Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML10204013821 July 2010License Amendment Request 261 Extended Power Uprate, Transmittal of Sample Reactor Protection System/Engineered Safety Features Actuation System Instrumentation Setpoint CalculationsOperability Determination
Power Uprate
ML1020301169 July 2010Calculation, CN-MRCDA-08-51, Revision 1, Evaluation of Bottom Mounted Instrumentation Conduits for a Postulated Closure Head Assembly Drop Event, Enclosure 2 to NRC 2010-0102Weld Overlay
Finite Element Analysis
Control of Heavy Loads
ML1019403928 July 2010Calculation 2008-12355, Rev. 0, Mass and Energy Calculation for High Energy Line Break in 3 Steam Line within Ccwhx Room, Enclosure 1, Attachment 18Earthquake
NRC 2010-0060, License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Information30 April 2010License Amendment Request 261 Extended Power Uprate, Response to Request for Additional InformationBoric Acid
ML10194039414 April 2010Calculation PBNP-994-21-13, Rev. 2, HELB Reconstitution Program Task 13 - Building Recovery, Enclosure 1, Attachment 15Boric Acid
ML10194038929 October 2009Calculation PBNP-994-21-15, Rev. 2, HELB Reconstitution Program - Task 15, Required Equipment List, Enclosure 1, Attachment 16Safe Shutdown
Boric Acid
Shutdown Margin
ML10194038210 December 2008Calculation PBNP-994-21-12, Rev. 0, Task 12 Jet Impingement Calculations, Enclosure 1, Attachment 12Boric Acid
Through-Wall Leak
ML10194038018 November 2008Calculation PBNP-994-21-06, Rev. 0, HELB Reconstitution Program - Task 6 - Break and Crack Size/Location Selection, Enclosure 1, Attachment 9
ML10194039112 November 2008Calculation PBNP-994-21-07, Rev. 0, HELB Task 07 - Mass & Energy Release for Pressure Limiting Cases, Enclosure 1, Attachment 17
ML10194038312 November 2008Calculation PBNP-994-21-09, Rev. 0, HELB Reconstitution Program Task 09 - Gothic Models, Enclosure 1, Attachment 14
ML10194038112 November 2008Calculation PBNP-994-21-10, Rev. 0, HELB Reconstruction Program Task 10 - Gothic Pressure Analyses, Enclosure 1, Attachment 10
ML10194036421 October 2008Calculation PBNP-994-21-02, Rev. 0, HELB Reconstitution Program - Task 2, High Energy System Selection, Enclosure 1, Attachment 2
ML1019403763 October 2008Calculation PBNP-994-21-05-P06, Rev. 0, Steam Supply Piping to AFW Pump and Radwaste GL 87-11, Break Location Determination, Enclosure 1, Attachment 8
ML1019403753 October 2008Calculation PBNP-994-21-05-P05, Rev. 0, Steam Supply Piping to AFW Pump GL 87-11, Break Location Determination, Enclosure 1, Attachment 7Operating Basis Earthquake
Code Reconciliation
Earthquake
ML10194037426 September 2008Calculation PBNP-994-21-05-P04, Rev. 0, Main Feedwater Line GL 87-11, Break Location Determination, Enclosure 1, Attachment 6Operating Basis Earthquake
Code Reconciliation
ML10194036526 September 2008Calculation PBNP-994-21-05-P01, Rev. 0, Main Steam Piping GL 87-11 Break Location Determination, Enclosure 1, Attachment 3Operating Basis Earthquake
Finite Element Analysis
Code Reconciliation
Earthquake
ML10194036626 September 2008Calculation PBNP-994-21-05-P02, Rev. 0, Main Steam Piping GL 87-11, Break Location Determination, Enclosure 1, Attachment 4Operating Basis Earthquake
Finite Element Analysis
Code Reconciliation
Earthquake
ML10194037326 September 2008Calculation PBNP-994-21-05-P03, Rev. 0, Main Feedwater Line GL 87-11, Break Location Determination, Enclosure 1, Attachment 5Operating Basis Earthquake
Code Reconciliation
NRC 2008-0013, Supplemental Response to Generic Letter 2004-02, Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors29 February 2008Supplemental Response to Generic Letter 2004-02, Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water ReactorsBoric Acid
Mission time
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Foreign Material Exclusion
Exemption Request
Earthquake
Fuel cladding
Scaffolding
ML05362035028 November 2005Calculation PBCH-14Q-303, Rev 1, Steam Generator a Flaw Evaluation.
ML05362034828 November 2005Calculation PBCH-14Q-302, Rev 3, Steam Generator B Flaw Evaluation.
ML05362034724 October 2005Calculation PBCH-14Q-301, Rev 0, Pressurizer Flaw Evaluation.
ML06129023229 August 2005Enclosure 2, Offsite Dose Calculation Manual (ODCM) Revision 17 Issued August 2005Grab sample
Offsite Dose Calculation Manual
NRC 2005-0110, Request for Withholding of Proprietary Information Form Public Disclosure26 August 2005Request for Withholding of Proprietary Information Form Public DisclosureFinite Element Analysis
Aging Management
Control of Heavy Loads
ML05228032015 July 2005Enclosure 6, Calculation 2003-0046, Battery Chargers Sizing and Current Limit Setpoints, Rev. 4
ML05187029923 June 2005Enclosure, Sargent & Lundy Calculation, Analysis of Postulated Reactor Head Load Drop Onto the Reactor Vessel Flange, Revision 3, Dated June 23, 2005Finite Element Analysis
Control of Heavy Loads
ML06024036420 June 2005Westinghouse Report Plastic Analysis of Point Beach Reactor Coolant Piping for Reactor Vessel Head Drop, Revision 1 Dated June 20, 2005Finite Element Analysis
Aging Management
ML0519403443 June 2005Calculation PBCH-09Q-302, Rev 3, PWSCC Crack Growth Correlations and Fatigue Crack Growth Calculations for Point Beach Unit 1.
ML05158033719 May 2005Calculation M-11165-048-1, Rev 00, Evaluation of Bottom-Mounted Instrument (Bmi) Conduits for Postulated Reactor Vessel Displacement
ML05158048729 October 2004Offsite Dose Calculation Manual, Revision 16Grab sample
Offsite Dose Calculation Manual
ML05087013715 May 2004PWSCC Crack Growth Correlations and Fatigue Crack Growth Calculations for Point Beach, Unit 1
ML04146049515 May 2004Unit I - CRDM Top Head Analysis, PWSCC Crack Growth Correlations and Fatigue Crack Growth Calculations for Point Beach Unit 1
NRC 2003-0095, to Fracture Mechanics Evaluation of Point Unit 2 Top Head CRDM 43.5 Degree Azimuth Penetration Weld Repair.4 October 2003to Fracture Mechanics Evaluation of Point Unit 2 Top Head CRDM 43.5 Degree Azimuth Penetration Weld Repair.Finite Element Analysis
ML03106064728 February 2003Calculation 32-5020244-01, Point Beach 1 CRDM Temperbead Bore Weld Analysis.Hydrostatic
ML03106060326 February 2003Calculation 32-5019398-01, PB-1 CRDM Nozzle Idtb Weld Anomaly Flaw Evaluations.Hydrostatic
ML03080058322 November 20021 Page of Handwritten Notes
ML0308004667 November 2002E-mail from Thomas Kendall, Wisconsin Electric, to Ken O'Brien Regarding: Flow Limiting Orifice Design.Xls.
ML0308004627 November 2002Computer Printout of Statistical Data - Provided by Email from Tom Kendall, Wisconsin Electric to Ken O'Brien, USNRC Dated 11/07/2002
ML03087058920 March 2002Calculation 2001-0056, TDAFP Mini Recirc Valve Instrument Air Accumulator Sizing
ML03106064626 February 2002Calculation 32-5019396-01, PB-1 CRDM Nozzle Idtb J-Groove Weld Flaw Evaluation.Nondestructive Examination
Finite Element Analysis
ML03087055528 January 2002Calculation 2002-0002, Nitrogen Backup System for Mdafp Discharge Valves and Minimum Flow Recirculation Valves