MONTHYEARML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19080A0592019-03-0808 March 2019 Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors ML17325B0222017-11-17017 November 2017 Fisher Controls International LLC Information Notice (FIN) 2017-05 ML17192A2652017-06-30030 June 2017 Areva Np, Inc. - Closure of Interim Report of an Evaluation of a Deviation Pursuant to 10 CFR 21.21(a)(2) ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML16252A2742016-08-29029 August 2016 Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay ML15243A1742015-08-25025 August 2015 Part 21 Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML15134A0162015-05-0101 May 2015 Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML15089A4362015-03-21021 March 2015 Part-21 Report - Valve Seat Leakage Defect ML14069A4672014-02-26026 February 2014 Part 21 Report Involving a Potential Manufacturing Defect in Replacement Masterpact Cradles ML13246A0872013-08-23023 August 2013 Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML0923900432009-08-25025 August 2009 Notification of Potential Part 21 Report Due to Radiation Monitor Defect ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0723304752007-08-14014 August 2007 Rosemount 1154 Pressure Transmitter Calibration Problem L-75-426, Letter Regarding a Reportable Incident Under 10 CFR 50.55(e) Relating to a Split Flange on Intake Cooling Water Line and Requesting Postponement of This Report Until October 6, 19751975-09-0909 September 1975 Letter Regarding a Reportable Incident Under 10 CFR 50.55(e) Relating to a Split Flange on Intake Cooling Water Line and Requesting Postponement of This Report Until October 6, 1975 L-75-388, Letter Regarding the Construction Incident Report (Final) Steam Generator 1B1 Primary Head Clad1975-08-0505 August 1975 Letter Regarding the Construction Incident Report (Final) Steam Generator 1B1 Primary Head Clad L-75-197, Letters Regarding an Interim Report Concerning a Crack Discovered in the East Wall of the Refueling Canal of Unit 1 and Requesting an Extension of Time for Submission of Reports on Refueling Wall Crack and Failure of Square D ...1975-04-28028 April 1975 Letters Regarding an Interim Report Concerning a Crack Discovered in the East Wall of the Refueling Canal of Unit 1 and Requesting an Extension of Time for Submission of Reports on Refueling Wall Crack and Failure of Square D ... 2019-03-08
[Table view] |
Text
A AR',EV,A 50-335 Project: TFPF
~Receiver:
Channel: PC CF-AN P-ZN RC-00001 Date: 2017-06-30 I ~ocument Control Desk U.S. Nuclear Regulatory Commission Sender: LECOUR Hugues I 11555 Rockville Pike eMail: hugues.lecour@areva.com I Rockville, MD 20852 Tel: +33 1 34 96 74 51 1USA i
Mobile: +33 6 30 49 02 85
[
Subject:
Cfosure-ofTnterim Report of an .Evaiuationata-*Deviation Pursuant to 10 CFR 21.21 (a)(2)==1 Ref. 1: Letter, Mr. Gary Peters (AREVA Inc.) to Document Control Desk (NRG), "Interim Report of an Evaluation of a Deviation Pursuant to 10 CFR 21.21(a)(2)," NRC:16:033,. December 7, 2016.
Dear Sir or Madam,
On behalf of AREVA NP SAS, AREVA Inc. (AREVA) issued an Interim Report to the NRC on De-cember 7, 2016 concerning the identification of an issue related to fabrication record anomalies at Creusot Forge (Reference 1), for the Sainte Lucie 1 pressurizer. This interim report set forth a completion date for the evaluation of June 30, 2017.
The evaluation is now complete. AREVA NP has concluded that the fabrication record anomalies identified through the evaluation of the Sainte Lucie 1 forgings manufacturing files would not create
- a substantial safety hazard and are therefore not reportable in accordance with 10 CFR Part 21.
Best regards, AREVA NP Pierre COLIN - Creusot Forge Conformance Project Manager Copies: Mike Street, David Emond, Gary Peters Attachments: N/A AREVA NP Head quarter: Tour AREVA 1, place Jean Millier-92084 Paris La Defense cedex- France Phone : 33 (0)1 34 96 00 00 - fax : 33 (0)1 34 96 00 01 SOCIETE PAR ACTIONS SIMPLIFIEES AU CAPITAL DE 400.000.100 EUR - 428 764 500 RCS NANTERRE - TVA FR 83 428 764 500 Page 1of1 FFP/ANP90004/D/en