Letter Sequence Other |
---|
|
|
MONTHYEARML20077A0281994-08-31031 August 1994 Technical Evaluation Rept:Evaluation of Utility Responses to Suppl 1 to NRC Bulletin 90-01:Beaver Valley-1/-2 Project stage: Other 1994-08-31
[Table View] |
|
---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML20205L0431999-01-31031 January 1999 Technical Evaluation Rept on Second 10-Year Interval Inservice Insp Program Plan, for Beaver Valley Power Station,Unit 2 L-98-008, Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan:Duquesne Light Co,Beaver Valley Power Station, Unit 11998-11-30030 November 1998 Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan:Duquesne Light Co,Beaver Valley Power Station, Unit 1 ML20128F4411995-08-31031 August 1995 TER on IPE Back-End Submittal ML20129H3001995-08-31031 August 1995 App a, TER on IPE Front End Analysis ML20128F4691995-08-23023 August 1995 TER on IPE Submittal Human Reliability Analysis,Final Rept ML20077A0281994-08-31031 August 1994 Technical Evaluation Rept:Evaluation of Utility Responses to Suppl 1 to NRC Bulletin 90-01:Beaver Valley-1/-2 ML20105B9201992-06-30030 June 1992 Technical Rept MT-L1529-6, Evaluation of Failed Riverwater Pump Shaft Coupling from Beaver Valley Power Plant ML20087B0341991-10-31031 October 1991 TER Pump & Valve Inservice Testing Program,Beaver Valley Power Station,Unit 2 ML20077B0931991-03-31031 March 1991 TER Pump & Valve Inservice Testing Program Bvps,Unit 1 ML20079A8341991-03-31031 March 1991 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan,Beaver Valley Power Station Unit 1 ML20072P7581990-08-27027 August 1990 Station Blackout Evaluation,Beaver Valley Power Station, Units 1 & 2 Final Technical Evaluation Rept ML20245H1521989-04-30030 April 1989 Technical Evaluation Rept,Tmi Action-NUREG-0737 (II.D.1), Relief & Safety Valve Testing,Beaver Valley Unit 2 ML20246B8151989-04-30030 April 1989 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept ML20151F8421988-07-19019 July 1988 Review of Beaver Valley,Unit 2 FSAR Amends 17 & 18 ML20235M8841987-06-30030 June 1987 Final Evaluation of Beaver Valley Power Station Unit 2 Tech Specs, Informal Rept ML20235L9061987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Beaver Valley Units 1 & 2, Final Informal Rept ML20214R2331987-04-30030 April 1987 Audit of Environ Qualification of Safety-Related Electrical Equipment for Beaver Valley Power Station Unit 2, Informal Rept ML20209F6711987-01-22022 January 1987 Evaluation of Dcrdr for Beaver Valley Unit 1, Technical Evaluation Rept ML20215J0561986-12-31031 December 1986 2 Sqrt, Informal Rept ML20207B6601986-11-30030 November 1986 Conformance to Reg Guide 1.97,Beaver Valley Power Station, Unit 1, Technical Evaluation Rept ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML20203G5071986-07-22022 July 1986 Marked-up Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28...Post-Trip Review:Data & Info Capabilities,Beaver Valley Power Station,Unit 2, Draft Technical Evaluation Rept ML20199F5151986-03-28028 March 1986 Revised Human Factors Engineering Dcrdr Technical Evaluation Rept for Beaver Valley Power Station Unit 2 ML20138K8721985-10-17017 October 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2 `Post-Trip Review:Data...,' Technical Evaluation Rept ML20138H2181985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Beaver Valley Unit 1,North Anna Units 1 & 2 & Surry Units 1 & 2 ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20100R6341984-11-27027 November 1984 Control of Heavy Loads,Duquesne Light Co,Beaver Valley Power Station Unit 1, Technical Evaluation Rept ML20086H6651983-11-30030 November 1983 Control of Heavy Loads at Nuclear Power Plants,Beaver Valley Nuclear Power Plant Unit 2 (Phase I), Draft Technical Evaluation Rept ML20076C3211982-10-0505 October 1982 ECCS Repts (F-47),TMI Action Plan Requirements,Beaver Valley Power Station Unit 1, Technical Evaluation Rept ML20027A9021982-08-31031 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Beaver Valley Power Station, Technical Evaluation Rept ML20062A4971982-05-31031 May 1982 Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Informal Interim Rept ML20052F6591982-04-30030 April 1982 Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1. ML20052H4841982-03-31031 March 1982 Technical Evaluation Rept of Overpressure Protection Sys for Beaver Valley Power Station,Unit 1, Preliminary Rept ML19240B9981981-03-31031 March 1981 Inservice Testing Program for Pumps & Valves at Beaver Valley Power Station Unit 1 (Docket 50-334) for Period 800130-810929 Revision 1 to Safety Evaluation ML19341C9891981-02-28028 February 1981 Evaluation of Operation of Beaver Valley Power Station, Unit 1 W/One Loop Isolated, Technical Evaluation Rept ML20003C0921981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Interim Preliminary Rept ML19341B3741980-12-31031 December 1980 Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Informal Rept ML20002A5491980-10-31031 October 1980 Inservice Testing Program for Pumps & Valves,Beaver Valley Power Station Unit 1, Safety Evaluation for 800130-810929 ML20002A5461980-10-31031 October 1980 Degraded Grid Protection for Class IE Power Sys,Beaver Valley Power Station, Technical Evaluation Rept ML19338C6891980-08-14014 August 1980 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Tech Spec Change for Main Steamline Break Protection Sys of Beaver Valley Nuclear Power Plant,Unit 1. ML19338C7241980-07-31031 July 1980 Technical Evaluation Rept on Mod of P-8 Reactor Trip Circuitry,Beaver Valley Nuclear Station,Unit 1. ML19321A3151980-05-28028 May 1980 Electrical,Instrumentation & Control Features of Quench Spray Sys Mods - Beaver Valley Nuclear Station,Unit 1. 1999-01-31
[Table view] Category:QUICK LOOK
MONTHYEARML20205L0431999-01-31031 January 1999 Technical Evaluation Rept on Second 10-Year Interval Inservice Insp Program Plan, for Beaver Valley Power Station,Unit 2 L-98-008, Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan:Duquesne Light Co,Beaver Valley Power Station, Unit 11998-11-30030 November 1998 Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan:Duquesne Light Co,Beaver Valley Power Station, Unit 1 ML20128F4411995-08-31031 August 1995 TER on IPE Back-End Submittal ML20129H3001995-08-31031 August 1995 App a, TER on IPE Front End Analysis ML20128F4691995-08-23023 August 1995 TER on IPE Submittal Human Reliability Analysis,Final Rept ML20077A0281994-08-31031 August 1994 Technical Evaluation Rept:Evaluation of Utility Responses to Suppl 1 to NRC Bulletin 90-01:Beaver Valley-1/-2 ML20105B9201992-06-30030 June 1992 Technical Rept MT-L1529-6, Evaluation of Failed Riverwater Pump Shaft Coupling from Beaver Valley Power Plant ML20087B0341991-10-31031 October 1991 TER Pump & Valve Inservice Testing Program,Beaver Valley Power Station,Unit 2 ML20077B0931991-03-31031 March 1991 TER Pump & Valve Inservice Testing Program Bvps,Unit 1 ML20079A8341991-03-31031 March 1991 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan,Beaver Valley Power Station Unit 1 ML20072P7581990-08-27027 August 1990 Station Blackout Evaluation,Beaver Valley Power Station, Units 1 & 2 Final Technical Evaluation Rept ML20245H1521989-04-30030 April 1989 Technical Evaluation Rept,Tmi Action-NUREG-0737 (II.D.1), Relief & Safety Valve Testing,Beaver Valley Unit 2 ML20246B8151989-04-30030 April 1989 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept ML20151F8421988-07-19019 July 1988 Review of Beaver Valley,Unit 2 FSAR Amends 17 & 18 ML20235M8841987-06-30030 June 1987 Final Evaluation of Beaver Valley Power Station Unit 2 Tech Specs, Informal Rept ML20235L9061987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Beaver Valley Units 1 & 2, Final Informal Rept ML20214R2331987-04-30030 April 1987 Audit of Environ Qualification of Safety-Related Electrical Equipment for Beaver Valley Power Station Unit 2, Informal Rept ML20209F6711987-01-22022 January 1987 Evaluation of Dcrdr for Beaver Valley Unit 1, Technical Evaluation Rept ML20215J0561986-12-31031 December 1986 2 Sqrt, Informal Rept ML20207B6601986-11-30030 November 1986 Conformance to Reg Guide 1.97,Beaver Valley Power Station, Unit 1, Technical Evaluation Rept ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML20203G5071986-07-22022 July 1986 Marked-up Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28...Post-Trip Review:Data & Info Capabilities,Beaver Valley Power Station,Unit 2, Draft Technical Evaluation Rept ML20199F5151986-03-28028 March 1986 Revised Human Factors Engineering Dcrdr Technical Evaluation Rept for Beaver Valley Power Station Unit 2 ML20138K8721985-10-17017 October 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2 `Post-Trip Review:Data...,' Technical Evaluation Rept ML20138H2181985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Beaver Valley Unit 1,North Anna Units 1 & 2 & Surry Units 1 & 2 ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20100R6341984-11-27027 November 1984 Control of Heavy Loads,Duquesne Light Co,Beaver Valley Power Station Unit 1, Technical Evaluation Rept ML20086H6651983-11-30030 November 1983 Control of Heavy Loads at Nuclear Power Plants,Beaver Valley Nuclear Power Plant Unit 2 (Phase I), Draft Technical Evaluation Rept ML20076C3211982-10-0505 October 1982 ECCS Repts (F-47),TMI Action Plan Requirements,Beaver Valley Power Station Unit 1, Technical Evaluation Rept ML20027A9021982-08-31031 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Beaver Valley Power Station, Technical Evaluation Rept ML20062A4971982-05-31031 May 1982 Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Informal Interim Rept ML20052F6591982-04-30030 April 1982 Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1. ML20052H4841982-03-31031 March 1982 Technical Evaluation Rept of Overpressure Protection Sys for Beaver Valley Power Station,Unit 1, Preliminary Rept ML19240B9981981-03-31031 March 1981 Inservice Testing Program for Pumps & Valves at Beaver Valley Power Station Unit 1 (Docket 50-334) for Period 800130-810929 Revision 1 to Safety Evaluation ML19341C9891981-02-28028 February 1981 Evaluation of Operation of Beaver Valley Power Station, Unit 1 W/One Loop Isolated, Technical Evaluation Rept ML20003C0921981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Interim Preliminary Rept ML19341B3741980-12-31031 December 1980 Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Informal Rept ML20002A5491980-10-31031 October 1980 Inservice Testing Program for Pumps & Valves,Beaver Valley Power Station Unit 1, Safety Evaluation for 800130-810929 ML20002A5461980-10-31031 October 1980 Degraded Grid Protection for Class IE Power Sys,Beaver Valley Power Station, Technical Evaluation Rept ML19338C6891980-08-14014 August 1980 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Tech Spec Change for Main Steamline Break Protection Sys of Beaver Valley Nuclear Power Plant,Unit 1. ML19338C7241980-07-31031 July 1980 Technical Evaluation Rept on Mod of P-8 Reactor Trip Circuitry,Beaver Valley Nuclear Station,Unit 1. ML19321A3151980-05-28028 May 1980 Electrical,Instrumentation & Control Features of Quench Spray Sys Mods - Beaver Valley Nuclear Station,Unit 1. 1999-01-31
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20205L0431999-01-31031 January 1999 Technical Evaluation Rept on Second 10-Year Interval Inservice Insp Program Plan, for Beaver Valley Power Station,Unit 2 L-98-008, Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan:Duquesne Light Co,Beaver Valley Power Station, Unit 11998-11-30030 November 1998 Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan:Duquesne Light Co,Beaver Valley Power Station, Unit 1 ML20128F4411995-08-31031 August 1995 TER on IPE Back-End Submittal ML20129H3001995-08-31031 August 1995 App a, TER on IPE Front End Analysis ML20128F4691995-08-23023 August 1995 TER on IPE Submittal Human Reliability Analysis,Final Rept ML20077A0281994-08-31031 August 1994 Technical Evaluation Rept:Evaluation of Utility Responses to Suppl 1 to NRC Bulletin 90-01:Beaver Valley-1/-2 ML20105B9201992-06-30030 June 1992 Technical Rept MT-L1529-6, Evaluation of Failed Riverwater Pump Shaft Coupling from Beaver Valley Power Plant ML20087B0341991-10-31031 October 1991 TER Pump & Valve Inservice Testing Program,Beaver Valley Power Station,Unit 2 ML20077B0931991-03-31031 March 1991 TER Pump & Valve Inservice Testing Program Bvps,Unit 1 ML20079A8341991-03-31031 March 1991 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan,Beaver Valley Power Station Unit 1 ML20072P7581990-08-27027 August 1990 Station Blackout Evaluation,Beaver Valley Power Station, Units 1 & 2 Final Technical Evaluation Rept ML20245H1521989-04-30030 April 1989 Technical Evaluation Rept,Tmi Action-NUREG-0737 (II.D.1), Relief & Safety Valve Testing,Beaver Valley Unit 2 ML20246B8151989-04-30030 April 1989 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept ML20151F8421988-07-19019 July 1988 Review of Beaver Valley,Unit 2 FSAR Amends 17 & 18 ML20235M8841987-06-30030 June 1987 Final Evaluation of Beaver Valley Power Station Unit 2 Tech Specs, Informal Rept ML20235L9061987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Beaver Valley Units 1 & 2, Final Informal Rept ML20214R2331987-04-30030 April 1987 Audit of Environ Qualification of Safety-Related Electrical Equipment for Beaver Valley Power Station Unit 2, Informal Rept ML20209F6711987-01-22022 January 1987 Evaluation of Dcrdr for Beaver Valley Unit 1, Technical Evaluation Rept ML20215J0561986-12-31031 December 1986 2 Sqrt, Informal Rept ML20207B6601986-11-30030 November 1986 Conformance to Reg Guide 1.97,Beaver Valley Power Station, Unit 1, Technical Evaluation Rept ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML20203G5071986-07-22022 July 1986 Marked-up Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28...Post-Trip Review:Data & Info Capabilities,Beaver Valley Power Station,Unit 2, Draft Technical Evaluation Rept ML20199F5151986-03-28028 March 1986 Revised Human Factors Engineering Dcrdr Technical Evaluation Rept for Beaver Valley Power Station Unit 2 ML20138K8721985-10-17017 October 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2 `Post-Trip Review:Data...,' Technical Evaluation Rept ML20138H2181985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Beaver Valley Unit 1,North Anna Units 1 & 2 & Surry Units 1 & 2 ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20100R6341984-11-27027 November 1984 Control of Heavy Loads,Duquesne Light Co,Beaver Valley Power Station Unit 1, Technical Evaluation Rept ML20086H6651983-11-30030 November 1983 Control of Heavy Loads at Nuclear Power Plants,Beaver Valley Nuclear Power Plant Unit 2 (Phase I), Draft Technical Evaluation Rept ML20076C3211982-10-0505 October 1982 ECCS Repts (F-47),TMI Action Plan Requirements,Beaver Valley Power Station Unit 1, Technical Evaluation Rept ML20027A9021982-08-31031 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Beaver Valley Power Station, Technical Evaluation Rept ML20062A4971982-05-31031 May 1982 Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Informal Interim Rept ML20052F6591982-04-30030 April 1982 Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1. ML20052H4841982-03-31031 March 1982 Technical Evaluation Rept of Overpressure Protection Sys for Beaver Valley Power Station,Unit 1, Preliminary Rept ML19240B9981981-03-31031 March 1981 Inservice Testing Program for Pumps & Valves at Beaver Valley Power Station Unit 1 (Docket 50-334) for Period 800130-810929 Revision 1 to Safety Evaluation ML19341C9891981-02-28028 February 1981 Evaluation of Operation of Beaver Valley Power Station, Unit 1 W/One Loop Isolated, Technical Evaluation Rept ML20003C0921981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Interim Preliminary Rept ML19341B3741980-12-31031 December 1980 Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Informal Rept ML20002A5491980-10-31031 October 1980 Inservice Testing Program for Pumps & Valves,Beaver Valley Power Station Unit 1, Safety Evaluation for 800130-810929 ML20002A5461980-10-31031 October 1980 Degraded Grid Protection for Class IE Power Sys,Beaver Valley Power Station, Technical Evaluation Rept ML19338C6891980-08-14014 August 1980 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Tech Spec Change for Main Steamline Break Protection Sys of Beaver Valley Nuclear Power Plant,Unit 1. ML19338C7241980-07-31031 July 1980 Technical Evaluation Rept on Mod of P-8 Reactor Trip Circuitry,Beaver Valley Nuclear Station,Unit 1. ML19321A3151980-05-28028 May 1980 Electrical,Instrumentation & Control Features of Quench Spray Sys Mods - Beaver Valley Nuclear Station,Unit 1. 1999-01-31
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20205L0431999-01-31031 January 1999 Technical Evaluation Rept on Second 10-Year Interval Inservice Insp Program Plan, for Beaver Valley Power Station,Unit 2 L-98-008, Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan:Duquesne Light Co,Beaver Valley Power Station, Unit 11998-11-30030 November 1998 Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan:Duquesne Light Co,Beaver Valley Power Station, Unit 1 ML20128F4411995-08-31031 August 1995 TER on IPE Back-End Submittal ML20129H3001995-08-31031 August 1995 App a, TER on IPE Front End Analysis ML20128F4691995-08-23023 August 1995 TER on IPE Submittal Human Reliability Analysis,Final Rept ML20077A0281994-08-31031 August 1994 Technical Evaluation Rept:Evaluation of Utility Responses to Suppl 1 to NRC Bulletin 90-01:Beaver Valley-1/-2 ML20105B9201992-06-30030 June 1992 Technical Rept MT-L1529-6, Evaluation of Failed Riverwater Pump Shaft Coupling from Beaver Valley Power Plant ML20087B0341991-10-31031 October 1991 TER Pump & Valve Inservice Testing Program,Beaver Valley Power Station,Unit 2 ML20077B0931991-03-31031 March 1991 TER Pump & Valve Inservice Testing Program Bvps,Unit 1 ML20079A8341991-03-31031 March 1991 Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan,Beaver Valley Power Station Unit 1 ML20072P7581990-08-27027 August 1990 Station Blackout Evaluation,Beaver Valley Power Station, Units 1 & 2 Final Technical Evaluation Rept ML20245H1521989-04-30030 April 1989 Technical Evaluation Rept,Tmi Action-NUREG-0737 (II.D.1), Relief & Safety Valve Testing,Beaver Valley Unit 2 ML20246B8151989-04-30030 April 1989 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept ML20151F8421988-07-19019 July 1988 Review of Beaver Valley,Unit 2 FSAR Amends 17 & 18 ML20235M8841987-06-30030 June 1987 Final Evaluation of Beaver Valley Power Station Unit 2 Tech Specs, Informal Rept ML20235L9061987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Beaver Valley Units 1 & 2, Final Informal Rept ML20214R2331987-04-30030 April 1987 Audit of Environ Qualification of Safety-Related Electrical Equipment for Beaver Valley Power Station Unit 2, Informal Rept ML20209F6711987-01-22022 January 1987 Evaluation of Dcrdr for Beaver Valley Unit 1, Technical Evaluation Rept ML20215J0561986-12-31031 December 1986 2 Sqrt, Informal Rept ML20207B6601986-11-30030 November 1986 Conformance to Reg Guide 1.97,Beaver Valley Power Station, Unit 1, Technical Evaluation Rept ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML20203G5071986-07-22022 July 1986 Marked-up Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28...Post-Trip Review:Data & Info Capabilities,Beaver Valley Power Station,Unit 2, Draft Technical Evaluation Rept ML20199F5151986-03-28028 March 1986 Revised Human Factors Engineering Dcrdr Technical Evaluation Rept for Beaver Valley Power Station Unit 2 ML20138K8721985-10-17017 October 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2 `Post-Trip Review:Data...,' Technical Evaluation Rept ML20138H2181985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Beaver Valley Unit 1,North Anna Units 1 & 2 & Surry Units 1 & 2 ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20100R6341984-11-27027 November 1984 Control of Heavy Loads,Duquesne Light Co,Beaver Valley Power Station Unit 1, Technical Evaluation Rept ML20086H6651983-11-30030 November 1983 Control of Heavy Loads at Nuclear Power Plants,Beaver Valley Nuclear Power Plant Unit 2 (Phase I), Draft Technical Evaluation Rept ML20076C3211982-10-0505 October 1982 ECCS Repts (F-47),TMI Action Plan Requirements,Beaver Valley Power Station Unit 1, Technical Evaluation Rept ML20027A9021982-08-31031 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Beaver Valley Power Station, Technical Evaluation Rept ML20062A4971982-05-31031 May 1982 Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Informal Interim Rept ML20052F6591982-04-30030 April 1982 Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1. ML20052H4841982-03-31031 March 1982 Technical Evaluation Rept of Overpressure Protection Sys for Beaver Valley Power Station,Unit 1, Preliminary Rept ML19240B9981981-03-31031 March 1981 Inservice Testing Program for Pumps & Valves at Beaver Valley Power Station Unit 1 (Docket 50-334) for Period 800130-810929 Revision 1 to Safety Evaluation ML19341C9891981-02-28028 February 1981 Evaluation of Operation of Beaver Valley Power Station, Unit 1 W/One Loop Isolated, Technical Evaluation Rept ML20003C0921981-01-31031 January 1981 Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Interim Preliminary Rept ML19341B3741980-12-31031 December 1980 Adequacy of Station Electric Distribution Sys Voltages, Beaver Valley Power Station,Unit 1, Informal Rept ML20002A5491980-10-31031 October 1980 Inservice Testing Program for Pumps & Valves,Beaver Valley Power Station Unit 1, Safety Evaluation for 800130-810929 ML20002A5461980-10-31031 October 1980 Degraded Grid Protection for Class IE Power Sys,Beaver Valley Power Station, Technical Evaluation Rept ML19338C6891980-08-14014 August 1980 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Tech Spec Change for Main Steamline Break Protection Sys of Beaver Valley Nuclear Power Plant,Unit 1. ML19338C7241980-07-31031 July 1980 Technical Evaluation Rept on Mod of P-8 Reactor Trip Circuitry,Beaver Valley Nuclear Station,Unit 1. ML19321A3151980-05-28028 May 1980 Electrical,Instrumentation & Control Features of Quench Spray Sys Mods - Beaver Valley Nuclear Station,Unit 1. 1999-01-31
[Table view] |
Text
. _ _- _ _. __
EGG DNSP 11436 August 1994
\
Nationai EVALUATION OF UTILITY RESPONSE TO !
' SUPPLEMENT 1 TO NRC BULLETIN 90 01: )
Engineering BEAVER VALLEY-1/ 2 Laboratory 1
Managed by the U S.
Department l ofEneroy Alan C. Udy f
1 9 EGzG-Wort perfoM uncter DOF Contrec.
No Of..t3 ~ SID015m i ATTACHMENT 94111001s4 DR 941104 ADOCK 05000334 PDR
EGG-DNSP-!!436 i
TECHNICAL EVALUATION REPORT Evaluation of Utility Response tc Cupplement I to NRC Bulletin 90-01: Beaver Valley-1/-2 Docket Nos. 50-334 and 50-412 <
Alan C. Udy 4
Published August 1994 l
l EG&G Idaho, Inc.
Idaho National Engineering Laboratory Idaho Falls, Idaho 83415 Prepared for the U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Under DOE Contract No. DE-AC07-761001570 FIN No. Ll695, Task No. 11 TAC Nos. M85354 and M85355 l
l I
i
! )
l l
l l
j i
SUMMARY
l This report documents the EG&G Idaho, Inc., review of the Duquesne Light i Company submittals that respond to Supplement 1 to NRC Bulletin.90-01 for Unit l Nos. 1 and 2 of the Beaver Valley Power Station. This NRC Bulletin provides j information regarding the loss of fill-oil in certain pressure and j dirferential pressure transmitters manufactured by Rosemourt, Inc. This i report finds the licensee conforms to the requesteo actions and the reporting i requirements of the Supplement.
g- <
l l
FIN No. L1695, Task No. 11 B&R No. 320-19-15-05-0 Docket Nos. 50-334 and 50-412 TAC Nos. M85354 and M85355 11 I i
)
h' 1
1 l
l l
1 i
i l
4 PREFACE This report is supplied as part of the " Technical Assistance in Support !
of the Instrumentation and Controls Systems Branch." It is being conducted )
for the U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor t Regulation, Division of Reactor Controls and Human Factors, by EG&G Idaho, I Inc., DOE /NRC Support Programs Unit.
l l
l i
iii i
1 i
I
CONTENTS
SUMMARY
.............................................................. 11 PREFACE .............................................................. iii
- 1. INTRODUCTION .................................................... I
- 2. NRC SPECIFIED REQUESTED ACTIONS ................................. 4
- 3. EVALUATION ...................................................... 7 3.1 Evaluation of Licensee Response to Reporting Requirements . 7 3.2 Evaluation of Licensee Response to Requested Actions ...... 7
- 4. CONCLUSIONS ..................................................... 12
- 5. REFERENCES ...................................................... 13 iv
Evaluation of Utility Response to Sucolement 1 to NRC Bulletin 90-01: Beaver Valley-1/-2
- 1. INTRODUCTION The NRC issued Bulletin 90-01 on March 9, 1990 (Reference 1). That Bulletin discussed certain Rosemount pressure and differential pressure transmitter models identified by the manufacturer as prone to fill-oil leakage. The bulletin requested licensees to identify whether these transmitters were or may later be installed in safety-related systems.
Actions were detailed for licensee implementation for certain identified transmitters installed in a safety-related system. These same actions apply to those identified transmitters presently held in inventory for later installation in a safety-related system.
With the gradual leakage of fill-oil, the transmitter would not have the long term accuracy, time response, and reliability needed for its intended safety function. Further, this condition could go undetected over a long period. Redundant instrument channels are subject to the same degradation mechanism. This increases the potential for a comon mode failure. Thus, this potential failure mechanism raised concern for the reliability of reactor protection systems (RPS), engineered safety features (ESF) actuation systems, and anticipated transient without scram (ATWS) mitigating systems. To achieve high functional reliability, there must be a low probability of component failure while operating, with any failures readily detectable.
Supplement 1 to NRC Bu'lletin 90-01 (Reference 2) was issued on December 22, 1992. The Supplement informed licensees of NRC staff activities regarding the subject transmitters, and noted continuing reports of transmitter failures. The NRC requested licensee action to resolve the issue. ,
The Supplement also updated the information contained in the original l bulletin. The licensee was requested to review the information and determine l if it was applicable at their facility. Further, the licensee was requested to modify their actions and enhanced surveillance monitoring programs to conform with the direction given. Finally, the licensee was instructed to !
i 1 l l
l 1
1
.g e respond to the NRC. The Reouested Actions in Supplement I to NRC Bulletin 90-01 supersede the original NRC Bulletin 90-01 Reouested Actions.
In responding to Supplement 1 to NRC Bulletin 90-01, the licensee is directed to address three items.
- 1. A statement either committing the licensee to take the NRC ,
Bulletin 90-01, Supplement 1, Reouested Actions or taking '
exception to those actions.
- 2. Addressing the actions committed to in the above statement, provide:
- a. a list of specific actions, including any justifications, to be taken to complete the commitment,
- b. a schedule for completion, and ,
- c. after completion, a statement confirming the actions committed to are complete. ,
- 3. A statement identifying the NRC Bulletin 90-01, Supplement 1, Reouested Actions not taken, along with an evaluation providing the basis for exemption.
In implementing the replacement option of the NRC Reauested Actions, plant shutdown exclusively for replacing the transmitters is not required.
This allowance infers that replacements can be scheduled. With replacement in a timely manner, enhanced surveillance monitoring for interim operation is not required. "
The Duquesne Light Company, the licensee for Unit Nos. I and 2 of the Beaver Valley Power Station, responded to Supplement 1 of NRC Bulletin 90-01 with a letter dated March 8, 1993 (Reference 3). Additional information and justifications were submitted on May 28, 1993 (Reference 4) and May 23, 1994 (Reference 5). This technical evaluation report evaluates the completeness of those submittals. It also determines whether proposed surveillance methods 2
i
i
~
are adequate to determine fill-oil loss-caused degradation of the transmitter.
Finally, this report addresses the interval of surveillance proposed by the licensee for any transmitters included in the enhanced surveillance monitoring program. i Many Rosemount transmitter failures have been attributed to the use of i stainless steel "0"-rings between the sensing module and the process flanges. !
Rosemount improved the manufacturing process for transmitters manufactured after July 11, 1989. Those improvements included a limit of the torque applied to the flange bolts. This limits the stress caused in the sensing l module by the "0"-ring. Post-production screening, including pressure testing l
of the sensing module for this potential latent defect, was also implemented at that time. Therefore, as described in Supplement 1 of NRC Bulletin 90-01, those Rosemount transmitters manufactured after July 11, 1989, are not subject to this review.
l l
1
)
1 l
l
1
.'~
- 2. NRC SPECIFIED REQUESTED ACTIONS The NRC staff specified the following Reouested Actions of licensees of operating reactors.
- 1. Review plant records and identify the following Rosemount transmitters (if manufactured before July 11,1989) that either are used in or may.be used in either safety-related or ATWS mitigating systems.
- Rosemount Model 1153, Series B
- Rosemount Model 1153, Series D
- Rosemount Model 1154 Following identification, the licensee is to establish the following:
- a. For those identified transmitters having a normal operating pressure greater than 1500 psi, and are installed as part of reactor protection trip systems, ESF actuation systems, or ATWS-mitigating systems, either replace the transmitter in an expedited manner, or monitor monthly, for the life of the transmitter, using an enhanced surveillance monitoring program. -
If the identified transmitter exceeds the 60,000 psi-month or the 130,000 psi-month criterion (depending on the range code of the transmitter) established by Rosemount, enhanced surveillance on a refueling (not exceeding 24 months) basis is acceptable. Under '
this option, justification must be based on the service record and the specific safety function of the transmitter. That justification can be based on high functional reliability provided by redundancy or diversity.
- b. For those identified transmitters having a normal operating pressure greater than 1500 psi, and are installed as part of a safety-related system other than reactor protection trip systems, ESF actuation, or ATWS mitigating systems, either replace the transmitter or monitor quarterly, for the _ life of the transmitter, using an enhanced surveillance monitoring program.
If the identified transmitter exceeds the 60.000 psi-month or the 130,000 psi-month criterion (depending on the range code of the transmitter) established by Rosemount, enhanced surveillance on a refueling (not exceeding 24 months) basis is acceptable. Under this option, justification must be based on the service record and the specific safety function of the transmitter. That 4
1 justification can be based on high functional reliability provided by redundancy or diversity.
- c. For boiling water reactors (BWR)--
For those identified transmitters having a normal operating pressure greater than 500 psi and less than or equal to 1500 psi, and are installed as part of reactor protection trip systems, ESF actuation systems, or ATWS mitigating '
systems, either replace the transmitter, or monitor monthly with an enhanced surveillance monitoring program, until the transmitter reaches the designated (by Rosemount) psi-month criterion (60,000 psi-month or 130,000 psi-month, depending on the transmitter range code).
For transmitters that provide signals to the RPS or ATWS trips for high pressure or low water level, the enhanced surveillance must be monthly. For other transmitters in this classification, enhanced surveillance on a refueling (not exceeding 24 months) basis is acceptable. Under this option, justification must be based on the service record and the specific safety function of the transmitter. That justification can be based on high functional reliability provided by redundancy or diversity.
For pressurized water reactors (PWR)--
For those identified transmitters having a normal operating pressure greater than 500 psi and less than or equal to 1500 psi, and are installed as part of reactor protection trip systems, ESF actuation systems, or ATWS mitigating systems, either replace the transmitter, or monitor with an enhanced surveillance monitoring program, until the transmitter reaches the designated (by Rosemount) psi-month criterion (60,000 psi-month or 130,000 psi-month, depending on the transmitter range code) on a refueling (not exceeding 24 months) basis,
- d. For those identified transmitters having a normal operating pressure greater than 500 psi and less than or equal to 1500 psi, and are installed as part of a safety-related system other than reactor protection trip systems, ESF actuation, or ATWS mitigating systems, either replace the transmitter or monitor with an enhanced surveillance monitoring program, until the transmitter reaches the designated (by Rosemount) psi-month criterion (60,000 psi-month or 130,000 psi-month, depending on the transmitter range code) on a refueling (not exceeding 24 months) basis.
5
- e. Those transmitters having a normal operating pressure greater than 500 psi and less than or equal to 1500 psi, and have accumulated sufficient psi-month operating history to exceed the criterion established by Rosemount, may be excluded from the enhanced surveillance monitoring program at the discretion of the licensee.
However, the licensee should retain a high level of confidence that a high level of reliability is maintained and that transmitter failure due to loss of fill-oil is detectable.
- f. Those transmitters having a normal operating pressure less than or equal _ to 500 psi may be excluded from the enhanced surveillance monitoring program at the discretion of the licensee. However, the licensee should retain a high-level of confidence that a high :
level of reliability is maintained and that transmitter failure due to loss of fill-oil is detectable.
- 2. Evaluate the enhanced surveillance monitoring program. The evaluation is to ensure the measurement data has an accuracy commensurate with the accuracy needed to compare the data to the manufacturers drift data criteria. It is this comparison that determines the degradation threshold for loss of fill-oil failures of the subject transmitters.
The Supplement also states the NRC may conduct audits or inspections in -
the future to verify compliance with the established requirements.
l 6
l
- 3. EVALUATION l
The licensee responded to Supplement 1 of NRC Bulletin 90-01 on March 8, !
1993 and May 28, 1993. The licensee provided additional information on May 23, 1994. Those responses were compared to the Bulletin Reportina Reauirements and Reauested Actions as described below. The licensee reported on Rosemount transmitters that are subject to the Reauested Actions of the Supplement. Other Rosemount transmitters are outside the scope of the Supplement due to replacement or refurbishment. The licensee reported on the Reauested Actions of the Supplement.
3.1 Evaluation of Licensee Response to Reoortino Reauirements The licensee states, in Reference 4, that their response to Supplement 1 of NRC Bulletin 90-01 is complete. Included with that statement is clarification, interpretation, and the limits placed on their actions. The licensee described the specific actions taken to implement the Reauested Actions of the Supplement. The licensee provides evaluation and justification '
supporting the position that their actions are acceptable.
The licensee submittals conform to the Reportina Reauirements of Supplement 1 of NRC Bulletin 90-01.
3.2 Evaluation of licensee Resoonse to Reauested Actions i Supplement 1 of NRC Bulletin 90-01 requested licensee action to resolve the issue of fill-oil leakage in Rosemount transmitters. This lechnical E w A tion h; port summarizes the Reauested Actions and the associated ;
transmitter criteria in Section 2. The licensee responded to these Reauested )
Actions and identified Rosemount transmitters that are in the scope of this review. However, the number of transmitters installed at the Beaver Valley Power Station was not identified. That number should be auditable at the )
1 l
l l
l
Beaver Valley Power Station. The licensee response to the Supplement is discussed in the following sections.
3.2.1 Licensee Response to Reouested Action 1.a The licensee states there are two Rosemount transmitters from this classification at the Beaver Valley Power Station, both at Unit 1. Both monitor the wide-range reactor coolant system pressure. Each exceeds the psi-month maturity threshold. Neither exhibits signs of loss of fill-oil. These transmitters are included in an enhanced surveillance program, consisting of two parts. Calibration data is taken on an 18-month interval and trended.
This data includes the calibration data from two calibration cycles previous to 1990. The calibration data and maintenance history are one part of the enhanced surveillance program. The second part of the enhanced surveillance program compares redundant channels using the safety parameter display system.
The comparison is to observe for a degraded transmitter signal where the operating signal drifts away from the redundant channel. The licensee states ,_
that this enhanced surveillance program will continue until the transmitters are either replaced or retired. We find the enhanced surveillance program for this transmitter classification acceptable.
l 3.2.2 Licensee Response to Reouested Action 1.b The licensee states there are five Rosemount transmitters from this classification at the Beaver Valley Power Station, Unit No.1. Unit No. 2 has no subject transmitters in this transmitter classification. Three transmitters individually monitor the three seal injection flow to the three reactor coolant pumps. Another transmitter monitors the high head safety-injection flow to the reactor coolant system. The fifth transmitter monitors the high head safety-injection flow to the boron injection tank. Each ;
transmitter exceeds the psi-month maturity threshold. None exhibits signs of loss of fill-oil. These transmitters are included in an enhanced surveillance program, consisting of two parts. Calibration data are taken on an 18-month j 8
l l
l
interval and trended. This data includes the calibration data from two calibration cycles previous to 1990. The calibration data and maintenance history is one part of the enhanced surveillance program. The second part of t
the enhanced surveillance program compares redundant channels using thi safety l l
parameter display system. The comparison is to observe for a degraded 1 transmitter signal where the operating signal drifts away from the redundant I channel. The licensee states that this enhanced surveillance program will continue until the transmitters are either replaced or retired. We find the enhanced surveillance program for this transmitter classification acceptable.
l l
3.2.3 Licensee Response to Reauested Action 1.c '
The licensee states there are Rosemount transmitters from this transmitter classification at the Beaver Valley Power Station. The licensee states that these transmitters participate in an enhanced surveillance program. The monitoring is done with an interval that does not exceed 24 months. This satisfies the Supplement and is acceptable. I 3.2.4 Licensee Resoonse to Reauested Action 1.d The licensee states there are Rosemount transmitters from this transmitter classification at the Beaver Valley Power Station. The licensee states that these transmitters participate in an enhanced surveillance program. The monitoring is done with an interval that does not exceed 24 months. This satisfies the Supplement and is acceptable.
3.2.5 Licensee Response to Reauested Action 1.e The licensee has Rosemount transmitters that meet the classification requirements for Reauested Action 1.c and 1.d, and exceed the psi-month maturity threshold. At the discretion of the licensee, these transmitters continue participation in the enhanced surveillance monitoring program. The 9
4 licensee states, in Reference 4, that when they have a high degree of confidence in the reliability of the transmitters, the transmitters may be excluded from the enhanced surveillance program. The licensee, in Reference 5, committed to inform the NRC if the enhanced coverage of these transmitters in their enhanced surveillance program is changed.
Based on continued participation of the medium-pressure Rosemount transmitters in the enhanced surveillance program, the licensee response for this transmitter classification is acceptable.
3.2.6 Licensee Resoonse to Reauested Action 1.f The licensee states there are Rosemount transmitters from this transmitter classification at the Beaver Valley Power Station. The licensee states, in Reference 4, that all transmitters in this transmitter classification are part of a failure detection program. In Reference 5, the licensee notes that this is the enhanced surveillance program. That program -
is based on an evaluation of historical trending of calibration data. The licensee states that these low-pressure Rosemount transmitters will remain in the enhanced surveillance program. Should new information or data cause consideration of other methods for maintaining a high level of confidence that a high level of reliability is maintained and that transmitter failure due to loss of fill-oil is detectable, the licensee is committed to notify the NRC prior to changing the commitment.
Based on continued participation of the low-pressure Rosemount transmitters in the enhanced surveillance program, the licensee response for this transmitter classification is acceptable.
3.2.7 Enhanced Surveillance Monitorina Procram The licensee states the enhanced surveillance monitoring program measurement data has an accuracy that is commensurate with the accuracy needed 10
l l
~
'to compare zero-drift and span-drift data from a transmitter to the manufacturer drift data criteria. The licensee states their enhanced surveillance' program is consistent with and'uses the acceptance criteria of Rosemount Technical Bulletin No. 4. We find the licensee description of their 1
enhanced surveillance program acceptable.
l l
1 l
l l
l l
I 1
11
. . - _ . .. . . ._- . . = _ - . - -. _=. -. _~.
e
- 4. CONCLUSIONS Based on our review of the licensee submittal, we find the licensee has I
, completed the reporting requirements of Supplement 1 of NRC Bulletin 90-01.
Further,_ the licensee conforms to the requested actions of Supplement 1 to NRC I
Bulletin 90-01.
l l
1 1
-l i
l 12
- 5. REFERENCES
- 1. NRC Bulletin No. 90-01: " Loss of Fill-oil in Transmitters Manufactured by Rosemount," March 9, 1990, OMB No. 3150-0011.
- 2. NRC Bulletin No. 90-01, Supplement 1: " Loss of Fill-oil in Transmitters Manufactured by Rosemount," December 22, 1992, OMB No. 3150-0011.
- 3. Letter, Duquesne Light Company (J. D. Sieber) to NRC, " Response to NRC Bulletin 90-01, Supplement 1," March 8, 1993.
- 4. Letter, Duquesne Light Company (G. S. Thomas) to NRC, " Response to NRC Bulletin 90-01, Supplement 1, ' Loss of Fill Oil in Transmitters Manufactured by Rosemount'," May 28, 1993.
- 5. Letter, Duquesne Light Company (J. D. Sieber) to NRC, " Response to NRC Bulletin 90-01, Supplement 1, ' Loss of Fill Oil in Transmitters Manufactured by Rosemount'," May 23, 1994.