Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24011A100 | 10 January 2024 | March 2024 Emergency Preparedness Program Inspection - Request for Information | |
ML23334A161 | 30 November 2023 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - RAIs Associated with License Renewal Commitment for Pressurizer Surge Line Welds Inspection Program to Manage Environmentally Assisted Fatigue | Aging Management License Renewal |
ML23334A007 | 29 November 2023 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for LAR That Revises TSs 3.5.1, SITs - Operating; 3.5.2, SIT Shutdown; 3.6.5, Containment Air Temperature; and SRs for TS 3.5.1, SITs Operating | |
ML23328A013 | 22 November 2023 | Supplement - Security Rule Exemption Request ISFSI Docket No. Reference (L-2023-LLE-0028) | Exemption Request |
ML23304A016 | 30 October 2023 | NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - LaSalle 1 & 2 - Exemption from Security Rule (L-2023-LLE-0028) | Time of Discovery Fitness for Duty Contraband |
ML23298A123 | 25 October 2023 | NRR E-mail Capture - Palo Verde, Unit 1 - RAIs for Relief Request 70, Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle | |
ML23268A002 | 22 September 2023 | NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 | |
ML23264A799 | 21 September 2023 | NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 | |
ML23243B008 | 31 August 2023 | NRR E-mail Capture - Action: Opportunity to Review and Comment on a New NRC Information Collection, 10 CFR Part 50.55a, Codes and Standards (3150-XXXX) | |
ML23237B397 | 24 August 2023 | NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines | |
ML23233A013 | 18 August 2023 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of License Renewal Commitment for Pressurizer Surge Line Welds Inspection Program to Manage Environmentally Assisted Fatigue | |
ML23220A051 | 3 August 2023 | NRR E-mail Capture - Re Palo Verde 1, 2, and 3 - SUNSI Review of UFSAR, Rev. 22 | |
ML23202A016 | 20 July 2023 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR to Revise TSs 3.5.1, SITs - Operating; 3.5.2, SIT Shutdown; 3.6.5, Containment Air Temperature; and SRs for TS 3.5.1, SITs Operating | |
ML23163A229 | 12 June 2023 | NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 | |
ML23153A156 | 2 June 2023 | NRR E-mail Capture - RAI LaSalle pressure-temperature Limits Report (PTLR) Amendment Request | Anticipated operational occurrence Hydrostatic Pressure and Temperature Limits Report |
ML23151A660 | 31 May 2023 | NRR E-mail Capture - LaSalle County Station, Units 1 and 2 - Acceptance of I4R-14 | |
ML23150A248 | 25 May 2023 | NRR E-mail Capture - RAI Re LaSalle Downcomer Analysis Amendment Request | |
ML23143A133 | 23 May 2023 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR Revising TS 3.3.11 to Adopt TSTF-266-A, Rev. 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls | |
ML23130A013 | 10 May 2023 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review for Authorized Use of Mururoa Supplied Air Suits (Models V4F1 and MTH2) Pursuant to 10 CFR 20.1703 and 10 CFR 20.1705 | Mururoa |
ML23128A161 | 8 May 2023 | NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing | |
ML23095A189 | 5 April 2023 | NRR E-mail Capture - LaSalle County Station, Units 1 and 2 - Audit Plan PTLR Amendment Request | Pressure and Temperature Limits Report |
ML23086B986 | 27 March 2023 | NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 | |
ML23074A037 | 14 March 2023 | NRR E-mail Capture - (External_Sender) Implementation of Exigent Amendment | |
ML23044A045 | 13 February 2023 | NRR E-mail Capture - LaSalle County Station, Units 1 and 2 - Acceptance of Requested Licensing Action License Amendment Request to Revise Lower Downcomer Braces Analysis | Pressure and Temperature Limits Report |
ML23046A113 | 13 February 2023 | Transmittal Email, Paul Bessette to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request | Exemption Request |
ML23033A032 | 1 February 2023 | NRR E-mail Capture - Request for Additional Information for Davis-Besse's 2022 Steam Generator Inspection Report (L-2022-LRO-0115) | |
ML23017A093 | 17 January 2023 | NRR E-mail Capture - Palo Verde - Acceptance of License Amendment Request Regarding Adoption of TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable (L-2022-LLA-0181) | |
ML23013A063 | 13 January 2023 | NRR E-mail Capture - Palo Verde Unit 1 -Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing | |
ML23052A204 | 10 January 2023 | E-mail from Paul Bessette Dated 01/10/2023 Regarding Diablo Canyon | |
ML22357A038 | 23 December 2022 | NRR E-mail Capture - LaSalle County Station, Units 1 and 2 - Acceptance of Requested Licensing Action License Amendment Request to Relocate the Pressure and Temperature Limit Curves | Pressure and Temperature Limits Report |
ML22354A262 | 20 December 2022 | NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI | |
ML22348A167 | 14 December 2022 | March 2023 Emergency Preparedness Exercise Inspection - Request for Information | |
ML22339A237 | 5 December 2022 | NRR E-mail Capture - Palo Verde Unit 1 Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing | |
ML22301A090 | 28 October 2022 | NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2 | |
ML22266A110 | 23 September 2022 | NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure | |
ML22256A011 | 12 September 2022 | NRR E-mail Capture - Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage | |
ML22200A078 | 19 July 2022 | NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits | Mururoa |
ML22173A068 | 17 June 2022 | Email Concurrence on SE Input for Columbia Pltr LAR | |
ML22167A187 | 16 June 2022 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Revised Acceptance Review of LAR to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues | |
ML22164A857 | 13 June 2022 | NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan | |
ML22138A411 | 18 May 2022 | NRR E-mail Capture - Lasalle 1 and 2 - (RAI) License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Changes to TS Sections 4.3.1 and 5.6.5 (EPID-L-2021-LLA-0124) | |
ML22136A092 | 16 May 2022 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR to Adopt TSTF-487-A, Revision 1, Relocate DNB Parameters to the COLR | |
ML22126A039 | 6 May 2022 | NRR E-mail Capture - Lasalle 1 and 2 Draft (RAI) License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to TS Sections 4.3.1 and 5.6.5 | |
ML22118A686 | 28 April 2022 | NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval | Probabilistic Risk Assessment Incorporated by reference |
ML22112A109 | 22 April 2022 | NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building | Earthquake |
ML22090A169 | 30 March 2022 | Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation | |
ML22080A251 | 18 March 2022 | NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) | |
ML22075A190 | 16 March 2022 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues |