Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20205L043 | 31 January 1999 | Technical Evaluation Rept on Second 10-Year Interval Inservice Insp Program Plan, for Beaver Valley Power Station,Unit 2 | Boric Acid Nondestructive Examination Incorporated by reference High Energy Line Break Dissimilar Metal Weld |
L-98-008, Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan:Duquesne Light Co,Beaver Valley Power Station, Unit 1 | 30 November 1998 | Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan:Duquesne Light Co,Beaver Valley Power Station, Unit 1 | Boric Acid Hydrostatic VT-2 Incorporated by reference High Energy Line Break Stress corrosion cracking Dissimilar Metal Weld |
ML20128F441 | 31 August 1995 | TER on IPE Back-End Submittal | Mission time Probabilistic Risk Assessment |
ML20129H300 | 31 August 1995 | App a, TER on IPE Front End Analysis | Shutdown Margin Mission time Internal Flooding Probabilistic Risk Assessment |
ML20128F469 | 23 August 1995 | TER on IPE Submittal Human Reliability Analysis,Final Rept | Internal Flooding |
ML20077A028 | 31 August 1994 | Technical Evaluation Rept:Evaluation of Utility Responses to Suppl 1 to NRC Bulletin 90-01:Beaver Valley-1/-2 | |
ML20105B920 | 30 June 1992 | Technical Rept MT-L1529-6, Evaluation of Failed Riverwater Pump Shaft Coupling from Beaver Valley Power Plant | |
ML20087B034 | 31 October 1991 | TER Pump & Valve Inservice Testing Program,Beaver Valley Power Station,Unit 2 | |
ML20077B093 | 31 March 1991 | TER Pump & Valve Inservice Testing Program Bvps,Unit 1 | Boric Acid Shutdown Margin Stroke time High Energy Line Break Stress corrosion cracking Cold shutdown justification Flow Induced Vibration |
ML20079A834 | 31 March 1991 | Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan,Beaver Valley Power Station Unit 1 | VT-2 Incorporated by reference Through-Wall Leak Scaffolding |
ML20072P758 | 27 August 1990 | Station Blackout Evaluation,Beaver Valley Power Station, Units 1 & 2 Final Technical Evaluation Rept | Safe Shutdown |
ML20245H152 | 30 April 1989 | Technical Evaluation Rept,Tmi Action-NUREG-0737 (II.D.1), Relief & Safety Valve Testing,Beaver Valley Unit 2 | Loop seal Anticipated operational occurrence Earthquake |
ML20246B815 | 30 April 1989 | Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept | |
ML20151F842 | 19 July 1988 | Review of Beaver Valley,Unit 2 FSAR Amends 17 & 18 | Fire Protection Program |
ML20235M884 | 30 June 1987 | Final Evaluation of Beaver Valley Power Station Unit 2 Tech Specs, Informal Rept | |
ML20235L906 | 30 June 1987 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Beaver Valley Units 1 & 2, Final Informal Rept | |
ML20214R233 | 30 April 1987 | Audit of Environ Qualification of Safety-Related Electrical Equipment for Beaver Valley Power Station Unit 2, Informal Rept | Boric Acid Anticipated operational occurrence High Energy Line Break Flow Induced Vibration Unidentified leakage |
ML20209F671 | 22 January 1987 | Evaluation of Dcrdr for Beaver Valley Unit 1, Technical Evaluation Rept | |
ML20215J056 | 31 December 1986 | 2 Sqrt, Informal Rept | Safe Shutdown Earthquake Hydrostatic Finite Element Analysis High Energy Line Break Earthquake Coast down |
ML20207B660 | 30 November 1986 | Conformance to Reg Guide 1.97,Beaver Valley Power Station, Unit 1, Technical Evaluation Rept | Boric Acid Shutdown Margin Anticipated operational occurrence Manual Operator Action |
ML17334B033 | 30 November 1986 | Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. | |
ML20203G507 | 22 July 1986 | Marked-up Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28...Post-Trip Review:Data & Info Capabilities,Beaver Valley Power Station,Unit 2, Draft Technical Evaluation Rept | |
ML20199F515 | 28 March 1986 | Revised Human Factors Engineering Dcrdr Technical Evaluation Rept for Beaver Valley Power Station Unit 2 | Safe Shutdown Feedwater Heater |
ML20138K872 | 17 October 1985 | Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2 `Post-Trip Review:Data...,' Technical Evaluation Rept | |
ML20138H218 | 30 September 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Beaver Valley Unit 1,North Anna Units 1 & 2 & Surry Units 1 & 2 | |
ML20244D387 | 10 July 1985 | Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. | |
ML20244D438 | 30 June 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities | |
ML20100R634 | 27 November 1984 | Control of Heavy Loads,Duquesne Light Co,Beaver Valley Power Station Unit 1, Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads |
ML20086H665 | 30 November 1983 | Control of Heavy Loads at Nuclear Power Plants,Beaver Valley Nuclear Power Plant Unit 2 (Phase I), Draft Technical Evaluation Rept | Safe Shutdown Coatings Control of Heavy Loads |
ML20076C321 | 5 October 1982 | ECCS Repts (F-47),TMI Action Plan Requirements,Beaver Valley Power Station Unit 1, Technical Evaluation Rept | |
ML20027A902 | 31 August 1982 | Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Beaver Valley Power Station, Technical Evaluation Rept | Fuel cladding Power change |
ML20062A497 | 31 May 1982 | Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Informal Interim Rept | |
ML20052F659 | 30 April 1982 | Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1. | |
ML20052H484 | 31 March 1982 | Technical Evaluation Rept of Overpressure Protection Sys for Beaver Valley Power Station,Unit 1, Preliminary Rept | Operating Basis Earthquake |
ML19240B998 | 31 March 1981 | Inservice Testing Program for Pumps & Valves at Beaver Valley Power Station Unit 1 (Docket 50-334) for Period 800130-810929 Revision 1 to Safety Evaluation | Boric Acid High Radiation Area Stroke time Power Operated Valves |
ML19341C989 | 28 February 1981 | Evaluation of Operation of Beaver Valley Power Station, Unit 1 W/One Loop Isolated, Technical Evaluation Rept | Shutdown Margin Fuel cladding |
ML20003C092 | 31 January 1981 | Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Interim Preliminary Rept | |
ML19341B374 | 31 December 1980 | Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Informal Rept | |
ML20002A549 | 31 October 1980 | Inservice Testing Program for Pumps & Valves,Beaver Valley Power Station Unit 1, Safety Evaluation for 800130-810929 | Boric Acid High Radiation Area Stroke time Power Operated Valves Scaffolding |
ML20002A546 | 31 October 1980 | Degraded Grid Protection for Class IE Power Sys,Beaver Valley Power Station, Technical Evaluation Rept | |
ML19338C689 | 14 August 1980 | Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Tech Spec Change for Main Steamline Break Protection Sys of Beaver Valley Nuclear Power Plant,Unit 1. | Shutdown Margin |
ML19338C724 | 31 July 1980 | Technical Evaluation Rept on Mod of P-8 Reactor Trip Circuitry,Beaver Valley Nuclear Station,Unit 1. | |
ML19321A315 | 28 May 1980 | Electrical,Instrumentation & Control Features of Quench Spray Sys Mods - Beaver Valley Nuclear Station,Unit 1. |