 Issue dateTitleTopic
ML23354A00319 January 2024Authorization and Safety Evaluation for Alternative Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations
ML23278A12914 December 2023Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines
ML23265A13227 September 2023Proposed Alternative Request RV-03 Associated with the Sixth 10-Year Inservice Testing IntervalIncorporated by reference
Power-Operated Valves
ML23262B44426 September 2023Authorization and Safety Evaluation for Alternative Request No. I4R-14
ML23156A67520 June 2023Request for Withholding Information from Public Disclosure for Proposed Alternative to the Requirements for Repair/Replacement of Saltwater System Buried Piping
ML23125A0618 May 2023Proposed Alternative to the Requirements of the ASME Code
ML23104A34714 April 2023Verbal Authorization for Relief Request I5R-14, Proposed Alternative Associated with N2E Dissimilar Metal Weld Overlay Repair with Laminar IndicationWeld Overlay
Dissimilar Metal Weld
DM weld
ML23073A36816 March 2023Authorization and Safety Evaluation for Proposed Alternative I6R-10, Revision 0 Related to the Steam Generators,
ML23041A42614 February 2023Proposed Alternative to the Requirements of the ASME OM CodeStroke time
Incorporated by reference
ML23033A0983 February 2023Authorization and Safety Evaluation for Alternative Request I6R-09, Revision 0,Nondestructive Examination
Incorporated by reference
ML23003A17812 January 2023Authorization and Safety Evaluation for Alternative Request I6R-09
ML23004A1716 January 2023Authorization and Safety Evaluation for Alternative Request I6R-10,Nondestructive Examination
ML22195A0253 January 2023Authorization and Safety Evaluation for Alternative Request No. ISI-05-016Probabilistic Risk Assessment
ML22339A05821 December 2022Relief Request Associated with Pump Periodic Verification Tests of Core Spray System PumpsIncorporated by reference
ML22332A54921 December 2022Proposed Alternative to the Requirements of the ASME OM CodeIncorporated by reference
Grace period
ML22335A54420 December 2022Authorization and Safety Evaluation for Alternative Request I6R-01,VT-2
Pressure Boundary Leakage
ML22327A26330 November 2022Authorization and Safety Evaluation for Alternative Request No. I6R-01, Rev. 0VT-2
Pressure Boundary Leakage
ML22307A24610 November 2022Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (EPIDs L-2021-LLR-0035 and L-2021-LLR-0036)Probabilistic Risk Assessment
Incorporated by reference
ML22256A11529 September 2022Proposed Alternative to the Requirements of the ASME OM CodeIncorporated by reference
ML22265A08628 September 2022Proposed Alternative to the Requirements of the ASME OM CodeStroke time
Incorporated by reference
ML22264A17528 September 2022Proposed Alternative to the Requirements of the ASME OM CodeIncorporated by reference
RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.20 September 2022Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.Non-Destructive Examination
Scaffolding
ML22236A67030 August 2022Authorization and Safety Evaluation for Alternative Request I5R-14, Revision 1,Nondestructive Examination
Incorporated by reference
RS-22-099, Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-1019 July 2022Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-10Non-Destructive Examination
Incorporated by reference
Moisture barrier
ML22194A91515 July 2022Proposed Alternative I4-R13 for Repair of Recirculation Flow Control ValvesIncorporated by reference
EVT-1
Liquid penetrant
ML22105A4052 May 2022Authorization and Safety Evaluation for Proposed Alternative No. ISI-05-019VT-2
RS-22-036, Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds10 March 2022Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds
RS-22-032, Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2 March 2022Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B RepairsNondestructive Examination
EVT-1
Liquid penetrant
ML22047A12722 February 2022Relief from the Requirements of the American Society of Mechanical Engineers CodeIncorporated by reference
ML22024A18524 January 2022Acceptance for Review of Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair
ML22003A00220 December 2021Proposed Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle RepairNon-Destructive Examination
Hydrostatic
Nondestructive Examination
VT-2
Finite Element Analysis
EVT-1
Dissimilar Metal Weld
ML21299A00328 October 2021and Waterford Steam Electric Station, Unit 3 - Approval of Request for Alternative EN-20-RR-003 from Certain Requirements of the ASME Code
ML21280A07827 October 2021Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148)Incorporated by reference
ML21250A38229 September 2021R. E. Ginna Nuclear Power Plant - Issuance of Relief Request I6R-06 Alternate Inspection for Reactor Vessel InternalsSafe Shutdown Earthquake
Operating Basis Earthquake
Incorporated by reference
Earthquake
Flow Induced Vibration
ML21246A10622 September 2021R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Alternative Request GR-03, Valve Position Verification Testing Extension Sixth 10-Year Inservice Testing Program IntervalIncorporated by reference
Grace period
NMP2L2777, Relief Request Associated with Excess Flow Check Valves8 September 2021Relief Request Associated with Excess Flow Check Valves
ML21230A2063 September 2021Proposed Alternative to Use ASME OM Code Case OMN-28Incorporated by reference
ML21190A0042 September 2021Proposed Alternative to the Requirements of the ASME Section XI, Subsection Iwl Concerning Unbound Post-Tensioning SystemsIncorporated by reference
ML21216A2205 August 2021Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining BoltingCoatings
Nondestructive Examination
Incorporated by reference
ML21134A0063 August 2021Proposed Alternatives to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (Epids L-2020-LLR-0099 and L-2020-LLR-0100)Incorporated by reference
ML21140A1533 June 2021Correction to April 22, 2021 Safety Evaluation for Requests for Alternative to the Inservice Testing Requirements of the ASME OM Code for the Fifth 10-Year Program Interval
ML21130A03821 May 2021Memo to File - Draft Request for Additional Information Relief Request CISI-03-01 Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements
ML21117A03126 April 2021Verbal Authorization by the NRC NRR for 10 CFR 50.55a Alternative Request Position Verification Testing Extension - Exelon Generation, R. E. Ginna Nuclear Power PlantIncorporated by reference
ML21109A21622 April 2021Proposed Alternative to Inservice Testing Requirements of the ASME OM Code for the Fifth 10-Year IntervalIncorporated by reference
Fuel cladding
ML21105A33822 April 2021Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Concerning Examination Coverage of Certain Class 1 and 2 Component WeldsIncorporated by reference
ML21049A02423 February 2021Alternative Request to the Requirements of the ASME OM Code for the Testing Intervals for the Instrument-Line Flow Check ValvesIncorporated by reference
Surveillance Frequency Control Program
RS-21-008, Request for Alternative: One-Time Deferral of Follow-Up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2)25 January 2021Request for Alternative: One-Time Deferral of Follow-Up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2)Boric Acid
Weld Overlay
Nondestructive Examination
VT-2
Incorporated by reference
Pandemic
Coronavirus
COVID-19
Pressure Boundary Leakage
Through-Wall Leak
ML20322A00910 December 2020Issuance of Alternative Requests 41-VRR-8 and 41-VRR-7 Regarding Certain Inservice Testing Program Requirements for Safety Relief ValvesIncorporated by reference
Grace period
ML20343A3497 December 2020Acceptance of Requested Licensing Action: Peach Bottom Relief Request for N-16 Nozzle
ML20280A7575 November 2020Revised Safety Evaluation of Relief Requests GVRR-8, 11 PRR-1, 90 PRR-1, and 47 VRR-2 Regarding the Fourth 10-Year Interval of the Inservice Testing Program (EPID L-2018-LLR-0384 Through EPID L-2018-LLR-0387)Safe Shutdown
Stroke time
Incorporated by reference
Surveillance Frequency Control Program
Scram Discharge Volume
Power-Operated Valves
Power Operated Valves