Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23241A002 | 25 August 2023 | Paragon Final Part 21 Report on Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors Modified by Paragon with Special Coils And/Or with RTV to Improve the Securing of Shading Coils | |
ML23221A370 | 3 August 2023 | Paragon Energy Solutions, 10CFR Part 21 Initial Notification: P21-08032023-IN, Rev. 0 | |
ML21271A234 | 23 September 2021 | EN 55282 (Updated) - Framatome Part 21 Reportable Defect - Vacuum Breakers | Overtravel |
ML20108F530 | 20 March 2020 | 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0129, Rev. 0, Test Stand Deficiency - EMD Fuel Injectors P/N H40084720 | |
ML19347A426 | 10 December 2019 | General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) | Post Accident Monitoring |
ML19317D093 | 25 October 2019 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing | |
ML19253A053 | 29 August 2019 | Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors | |
ML19120A106 | 17 April 2019 | Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors | |
ML19091A050 | 21 March 2019 | Engine Systems, Inc. 10 CFR 21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0124, Rev. 0, Excitation Transformers for Vickers Voltage Regulator System | |
ML19087A252 | 21 March 2019 | Engine Systems, Inc. - 10 CFR 21 Reportable Notification on Excitation Transformers for Vickers Voltage Regulator System | |
ML19080A059 | 8 March 2019 | Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors | |
ML19053A500 | 1 February 2019 | Sor, Inc. Part 21 Notification of Deviation Sor R-Series Housing with Terminal Block | |
ML19042A080 | 25 January 2019 | Part 21 Report No. 10CFR21-0124-INT; Rev. 0 - Saturable Reactor (Magnetic Amplifier) for Vickers Voltage Regulator System, P/N 8408218-ESI | |
ML19002A204 | 21 December 2018 | to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts | |
ML18354A742 | 4 December 2018 | Engine Systems, Inc., Submittal of 1OCFR21 Reporting of Defects and Non-Compliance - Report No. 1OCFR21-0123, Rev. 0 - Emo Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts | |
ML18353A428 | 30 November 2018 | Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps | |
ML17325B022 | 17 November 2017 | Fisher Controls International LLC Information Notice (FIN) 2017-05 | |
ML17324A979 | 17 November 2017 | Part 21 Report Re Fisher Type 461 Valve Plug Machining | |
ML17194A825 | 11 July 2017 | Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections | Anchor Darling |
ML17104A288 | 13 April 2017 | Emerson Process Management, LLC - Fisher Information Notice, (FIN) 2017-02 | |
ML17114A070 | 13 April 2017 | Part 21 Notification - Identified Fisher 546S Electro-Pneumatic Transducers Standard Mounting Brackets Failed Seismic Testing Standards | |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17026A414 | 20 January 2017 | C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling | |
ML16278A471 | 22 September 2016 | Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close | |
ML16281A270 | 22 September 2016 | Part 21 - Initial Notification of Masterpact Breaker Fail to Close | |
ML16252A274 | 29 August 2016 | Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay | |
ML16243A474 | 26 August 2016 | Potential Part 21 Unqualified Component in Certain Allen Bradley Timing Relays | |
ML16232A604 | 15 August 2016 | Potentially Unqualified Component in Certain Allen Bradley Timing Relays | |
ML16238A186 | 15 August 2016 | Update - Report of Potential l0CFR Part 21, Allen Bradley Timing Relay Model 700RTC-NRC Event Number 51030, Accession Number ML15134A016 | |
ML16209A050 | 13 July 2016 | Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B | |
ML16196A064 | 10 July 2016 | Part 21 Report - Materials Not Properly Dedicated | |
ML16188A376 | 21 June 2016 | Part 21 Interim Evaluation of Deviation - Contractor Failure | |
ML16154A207 | 26 May 2016 | Part 21, Azz/Nli Nuclear Logistics, Inc., Potentially Unqualified Component in Certain Allen Bradley Timing Relays Model 700RTC | |
ML16194A199 | 25 May 2016 | Azz/Nli - Update - Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC | |
ML16154A205 | 20 May 2016 | Part 21 Interim Evaluation of a Deviation - Contactor Failure | |
ML16139A832 | 13 May 2016 | Part 21 - Initial Notification of Masterpact Breaker Fail to Close | |
ML16139A833 | 13 May 2016 | Part 21 - Initial Notification of Masterpact Breaker Fail to Close | |
ML16111A420 | 8 April 2016 | Part 21 Report No. P21-04302015, Rev. 1 Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays, Per Browns Ferry, Ginna, Millstone, Nine Mile Point, North Anna, Ft. Calhoun, Perry, River Bend, South Texas Project | |
ML16061A011 | 27 February 2016 | Nuclear Logistics, Inc. - Part 21 Contactor Making Noise, Per Turkey Point | Condition Adverse to Quality |
ML16061A010 | 19 February 2016 | Nuclear Logistics, Inc. - Part 21 - Contractor Making Noise | Condition Adverse to Quality |
ML15345A390 | 8 December 2015 | Part 21 Report - 2 Motors Were Not Properly Prepared Before Small Steel Shot Blasting | |
ML15134A016 | 1 May 2015 | Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays | |
ML15159A568 | 30 April 2015 | Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC | |
ML15089A436 | 21 March 2015 | Part-21 Report - Valve Seat Leakage Defect | |
ML15089A437 | 20 March 2015 | Part 21 - Dual Alarm Modules That May Contain Faulty Diodes in Single State Relays | |
ML15049A458 | 6 February 2015 | Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance | Shutdown Margin |
ML15022A650 | 20 January 2015 | Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification | |
ML14274A052 | 22 September 2014 | Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities | |
ML14217A347 | 31 July 2014 | Part 21 Interim Report - Temperature Switch Set Points Out of Calibration | |
ML14169A030 | 15 June 2014 | Update to Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Seismic Qualifications for PV-62 |