ML030800462
From kanterella
Jump to navigation
Jump to search
ML030800462 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 11/07/2002 |
From: | Kendall T Wisconsin Electric |
To: | O'Brien K NRC/RGN-III |
References | |
FOIA/PA-2003-0094 | |
Download: ML030800462 (4) | |
Similar Documents at Point Beach | |
---|---|
Category:Calculation
MONTHYEARML1020401382010-07-21021 July 2010
[Table view]License Amendment Request 261 Extended Power Uprate, Transmittal of Sample Reactor Protection System/Engineered Safety Features Actuation System Instrumentation Setpoint Calculations ML1020301162010-07-0909 July 2010 Calculation, CN-MRCDA-08-51, Revision 1, Evaluation of Bottom Mounted Instrumentation Conduits for a Postulated Closure Head Assembly Drop Event, Enclosure 2 to NRC 2010-0102 ML1019403922010-07-0808 July 2010 Calculation 2008-12355, Rev. 0, Mass and Energy Calculation for High Energy Line Break in 3 Steam Line within Ccwhx Room, Enclosure 1, Attachment 18 NRC 2010-0060, License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Information2010-04-30030 April 2010 License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Information ML1019403942010-04-14014 April 2010 Calculation PBNP-994-21-13, Rev. 2, HELB Reconstitution Program Task 13 - Building Recovery, Enclosure 1, Attachment 15 ML1019403892009-10-29029 October 2009 Calculation PBNP-994-21-15, Rev. 2, HELB Reconstitution Program - Task 15, Required Equipment List, Enclosure 1, Attachment 16 ML1019403822008-12-10010 December 2008 Calculation PBNP-994-21-12, Rev. 0, Task 12 Jet Impingement Calculations, Enclosure 1, Attachment 12 ML1019403802008-11-18018 November 2008 Calculation PBNP-994-21-06, Rev. 0, HELB Reconstitution Program - Task 6 - Break and Crack Size/Location Selection, Enclosure 1, Attachment 9 ML1019403912008-11-12012 November 2008 Calculation PBNP-994-21-07, Rev. 0, HELB Task 07 - Mass & Energy Release for Pressure Limiting Cases, Enclosure 1, Attachment 17 ML1019403832008-11-12012 November 2008 Calculation PBNP-994-21-09, Rev. 0, HELB Reconstitution Program Task 09 - Gothic Models, Enclosure 1, Attachment 14 ML1019403812008-11-12012 November 2008 Calculation PBNP-994-21-10, Rev. 0, HELB Reconstruction Program Task 10 - Gothic Pressure Analyses, Enclosure 1, Attachment 10 ML1019403642008-10-21021 October 2008 Calculation PBNP-994-21-02, Rev. 0, HELB Reconstitution Program - Task 2, High Energy System Selection, Enclosure 1, Attachment 2 ML1019403762008-10-0303 October 2008 Calculation PBNP-994-21-05-P06, Rev. 0, Steam Supply Piping to AFW Pump and Radwaste GL 87-11, Break Location Determination, Enclosure 1, Attachment 8 ML1019403752008-10-0303 October 2008 Calculation PBNP-994-21-05-P05, Rev. 0, Steam Supply Piping to AFW Pump GL 87-11, Break Location Determination, Enclosure 1, Attachment 7 ML1019403742008-09-26026 September 2008 Calculation PBNP-994-21-05-P04, Rev. 0, Main Feedwater Line GL 87-11, Break Location Determination, Enclosure 1, Attachment 6 ML1019403652008-09-26026 September 2008 Calculation PBNP-994-21-05-P01, Rev. 0, Main Steam Piping GL 87-11 Break Location Determination, Enclosure 1, Attachment 3 ML1019403662008-09-26026 September 2008 Calculation PBNP-994-21-05-P02, Rev. 0, Main Steam Piping GL 87-11, Break Location Determination, Enclosure 1, Attachment 4 ML1019403732008-09-26026 September 2008 Calculation PBNP-994-21-05-P03, Rev. 0, Main Feedwater Line GL 87-11, Break Location Determination, Enclosure 1, Attachment 5 NRC 2008-0013, Supplemental Response to Generic Letter 2004-02, Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-02-29029 February 2008 Supplemental Response to Generic Letter 2004-02, Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML0536203502005-11-28028 November 2005 Calculation PBCH-14Q-303, Rev 1, Steam Generator a Flaw Evaluation. ML0536203482005-11-28028 November 2005 Calculation PBCH-14Q-302, Rev 3, Steam Generator B Flaw Evaluation. ML0536203472005-10-24024 October 2005 Calculation PBCH-14Q-301, Rev 0, Pressurizer Flaw Evaluation. ML0612902322005-08-29029 August 2005 Enclosure 2, Offsite Dose Calculation Manual (ODCM) Revision 17 Issued August 2005 NRC 2005-0110, Request for Withholding of Proprietary Information Form Public Disclosure2005-08-26026 August 2005 Request for Withholding of Proprietary Information Form Public Disclosure ML0522803202005-07-15015 July 2005 Enclosure 6, Calculation 2003-0046, Battery Chargers Sizing and Current Limit Setpoints, Rev. 4 ML0518702992005-06-23023 June 2005 Enclosure, Sargent & Lundy Calculation, Analysis of Postulated Reactor Head Load Drop Onto the Reactor Vessel Flange, Revision 3, Dated June 23, 2005 ML0602403642005-06-20020 June 2005 Westinghouse Report Plastic Analysis of Point Beach Reactor Coolant Piping for Reactor Vessel Head Drop, Revision 1 Dated June 20, 2005 ML0519403442005-06-0303 June 2005 Calculation PBCH-09Q-302, Rev 3, PWSCC Crack Growth Correlations and Fatigue Crack Growth Calculations for Point Beach Unit 1. ML0515803372005-05-19019 May 2005 Calculation M-11165-048-1, Rev 00, Evaluation of Bottom-Mounted Instrument (Bmi) Conduits for Postulated Reactor Vessel Displacement ML0515804872004-10-29029 October 2004 Offsite Dose Calculation Manual, Revision 16 ML0508701372004-05-15015 May 2004 PWSCC Crack Growth Correlations and Fatigue Crack Growth Calculations for Point Beach, Unit 1 ML0414604952004-05-15015 May 2004 Unit I - CRDM Top Head Analysis, PWSCC Crack Growth Correlations and Fatigue Crack Growth Calculations for Point Beach Unit 1 NRC 2003-0095, to Fracture Mechanics Evaluation of Point Unit 2 Top Head CRDM 43.5 Degree Azimuth Penetration Weld Repair.2003-10-0404 October 2003 to Fracture Mechanics Evaluation of Point Unit 2 Top Head CRDM 43.5 Degree Azimuth Penetration Weld Repair. ML0310606472003-02-28028 February 2003 Calculation 32-5020244-01, Point Beach 1 CRDM Temperbead Bore Weld Analysis. ML0310606032003-02-26026 February 2003 Calculation 32-5019398-01, PB-1 CRDM Nozzle Idtb Weld Anomaly Flaw Evaluations. ML0308005832002-11-22022 November 2002 1 Page of Handwritten Notes ML0308004662002-11-0707 November 2002 E-mail from Thomas Kendall, Wisconsin Electric, to Ken O'Brien Regarding: Flow Limiting Orifice Design.Xls. ML0308004622002-11-0707 November 2002 Computer Printout of Statistical Data - Provided by Email from Tom Kendall, Wisconsin Electric to Ken O'Brien, USNRC Dated 11/07/2002 ML0308705892002-03-20020 March 2002 Calculation 2001-0056, TDAFP Mini Recirc Valve Instrument Air Accumulator Sizing ML0310606462002-02-26026 February 2002 Calculation 32-5019396-01, PB-1 CRDM Nozzle Idtb J-Groove Weld Flaw Evaluation. ML0308705552002-01-28028 January 2002 Calculation 2002-0002, Nitrogen Backup System for Mdafp Discharge Valves and Minimum Flow Recirculation Valves 2010-07-09 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML030800462&oldid=2695799"