Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML102040138 | 21 July 2010 | License Amendment Request 261 Extended Power Uprate, Transmittal of Sample Reactor Protection System/Engineered Safety Features Actuation System Instrumentation Setpoint Calculations | Operability Determination Power Uprate |
ML102030116 | 9 July 2010 | Calculation, CN-MRCDA-08-51, Revision 1, Evaluation of Bottom Mounted Instrumentation Conduits for a Postulated Closure Head Assembly Drop Event, Enclosure 2 to NRC 2010-0102 | Weld Overlay Finite Element Analysis Control of Heavy Loads |
ML101940392 | 8 July 2010 | Calculation 2008-12355, Rev. 0, Mass and Energy Calculation for High Energy Line Break in 3 Steam Line within Ccwhx Room, Enclosure 1, Attachment 18 | Earthquake |
NRC 2010-0060, License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Information | 30 April 2010 | License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Information | Boric Acid |
ML101940394 | 14 April 2010 | Calculation PBNP-994-21-13, Rev. 2, HELB Reconstitution Program Task 13 - Building Recovery, Enclosure 1, Attachment 15 | Boric Acid |
ML101940389 | 29 October 2009 | Calculation PBNP-994-21-15, Rev. 2, HELB Reconstitution Program - Task 15, Required Equipment List, Enclosure 1, Attachment 16 | Safe Shutdown Boric Acid Shutdown Margin |
ML101940382 | 10 December 2008 | Calculation PBNP-994-21-12, Rev. 0, Task 12 Jet Impingement Calculations, Enclosure 1, Attachment 12 | Boric Acid Through-Wall Leak |
ML101940380 | 18 November 2008 | Calculation PBNP-994-21-06, Rev. 0, HELB Reconstitution Program - Task 6 - Break and Crack Size/Location Selection, Enclosure 1, Attachment 9 | |
ML101940391 | 12 November 2008 | Calculation PBNP-994-21-07, Rev. 0, HELB Task 07 - Mass & Energy Release for Pressure Limiting Cases, Enclosure 1, Attachment 17 | |
ML101940383 | 12 November 2008 | Calculation PBNP-994-21-09, Rev. 0, HELB Reconstitution Program Task 09 - Gothic Models, Enclosure 1, Attachment 14 | |
ML101940381 | 12 November 2008 | Calculation PBNP-994-21-10, Rev. 0, HELB Reconstruction Program Task 10 - Gothic Pressure Analyses, Enclosure 1, Attachment 10 | |
ML101940364 | 21 October 2008 | Calculation PBNP-994-21-02, Rev. 0, HELB Reconstitution Program - Task 2, High Energy System Selection, Enclosure 1, Attachment 2 | |
ML101940376 | 3 October 2008 | Calculation PBNP-994-21-05-P06, Rev. 0, Steam Supply Piping to AFW Pump and Radwaste GL 87-11, Break Location Determination, Enclosure 1, Attachment 8 | |
ML101940375 | 3 October 2008 | Calculation PBNP-994-21-05-P05, Rev. 0, Steam Supply Piping to AFW Pump GL 87-11, Break Location Determination, Enclosure 1, Attachment 7 | Operating Basis Earthquake Code Reconciliation Earthquake |
ML101940374 | 26 September 2008 | Calculation PBNP-994-21-05-P04, Rev. 0, Main Feedwater Line GL 87-11, Break Location Determination, Enclosure 1, Attachment 6 | Operating Basis Earthquake Code Reconciliation |
ML101940365 | 26 September 2008 | Calculation PBNP-994-21-05-P01, Rev. 0, Main Steam Piping GL 87-11 Break Location Determination, Enclosure 1, Attachment 3 | Operating Basis Earthquake Finite Element Analysis Code Reconciliation Earthquake |
ML101940366 | 26 September 2008 | Calculation PBNP-994-21-05-P02, Rev. 0, Main Steam Piping GL 87-11, Break Location Determination, Enclosure 1, Attachment 4 | Operating Basis Earthquake Finite Element Analysis Code Reconciliation Earthquake |
ML101940373 | 26 September 2008 | Calculation PBNP-994-21-05-P03, Rev. 0, Main Feedwater Line GL 87-11, Break Location Determination, Enclosure 1, Attachment 5 | Operating Basis Earthquake Code Reconciliation |
NRC 2008-0013, Supplemental Response to Generic Letter 2004-02, Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | 29 February 2008 | Supplemental Response to Generic Letter 2004-02, Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | Boric Acid Mission time Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Foreign Material Exclusion Exemption Request Earthquake Fuel cladding Scaffolding |
ML053620350 | 28 November 2005 | Calculation PBCH-14Q-303, Rev 1, Steam Generator a Flaw Evaluation. | |
ML053620348 | 28 November 2005 | Calculation PBCH-14Q-302, Rev 3, Steam Generator B Flaw Evaluation. | |
ML053620347 | 24 October 2005 | Calculation PBCH-14Q-301, Rev 0, Pressurizer Flaw Evaluation. | |
ML061290232 | 29 August 2005 | Enclosure 2, Offsite Dose Calculation Manual (ODCM) Revision 17 Issued August 2005 | Grab sample Offsite Dose Calculation Manual |
NRC 2005-0110, Request for Withholding of Proprietary Information Form Public Disclosure | 26 August 2005 | Request for Withholding of Proprietary Information Form Public Disclosure | Finite Element Analysis Aging Management Control of Heavy Loads |
ML052280320 | 15 July 2005 | Enclosure 6, Calculation 2003-0046, Battery Chargers Sizing and Current Limit Setpoints, Rev. 4 | |
ML051870299 | 23 June 2005 | Enclosure, Sargent & Lundy Calculation, Analysis of Postulated Reactor Head Load Drop Onto the Reactor Vessel Flange, Revision 3, Dated June 23, 2005 | Finite Element Analysis Control of Heavy Loads |
ML060240364 | 20 June 2005 | Westinghouse Report Plastic Analysis of Point Beach Reactor Coolant Piping for Reactor Vessel Head Drop, Revision 1 Dated June 20, 2005 | Finite Element Analysis Aging Management |
ML051940344 | 3 June 2005 | Calculation PBCH-09Q-302, Rev 3, PWSCC Crack Growth Correlations and Fatigue Crack Growth Calculations for Point Beach Unit 1. | |
ML051580337 | 19 May 2005 | Calculation M-11165-048-1, Rev 00, Evaluation of Bottom-Mounted Instrument (Bmi) Conduits for Postulated Reactor Vessel Displacement | |
ML051580487 | 29 October 2004 | Offsite Dose Calculation Manual, Revision 16 | Grab sample Offsite Dose Calculation Manual |
ML050870137 | 15 May 2004 | PWSCC Crack Growth Correlations and Fatigue Crack Growth Calculations for Point Beach, Unit 1 | |
ML041460495 | 15 May 2004 | Unit I - CRDM Top Head Analysis, PWSCC Crack Growth Correlations and Fatigue Crack Growth Calculations for Point Beach Unit 1 | |
NRC 2003-0095, to Fracture Mechanics Evaluation of Point Unit 2 Top Head CRDM 43.5 Degree Azimuth Penetration Weld Repair. | 4 October 2003 | to Fracture Mechanics Evaluation of Point Unit 2 Top Head CRDM 43.5 Degree Azimuth Penetration Weld Repair. | Finite Element Analysis |
ML031060647 | 28 February 2003 | Calculation 32-5020244-01, Point Beach 1 CRDM Temperbead Bore Weld Analysis. | Hydrostatic |
ML031060603 | 26 February 2003 | Calculation 32-5019398-01, PB-1 CRDM Nozzle Idtb Weld Anomaly Flaw Evaluations. | Hydrostatic |
ML030800583 | 22 November 2002 | 1 Page of Handwritten Notes | |
ML030800466 | 7 November 2002 | E-mail from Thomas Kendall, Wisconsin Electric, to Ken O'Brien Regarding: Flow Limiting Orifice Design.Xls. | |
ML030800462 | 7 November 2002 | Computer Printout of Statistical Data - Provided by Email from Tom Kendall, Wisconsin Electric to Ken O'Brien, USNRC Dated 11/07/2002 | |
ML030870589 | 20 March 2002 | Calculation 2001-0056, TDAFP Mini Recirc Valve Instrument Air Accumulator Sizing | |
ML031060646 | 26 February 2002 | Calculation 32-5019396-01, PB-1 CRDM Nozzle Idtb J-Groove Weld Flaw Evaluation. | Nondestructive Examination Finite Element Analysis |
ML030870555 | 28 January 2002 | Calculation 2002-0002, Nitrogen Backup System for Mdafp Discharge Valves and Minimum Flow Recirculation Valves |