Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24025A15925 January 2024NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - Rvi AMP and Inspection Plan (L-2023-LLL-0016)
ML24029A11316 January 2024Notification of Inspection and Request for Information (Email)
ML24002A7382 January 2024NRR E-mail Capture - Request for Additional Information Regarding Duke'S August 20, 2023, License Amendment Request for Robinson, Unit 2
ML23262B45019 September 2023NRR E-mail Capture - H. B. Robinson Steam Electric Plant, Unit 2 - Acceptance of License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures Based on Leak-Before-Break Methodology
ML23220A2348 August 2023NRR E-mail Capture - Robinson, Unit 2 - Acceptance Review Results for Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule
ML23207A07614 July 2023EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06
ML23192A05511 July 2023Relief Request Later Edition of ASME Code for ISI
ML23177A19926 June 2023NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-23-0005 - LAR to Align Certain TSs with ISTS (L-2023-LLA-0078)
ML23172A01320 June 2023Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement FrequenciesSurveillance Frequency Control Program
ML23159A0055 June 202356557-EN 56557 - Paragon - Redlined
ML23153A1892 June 2023Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement FrequenciesSurveillance Frequency Control Program
ML23151A34830 May 2023Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)Incorporated by reference
ML23142A27322 May 2023Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)Incorporated by reference
ML23131A41910 May 2023003 Radiation Safety Baseline Inspection Information RequestContraband
Process Control Program
Coronavirus
ML23124A1214 May 2023Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)
ML23087A24927 March 202350.69 Acceptance Email
ML23087A02827 March 2023Acceptance of Requested Licensing Action Amendment TSTF-505
ML23082A04323 March 2023002 Radiation Safety Baseline Inspection Information Request FinalHigh Radiation Area
Locked High Radiation Area
Process Control Program
COVID-19
ML23073A22813 March 2023Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review
ML23065A0946 March 2023NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-22-0081 - LAR to Address Administrative Changes to the Operating License and Technical Specifications (L-2023-LLA-0020)
ML23058A05627 February 2023Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System InstrumentationSurveillance Frequency Control Program
Operational leakage
ML23048A15116 February 2023Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003)
ML23030B90330 January 2023Formal Release of RAIs for McGuire Unit 1, Relief Request Impractical RPV Rx Coolant System Welds, Due March 1, 2023 (Email)
ML23017A22313 January 2023Request for Additional Information (RAI) Issuance for McGuire Unit 1 Steam Generator Tube Inspection Report (Email)
ML23011A01511 January 2023NRR E-mail Capture - Request for Additional Information to Duke'S Request for Robinson to Add Feedwater Isolation Function to TS 3.3.2 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.bAnticipated operational occurrence
ML22291A46017 October 2022Relief Request Impractical RPV and Rx Coolant Sys. Welds
ML22285A15512 October 2022NRR E-mail Capture - H. B. Robinson, Unit 2 - Acceptance of License Amendment Request Regarding the Addition of Feedwater Isolation Function to TS 3.3.2 and Removal of Obsolete Content from TS 2.1.1.1 and TS 5.6.5.b
ML22242A16030 August 2022Hardship Relief Request Pilot-Operated Relief Valve Acceptance Review Results
ML22237A16325 August 2022004 Radiation Safety Baseline Inspection Information RequestSurveillance Frequency Control Program
Coronavirus
ML22222A10810 August 2022NRR E-mail Capture - Request for Additional Information Regarding Duke'S Request to Remove 4.160 Kv Bus 2 from Surveillance Requirement 3.8.1.16
ML22146A36525 May 2022Acceptance of Requested Licensing Action License Amendment Request for Application to Revise Surveillance Requirement 3.8.1.16
ML22115A14125 April 2022NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition InformationHealth Physics Network
High winds
ML22112A14822 April 2022Correction_H. B. Robinson Steam Electric Plant, Unit 2 - Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02
ML22108A01815 April 2022NRR E-mail Capture - Accepted for Review - Duke Energy Relief Request for Harris Nuclear Plant Inservice Testing Program Plan - Fourth Ten-Year Interval to Extend Type C Test to 75 Months
ML22083A07024 March 2022NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, and McGuire Nuclear Station, Units 1 and 2 - Acceptance Review for TSTF-569 LAR
ML22083A02823 March 2022Email Snsb Safety Evaluation for Harris LAR to Revise Reactor Protection System TS
ML22080A00418 March 2022Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections
ML22049B01517 February 2022NRC RP Inspection Document Request LetterHigh Radiation Area
Locked High Radiation Area
ML22038A1577 February 2022NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2
ML22024A39524 January 2022Acceptance of Requested Licensing Action Amendment McGuire RCS PT Limits Change TS 3.4.3 and EFPY Changes
ML22018A02718 January 20222022 All RFI Responses - Exercise and Program Inspections - Revl
ML22012A36612 January 2022Acceptance of Requested Licensing Action License Amendment Re2uest for Application to Revise Technical Specification to Adopt TSTF-577, Revised Frequencies for Steam Generating Tube Inspections
ML22005A0875 January 2022Acceptance of Requested Licensing Action Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves
ML21361A01223 December 2021NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility
ML21354A86115 December 2021NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156)Incorporated by reference
Aging Management
Stress corrosion cracking
ML21286A78122 November 2021Acceptance of Requested Licensing Action Revision to the End of Cycle Moderator Temperature Coefficient Measurement Methodology
ML21321A37816 November 2021NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193
ML21295A29922 October 2021Document Request for Robinson Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021004
ML21288A08015 October 2021NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-21-0213 - Remove Limitations to Perform Certain SRs During Shutdown (L-2021-LLA-0167)
ML21286A66113 October 2021Acceptance for Review of Proposed Alternative ISI-05-017 for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections