Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18094B329 | 14 February 1990 | Forwards Printouts Containing RW-859 Nuclear Fuel Data for Period Ending 891231 & Diskettes | |
ML19324B805 | 28 September 1989 | Forwards NPDES Wastewater Monitoring Repts for Listed Facilities | |
ML20246C674 | 11 August 1989 | Informs That DOE Will Not Extend Sales Agreement & Will Discontinue Discussions of Sale of Centrifuge Equipment | |
ML20246C694 | 11 August 1989 | Discusses Key Issues Affecting Technology Transfer of Classified Gas Centrifuge Equipment & Technology from DOE to Alchemie.Requests That DOE Give Alchemie Necessary Time to Consummate Few Remaining Matters in Appropriate Fashion | |
ML17285B453 | 28 June 1989 | Potential Significant Deficiency & Part 21 Rept Re Insufficient Actuator Force to Open Atmospheric Dump Valves. New Plug Assembly & New Piston Ring Assembly Should Be Installed.Nrc Also Informed of Problem | |
B13167, Forwards Info Re Radwastes at Plants,Including Radwaste Vol Projections for Class A,B & C & Mixed Waste for 1990-1994, Estimate of Present Radwaste Storage Capacity & Estimate for Expansion of Storage Capacity | 8 March 1989 | Forwards Info Re Radwastes at Plants,Including Radwaste Vol Projections for Class A,B & C & Mixed Waste for 1990-1994, Estimate of Present Radwaste Storage Capacity & Estimate for Expansion of Storage Capacity | |
ML18093B151 | 12 September 1988 | Lists Personnel Authorized as Representatives to Sign All State of Nj PDES-related Correspondence & Repts | NJPDES |
ML18093A640 | 12 February 1988 | Forwards Printouts of IBM-PC Diskettes Containing RW-859 Nuclear Fuel Data for Period Ending 871231 | |
ML20203J318 | 18 July 1986 | Notifies That,Per Njac 7:14A-2.4,radiation Protection/ Chemistry Managers for Plants Authorized to Sign All NJPDES- Related Correspondence & Repts | NJPDES |
ML20197H521 | 6 May 1986 | Requests That Cp&L/Power Agency Reach Agreement W/O Delay. Util Prepared to Eliminate Joint Ownership in Roxboro 4, Reduce Ownership Interest in Licenses DPR-62 & DPR-71 & Propose Sliding Scale Adjustments | |
B11887, Forwards Applications for 1986 Radwaste Transport Permits. Certificates of Liability Insurance & Fees Encl | 27 November 1985 | Forwards Applications for 1986 Radwaste Transport Permits. Certificates of Liability Insurance & Fees Encl | |
ML18092A874 | 15 October 1985 | Informs That Radiation Protection/Chemistry Managers for Facilities Duly Authorized Representatives to Sign All State of Nj Pollution Discharge Elimination Sys Related Correspondence & Repts | NJPDES |
ML20087M061 | 22 September 1983 | Forwards Preliminary Results of Natural Circulation Analyses for 811111 Transient at McGuire & 800605 Natural Circulation Low Power Test at North Anna | |
ML20080G641 | 11 July 1983 | Responds to 830708 Telcon Request.Util Prepared to Support Exercise of Radiological Emergency Response Interim Plan for Implementing Compensating Measures for Rockland County, During Wk of 830808 | |
ML20081C062 | 5 April 1983 | Forwards Analyses of Steam Generator Tube Ruptures in Arkansas Nuclear One,Unit 2, Dtd Apr 1983.Work Documented in Rept Performed as Part of Severe Accident Analysis Program at NRC Request | |
ML20023D196 | 27 October 1982 | Forwards Vols 1-4 to Independent HVAC Review,Lasalle County Nuclear Plant, Final Rept | |
ML20023D172 | 15 September 1982 | Forwards LaSalle County Station Independent HVAC Review, Interim Rept.Rept Also Sent to Jg Keppler | |
ML20023D145 | 27 August 1982 | Forwards Rev 0 to Assessment of Stitch Weld Strength in HVAC Ductwork Const,Lasalle County Station Units 1 & 2. QC Rejectable Welds Have Sufficient Strength to Meet Design Requirements of HVAC Ductwork & Need Not Be Repaired | |
ML20063H166 | 26 August 1982 | Advises That Author Is No Longer Counsel in Case.Name Should Be Removed from Svc List | |
ML18025B706 | 16 January 1982 | Requests NPDES Aquatic Monitoring Program - Plankton Entrainment Study Be Deleted from Monitoring Program.Based on Extensive Studies at Browns Ferry & Lack of Expected Effects at Sequoyah,Entrainment Should Be Inconsequential | |
ML20055A261 | 9 December 1981 | Summarizes Delivery Schedule for Prompt Notification Sys Equipment.Final Shipment Scheduled for 820129 | Siren |
ML20079R118 | 15 July 1981 | Forwards Project Schedule Change Notice 2 Which Finalizes Rev 11 Dates Under Further Study.Related Info Encl | Boric Acid |
ML19341D660 | 30 March 1981 | Confirms 810409 Appearance for Deposition in Ofcs of Baker & Botts.All Workpapers Re Testimony Should Be Brought.Related Correspondence | |
ML20003C597 | 24 February 1981 | Forwards Schedule for Health & Safety Portion of Facility Licensing Proceedings Presented on 810223.Certificate of Svc Encl | Turbine Missile |
ML19347C667 | 27 December 1980 | Expresses Concern Re Amount of Time Taken to Handle & Process Requests Re Reed Rept | |
ML19343A788 | 17 November 1980 | Advises That Applicant Has Identified NUREG-0594, Occupational Radiation Exposure at Commercial Nuclear Power Reactors 1978, as Document to Be Used in Prepared Testimony Addressing Tx Pirg Addl Contention 21 | |
ML19332B178 | 24 September 1980 | Forwards Applicant Response to First Set of Interrogatories. Provides Status of ASLB Actions Re Final Language of Emergency Planning Contention.Applicant Will File Updated Response,If Necessary,Following Review of ASLB Order | |
ML20080E691 | 20 August 1980 | Forwards Audit Trend Analysis Rept.Vendor Requested to Respond to Trends Identified within Summary & Conclusion, Indicating Corrective Actions to Prevent Reoccurrence.Dates When Corrective Actions Will Be Completed Also Requested | |
ML19318D160 | 30 June 1980 | Forwards Page 12 to Be Inserted in Applicant Response to Jf Doherty 14th Set of Interrogatories.Related Correspondence | |
ML19323H662 | 6 June 1980 | Forwards 800606 Interrogatories & Requests for Production of Documents | |
ML19323D800 | 18 April 1980 | Confirms Understanding That WE Rentfro Will Be Leading Party for Discovery,Presentation of Witnesses & cross-examination Re Consolidated Contention Pertaining to High Voltage Transmission Lines' Health Effects.Certificate of Svc Encl | |
ML19323E538 | 15 April 1980 | Advises That Jm Bishop Contention 23(c) & P Hinderstein Contention 5 Have Been Consolidated.C Hinderstein Will Conduct Discovery & Pleadings Re Consolidated Contention. Requests That Jm Bishop Be Provided W/Copies | |
ML19323J177 | 31 March 1980 | Responds to Telcon & Ltr Requesting Clarification of Applicant Responses to 13th Set of Interrogatories.Explains Use of Citations & Extent of Answers.Related Correspondence | |
ML20126C129 | 19 March 1980 | Advises That Proposed Barge off-loading Facility in Brazoria County Will Not Affect Sites on Natl Register of Historic Places,Based on Review of Archeological Evaluation | |
ML19309C155 | 7 February 1980 | Requests That Public Utils Board Provide Full & Complete Answers to Incomplete Interrogatories | |
ML19294B798 | 5 February 1980 | Notifies of Receipt of Tx Pirg Answers to Util Fourth Set of Interrogatories.Requests Identification of Individuals Providing Technical Knowledge for Specified Intervenor Contention | |
ML19296B818 | 29 January 1980 | Forwards Listing of Addl Documents for Possible Citation Re Certain Contentions & Response to Request Re Conservation Elasticities | |
ML19290C599 | 3 January 1980 | Forwards Fourth Set of Interrogatories Re Tx Pirg New Contentions Admitted at Fall 1979 Prehearing Conference | |
ML19209C211 | 2 October 1979 | Responds to Request Re Effect of Plant Const on Historical Sites.Tx Historical Commission Suggests That Project Implementation May Effect Sweeny Plantation & Other Sites. Forwards List of Profs Who Could Aid NRC | |
ML20079R096 | 7 September 1979 | Forwards Project Status Rept,Jul 1979 | |
ML19208D113 | 1 August 1979 | Expresses Opposition to Nuclear Power | |
ML19263A832 | 7 December 1978 | Forwards Documents Filed W/Aslb on 781113,including Response to Contentions & Stipulations of Intervenors.W/O Encl | |
ML20214U296 | 14 October 1977 | Requests Attention to Possibility That Util Failed to Disclose Existence of Hosgri Fault Near Diablo Canyon in San Luis Obispo,Ca to NRC for 2 Yrs.Investigation Similar to That Being Conducted Re North Anna Suggested | Safe Shutdown Safe Shutdown Earthquake Earthquake Backfit |
ML20235C415 | 24 May 1974 | Expresses Concern Re Energy Crisis Proclaimed by Ofc of President & Unreasonable Length of Time Needed to Construct & License Nuclear Power Plants |