q2 | Fort Calhoun | Failure to Identify and Correct Loose Incore Instrument Nozzle Connection |
05000285/FIN-2015002-07 | 2015Q2 | Fort Calhoun | Failure to Perform Functionality Assessments for the Spent Fuel Pool Cooling System |
05000456/FIN-2015002-02 | 2015Q2 | Braidwood | Mechanic Joint Leakage Accepted for Continued Service Without Code Corrective Actions |
05000456/FIN-2015002-01 | 2015Q2 | Braidwood | Failure to Update the Final Safety Analysis Report-Thimble Tube Inspection Program |
05000263/FIN-2015002-02 | 2015Q2 | Monticello | Failure to Measure Interpass Temperature |
05000285/FIN-2015002-01 | 2015Q2 | Fort Calhoun | Failure to Include a Class 1 Component in the Reactor Vessel Pressure Boundary Integrity Test |
05000368/FIN-2015002-03 | 2015Q2 | Arkansas Nuclear | Failure to Verify Material Properties Prior to Installation |
05000354/FIN-2015002-01 | 2015Q2 | Hope Creek | Failure to Identify and Correct a Condition Adverse to Quality Associated with Safety Relief Valve Inlet Piping |
05000313/FIN-2015002-04 | 2015Q2 | Arkansas Nuclear | Failure to Perform Testing of Diesel Fuel Oil Transfer Piping |
05000280/FIN-2015002-01 | 2015Q2 | Surry | Failure to conduct a detailed visual examination of the concrete-liner interface for the Unit 1 containment |
05000373/FIN-2015001-02 | 2015Q1 | LaSalle | Failure to Measure Interpass Temperature |
05000440/FIN-2015001-02 | 2015Q1 | Perry | Liquid Penetrant Testing Procedure Was Not Qualified for Its Full Applicability Range |
05000373/FIN-2015001-01 | 2015Q1 | LaSalle | Liquid Penetrant Testing Procedure Was Not Qualified for Its Full Applicability Range |
05000482/FIN-2015001-01 | 2015Q1 | Wolf Creek | Question Related to Ultrasonic Examination of Reactor Vessel Flange Stud Hole Threads |
05000331/FIN-2014005-01 | 2014Q4 | Duane Arnold | Construction Code Used during a Replacement Activity Not Reconciled with the Owner's Requirements |
05000331/FIN-2014005-02 | 2014Q4 | Duane Arnold | Liquid Penetrant Testing Procedures Not Qualified for their Full Applicability Range |
05000454/FIN-2014005-01 | 2014Q4 | Byron | failure to Measure Interpass Temperature |