Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19317D09325 October 2019Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing
ML19080A0598 March 2019Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors
ML18263A28120 September 2018(Waterford 3) - Part 21 Report of Westinghouse 7300 Circuit Card Increased Failure RateUltimate heat sink
ML17325B02217 November 2017Fisher Controls International LLC Information Notice (FIN) 2017-05
ML17192A26530 June 2017Areva Np, Inc. - Closure of Interim Report of an Evaluation of a Deviation Pursuant to 10 CFR 21.21(a)(2)
ML17081A45320 March 2017Part 21 - Plastic Jar Dedication Sampling
ML16252A27429 August 2016Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay
ML15243A17425 August 2015Part 21 Furmanite Nuclear Grade Leak Seal Material FSC-N-1B
ML15134A0161 May 2015Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays
ML15089A43621 March 2015Part-21 Report - Valve Seat Leakage Defect
W3F1-2014-0069, Part 21 Report of Time-Delay Relay Failure12 November 2014Part 21 Report of Time-Delay Relay Failure
W3F1-2014-0042, Part 21 Report of Pneumatic Valve Actuator Reverse Action9 July 2014Part 21 Report of Pneumatic Valve Actuator Reverse Action
W3F1-2014-0026, Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation11 April 2014Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation
ML14107A1619 April 2014Qualtech Np Response to 10CFR Part 21 Notification on Allen Bradley Timing Relays, Event # 49911, Docket No. 99901414
ML14079A02813 March 2014Part 21 - Allen Bradley Type 700RTC Relay Spuriously De-EnergizingUnanalyzed Condition
ML14069A46726 February 2014Part 21 Report Involving a Potential Manufacturing Defect in Replacement Masterpact Cradles
ML13246A08723 August 2013Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification
ML13165A34212 June 201360-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML12094A3712 April 2012Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations
ML12066A1182 March 2012Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations
ML12097A3162 March 2012Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition
ML0934301402 December 200910CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 1OCFR21-0098, Rev. 0, Amot Thermostatic Valve Element, P/N: 9760X
ML09239004325 August 2009Notification of Potential Part 21 Report Due to Radiation Monitor Defect
ML09076118811 March 2009Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs
ML07233047514 August 2007Rosemount 1154 Pressure Transmitter Calibration Problem
L-75-426, Letter Regarding a Reportable Incident Under 10 CFR 50.55(e) Relating to a Split Flange on Intake Cooling Water Line and Requesting Postponement of This Report Until October 6, 19759 September 1975Letter Regarding a Reportable Incident Under 10 CFR 50.55(e) Relating to a Split Flange on Intake Cooling Water Line and Requesting Postponement of This Report Until October 6, 1975
L-75-388, Letter Regarding the Construction Incident Report (Final) Steam Generator 1B1 Primary Head Clad5 August 1975Letter Regarding the Construction Incident Report (Final) Steam Generator 1B1 Primary Head Clad
L-75-197, Letters Regarding an Interim Report Concerning a Crack Discovered in the East Wall of the Refueling Canal of Unit 1 and Requesting an Extension of Time for Submission of Reports on Refueling Wall Crack and Failure of Square D ...28 April 1975Letters Regarding an Interim Report Concerning a Crack Discovered in the East Wall of the Refueling Canal of Unit 1 and Requesting an Extension of Time for Submission of Reports on Refueling Wall Crack and Failure of Square D ...