CNL-15-071, Two-Unit Offsite Dose Calculation Manual, Revision 0
From kanterella
Jump to navigation
Jump to search
ML15117A395 | |
Person / Time | |
---|---|
Site: | Watts Bar ![]() |
Issue date: | 04/24/2015 |
From: | James Shea Tennessee Valley Authority |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
CNL-15-071 L44 150424 001 | |
Download: ML15117A395 (211) | |
Similar Documents at Watts Bar | |
---|---|
Category:Calculation
MONTHYEARCNL-15-071, Two-Unit Offsite Dose Calculation Manual, Revision 02015-04-24024 April 2015
[Table view]Two-Unit Offsite Dose Calculation Manual, Revision 0 ML14177A1672014-06-25025 June 2014 Probabilistic Risk Assessment (PRA) Summary Report - Information Previously Committed to Provide (TAC ME3334). Part 4 of 4 ML14177A7262014-06-25025 June 2014 Probabilistic Risk Assessment (PRA) Summary Report - Information Previously Committed to Provide (TAC ME3334). Part 2 of 4 ML14177A7252014-06-25025 June 2014 Probabilistic Risk Assessment (PRA) Summary Report - Information Previously Committed to Provide (TAC ME3334). Part 1 of 4 ML14177A1662014-06-25025 June 2014 Probabilistic Risk Assessment (PRA) Summary Report - Information Previously Committed to Provide (TAC ME3334). Part 3 of 4 ML12311A1512012-10-31031 October 2012 Draft Two-Unit Offsite Dose Calculation Manual (ODCM) ML12073A2252012-02-28028 February 2012 Attachment 6, TVA Calculation WBPEVAR8807025, Revision 8, Bypassed and Inoperable Status Indication Logic Input Indications (Letter Item 4) ML12069A3312012-01-19019 January 2012 Attachment 11 - TVA Calculation WCGACQ0766, Required Response Spectra for Evaluation of Radiation Monitoring Equipment, Revision 1 (Letter Item 2, Sser Appendix Hh Item Number TVA21) ML12073A2262012-01-0606 January 2012 Attachment 9, Redacted TVA Calculation WCGACQ0766, Revision 1, Required Response Spectra for Evaluation of Radiation Monitoring Equipment. (Letter Item 6) ML12018A2142011-12-22022 December 2011 Attachment 3 - TVA Calculation EPM-MCP-071689, Cooling/Heating Load & Equipment/Component Performance Analysis for the Control Building Electrical Board Room Areas (El. 692.0 & 708.0), Revision 21. (Letter Item 4, Sser 23 Appendix Hh Item N ML11341A1372011-11-30030 November 2011 Attachments 23 Through 24, WNA-DS-01667-WBT-NP, Revision 5 and CAW-11-3301, Post Accident Monitoring System - System Design Specification ML11341A1582011-11-30030 November 2011 Attachments 11 Through 12, CN-EQT-10-44-NP, Revision 1 and CAW-11-3278, Dynamic Similarity Analysis for the Post Accident Monitoring System ML11341A1572011-11-30030 November 2011 Attachments 7 Through 9, WNA-CN-00157-WBT-NP, Revision 1, CAW-11-3316, and WBT-D-3566 Np, Incore Instrument System Signal Processing System Isolation Requirement ML11341A1352011-11-30030 November 2011 Attachments 17 Through 18, EQLR-171-NP, Revision 1 and CAW-11-3299, Environmental and Seismic Test Report Analog Input AI687 and AI688 Modules and Supporting Components for Use in Common Qualified Post Accident Monitoring System ML12171A3202011-09-19019 September 2011 Calculation WBNTSR-009, Control Room Operator and Offsite Doses from a Fuel Handling Accident, Revision 14 (Enclosure 2) ML11257A0492011-09-0101 September 2011 Attachment 3, Calculation, WNA-CN-00157-WBT-NP, Revision 0, Watts Bar 2 Incore Instrument System (Iis) Signal Processing System (SPS) Isolation Requirements ML12018A2152011-08-14014 August 2011 Attachment 4 - TVA Calculation EPM-LCP-072489, Cooling and Heating Load Analysis, Main Control Room HVAC, Revision 14 (Letter Item 4, Sser 23 Appendix Hh Item Number 108) ML11222A1142011-06-0808 June 2011 Enclosure 1, TVA Calculation WBNAPS3127, EQ Dose in the Control Building, Revision 0, Attachment 1 ML11154A1412011-04-14014 April 2011 Enclosure 3, Calculation RSOGENROGCDX00033320110002, Seismic Evaluation of Hesco Baskets ML1032001502010-11-0909 November 2010 Summary of Contingency Events and the Cases/Scenario Run ML1022403842010-08-0202 August 2010 Nuclear Power Group Calculation Titled Segmentation Analysis for Watts Bar Unit 2 DCS (Distributed Control System), Dated August 2, 2010, Revision 0, Enclosure 2 ML1016005022010-06-0303 June 2010 Chapter 12 - Question 8 - Calculation ML1016004902010-06-0303 June 2010 Chapter 12 - Question 6 - Calculations ML1013901022010-05-13013 May 2010 EEB-TI-28, Branch Technical Instruction, Setpoint Calculations ML13123A2072010-01-26026 January 2010 2012 Watts Bar Nuclear Plant, Unit 1, Effluent and Waste Disposal Annual Report; Offsite Dose Calculation Manual Revision 23 (No Revisions in 2012) ML11126A1812010-01-26026 January 2010 Offsite Dose Calculation Manual, Effluent and Waste Disposal Annual Report - 2010, Attachment 3 ML12124A2172010-01-26026 January 2010 Attachment 3, Offsite Dose Calculation Manual Revision 23 (No Revisions in 2011) ML11157A0422009-11-0202 November 2009 Enclosure 2, Calculation RSOFLHROGCDX00033320090003, PMF Temporary Modification Analysis ML0907208692009-02-25025 February 2009 Calculation, ALION-CAL-TVA-2739-03, Rev. 4, Watts Bar Reactor Building GSI-191 Debris Generation Calculation ML0810905022008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Figure 4.25 - Case 3 Through Calculation PCI-5464-S01, Page 107 ML0811201592008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5343-S01, Rev. 0, Attachment D, Page 374 of 575 Through Calculation No. PCI-5343-S02, Rev 0, Attachment B, Page 100 of 631 ML0810905082008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5464-S02, Rev. 0, Attachment B Page 101 Through End ML0810905052008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5464-S01, Rev. 2, Attachment B, Page 385 Through 680 ML0810905032008-03-31031 March 2008 Enclosure 1, Supplemental Response Addressing GL-04-002 Actions, Calculation No. PCI-5464-S01, Rev. 2, Attachments a and B, Page 384 of 680 ML0912603742008-01-15015 January 2008 Effluent and Waste Disposal Annual Report, Offsite Dose Calculation Manual ML0712300842006-08-18018 August 2006 2006 Effluent and Waste Disposal Annual Report, Attachment 3.0 Offsite Dose Calculation Manual, Rev 18 ML0612202592005-08-19019 August 2005 2005 Watts Bar Nuclear Plant Effluent and Waste Disposal Annual Report, Attachment 3 to Enclosure 1 Offsite Dose Calculation Manual ML0512506262004-10-19019 October 2004 Attachment 3.0, Watts Bar, Offsite Dose Calculation Manual, Revision 13 ML0413902182004-05-14014 May 2004 Annual Radiological Environmental Operating Report - 2003 ML0405006562001-12-20020 December 2001 Excerpts from Revision 9 of Calculation WBN-OSG4-091, Maximum Containment Water Level 2015-04-24 Category:Letter type:CNL MONTHYEARCNL-25-010, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Response to Request for Additional Information - TVA Request for Approval of Revision 43 to TVA Fleet Quality Assurance Program Description2025-02-26026 February 2025
[Table view]Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Response to Request for Additional Information - TVA Request for Approval of Revision 43 to TVA Fleet Quality Assurance Program Description CNL-25-026, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2025-02-12012 February 2025 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-25-028, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for (SQN-TS-23-02 & WBN-TS-23-08) (EPID L-2023-LLA-01752025-02-12012 February 2025 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for (SQN-TS-23-02 & WBN-TS-23-08) (EPID L-2023-LLA-0175 CNL-25-009, And Watts Bar Nuclear Plant, Units 1 and 2 - Organization Topical Report, TVA-NPOD89-A, Revision 262025-01-29029 January 2025 And Watts Bar Nuclear Plant, Units 1 and 2 - Organization Topical Report, TVA-NPOD89-A, Revision 26 CNL-25-012, Supplement to License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources - Operating to Clarify Requirements for Diesel Generator .2025-01-16016 January 2025 Supplement to License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources - Operating to Clarify Requirements for Diesel Generator . CNL-24-076, Response to Request for Additional Information Regarding Application to Modify the Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2025-01-16016 January 2025 Response to Request for Additional Information Regarding Application to Modify the Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) CNL-25-001, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-12-27027 December 2024 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b CNL-24-009, Brown Ferry Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Plant, Units 1 & 2 - Triennial Decommission Funding Plans for Independent Spent Fuel Storage Installations2024-12-17017 December 2024 Brown Ferry Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Plant, Units 1 & 2 - Triennial Decommission Funding Plans for Independent Spent Fuel Storage Installations CNL-24-082, Central Emergency Control Center Emergency Plan Implementing Procedure Revision2024-12-17017 December 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-24-072, Request for Alternative to Extend First Containment Inservice Inspection Interval2024-12-12012 December 2024 Request for Alternative to Extend First Containment Inservice Inspection Interval CNL-24-075, Response to Request for Additional Information for Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah and Watts Bar (SQN-TSTS-23-02 and W2024-11-27027 November 2024 Response to Request for Additional Information for Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah and Watts Bar (SQN-TSTS-23-02 and WBN CNL-24-080, Response to Request for Additional Information Regarding Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (WBN-19-011)2024-11-20020 November 2024 Response to Request for Additional Information Regarding Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (WBN-19-011) CNL-24-021, Application to Revise Technical Specification Limiting Condition of Operation 3.5.2, ECCS – Operating, Note 1 to Include Residual Heat Removal Pump Flow Paths (SQN-TS-23-04 and WBN-TS-23-020)2024-11-12012 November 2024 Application to Revise Technical Specification Limiting Condition of Operation 3.5.2, ECCS – Operating, Note 1 to Include Residual Heat Removal Pump Flow Paths (SQN-TS-23-04 and WBN-TS-23-020) CNL-24-014, License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22)2024-11-0404 November 2024 License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22) CNL-24-064, Response to Request for Additional Information Regarding the Watts Bar Nuclear Plant, Unit 2 Steam Generator Tube Inspection Report for U2R52024-11-0404 November 2024 Response to Request for Additional Information Regarding the Watts Bar Nuclear Plant, Unit 2 Steam Generator Tube Inspection Report for U2R5 CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule CNL-24-031, Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-03-18018 March 2024 Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance CNL-24-028, Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-14014 March 2024 Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-24-029, Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 372024-03-14014 March 2024 Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 37 CNL-24-012, Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-02-28028 February 2024 Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance CNL-24-023, Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 252024-02-20020 February 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 25 CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) CNL-23-005, Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (WBN-19-011)2023-12-26026 December 2023 Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (WBN-19-011) CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) 2025-02-26 |