Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
CNL-15-071, Two-Unit Offsite Dose Calculation Manual, Revision 0 | 24 April 2015 | Two-Unit Offsite Dose Calculation Manual, Revision 0 | Time of Discovery Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
ML14177A167 | 25 June 2014 | Probabilistic Risk Assessment (PRA) Summary Report - Information Previously Committed to Provide (TAC ME3334). Part 4 of 4 | Safe Shutdown Internal Flooding Probabilistic Risk Assessment |
ML14177A726 | 25 June 2014 | Probabilistic Risk Assessment (PRA) Summary Report - Information Previously Committed to Provide (TAC ME3334). Part 2 of 4 | Boric Acid Internal Flooding Probabilistic Risk Assessment |
ML14177A725 | 25 June 2014 | Probabilistic Risk Assessment (PRA) Summary Report - Information Previously Committed to Provide (TAC ME3334). Part 1 of 4 | High winds Mission time Internal Flooding Probabilistic Risk Assessment Large early release frequency |
ML14177A166 | 25 June 2014 | Probabilistic Risk Assessment (PRA) Summary Report - Information Previously Committed to Provide (TAC ME3334). Part 3 of 4 | Probabilistic Risk Assessment |
ML12311A151 | 31 October 2012 | Draft Two-Unit Offsite Dose Calculation Manual (ODCM) | Offsite Dose Calculation Manual |
ML12073A225 | 28 February 2012 | Attachment 6, TVA Calculation WBPEVAR8807025, Revision 8, Bypassed and Inoperable Status Indication Logic Input Indications (Letter Item 4) | Safe Shutdown Boric Acid |
ML12069A331 | 19 January 2012 | Attachment 11 - TVA Calculation WCGACQ0766, Required Response Spectra for Evaluation of Radiation Monitoring Equipment, Revision 1 (Letter Item 2, Sser Appendix Hh Item Number TVA21) | Earthquake |
ML12073A226 | 6 January 2012 | Attachment 9, Redacted TVA Calculation WCGACQ0766, Revision 1, Required Response Spectra for Evaluation of Radiation Monitoring Equipment. (Letter Item 6) | Earthquake |
ML12018A214 | 22 December 2011 | Attachment 3 - TVA Calculation EPM-MCP-071689, Cooling/Heating Load & Equipment/Component Performance Analysis for the Control Building Electrical Board Room Areas (El. 692.0 & 708.0), Revision 21. (Letter Item 4, Sser 23 Appendix Hh Item N | Boric Acid Ultimate heat sink Emergency Lighting |
ML11341A137 | 30 November 2011 | Attachments 23 Through 24, WNA-DS-01667-WBT-NP, Revision 5 and CAW-11-3301, Post Accident Monitoring System - System Design Specification | Post Accident Monitoring |
ML11341A158 | 30 November 2011 | Attachments 11 Through 12, CN-EQT-10-44-NP, Revision 1 and CAW-11-3278, Dynamic Similarity Analysis for the Post Accident Monitoring System | Post Accident Monitoring |
ML11341A157 | 30 November 2011 | Attachments 7 Through 9, WNA-CN-00157-WBT-NP, Revision 1, CAW-11-3316, and WBT-D-3566 Np, Incore Instrument System Signal Processing System Isolation Requirement | Boric Acid Post Accident Monitoring Earthquake |
ML11341A135 | 30 November 2011 | Attachments 17 Through 18, EQLR-171-NP, Revision 1 and CAW-11-3299, Environmental and Seismic Test Report Analog Input AI687 and AI688 Modules and Supporting Components for Use in Common Qualified Post Accident Monitoring System | Safe Shutdown Earthquake Post Accident Monitoring Operating Basis Earthquake |
ML12171A320 | 19 September 2011 | Calculation WBNTSR-009, Control Room Operator and Offsite Doses from a Fuel Handling Accident, Revision 14 (Enclosure 2) | Deep Dose Equivalent |
ML11257A049 | 1 September 2011 | Attachment 3, Calculation, WNA-CN-00157-WBT-NP, Revision 0, Watts Bar 2 Incore Instrument System (Iis) Signal Processing System (SPS) Isolation Requirements | Post Accident Monitoring |
ML12018A215 | 14 August 2011 | Attachment 4 - TVA Calculation EPM-LCP-072489, Cooling and Heating Load Analysis, Main Control Room HVAC, Revision 14 (Letter Item 4, Sser 23 Appendix Hh Item Number 108) | Ultimate heat sink Emergency Lighting |
ML11222A114 | 8 June 2011 | Enclosure 1, TVA Calculation WBNAPS3127, EQ Dose in the Control Building, Revision 0, Attachment 1 | |
ML11154A141 | 14 April 2011 | Enclosure 3, Calculation RSOGENROGCDX00033320110002, Seismic Evaluation of Hesco Baskets. | Hydrostatic Operating Basis Earthquake Temporary Modification |
ML103200150 | 9 November 2010 | Summary of Contingency Events and the Cases/Scenario Run | Boric Acid Fuel cladding |
ML102240384 | 2 August 2010 | Nuclear Power Group Calculation Titled Segmentation Analysis for Watts Bar Unit 2 DCS (Distributed Control System), Dated August 2, 2010, Revision 0, Enclosure 2 | Boric Acid |
ML101600502 | 3 June 2010 | Chapter 12 - Question 8 - Calculation | |
ML101600490 | 3 June 2010 | Chapter 12 - Question 6 - Calculations | |
ML101390102 | 13 May 2010 | EEB-TI-28, Branch Technical Instruction, Setpoint Calculations. | Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Condition Adverse to Quality |
ML13123A207 | 26 January 2010 | 2012 Watts Bar Nuclear Plant, Unit 1, Effluent and Waste Disposal Annual Report; Offsite Dose Calculation Manual Revision 23 (No Revisions in 2012) | Time of Discovery Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
ML11126A181 | 26 January 2010 | Offsite Dose Calculation Manual, Effluent and Waste Disposal Annual Report - 2010, Attachment 3 | Offsite Dose Calculation Manual |
ML12124A217 | 26 January 2010 | Attachment 3, Offsite Dose Calculation Manual Revision 23 (No Revisions in 2011) | Time of Discovery Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
ML11157A042 | 2 November 2009 | Enclosure 2, Calculation RSOFLHROGCDX00033320090003, PMF Temporary Modification Analysis. | Hydrostatic Temporary Modification |
ML090720869 | 25 February 2009 | Calculation, ALION-CAL-TVA-2739-03, Rev. 4, Watts Bar Reactor Building GSI-191 Debris Generation Calculation. | |
ML081090502 | 31 March 2008 | Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Figure 4.25 - Case 3 Through Calculation PCI-5464-S01, Page 107 | Fire Barrier Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Finite Element Analysis FLEX Code Reconciliation Earthquake |
ML081120159 | 31 March 2008 | Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5343-S01, Rev. 0, Attachment D, Page 374 of 575 Through Calculation No. PCI-5343-S02, Rev 0, Attachment B, Page 100 of 631 | |
ML081090508 | 31 March 2008 | Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5464-S02, Rev. 0, Attachment B Page 101 Through End | |
ML081090505 | 31 March 2008 | Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5464-S01, Rev. 2, Attachment B, Page 385 Through 680 | |
ML081090503 | 31 March 2008 | Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5464-S01, Rev. 2, Attachments a and B, Page 384 of 680 | |
ML091260374 | 15 January 2008 | Effluent and Waste Disposal Annual Report, Offsite Dose Calculation Manual | Time of Discovery Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
ML071230084 | 18 August 2006 | 2006 Effluent and Waste Disposal Annual Report, Attachment 3.0 Offsite Dose Calculation Manual, Rev 18 | Time of Discovery Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
ML061220259 | 19 August 2005 | 2005 Watts Bar Nuclear Plant Effluent and Waste Disposal Annual Report, Attachment 3 to Enclosure 1 Offsite Dose Calculation Manual | Offsite Dose Calculation Manual |
ML051250626 | 19 October 2004 | Attachment 3.0, Watts Bar, Offsite Dose Calculation Manual, Revision 13 | Time of Discovery Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
ML041390218 | 14 May 2004 | Annual Radiological Environmental Operating Report - 2003 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Chernobyl |
ML040500656 | 20 December 2001 | Excerpts from Revision 9 of Calculation WBN-OSG4-091, Maximum Containment Water Level. |