Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-22-0190, Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 28, 10 CFR 54.37 Update, Technical Requirements Manuals, Quality Assurance Program Description, Technical Specification Bases, 10 CFR 50.59 and 10 CFR .11 August 2022Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 28, 10 CFR 54.37 Update, Technical Requirements Manuals, Quality Assurance Program Description, Technical Specification Bases, 10 CFR 50.59 and 10 CFR .Incorporated by reference
Aging Management
RA-20-0244, Submittal of Updated Final Safety Analysis Report Revision 27, 10 CFR 54.37 Update, Technical Specifications Bases, Technical Requirements Manuals, Quality Assurance Program Description12 August 2020Submittal of Updated Final Safety Analysis Report Revision 27, 10 CFR 54.37 Update, Technical Specifications Bases, Technical Requirements Manuals, Quality Assurance Program DescriptionIncorporated by reference
Aging Management
ML18249A15513 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 17A, Quality Assurance, Figures
ML18249A15413 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 15A, Operational Safety Analysis, FiguresReactor Vessel Water Level
Feedwater Controller Failure
ML18249A15313 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses, Figures
ML18249A15113 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program, Figures
ML18249A15013 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Figures
ML18249A14913 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection, Figures (Redacted)
ML18249A14813 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management, Figures
ML18249A14713 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Figures
ML18249A14613 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Electric Power, Figures
ML18249A14513 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Figures
ML18249A14313 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Figures
ML18249A14213 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Figures. (Redacted)
ML18249A14013 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 4, Reactor, Figures
ML18249A13513 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Figures. (Redacted)
ML18249A13413 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Representative Excavation and Stockpiling Summary Sheets, Appendix 2E
ML18249A13313 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Representative Examples of Backfill Progress Sketches and Field and Laboratory Test Data Summary Sheet, Appendix 2D
ML18249A13113 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Pertinent Portions of BSEP Structural Fill Quality Assurance Specifications, Appendix 2C
ML18249A13013 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Additional Geophysical Information, Appendix 2B
ML18249A12913 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2A Figures
ML18249A12813 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, FiguresEarthquake
ML18249A12613 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary, Figures
ML18250A01311 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2A, Figures
BSEP 16-0069, Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Figures11 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, FiguresEmergency Lighting
ML18250A02211 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Electric Power, Figures
ML18250A02111 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Analog Channels for Engineered Safeguards Sensor Trip Inputs, Appendix 7B, Figures
ML18250A02011 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Figures
ML18250A01911 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Figures
ML18250A01811 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Figures (Redacted)
ML18250A01711 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 4, Reactor, FiguresPower Uprate
ML18250A01611 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Figures (Redacted)Operating Basis Earthquake
Incorporated by reference
Finite Element Analysis
ML18250A01411 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2B, Figures
ML18250A01211 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, FiguresEarthquake
ML18250A01111 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 1, Figures (Redacted)
ML18250A01011 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 17A, Figures
ML18250A00911 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 15A, FiguresFeedwater Controller Failure
ML18250A00811 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 15, FiguresAbnormal operational transient
Feedwater Controller Failure
Power Uprate
ML18250A00711 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 14, Figures
ML18250A00611 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Figures
ML18250A00511 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection, Figures (Redacted)
ML18250A00411 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management, Figures
ML16257A40431 May 2016ANP-3280(NP), Revision 1, Brunswick Unit 1 Cycle 19 Mellla+ Reload Safety Analysis.Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Feedwater Controller Failure
MELLLA
Exclusive Use
Affidavit
BSEP 14-0095, Updated Final Safety Analysis Report, Revision 24, and Changes to Quality Assurance Program Description14 August 2014Updated Final Safety Analysis Report, Revision 24, and Changes to Quality Assurance Program DescriptionSafe Shutdown
Incorporated by reference
Fire Protection Program
BSEP 10-0100, Updated FSAR, Revision 2219 August 2010Updated FSAR, Revision 22Incorporated by reference
BSEP 09-0066, Cycle 19 Startup Report25 June 2009Cycle 19 Startup ReportShutdown Margin
BSEP 04-0006, Application for Renewal of Operating Licenses18 October 2004Application for Renewal of Operating Licenses
BSEP 03-0062, Request for License Amendments Re Implementation of the Boiling Water Reactor Vessel and Internals Project Reactor Pressure Vessel Integrated Surveillance Program to Address the Requirements of Appendix H to 10 CFR Part 5029 May 2003Request for License Amendments Re Implementation of the Boiling Water Reactor Vessel and Internals Project Reactor Pressure Vessel Integrated Surveillance Program to Address the Requirements of Appendix H to 10 CFR Part 50Unanalyzed Condition
Anticipated operational occurrence
Weld Overlay
Hydrostatic