Issue date | Title | Topic | |
---|---|---|---|
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20211D649 | 25 August 1999 | Part 21 Rept Re Nonconformance within LCR-25 safety-related Lead Acid Battery Cells Manufactured by C&D.Analysis of Cells Completed.Analysis of Positive Grid Matl Shows Nonconforming Levels of Calcium within Positive Grid Alloy | |
ML18016A901 | 12 April 1999 | Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected | |
ML20207M923 | 12 March 1999 | Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results | |
B17414, Part 21 Rept Re 980116 Failure of Tachometer Transducer,Id Number TG-25-5,during Surveillance Test.Caused by Bearing Failure Which Could Cause Shaft to Seize & Break.Removed from Svc & Replaced Failed Tachometer Transducer | 3 September 1998 | Part 21 Rept Re 980116 Failure of Tachometer Transducer,Id Number TG-25-5,during Surveillance Test.Caused by Bearing Failure Which Could Cause Shaft to Seize & Break.Removed from Svc & Replaced Failed Tachometer Transducer | Commercial Grade Dedication |
ML18066A277 | 13 August 1998 | Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency | |
ML20236Y123 | 7 August 1998 | Part 21 Rept Re Gas & Turbine Generator for Dedicated Emergency Power to Vital AC Buses | |
ML20236N675 | 9 July 1998 | Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps | |
ML20248F353 | 21 May 1998 | Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted | Reverse polarity |
ML20247G613 | 13 May 1998 | Part 21 Rept Re Defect Contained in Automatic Switch Co, Solenoid Valves,Purchased Under Purchase Order (Po) 970161. Caused by Presence of Brass Strands.Replaced Defective Valves | |
ML20247B675 | 1 May 1998 | Part 21 Rept Re Evaluation & Notification for RELAP4 Excessive Variability at Millstone Unit 2.Caused by Small Changes in Input to RELAP4 That Can Result in Large Changes in Calculated Peak Cladding Temp.Informed NRC of Deviation | |
ML20217A153 | 16 April 1998 | Closure to Interim Part 21 Rept Submitted to NRC on 970929. New Date Established for Completion of Level I & 2 Setpoint Project Committed to in .Final Approval of Setpoint Calculations Will Be Completed by 980531 | |
ML20217D570 | 20 March 1998 | Part 21 Rept 40 Re Governor Valve Stems Made of Inconel 718 Matl Which Caused Loss of Governor Control.Control Problems Have Been Traced to Valve Stems Mfg by Bw/Ip.Id of Carbon Spacer Should Be Increased to at Least .5005/.5010 | |
ML20198E063 | 7 January 1998 | Part 21 Rept Re Shipment by Dubose National Energy Svcs,Inc, of 40 Pieces of 4 inch,90 Degree Elbows Which Did Not Meet ASME Section II SA-234 Requirements | |
LD-97-033, Part 21 Rept Re Defect in Potter & Brumfield Mdr Relays, Models 170-1 & 7032.Extended Problem to Include All Mdr Relay Models W/Date Codes 93XX-95XX.Root Cause Analysis, Written Rept & Recommended Corrective Actions Due by 971201 | 20 November 1997 | Part 21 Rept Re Defect in Potter & Brumfield Mdr Relays, Models 170-1 & 7032.Extended Problem to Include All Mdr Relay Models W/Date Codes 93XX-95XX.Root Cause Analysis, Written Rept & Recommended Corrective Actions Due by 971201 | |
ML20217H871 | 15 October 1997 | Part 21 Rept Re Potential Safety Hazard for Some 3/4 Sch 40 Pipe Shipped to CP&L & VA Power Corp.Matl Has Been Found to Have Areas Where Wall Thickness Falls Below Minimum Allowed by SA 312 Specification.Customers Have Been Notified | |
LD-97-028, Part 21 Rept Re Contamination of Lubricant Which Has Led to Hardening of Lubricant in Certain Potter & Brumfield Mdr Relay Models 170-1 & 7032.Will Distribute Copy of Rept to Utils Having ABB-CE Designed Nuclear Steam Supply Sys | 13 October 1997 | Part 21 Rept Re Contamination of Lubricant Which Has Led to Hardening of Lubricant in Certain Potter & Brumfield Mdr Relay Models 170-1 & 7032.Will Distribute Copy of Rept to Utils Having ABB-CE Designed Nuclear Steam Supply Sys | |
ML20211M649 | 8 October 1997 | Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted | |
ML20211H791 | 30 September 1997 | Part 21 Rept Re Failure of Weldment Associated w/lube-oil Piping Sys on 970804 at Millstone,Unit 2.Root Cause Is Not Yet Known.Quality of Weldment Is Being Considered.Listed Util Sites Affected | |
ML17309A621 | 29 September 1997 | Part 21 Rept Re Final Disposition of Masterflow 713 & Embeco 636 Grout Nonconformance Reported by Master Builders,Inc. Licensee Continuing to Monitor shelf-life of Masterflow 713 & Embeco 636 Grouts Produced at Rancho Cucamonga | |
ML20217D414 | 29 September 1997 | Interim Part 21 Rept Re Errors Noted During Preparation of ITS Surveillance Test Procedures Using GE Calculated Setpoints.Setpoint Calculations Will Be Reviewed,Corrected & Approved to Establish Significance of Errors | |
LD-97-024, Part 21 Rept Re Error in Energy Redistribution Factor Used in LOCA Analysis for Listed Plants for Which ABB-CE Performed Analysis.Issued Recommendations Info Bulletin 97-004 | 14 August 1997 | Part 21 Rept Re Error in Energy Redistribution Factor Used in LOCA Analysis for Listed Plants for Which ABB-CE Performed Analysis.Issued Recommendations Info Bulletin 97-004 | |
B16531, Part 21 Rept Re GE Commercial Grade Dedication Program Being Determined to Be Inadequate in Ability to Demonstrate Seismic Capability of Specific Relay.Returned Relays to GE Facility for Repair | 3 July 1997 | Part 21 Rept Re GE Commercial Grade Dedication Program Being Determined to Be Inadequate in Ability to Demonstrate Seismic Capability of Specific Relay.Returned Relays to GE Facility for Repair | Time of Discovery Commercial Grade Dedication Design basis earthquake |
ML18153A143 | 10 June 1997 | Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem | |
ML20140D658 | 6 June 1997 | Part 21 Rept Re GE Model Ifcs Relays Procured from GE Delivered W/Loose Hardware & Unsuitable for Use at Unit 1 | |
ML20140A966 | 29 May 1997 | Part 21 Rept Re Ksv Emergency Diesel Generator Power Piston Failure.Caused by Jacket Water in Combustion Chamber. Recommends That Users Verify That Crown Thickness at Valve Cutout Be 100 Minimum | Finite Element Analysis |
ML20140G448 | 1 May 1997 | Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages | |
ML20210E359 | 27 March 1997 | Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A | |
ML20137F322 | 26 March 1997 | Part 21 Rept Re Perry Nuclear Power Plant Experiencing False Trip of K600S K-Line Low Voltage Circuit Breaker w/SS-5 Solid State Trip Device.Breaker Removed from Svc & Returned to Abb for Analysis | |
ML20137G626 | 25 March 1997 | Svcs Part 21 Rept Re Emergency Generators Installed at Zion Station Which Developed Significant Drop in Crankcase Lube Oil Level.Caused by Crack in Liner Wall,Allowing Jacket Water to Enter Chamber | Finite Element Analysis |
B16149, Part 21 Rept Re Cracked Fuse Ferrule Defects Due to Administrative Error in Ltr Detailing Commitments Re Issue. Corrected Copy of Commitments Associated W/Ltr Provided | 14 January 1997 | Part 21 Rept Re Cracked Fuse Ferrule Defects Due to Administrative Error in Ltr Detailing Commitments Re Issue. Corrected Copy of Commitments Associated W/Ltr Provided | |
ML20133E800 | 8 January 1997 | Deficiency Rept Re Nonconformance Related to Masterflow 713 Grout,Which Master Builders,Inc Has Supplied as Nuclear SR Product to 18 Npps.Cause Unknown.Requests That Listed Info Be Provided to Gain Insight as to Scope & Possible Cause | |
B16030, Part 21 Rept Re Stocked safety-related Fuses Issued from Storeroom for Installation Which Had Cracked Ferrules in Longitudinal Direction on 960911.Procurement & Warehouse Groups Completed Inspecting Fuses in Warehouse | 13 December 1996 | Part 21 Rept Re Stocked safety-related Fuses Issued from Storeroom for Installation Which Had Cracked Ferrules in Longitudinal Direction on 960911.Procurement & Warehouse Groups Completed Inspecting Fuses in Warehouse | |
ML20135D801 | 26 November 1996 | Part 21 Rept Re Two Safety Related Valves Supplied by Velan Valve Corp Were Not in Compliance W/Originally Supplied QA Documentation.Returned Valves to Velan in May 1996 & on 961120 Velan Advised That Valves Had Been Misplaced | |
ML20134N406 | 22 November 1996 | Part 21 Rept Re Fifteen Different Fuse Types from Three Different Mfgs Found to Have Axial Cracks Due to Brass Being Susceptible to Defect.Functional Testing Should Be Performed on Sample of Fuses | |
ML20134H336 | 5 November 1996 | Part 21 Rept Re Defective Inner Thrust Bearing 1801461-01 Used in PSA 35 Mechanical Shock Arrestor Used as Restraint on Piping Sys for Nuclear Generating Plant.Lot of Defective Parts Located & Isolated to Three Customers | |
ML18065B011 | 18 October 1996 | Part 21 Rept Re Application of Certain Aspects of ABB-CE Safety Analysis Methodology | |
ML20115D200 | 9 July 1996 | Part 21 Rept Re Mfg Defect of Enterprise DSR-4 & DSRV-4 Edgs,Originally Mfg by Calcon Corp.Amot Control Corp Purchased Calcon Product Line & Maintains Design & Production.Valves Returned to Cooper Energy Svcs on 960131 | |
ML20113D420 | 15 May 1996 | Part 21 Rept Re Certain Lots of Commercial Grade Potentiometers in Transmeters Have Been Supplied W/Lubrication in Noncompliance W/Engineering Spec Requirements | |
ML20117G464 | 14 May 1996 | Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs | |
LD-96-014, Part 21 Rept Re Response to NRC Notice on Nonconformance. Licensee Will Direct Cognizant Personnel Reviewing Deviation or Failure to Comply for Basic Components Delivered to Customers,To Document Whether/Not Facts Indicate Evaluation | 26 April 1996 | Part 21 Rept Re Response to NRC Notice on Nonconformance. Licensee Will Direct Cognizant Personnel Reviewing Deviation or Failure to Comply for Basic Components Delivered to Customers,To Document Whether/Not Facts Indicate Evaluation | |
LD-96-009, Part 21 Rept Re Potential Instrumentation Decalibr at Low Power.Affected Utils Should Ensure That Log Power Channels Properly Calibr & cross-correlated to Linear Power Channels at 100% Reactor Power | 15 April 1996 | Part 21 Rept Re Potential Instrumentation Decalibr at Low Power.Affected Utils Should Ensure That Log Power Channels Properly Calibr & cross-correlated to Linear Power Channels at 100% Reactor Power | |
ML20086A275 | 27 June 1995 | Part 21 Rept Re Several Incidents of Instrument Drift in Excess of Specified Limits for Rosemount Pressure Transmitter Model 1154SH9.Other Licensees Advised to Be Alert to Differences in Pressure Indication | |
ML20083R910 | 26 April 1995 | Final Part 21 Rept Re Kepco,Inc Model RMX24-D-20804 Power Supplies in Which Transistors Q15 &/Or Q16 Failed to Open & R1 Was Open.Replacement of Transmitters w/XSIS-095 Along W/ Replacement of Electrolytic Capacitors Provides Solution | |
ML20077D343 | 29 November 1994 | Part 21 Rept Re Suspect Master Connecting Rods & Contains Info Location in Engine for Rods | |
ML20078G305 | 9 November 1994 | Rev to Part 21 Rept Re Potential Problem W/Master Power Connecting Rods.Vendor Recommends Listed Utils Perform Visual Insp of Master Rods to Determine Applicability of Rept | |
ML18153B084 | 26 September 1994 | Suppl to 940902 Initial Part 21 Rept Re Defect W/Governor Valves Used in turbine-driven Pumps Mfg by Dresser-Rand to Formally Addresss Written 30 Day Rept Requirement of 10CFR21(c)(3)(ii) | |
ML18038A897 | 7 September 1994 | Part 21 Rept Re Defect in Latching Mechanism of Potter & Brumfield Relay on C&D High Voltage Shut Down Alarm Assembly Printed Circuit Boards.Pull Test on Relay Reset Button Incorporated Into Receiving Insp Procedures | |
ML18153B060 | 2 September 1994 | Initial Part 21 Rept Re Steam Drive AFW Pump Governor Valve Mfg by Dresser-Rand.Maint Procedure to Stroke Governor Valve Stem Performed Weekly & Monitoring of Corrosion Build Up in Gland Seal Leakoff Area Performed Weekly | |
ML20059H772 | 17 January 1994 | Part 21 Rept Re Virginia Power Notifying Fairbands Morse Via Failure Analysis Rept NESML-Q-058 of Defective Air Start Distributor cam,16104412 |