Calculation PBNP-994-21-13, Rev. 2, HELB Reconstitution Program Task 13 - Building Recovery, Enclosure 1, Attachment 15
ML101940394
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/14/2010
From: Kern R
Automated Engineering Services Corp
To:
Florida Power & Light Co, Office of Nuclear Reactor Regulation
References
PBNP-994-21-13, Rev. 2
Download: ML101940394 (206)


Text

ENCLOSURE I ATTACHMENT 15 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS I AND 2 LICENSE AMENDMENT REQUEST 261 EXTENDED POWER UPRATE RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION PBNP-994-21-13, REVISION 2, HELB RECONSTITUTION PROGRAM TASK 13 - BUILDING RECOVERY 205 pages follow

Automated CALCULATION SHEET Page: 4 of 12 Engineering Cale. No.:

Services Corp.

PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No Eli Date: 04/14/2010 Table of Contents Section Title Page

1. Purpose 5
2. Design Input 6
3. Assumptions 6
4. Acceptance Criteria 7
5. Software 8 6 Methodology 8
7. Analysis 8
8. Conclusions 12
9. References 12 Attachment Title No. of Pages A Case Specific Changes Made to the Base Cases 3 B Maximum Temperature Distribution Results 50 C Temperature Responses in the HELB Rooms 49 D GOTHIC Control Volume Descriptions 5 E Representative Values from Attachment C/Room Temperature Time History 18 F Rooms above 1300 F for Each Case 2 Addendum Title No. of Pages A Additional Case AA-1 to AA-31 B Swing Battery Room and Switchgear Room Temperature Responses AB-1 to AB-38 Form 3.1-3 Rev. 2

/

  • SEngineering Automated Services Corp.

CALCULATION SHEET Calc.

Page: No.:

5 of 12 PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes E] No [I Date: 04/14/2010

1. Purpose The purpose of Task 13 of the High Energy Line Break (HELB) Reconstitution Program as defined in Design Input (DI) 1 is to determine the temperature responses in the Primary Auxiliary Building (PAB) and the Turbine Building (TB) of the Point Beach Nuclear Plant (PBNP) using the appropriate mass and energy (M&E) releases for the limiting HELBs defined in Task 6 (DI 2). After the issuance of DI 1 the Facades were added to the scope of work. The M&E data to be used is documented in DI 4, 5, and 6 along with supplements developed in this calculation. The analyses are performed using the GOTHIC base case models developed under Task 9 and documented in DI 3.

This calculation presents the results of the time dependent temperature histories for the limiting HELB events identified in DI 2. Section 7 (Analysis) provides a discussion and table of which cases were run, their file names and description of each room number.

Attachment A details the changes made to the base GOTHIC model (DI 3) for the temperature limiting cases.

Attachment B identifies the peak temperature and time when it occurs for all rooms in the model sorted in descending peak temperature. The limiting EQ Program temperature was assumed to be 130o F. All rooms that'did not exceed this value were not included in the Attachment B tables. Rooms that did exceed 130' F, but did not contain required equipment were not evaluated.

Attachment C provides the time dependent temperature responses for the various rooms corresponding to the cases that yielded the maximum temperatures in those rooms.

Attachment D shows the GOTHIC control volume descriptions.

Attachment E gives representative values from the Attachment C results in terms of the room temperature time history.

Attachment F shows the rooms above 130° F for each case.

Addendum A has been added to document an additional case set up and run to reduce overly conservative assumptions in the original cases.

Form 3.1-3 Rev. 2

/ Automated CALCULATION SHEET Page: 6 of 12 AU Engineering Services Corp.

Calc. No.:

PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes 5J No El Date: 04/14/2010 Addendum B has been added to document an additional case set up and run to determine the temperature response in the Swing Battery Room, which was not included in the original Primary Auxiliary Building model. The Switchgear Room, which contains EQ equipment, was also included in this additional case.

2. Design Input The Design Input (DI) used in this analysis consists of-the following:
1. AES Project Plan PBNP-994-21,01 "Project Plan for HELB Reconstitution Program" December 18, 2007.
2. AES Calculation PBNP-994-21-06 Rev. 0, "HELB Reconstitution Program Task 6 - Break &

Crack Size/Location".

3. AES Calculation PBNP-994-21-09 Rev. 0, "HELB Reconstitution Program Task 9 - GOTHIC Models".
4. Westinghouse Letter LTR-CRA-08-112 "Transmittal of Steamline Break Mass/Energy Releases Outside Containment for the Point Beach Extended Power Uprate Program", May 23, 2008.
5. Point Beach Calculation 2008-12355 Rev. 0 "Mass and Energy Calculation for High Energy Line Break in 3" Steam Line within CCW HX Room".
6. Westinghouse Letter LTR-CRA-08-112, Rev. 1 "Transmittal of Steamline Break Mass/Energy Releases Outside Containment for the Point Beach Extended Power Uprate Program",

December 19, 2008 (transmitted by PB-EPU-08-2352 DIT-PB-EPU-08-AES-0010).

3. Assumptions
1. Since the HELB areas defined in DI 2 do not exactly match those in DI 4 and 6, the M&E data that was used in these analyses correspond to the closest one in those DIs. The mass/energy releases for the largest effective break area (2.8 ft2 ) in DI 4 and 6 were used for the 30" break (4.3303 ft 2) in Room 596 and the 24" break (2.6552 ft2) in Room 301 from DI 2. The mass/energy releases for a break area of 0.2 ft2 in DI 4 and 6 were used for the 6" break (0.2010 ft2 ) in Room 301 from DI 2. The mass/energy release for a break area of 0.05 ft 2 in DI 4 was used for the 3" break (0.0513 ft 2) in Room 301 and the 30" crack (0.0444 ft 2) in Room 272 from DI 2. The mass/energy release for the smallest Form 3.1-3 Rev. 2

Automated CALCULATION SHEET Page: 7 Caic. No.:

of 12 Engineering Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 04/14/2010 effective break area (0.01 ft2 ) in DI 4 was used for the 3" crack (0.0012 ft2 ) in Room 271 from DI 2.

2. There is no M&E data available for the 30" double ended break (4.3303 ft2 ) in the Main Steam Line, so the data for the largest HELB (2.8 ft2 ) in DI 4 and 6 were used for that case. For a 30" diameter main steam line break, the initial M&E release is larger than that for a 16" break (Case D28), however it is quickly restricted by the 16" diameter flow nozzle located in containment following the blowdown of the initial steam within the steam lines between the flow nozzle and the break. The D28 break size was chosen to adequately represent the 30"/16" case, since the total M&E releases are relatively close.
3. For the HELB in the Steam Generator Blowdown Line, the fluid conditions are conservatively assumed to- remain constant at their initial conditions during-the blowdown and there are no other mass additions during this event, since the limiting condition is Zero Power Hot Shutdown. Also the flow changes are assumed to occur over a 0.001 sec time interval.
4. No compensatory actions are included to assist in room heat removal capability.
5. HVAC components are not credited in the analysis to mitigate HELB and are not in the required EQ list in Task 15 of the High Energy Line Break (HELB) Reconstitution Program.
6. The propagation of high temperatures resulting from a HELB through openings or drains has to be encouraged by a large pressure spike. This is not the case at Point Beach. The pressure spike in areas with drains is on the order of 0.1 psig. Such a pressure spike will not encourage harsh temperature conditions to propagate. There are no drain flow paths in the current GOTHIC models. Since the plant is at grade, the drains would not be effective flow paths for migration of a harsh environment unless there was a significant pressure differential between compartments. This condition is not applicable to Point Beach. Therefore, the GOTHIC model was not revised to include the various drains for HELB analyses.
4. Acceptance Criteria There are no acceptance criteria associated with the analyses documented in this calculation. The results of the temperature responses documented in this calculation will be used to determine the environmental equipment qualification within the PBNP PAB and TB.

Form 3.1-3 Rev. 2

I Automated CALCULATION SHEET Page: 8 of 12 A Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

I-ELB Reconstitution Program Task 13 -Building Recovery Reviewed By: CD Henry Safety Related Yes E No ElI Date: 04/14/2010

5. Software The version of GOTHIC Version 7.2a(QA) (Reference 1) as provided to AES by FP&L Energy was used for these analyses.
6. Methodology The methodology consisted of the following steps:
1. The limiting temperature cases defined in DI 2 were reviewed to determine the case list.
2. The GTH file for the base case-models documented in DI 3 which are steady state cases were modified by incorporating the appropriate M&E data from DI 4, 5, and 6 via the boundary HELB condition which was tripped on after the 1 second initialization. GOTHIC control volume descriptions are given in Attachment D.
3. Also, the HELB path which is between the HELB boundary condition and the volume in which the HELB is located was changed in the GTH file as needed.
4. The GTH files for these cases are identified from their names in the following manner:

PB-PAB-XXX T-Y where XXX is the room designation of the break location and Y is used to distinguish between cases where different HELBs at various locations may occur within a particular room. For sensitivity study cases in which the maximum AFW flow is assumed for the generation of the M&E input data, the case ID name is appended with -s3.

5. The end times of these cases were set sufficiently large, so that the temperatures throughout the PAB and TB were reduced to 130F or until the temperature in the room where the HELB occurs reaches an asymptotic limit. Compensatory action is required to achieve building recovery for these latter cases.
6. Attachment A documents the specific changes made to the base case for each of the cases that were run.
7. Analysis The models developed in DI 3 were based on a model that was developed for application to analyses of HVAC type calculations. The original base model is highly detailed in terms of the representations of the rooms, flow paths, and heat structures. A review of that model showed that the main concern for adapting it to HELB analyses related to the heat transfer 3.1-3 Form 3.1-3 Rev. 2 Rev. 2

Automated CALCULATION SHEET Page: 9 of 12 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No E1 Date: 04/14/2010 coefficients, particular for condensation of vapor on the heat structure exposed surfaces, and that the heat transfer correlations in the original model are suitable for HELB analyses.

Based on a review of the temperature limiting cases identified in DI 2, HELBs in the following rooms were not analyzed.

Room 524 (Unit 1 Facade) - Room 596 (Unit 2 Facade) is more limiting, since its volume is smaller.

Room 583 (Unit 2 Turbine Hall) - Room 301 (Unit 1 Turbine Hall) is assumed to be identical.

Room 224 (Unit 2 Alternate Shutdown Area) - Room has large opening to Turbine Hall and HELB M&E release is relatively small (feedwater line crack). The only required equipment in the room are the Unit 2 feedwater flow transmitters.

Room 122 (Water Treatment Area) - Room is a large volume open to the Turbine Hall.

HELB M&E release is relatively small (break in condensate return from steam generator blowdown heat exchangers). No required equipment in the room.

Room 137 (Unit 2 Pipe Chase) - identical to Room 140 (Unit 1 Pipe Chase).

Rooms 147 (Unit 1 Seal Water Heat Exchanger), Room 146 (Unit 1 Letdown Heat Exchanger), Room 144 (Unit 2 Seal Water Heat Exchanger) and Room 145 (Unit 2 Letdown Heat Exchanger). HELB M&E release is relatively small and contain no required equipment.

Bounded by HELB in Room 140.

Room 360 (South Service Building) - Large volume not connected to PAB. Has metal wall panels that will vent to atmosphere. HELB M&E release is relatively small (feedwater crack).

The only required equipment in the room are the Unit 1 feedwater flow transmitters.

Room 238 (Basketball Court) - Large volume with relatively small M&E release (crack in 3" steam supply line to AFWPT). Bounded by break in Room 271 (Boric Acid Batch Tank Area).

Room 273 (Unit 2 HVAC Equipment Room) - Identical to and connected to Room 272 (Unit 1 HVAC Equipment Room).

Form 3.1-3 3.1-3 Rev. 2 Form Rev. 2

Automated CALCULATION SHEET Page: 10 of 12 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No Lo Date: 04/14/2010 The temperature limiting cases that were run are as follows:

GOTHIC Room Description HELB Event Task 6 (DI 2) Example Case ID PB-PAB- 596 Unit 2 Farade-Upper 86' to 159' 30" MS Break 2-MS-B1 596 T-1 PB-PAB- 596 Unit 2 Fagade-Middle 39' to 86' 3" MS AFWPT Break 2-MS-B12 596 T-2 PB-PAB- 596 Unit 2 Fagade-Lower 6.5' to 39' 2: SGB Break N/A 596 T-3 PB-PAB- 301 Unit 1 Turbine Hall Above 44'- 24" MS Break 1-MS-B2 301 T-1 PB-PAB- 301 Unit 1 Turbine Hall Below 44' 6" MS Break 1-MS-B21 301 T-2 PB-PAB- 140 Unit 1 CVCS Letdown Pipe Chase 2" CVCS Break N/A 140 T PB-PAB- 237 CCW Heat Exchanger Room 3" MS AFWPT Break 1-MS-B12 237 T PB-PAB- 271 Boric Acid Batch Tank Area 3" MS AFWPT Crack N/A 271 T PB-PAB- 272 Unit 1 HVAC Equipment Room 30" MS Crack N/A 272 T_____________________________________

Note three maximum AFW flow sensitivity study cases were also run which are PB-PAB-596_T1-s3, PB-PAB-301_T1-s3, and PB-PAB-301 T2-s3.

The following table presents the summary of the results. The maximum temperatures in this table are for all of the volumes; GOTHIC control volume descriptions are given in Attachment D. The distributions of the maximum temperatures for all volumes for these cases are shown in Attachment B. Attachment C contains the time dependent temperature response in the room where the HELB is located; Attachment E shows representative values from Attachment C in terms of the room temperature time history. Attachment F shows the rooms above 130° F for each case.

GOTHIC Case ID Maximum Time to Temperature Reach 130 F and Time (sec)

Form 3.1-3 Rev. 2

Automated CALCULATION SHEET Page:I I of 12 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes No D Date: 04/14/2010

[F/secl PB-PAB-596 T-1 360 / 78.6 820 PB-PAB-596 T-1-s3 386 / 100 =959 PB-PAB-596 T-2 200 / 934 1178 PB-PAB-596 T-3 230 / 885 210.0F 1 PB-PAB-301 T-1 231 /72.6 =1010 PB-PAB-301 T-1-s3 245/107.2 238.7F 1 PB-PAB-301 T-2 243 / 440 183.2F 1 PB-PAB-301 T-2-s3 250 / 857 184.6F 1 PB-PAB-140 T 188 /599 2382 PB-PAB-237_T 267/1801 145.1F 1 PB-PAB-271 T 191 1-1801 156.6F' PB-PAB-272 T 363 / 1054 163.4F1 Note 1. The temperature reaches an asymptotic value which is above 130 F as can be seen from the results in Attachment C, so that compensatory action is required to achieve building recovery.

There are three different HELBs for Room 596 and two for Room 301. In these cases, the values of Y correspond to decreasing elevation starting at the top. Thus, Case PB-PAB-596_T-1 has the HELB in the upper vertical layer, and Case PB-PAB-596_T-3 has the HELB in the lower vertical layer. Similarly, the HELB is located above the Turbine Deck for Case PB-PAB-301_T-1 and below the Turbine Deck for Case PB-PAB-301_T-2.

The humidity initially decreases, but then increases and remains at 100% saturation for the remainder of the HELB event.

The cases documented in this calculation are based on the base cases documented in DI 3, so that they have similar basic characteristics as those cases. That is to say that even during a null transient that represents steady state conditions there will be minor deviations from the initial conditions. Thus, for the current cases, some of the volumes that are not affected by the HELB will display a slight downward drift in their temperatures resulting in the maximum occurring at t = 0 as seen in the Attachment B results.

Form 3.1-3 Rev. 2

Automated CALCULATION SHEET Page: 12 of 12 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes 51 No El Date: 04/14/2010

8. Conclusions The analyses of the temperature limiting cases for the PB PAB are documented in this calculation, and the distributions of the maximum temperatures for all the cases are contained in the tables in Attachment B. AFW flow sensitivity study cases were run for the larger HELB breaks which showed that assuming maximum AFW yielded more severe

.temperature responses and are the limiting condition. The time dependent temperature responses in the room where the HELB is located are given in Attachment C; Attachment E shows representative values from Attachment C. Attachment F shows the-rooms above 1300 F for each case. These results can be used to evaluate the environmental qualification of the equipment within these buildings. Also, this analysis has- established HELBs for which compensatory action is required to achieve building recovery.

9. References
1. AES VerificationFile GOTHIC Software Version 7.2a (QA), 2/28/08 "GOTHIC CONTAINMENT ANALYSIS PACKAGE USER MANUAL Version 7.2a(QA)

January 2006", NAI 8907-02 Rev 17

2. ASME Steam Tables Form 3.1-3 Rev. 2

Automated CALCULATION SHEET Page: A-i of A-3 A Engineering Services Corp.

Calc. No.:

PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RCKern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CDHenry Safety Related Yes [9 No E[1 Date: 12/23/2008 Attachment A Case Specific Changes Made to the Base Case This attachment documents the specific changes made to the base cases documented in DI 3 for each of the temperature limiting cases that were analyzed.

GOTHIC Case ID HELB Volume 1 HELB Area (ft 2 ) M&E Source PB-PAB-596 T-1 124s3 4.3303 DI 4-D28 pp 5-6 PB-PAB-596 T-1-s3 124s3 4.3303 DI 6 Table 2 PB-PAB-596 T-2 124s2 0.0513 DI 4-U005-pp 89-90 PB-PAB-596 T-3 124sl 0.0210 This attachment PB-PAB-301 T-1 134 2.6552 DI 4-D28 pp 5-6 PB-PAB-301 T-1-s3 134 2.6552 DI 6 Table 2 PB-PAB-301 T-2 133 0.2010 DI 4-D02 pp 38-39 PB-PAB-301 T-2-s3 133 0.2010 DI 6 Table 5 PB-PAB-140 T 25sl 0.0233 This attachment PB-PAB-237 T 103 0.0513 DI 5-Section 7.1 PB-PAB-271 T 95s12 0.0012 DI 4-UO01 pp 93-952 PB-PAB-272 T 108 0.0444 DI 4-DO05 pp 51-52

1. GOTHIC control volume descriptions are given in Attachment D.
2. The HELB boundary condition (BC 125F) for this case was tripped off using the added Component Trip 42 at 1800 sec due to isolation based on DI 5.

The M&E data is entered using Boundary Condition 125F that was tripped on with Component Trip 36 after the initialization period (t = 1.0) with the steam and air volume fractions set to 1 and 0, respectively.

FP 616 is the HELB flow path, so the Volume A for FP 616 is the HELB volume listed above, and the elevation and height for that connection was set accordingly.

The following is a calculation of the M&E associated with the HELB in the Steam Generator Blowdown Line that is located in the lower third of Room 596. As seen in DI 2 and 5, the area of this HELB is 0.0210 ft2 and the enthalpy corresponds to saturated liquid or Form 3.1I-3 Rev. 2

Automated CALCULATION SHEET Page: A-2 of A-3 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RCKern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CDHenry Safety Related Yes No [I Date: 12/23/2008 saturated steam. Assumption 3 states that the fluid conditions conservatively remain constant at their initial conditions during the blowdown. The mass fluxes for saturated steam and liquid at 1020 psia are 2135 and 8018 Ibm/ft2 -s as obtained from fluid conditions 1 and 4 in the table in Section A.2 of DI 4, respectively. From DI 2, the initial saturated liquid and steam volumes per SG for Unit 1 are 2877 and 1804 ft 3 respectively. The Unit 1 volumes are chosen because of the larger liquid volume. The specific volumes for saturated liquid and steam as obtained from Reference 2 at 1020 psia are 0.02166. and 0.43620 ft 3/lbm. Thus, the flow rates and times for blowdown of the liquid and steam are:

Wf= 0.0210*8018 = 168.4 Ibm/sec Wg= 0.0210*2135 = 44.8 Ibm/sec Tf= 2877/(0.02166*168.4) = 788.7 sec Tg= 1804/(0.43620*44.8) = 92.3 sec These results yield the following time dependent M&Es for this case:

Time Time (sec) Flow (Ibm/s) Enthalpy (BTU/lbm)

Point 1 0.0 0.0 546 2 0.001 168.4 546 3 788.7 168.4 546 4 788.701 44.8 1191 5 . 881.0 44.8 1191 6 881.001 0.0 1191 7 100000. 0.0 1191 The following is a calculation of the M&E associated with the HELB in the CVCS System Letdown Line that is located in Room 140. As seen in DI 2, the flow is limited to 87 gpm with an enthalpy of 249 BTU/Ibm (280 F) at 300 psia and is isolated in 10 minutes.

Following Assumption 3, the fluid conditions conservatively remain constant at their initial conditions during the blowdown. The specific volume for the discharged fluid as obtained from Reference 2 is 0.01725 ft 3/lbm. Thus, the flow rate is gpm ft 3/gal Ibm/ft 3 min/s W = 87-0.13368/(0.01725"60) = 11.2 Ibm/sec Form 3.1-3 Rev. 2

I Engineering Automated Services Corp.

CALCULATION SHEET Calc.

Page: No.:

A-3 of A-3 PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RCKern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CDHenry Safety Related Yes N No [F] Date: 12/23/2008 These results yield the following time dependent M&Es for this case:

Time Time (sec) Flow (Ibm/s) Enthalpy (BTU/Ibm)

Point 1 0.0 0.0 249 2 0.001 11.2 249 3 600.0 11.2 249 4 600.001 0.0 249 5 100000. 0.0 249 The transient time intervals have been chosen sufficiently long to ensure that the time-period of interest has been covered for each case. This has been assured by extending the analyses well beyond the time at which the M&E forcing functions have ended.

Rev. 2 Form 3.1-3 Form 3.1-3 Rev. 2

Automated CALCULATION SHEET Page: B-1 of B-50 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes 5J No El Date: 12/23/2008 Attachment B Maximum Temperature Distribution Results This attachment contains the tables of the maximum temperatures for each of the volumes (cells) for the six cases that were run as identified in Section 7. GOTHIC control volume descriptions are given in Attachment D. The volume (ft3 ) along with the maximum temperature (F) and time of occurrence (sec) is included for each of the volumes in the models. The first set of cell numbers in these tables shows the numerical sequence of the cells (volumes and sub-volumes for subdivided volumes) in which GOTHIC processes the calculations, and the second set shows the cell number within the volumes and subdivided-volumes. Refer to Section 10.2 of Reference 1. The results as obtained from the max-temp.txt files generated by GOTHIC as described in DI 3 have been reordered from the highest to lowest maximum temperature and the times of the maximums are given to the nearest hundredth of a sec.

B.1 PB-PAB-596_T-1 Max Temperature Filename Cell Vol L Cell Volume Max Value Max Time 187 124 3 1396400.00 359.8100 78.58 186 124 2 894670.00 300.4700 71.71 80 47 6 2315.60 105.1300 1.03 78 47 4 367.50 105.0800 1.06 82 47 8 498.75 105.0200 1.05 81 47 7 698.25 105.0100 1.06 77 47 3 514.50 104.6100 0.96 75 47 1 2388.80 104.5000 0.00 76 47 2 1706.30 104.5000 0.00 79 47 5 3241.90 104.5000 0.00 70 42 4 2160.00 100.0100 0.79 69 42 3 2880.00 99.9970 0.79 68 42 2 2400.00 99.9450 0.79 67 42 1 3200.00 99.5000 0.00 138 88 1 1257.30 96.3670 1.00 132 82 1 1419.30 95.6950 1.00 185 124 1 627740.00 95.1700 1.87 183 122 1 5000.00 94.9900 1000.00 184 123 1 5000.00 94.9900 1000.00 164 103 1 59208.00 94.5450 1.49 42 21 3 3392.80 94.0400 1000.00 5o 25 4 3392.80 93.6160 1000.00

I Engineering Automated Services Corp.

CALCULATION SHEET Caic.

Page: No.:

B-2 PBNP-994-21-13 of B-50 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [I- No L-I Date: 12/23/2008 47 25 1 1947.70 91.8140 0.59 41 21 2 1947.70 91.8000 0.59 49 25 3 1876.90 91.7990 0.59 43 21 4 1876.90 91.7980 0.59 96 58 1 3024.00 91.7220 0.59 97 58 2 4368.00 91.6330 0.59 40 21 1 3520.80 91.5000 0.00 48 25 2 3520.80 91.5000 0.00 144 94 1 2023.40 91.3120 1000.00 139 89 1 1070.10 89.3750 1000 00 162 101 1 38741.00 89.2140 1000.00 166 105 1 41586.00 88.9370 1000.00 163 102 1 57058.00 88.8210 1000.00 160 99 1 1169.60 88.8090 1000.00 165 104 1 59956.00 88.7070 1000.00 94 56 1 42982.00 88.4730 1000.00 131 81 1 1422.00 88.2420 30.98 90 52 1 10883.00 88.0040 1000.00 140 90 1 8612.50 87.8860 1000.00 123 73 1 5110.70 87.5950 1000.00 83 48 1 8654.10 87.5850 1000.00 95 57 1 13874.00 87.5200 1000.00 161 100 1 1251.60 87.4970 1000.00 102 62 2 4368.00 87.4110 1000.00 108 63 6 43326.00 87.2270 1000.00 101 62 1 3024.00 87.1760 1000.00 107 63 5 34362.00 87.1660 1000.00 168 107 1 258090.00 87.1270 1000.00 103 63 1 33120.00 87.0760 1000.00 104 63 2 41760.00 87.0210 1000.00 71 43 1 19199.00 87.0000 1000.00 109 63 7 28635.00 86.9830 1000.00 169 108 1 258090.00 86.9810 1000.00 110 63 8 36105.00 86.9630 1000.00 106 63 4 34800.00 86.9520 1000.00 167 106 1 97427.00 86.9100 1000.00 58 33 1 2776.80 86.8900 1000.00 105 63 3 27600.00 86.8490 1000.00 152 95 8 58302.00 86.8390 1000.00 151 95 7 27892.00 86.8330 1000.00 93 55 1 11245.00 86.7360 1000.00 141 91 1 9934.60 86.7290 1000.00 127 77 1 98439.00 86.7180 1000.00 153 95 9 88106.00 86.7050 1000.00 156 95 12 93727.00 86.6280 1000.00 155 95 11 44840.00 86.6190 1000.00 137 87 1 10100.00 86.5880 1000.00 120 70 1 21941.00 86.5810 1000.00 154 95 10 184160.00 86.5760 1000.00 133 83 1 10478.00 86.5050 1000.00

Automated CALCULATION SHEET Page: B-3 of B-50 A Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes E[ No D Date: 12/23/2008 66 41 2706.90 86.4220 1000.00 147 95 42461.00 86.4090 1000.00 148 95 88754.00 86.4090 1000.00 60 35 2954.20 86.4030 1000.00 59 34 2844.50 86.3970 1000.00 145 95 13442.00 86.3510 1000.00 88 51 10874.00 86.3130 1000.00 124 74 5060.50 86.2910 1000.00 146 95 28097.00 86.2660 1000.00 100 61 14847.00 86.2630 1000.00 57 32 2771.50 86.2620 1000.00 89 51 102.70.00 86.2540 1000.00 84 49 10874.00 86.2530 1000.00 74 46 2172.70 86.2480 1000.00 143 93 1778.40 86.2300 1000.00 85 49 10270.00 86.2260 1000.00 51 26 2771.50 86.2200 1000.00 56 31 1512.00 86.1980 1000.00 37 19 1151.70 86.1590 1000.00 179 118 2900.00 86.1330 1.22 142 92 7670.00 86.1250 1000.00 181 120 2400.00 86.1190 1.08 136 86 4558.20 86.1150 1000.00 73 45 14460.00 86.0710 1000.00 91 53 1719.10 86.0620 1000.00 65 40 2706.90 86.0550 1.04 54 29 29469.00 86.0470 1000.00 119 69 2625.90 86.0470 1000.00 135 85 3517.70 86.0400 1000.00 64 39 2954.20 86.0160 1000.00 45 23 9063.00 86.0120 1000.00 125 75 4334.30 85.9300 1000.00 10 5 56.25 85.8880 1.30 46 24 3138.80 85.8620 1.04 44 22 3138.80 85.8540 1.04 113 64 5620.90 85.8430 1000.00 126 76 905.71 85.8350 1000.00 112 64 25758.00 85.8340 1000.00 130 80 3947.40 85.8340 1000.00 114 64 5620.90 85.8330 1000.00 128 78 905.71 85.8290 1000.00 111 64 25758.00 85.8200 1000.00 72 44 1659.40 85.8160 1000.00 39 20 5096.00 85.7780 1000.00 87 50 10270.00 85.7390 1.03 63 38 25676.00 85.7220 1000.00 118 68 3951.10 85.7220 1000.00 115 65 1216.30 85.7180 1000.00 24 12 1151.70 85.6970 366.95 117 67 1038.80 85.6950 1000.00

Automated CALCULATION SHEET Page: B-4 of B-50 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No ED Date: 12/23/2008 129 79 1 1038.80 85.6950 1000.00 121 71 1 1507.10 85.6830 1000.00 38 20 1 10400.00 85.6790 1000.00 62 37 1 3010.20 85.6140 1000.00 180 119 1 2900.00 85.5870 1.10 25 12 4 1407.70 85.:5850 622.73 116 66 1 2214.70 85.5840 1000.00 122 72 1 2214.70 85.5640 1000.00 12 7 1 291.53 85.5630 0.59 1 1 1 614.25 85.5610 0.40 4 2 1 614.25 85.5580 0.40 19 11 1 614.25 85.5580 0.44 15 10 1 614.25 85.5560 0.44 134 84 1 1292.50 85.5560 1000.00 188 125 1 629770.00 85.5440 0.09 36 19 3 1407-.70 85.5310 170.18 8 3 1 1698.30 85.5280 0.59 9 4 1 1698.30 85.5280 0.59 13 8 1 1698.30 85.5280 0.59 14 9 1 1792.60 85.5270 0.59 2 1 2 614.25 85.5230 0.40 5 2 2 614.25 85.5200 0.40 20 11 2 614.25 85.5200 0.44 16 10 2 614.25 85.5180 0.44 92 54 1 1703.40 85.5170 1000.00 159 98 1 5936.10 85.4870 1000.00 182 121 1 4000.00 85.4840 1000.00 34 19 1 1147.80 85.4800 0.44 11 6 1 5404.20 85.4750 0.59 23 12 2 1147.80 85.4750 0.40 3 1 3 921.38 85.4720 0.40 7 2 4 241.31 85.4710 1000.00 21 11 3 921.38 85.4700 0.44 6 2 3 921.38 85.4690 0.40 17 10 3 921.38 85.4680 0.44 26 13 1 1182.60 85.4560 0.40 31 17 1 1182.60 85.4560 0.44 27 13 2 1450.30 85.4380 1000.00 18 10 4 241.31 85.4270 0.44 30 16 1 543.38 85.4170 0.54 33 18 1 522.11 85.4110 0.54 61 36 1 8107.80 85.4020 1000.00 29 15 1 5589.70 85.3940 0.54 28 14 1 1399.80 85.3930 0.54 55 30 1 1135.80 85.3930 0.72 53 28 1 1054.80 85.3910 0.72 32 17 2 1450.30 85.3850 404.23 52 27 1 1512.00 85.3350 0.65 86 50 1 10874.00 85.2950 0.65 189 125 2 895990.00 85.2620 0.09

I Engineering Automated Services Corp.

CALCULATION SHEET Calc.

Page: No.:

B-5 PBNP-994-21-13 of B-50 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No El Date: 12/23/2008 157 96 4031.80 85.2580 1000.00 196 131 1000000.00 85.2560 1000.00 192 127 1000000.00 85.2280 1000.00 195 130 1000000.00 85.1190 33.98 98 59 9999.00 85.0790 16.38 99 60 9999.00 85.0790 16.38 191 126 1000000.00 85.0710 1000.00 197 132 1000000.00 85.0640 1000.00 158 97 5021.10 85.0410 1000.00 22 12 939.09 85.0000 0.00 35 19 939.09 85.0000 0.00 149 95 21609.00 85.0000 0.00 150 95 45170.00 85.0000 0.00 170 109 1000000000.00 85.0000 129.98 171 110 1000000000.00 85.0000 129.98 172 111 1000000000.00 85.0000 129.98 173 112 1000000000.00 85.0000 129.98 174 113 1000000000.00 85.0000 129.98 175 114 1000000000.00 85.0000 129.98 176 115 1000000000.00 85.0000 129.98 177 116 1000000000.00 85.0000 129.98 178 117 1000000000.00 85.0000 59.43 190 125 1393100.00 85.0000 0.00 193 128 1000000.00 85.0000 93.44 194 129 1000000.00 85.0000 93.44 B.2 PB-PAB-596_T-1-s3 Max Temperature Filename Cell Vol L Cell Volume Max Value Max Time 187 124 3 1396400.00 386.2400 100.00 186 124 2 894670.00 302.2600 71.71 80 47 6 2315.60 105.1300 1.03 78 47 4 367.50 105.0800 1.06 82 47 8 498.75 105.0200 1.05 81 47 7 698.25 105.0100 1.06 77 47 3 514.50 104.6100 0.96 75 47 1 2388.80 104.5000 0.00 76 47 2 1706.30 104.5000 0.00 79 47 5 3241.90 104.5000 0.00 70 42 4 2160.00 100.0100 0.79 69 42 3 2880.00 99.9970 0.79 68 42 2 2400.00 99.9450 0.79 67 42 1 3200.00 99.5000 0.00 138 88 1 1257.30 96.3670 1.00 132 82 1 1419.30 95.6950 1.00 185 124 1 627740.00 95.1700 1.87 183 122 1 5000.00 95.0000 1999.50

Page: B-6 of B-50 a Automated CALCULATION SHEET Cale. No.:

ZAI Engineering Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HfELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [] No LI. Date: 12/23/2008 184 123 1 5000.00 95.0000 1999.50 164 103 1 59208.00 94.5450 1.49 42 21 3 3392.80 94.1810 2000.00 50 25 4 3392.80 93.7080 2000.00 47 25 1 1947.70 91.8140 0.59 41 21 2 1947.70 91.8000 0.59 49 25 3 1876.90 91.7990 0.59 43 21 4 1876.90 91.7980 0.59 96 58 1 3024.00 91.7220 0.59 97 58 2 4368.00 91.6330 0.59 144 94 1 2023.40 91.6330 2000.00 40 21 1 3520.80 91.5000 0.00 48 25 2 3520.80 91.5000 0.00 162 101 1 38741.00 89.8680 2000.00 163 102 1 57058.00 89.7280 2000.00 166 105 1 41586.00 89.7010 2000.00 165 .104 1 59956.00 89.6320 2000.00 139 89 1 1070.10 89.5480 2000.00 94 56 1 42982.00 89.0700 2000.00 160 99 1 1169.60 88.9320 2000.00 169 108 1 258090.00 88.6710 2000.00 131 81 1 1422.00 88.2420 30.98 90 52 1 10883.00 88.1310 2000.00 108 63 6 43326.00 88.1260 2000.00 107 63 5 34362.00 88.0730 2000.00 140 90 1 8612.50 88.0420 2000.00 103 63 1 33120.00 88.0140 2000.00 104 63 2 41760.00 87.9760 2000.00 109 63 7 28635.00 87.9610 2000.00 110 63 8 36105.00 87.9570 2000.00 106 63 4 34800.00 87.9430 2000.00 167 106 1 97427.00 87.9230 2000.00 152 95 8 58302.00 87.9100 2000.00 105 63 3 27600.00 87.8500 2000.00 151 95 7 27892.00 87.8400 2000.00 153 95 9 88106.00 87.8300 2000.00 168 107 1 258090.00 87.7890 2000.00 83 48 1 8654.10 87.7770 2000.00 155 95 11 44840.00 87.7760 2000.00 123 73 1 5110.70 87.7690 2000.00 154 95 10 184160.00 87.7640 2000.00 156 95 12 93727.00 87.7640 2000.00 95 57 1 13874.00 87.7630 2000.00 148 95 4 88754.00 87.6130 2000.00 147 95 3 42461.00 87.5860 2000.00 161 100 1 1251.60 87.5770 2000.00 102 62 2 4368.00 87.5750 2000.00 145 95 1 13442.00 87.5480 2000.00 101 62 1 3024.00 87.3370 2000.00 71 43 1 19199.00 87.1130 2000.00

Automated CALCULATION SHEET Page: B-7 of B-50 SEngineering Calc. No.:

Z-Lý Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No 0I Date: 12/23/2008 58 33 2776.80 86. 9840 2000.00 93 55 11245.00 86. 8910 2000.00 127 77 98439.00 86. 8810 2000.00 100 61 14847.00 86.8440 2000.00 141 91 9934.60 86.8380 2000.00 120 70 21941.00 86. 7820 2000.00 137 87 10100.00 86. 7260 2000.00 133 83 10478.00 86. 6500 2000.00 146 95 28097.00 86. 6500 2000.00 37 19 1151.70 86. 5780 2000.00 66 41 2706.90 86.5250 2000.00 60 35 2954.20 8.6..5050 2000.00 59 34 2844.50 86. 4970 2000.00 124 74 5060.50 86. 4070 2000.00 73 45 14460.00 86. 3650 2000.00 143 93 1778.40 86. 3640 2000.00 88 51 10874.00 86. 3530 2000.00 57 32 2771.50 86. 3330 2000.00 74 46 2172.70 86.3280 2000.00 89 51 10270.00 86. 3160 2000.00 51 26 2771.50 86. 2910 2000.00 84 49 10874.00 86.2850 2000.00 142 92 7670.00 86. 2650 2000.00 85 49 10270.00 86. 2600 2000.00 56 31 1512.00 86. 2300 2000.00 136 86 4558.20 86. 2180 2000.00 91 53 1719.10 86. 1570 2000.00 54 29 29469.00 86. 1380 2000.00 179 118 2900.00 86. 1330 1.22 119 69 2625.90 86. 1320 2000.00 181 -120 2400.00 86. 1190 1.08 135 85 3517.70 86. 1170 2000.00 45 23 9063.00 86. 0900 1929.20 64 39 2954.20 86.0820 2000.00 65 40 2706.90 86.0680 2000.00 125 75 4334.30 85.9920 2000.00 126 76 905.71 8 5.9600 2000.00 128 78 905.71 8 5.9490 2000.00 113 64 5620.90 85.9110 2000.00 111 64 25758.00 85.9100 1959.20 112 64 25758.00 8 5.9080 1844.20 114 64 5620.90 8 5.9080 2000.00 130 80 3947.40 8 5.9040 2000.00 72 44 1659.40 85.9030 2000.00 10 5 56.25 85.8880 1.30 118 68 3951.10 85.8690 2000.00 63 38 25676.00 85.'8640 2000.00 46 24 3138.80 85.8620 1.04 44 22 3138.80 85.8540 1.04 115 65 1216.30 85.8260 2000.00

Automated CALCULATION SHEET Page: B-8 of B-50 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No E Date: 12/23/2008 39 20 2 5096.00 85.8180 2000.00 117 67 1 1038.80 85.8050 2000.00 129 79 1 1038.80 85.8050 2000.00 121 71 1 1507.10 85.7930 2000.00 159 98 1 5936.10 85.7840: 2000.00 87 50 2 10270.00 85.7390 1.03 38 20 1 10400.00 85.7270 2000.00 24 12 3 1151.70 85.6970 367.00 62 37 1 3010.20 85.6880 2000.00 116 66 1 2214.70 85.6830 2000.00 122 72 1 2214.70 85.6620 2000.00 157 96 1 4031.80 85.6400 2000.00 134 84 1 1292.50 85.6330 2000.00 92 54 1 1703.40 85.5970 2000.00 180 119 1 2900.00 85.5870 1.10 25 12 4 1407.70 85.5850 623.10 182 121 1 4000.00 85.5840 2000.00 12 7 1 291.53 85.5630 0.59 1 1 1 614.25 85.5610 0.40 4 2 1 614.25 85.5580 0.40 19 11 1 614.25 85.5580 0.44 15 10 1 614.25 85.5560 0.44 188 125 1 629770.00 85.5440 0.09 36 19 3 1407.70 85.5310 170.18 8 3 1 1698.30 85.5280 0.59 9 4 1 1698.30 85.5280 0.59 13 8 1 1698.30 85.5280 0.59 14 9 1 1792.60 85.5270 0.59 2 1 2 614.25 85.5230 0.40 5 2 2 614.25 85.5200 0.40 20 11 2 614.25 85.5200 0.44 16 10 2 614.25 85.5180 0.44 34 19 1 1147.80 85.4800 0.44 7 2 4 241.31 85.4770 1332.00 11 6 1 5404.20 85.4750 0.59 23 12 2 1147.80 85.4750 0.40 3 1 3 921.38 85.4720 0.40 21 11 3 921.38 85.4700 0.44 6 2 3 921.38 85.4690 0.40 17 10 3 921.38 85.4680 0.44 26 13 1 1182.60 85.4560 0.40 31 17 1 1182.60 85.4560 0.44 61 36 1 8107.80 85.4510 2000.00 27 13 2 1450.30 85.4410 1249.00 18 10 4 241.31 85.4270 0.44 53 28 1 1054.80 85.4220 2000.00 30 16 1 543.38 85.4170 0.54 33 18 1 522.11 85.4110 0.54 29 15 1 5589.70 85.3940 0.54 28 14 1 1399.80 85.3930 0.54

Automated CALCULATION SHEET Page: B-9 of B-50 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [El No D Date: 12/23/2008 55 30 1135.80 85.3930 0.72 32 17 1450.30 85.3850 404.30 196 131 1000000.00 85.3830 2000.00 192 127 1000000.00 85.3420 2000.00 52 27 1512.00 85.3350 0.65 86 50 10874.00 85.2950 0.65 189 125 895990.00 85.2620 0.09 158 97 5021.10 85.1690 2000.00 195 130 1000000.00 85.1190 33.98 191 126 1000000.00 85.0920 2000.00 98 59 9999.00 85.0790 16.38 99 60 9999.00 85.0790 16.38 197 132 1000000.00 85.0740 2000.00 22 12 939.09 85.0000 0.00 35 19 939.09 85.0000 0.00 149 95 21609.00 85.0000 0.00 150 95 45170.00 85.0000 0.00 170 109 1000000000.00 85.0000 129.98 171 110 1000000000.00 85.0000 129.98 172 111 1000000000.00 85.0000 129.98 173 112 1000000000.00 85.0000 129.98 174 113 1000000000.00 85.0000 129.98 175 114 1000000000.00 85.0000 129.98 176 115 1000000000.00 85.0000 129.98 177 116 1000000000.00 85.0000 129.98 178 117 1000000000.00 85.0000 59.43

'190 125 1393100.00 85.0000 0.00 193 128 1000000.00 85.0000 95.11 194 129 1000000.00 85.0000 95.11 B.3 PB-PAB-596_T-2 Max Temperature Filename Cell Vol L Cell Volume Max Value Max Time 186 124 2 894670.00 200.3000 934.40 187 124 3 1396400.00 193.1800 983.66 80 47 6 2315.60 105.1300 1.03 78 47 4 367.50 105.0800 1.06 82 47 8 498.75 105.0200 1.05 81 47 7 698.25 105.0100 1.06 77 47 3 514.50 104.6100 0.96 75 47 1 2388.80 104.5000 0.00 76 47 2 1706.30 104.5000 0.00 79 47 S 3241.90 104.5000 0.00 70 42 4 2160.00 100.0100 0.79 69 42 3 2880.00 99.9970 0.79 68 42 2 2400.00 99.9450 0.79 67 42 1 3200.00 99.5000 0.00

Automated CALCULATION SHEET Page: B-10 Ioff B-50

-5 zI.L Engineering Services Corp.

Cale. No.:

PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No El Date: 12/23/2008 138 88 1257.30 96. 3670 1.00 132 82 1419.30 95. 6950 1.00 183 122 5000.00 9 5.0000 2000.00 184 123 1 5000.00 9 5.0000 2000.00 164 103 1 59208.00 94. 5450 1.49 1

42 21 1 3392.80 94.1810 2000.00 50 25 3392.80 93.7080 2000.00 47 25 3 1947.70 91. 8140 0.59 41 21 4 1947.70 91.8000 0.59 49 25 1 1876.90 91. 7990 0.59 43 21 2 1876.90 91. 7980 0.59 96 58 3024.00 91. 7220 0.59 97 58 4368.00 91. 6330 0.59 144 94 2023.40 91. 6330 2000.00 40 21 3520.80 91. 5000 0.00 48 25 3520.80 91. 5000 0.00 162 101 38741.00 89. 8680 2000.00 163 102 57058.00 89. 7280 2000.00 166 105 41586.00 89. 7010 2000.00 165 104 59956.00 89. 6320 2000.00 139 89 1070.10 89. 5480 2000.00 94 56 2 42982.00 89. 0700 2000.00 160 99 1 1169.60 88. 9320 2000.00 169 108 1 258090.00 88.4910 2000.00 131 81 2 1422.00 88. 2610 31.03 90 52 1 10883.00 88.13 10 2000.00 108 63 1 43326.00 88.1260 2000.00 107 63 1 34362.00 88. 0730 2000.00 140 90 1 8612.50 88. 0420 2000.00 103 63 1 33120.00 88. 0140 2000.00 104 63 41760.00 87. 9760 2000.00 109 63 28635.00 87. 9610 2000.00 110 63 10 36105.00 87. 9570 2000.00 106 63 12 34800.00 87. 9430 2000.00 167 106 1 97427.00 87. 9230 2000.00 95 1 2000.00 152 1 58302.00 87. 9100 105 63 6 27600.00 87. 8500 2000.00 151 95 27892.00 87. 8400 2000.00 153 95 1 88106.00 87.8310 2000.00 83 48 2 8654.10 87.7770 2000.00 155 95 44840.00 87. 7760 2000.00 123 73 5110.70 87. 7690 2000.00 154 95 184160.00 87. 7640 2000.00 156 95 93727.00 87. 7640 2000.00 95 57 13874.00 87. 7630 2000.00 148 95 88754.00 87. 6130 2000.00 168 107 258090.00 87. 5940 2000.00 147 95 42461.00 87. 5860 2000.00 161 100 1251.60 87. 5770 2000.00 102 62 4368.00 87.5750 2000.00

Automated CALCULATION SHEET Page: B3-Il of B-50 zI . Engineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [IZ No L] Date: 12/23/2008 145 95 13442.00 87. 5480 2000.00 101 62 3024.00 87. 3370 2000.00 71 43 19199.00 87. 1130 2000.00 58 33 2776.80 86. 9840 2000.00 93 55 11245.00 86. 8910 2000.00 127 77 98439.00 86. 8810 2000.00 100 61 14847.00 86. 8440 2000.00 141 91 9934.60 86. 8380 2000.00 120 70 21941.00 86. 7820 2000.00 137 87 10100.00 86. 7260 2000.00 133 83 10478.00 86. 6500 2000.00 146 95 28097.00 86. 6500 .2000.00 37 19 1151.70 86. 5740 1980.00 66 41 2706.90 86. 5250 2000.00 60 35 2954.20 86. 5050 2000.00 59 34 2844.50 86. 4970 2000.00 124 74 5060.50 86. 4070 2000.00 73 45 14460.00 86. 3650 2000.00 143 93 1778.40 86. 3640 2000.00 88 51 10874.00 86.3530 2000.00 57 32 2771.50 86.3330 2000.00 74 46 2172.70 86. 3280 2000.00 89 51 10270.00 86. 3160 2000.00 51 26 2771.50 86. 2910 2000.00 84 49 10874.00 86. 2850 2000.00 142 92 7670.00 86. 2650 2000.00 85 49 10270.00 86. 2600 2000.00 56 31 1512.00 86. 2300 2000.00 136 86 4558.20 86. 2180 2000.00 91 53 1719.10 86. 1570 2000.00 54 29 29469.00 86. 1380 2000.00 179 118 2900.00 86. 1330 1.22 119 69 2625.90 86. 1320 2000.00 181 120 2400.00 86. 1190 1.08 135 85 3517.70 86. 1170 2000.00 45 23 9063.00 86. 0900 1928.80 64 39 2954.20 86. 0820 2000.00 65 40 2706.90 86.0680 2000.00 125 75 4334.30 85.9920 2000.00 126 76 905.71 85.9600 2000.00 128 78 905.71 8 5.9490 2000.00 113 64 5620.90 85. 9110 2000.00 111 64 25758.00 85.9100 1958.70 112 64 25758.00 85. 9080 1844.00 114 64 5620.90 85. 9080 2000.00 130 80 3947.40 85. 9040 2000.00 72 44 1659.40 85. 9030 2000.00 10 5 56.25 85.8880 1.30 118 68 3951.10 8 5.8690 2000.00 63 38 25676.00 85. 8640 2000.00

Automated CALCULATION SHEET Page: B-12 of B-50

/,jJ Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client-. FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D-- Date: 12/23/2008 46 24 3138.80 85.8620 1.04 44 22 3138.80 85.8540 1.04 115 65 1216.30 85.8260 2000.00 39 20 5096.00 85.8180 2000.00 117 67 1038.80 85.8050 2000.00 129 79 1038.80 85.8050 2000.00 121 71 1507.10 85.7930 2000.00 159 98 5936.10 85.7840 2000.00 87 50 10270.00 85.7390 1.03 38 20 10400.00 85.7270 2000.00 24 12 1151.70 85.6970 366.67 62 37 3010.20 85.6880 2000.00 116 66 2214.70 85.6830 2000.00 122 72 2214.70 85.6620 2000.00 185 124 627740.00 85.6420 2.28 157 96 4031.80 85.6400 2000.00 134 84 1292.50 85.6330 2000.00 92 54 1703.40 85. 5970 2000.00 180 119 2900.00 85. 5870 1.10 25 12 1407.70 85. 5850 620.97 182 121 4000.00 85. 5840 2000.00 12 7 291.53 85. 5630 0.59 1 1 614.25 85.5610 0.40 4 2 614.25 85. 5580 0.40 19 11 614.25 85. 5580 0.44 15 10 614.25 85. 5560 0.44 188 125 629770.00 85. 5440 0.09 36 19 1407.70 85. 5300 170.82 8 3 1698.30 85 5280 0.59 9 4 1698.30 85.5280 0.59 13 8 1698.30 85.5280 0.59 14 9 1792.60 85.5270 0.59 2 1 614.25 85.5230 0.40 5 2 614.25 85.5200 0.40 20 11 614.25 85.5200 0.44 16 10 614.25 85.5180 0.44 34 19 1147.80 85.4800 0.44 7 2 241.31 85.4770 1327.70 11 6 5404.20 85.4750 0.59 23 12 1147.80 85.4750 0.40 3 1 921.38 85.4720 0.40 21 11 921.38 85.4700 0.44 6 2 921.38 85.4690 0.40 17 10 921.38 85.4680 0.44 26 13 1182.60 85.4560 0* 40 31 17 1182.60 85.4560 0.44 61 36 8107.80 85.4510 2000.00 27 13 1450.30 85.4410 1247.50 18 10 241.31 85.4270 0.44 53 28 1054.80 85.4220 2000.00

Automated CALCULATION SHEET Page: B-13 of B-50 Engineering Calc. No.:

Services Corp. PBN P-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D-1 Date: 12/23/2008 30 16 543.38 85.4170 0.54 33 18 522.11 85.4110 0.54 29 15 5589.70 85.3940 0.54 28 14 1399.80 85.3930 0.54 55 30 1135.80 85.3930 0.72 32 17 1450.30 85.3850 403.95 196 131 1000000.00 85.3830 2000.00 192 127 1000000.00 85.3420 2000.00 52 27 1512.00 85.3350 0.65 86 50 10874.00 85.2950 0.65 189 125 895990.00 85.2620 0.09 158 97 5021.10 85.1690 2000.00 195 130 1000000.00 85.1200 32.44 191 126 1000000.00 85.0920 2000.00 98 59 9999.00 85.0790 16.38 99 60 9999.00 85.0790 16.38 197 132 1000000.00 85.0740 2000.00 22 12 939.09 85.0000 0.00 35 19 939.09 85.0000 0.00 149 95 21609.00 85.0000 0.00 150 95 45170.00 85.0000 0.00 170 109 1000000000.00 85.0000 122.78 171 110 1000000000.00 85.0000 122.78 172 111 1000000000.00 85.0000 122.78 173 112 1000000000.00 85.0000 122.78 174 113 1000000000.00 85.0000 122.78 175 114 1000000000.00 85.0000 122.78 176 115 1000000000.00 85.0000 122.78 177 116 1000000000.00 85.0000 122.78 178 117 1000000000.00 85.0000 65.47 190 125 1393100.00 85.0000 0.00 193 128 1000000.00 85.0000 95.07 194 129 1000000.00 85.0000 95.07 B.4 PB-PAB-596_T-3 Max Temperature Filename

,Cell Vol L Cell Volume Max Value Max Time 185 124 1 627740.00 230.1600 884.57 186 124 2 894670.00 157.7300 497.69 187 124 3 1396400.00 157.0300 797.77 80 47 6 2315.60 105.1300 1.03 78 47 4 367.50 105.0800 1.06 82 47 8 498.75 105.0200 1.05 81 47 7 698.25 105.0100 1.06 77 47 3 514.50 104.6100 0.96 75 47 1 2388.80 104.5000 0.00 76 47 2 1706.30 104.5000 0.00

Automated CALCULATION SHEET Page: B-14 of B-50 ZI Engineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes 51 No D- Date: 12/23/2008 79 47 5 3241.90 104.5000 0.00 70 42 4 2160.00 100.0100 0.79 69 42 3 2880.00 99.9970 0.79 68 42 2 2400.00 99.9450 0.79 67 42 1 3200.00 99.5000 0.00 138 .88 1 1257.30 96.3670 1.00 132 82 1 1419.30 95.6950 1.00 183 122 1 5000.00 95.0000 1999.60 184 123 1 5000.00 95.0000 1999.60 164 103 1 59208.00 94.5450 1.49 42 21 3 3392.80 94.1810 2000.00 50 25 4 3392.80 93.7080 2000.00 47 25 1 1947.70 91.8140 0.59 41 21 2 1947.70 91.8000 0.59 49 25 3 1876.90 91.7990 0.59 43 21 4 1876.90 91.7980 0.59 96 58 1 3024.00 91.7220 0.59 97 58 2 4368.00 91.6330 0.59 144 94 1 2023.40 91.6330 2000.00 40 21 1 3520.80 91.5000 0.00 48 25 2 3520.80 91.5000 0.00 162 101 1 38741.00 89.8680 2000.00 163 102 1 57058.00 89.7280 2000.00 166 105 1 41586.00 89.7010 2000.00 165 104 1 59956.00 89.6320 2000.00 139 89 1 1070.10 89.5480 2000.00 94 56 1 42982.00 89.0700 2000.00 160 99 1 1169.60 88.9320 2000.00 169 108 1 258090.00 88.5700 2000.00 131 81 1 1422.00 88.2420 30.98 90 52 1 10883.00 88.1310 2000.00 108 63 6 43326.00 88.1260 2000.00 107 63 5 34362.00 88.0730 2000.00 140 90 1 8612.50 88.0420 2000.00 103 63 1 33120.00 88.0140 2000.00 104 63 2 41760.00 87.9750 2000.00 109 63 7 28635.00 87.9610 2000.00 110 63 8 36105.00 87.9570 2000.00 106 63 4 34800.00 87.9420 2000.00 167 106 1 97427.00 87.9230 2000.00 152 95 8 58302.00 87.9100 '2000.00 105 63 3 27600.00 87.8500 2000.00 151 95 7 27892.00 87.8400 2000.00 153 95 9 88106.00 87.8300 2000.00 83 48 1 8654.10 87.7770 2000.00 155 95 11 44840.00 87.7760 2000.00 123 73 1 5110.70 87.7690 2000.00 154 95 10 184160.00 87.7640 2000.00 156 95 12 93727.00 87.7640 2000.00 95 57 1 13874.00 87.7630 2000.00

Automated CALCULATION SHEET Page: B-15 of B-50 Z2 Engineering Caic. No.:

Servces orp.PBN P-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No Lii Date: 12/23/2008 148 95 4 88754.00 87.6130 2000.00 168 107 1 258090.00 87.6110 2000.00 147 95 3 42461.00 87.5860 2000.00 161 100 1 1251.60 87.5770 2000.00 102 62 2 4368.00 87.5750 2000.00 145 95 1 13442.00 87.5480 2000.00 101 62 1 3024.00 87.3370 2000.00 71 43 1 19199.00 87.1130 2000.00 58 33 1 2776.80 86.98402000 93 55 1 11245.00 86.8910 2000.00 127 77 1 98439.00 86.8810 2000.00 10.0 61 1 14847.00 86.8440 2000.00 141 91 1 9934.60 86.8380 2000.00 120 70 1 21941.00 86.7820 2000.00 137 87 1- 10100.00 86.7260 2000.00 133 83 1 104-78.00 86.6500 2000.00 146 95 2 28097.00 86.6500 2000.00 37 19 4 1151.70 86.5720 1978.40 66 41 1 2706.90 86.5250 2000.00 60 35 1 .2954.20 86.5050 2000.00 59 34 1 2844.50 86.4970 2000.00 124 74 1 5060.50 86.4070 2000.00 73 45 1 14460.00 86.3650 2000.00 143 93 1 1778.40 86.3640 2000.00 88 51 1 10874.00 86.3530 2000.00 57 32 1 2771.50 86.3330 2000.00 74 46 1 2172.70 86.3280 2000.00 89 51 2 10270.00 86.3160 2000.00 51 26 1 2771.50 86.2910 2000.00 84 49 1 10874.00 86.2850 2000.00 142 92 1 7670.00 86.2650 2000.00 85 49 210270.00 .86.2600 2000.00 56 31 1 1512.00 86.2300 2000.00 136 86 1 4558.20 86.2180 2000.00 91 53 1 1719.10 86.1570 2000.00 54 29 1 29469.00 86.1380 2000.00 179 118 1 2900.00 86.1330 1.22 119 69 1 2625.90 86.1320 2000.00 181 120 1 2400.00 86.1190 1.08 135 85 1 3517.70 86.1170 2000.00 45 23 1 9063.00 86-0900 1929.10 64 39 1 2954.20 86.0820 2000.00 65 40 1 2706.90 86.0680 2000.00 125 75 1 4334.30 85.9920 2000.00 126 76 1 905.71 85.9600 2000.00 128 78 1 905.71 85.9490 2000.00 113 64 3 5620.90 85.9110 2000.00 111 64 1 25758.00 85.9100 1959.20 112 64 2 25758.00 85.9080 1844.00 114 64 4 5620.90 85.9080 2000.00

Automated CALCULATION SHEET Page: B-16 of B-50 Zl w Engineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safely Related Yes El No 0Z Date: 12/23/2008 130 80 1 3947.40 85.9040 2000.00 72 44 1 1659.40 85.9030 2000.00 10 5 1 56.25 85.8880 1.30 118 68 1 3951.10 8S.8690 2000.00 63 38 1 25676.00 85.8640 2000.00 46 24 1 3138.80 85.8620 1.04 44 22 1 3138.80 85.8540 1.04 115 65 1 1216.30 85.8260 2000.00 39 20 2 5096.00 85.8180 2000.00 117 67 1 1038.80 85.8050 2000.00 129 79 1 1038.80' 85.8050 2000.00 121 71 1 1507.10 8-5.7930 2000.00 159 98 1 5936.10 85.7840 2000.00 87 50 2 10270.00 85.7390 1.03 38 20 .1 10400.00 85.7270 2000.00 24 12 3 1151.70- 85.6970 363.91 62 37 1 3010.20 85.6880 2000.00 116 66 1 2214.70 85.6830 2000.00 122 72 1 2214.70 85.6620 2000.00 157 96 1 4031.80 85.6400 2000.00 134 84 1 1292.50 85.6330 2000.00 92 54 1 1703.40 85.5970 2000.00 180 119 1 2900.00 85.5870 1.10 25 12 4 1407.70 85.5850 619.38 182 121 1 4000.00 85.5840 2000.00 12 7 1 291.53 85.5630 0.59 1 1 1 614.25 85.5610 0.40 4 2 1 614.25 85.5580 0.40 19 11 1 614.25 85.5580 0.44 15 10 1 614.25 85.5560 0.44 188 125 1 629770.00 85.5440 0.09 36 19 3 1407.70 85.5310 170.17 8 3 1 1698.30 85.5280 0.59 9 4 1 1698.30 85.5280 0.59 13 8 1 1698.30 85.5280 0.59 14 9 1 1792.60 85.5270 0.59 2 1 2 614.25 85.5230 0.40 5 2 2 614.25 85.5200 0.40 20 11 2 614.25 85.5200 0.44 16 10 2 614.25 85.5180 0.44 34 19 1 1147.80 85.4800 0.44 7 2 4 241.31 85.4770 1335.80 11 6 1 5404.20 85.4750 0.59 23 12 2 1147.80 85.4750 0.40 3 1 3 921.38 85.4720 0.40 21 11 3 921.38 85.4700 0.44 6 2 3 921.38 85.4690 0.40 17 10 3 921.38 85.4680 0.44 26 13 1 1182.60 85.4560 0.40 31 17 1 1182.60 85-.4560 0.44

/ I Engineering Automated Services Corp.

CALCULATION SHEET Calc. No.:

Page: B-17 of B-50 PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No L-] Date: 12/23/2008 61 36 8107.80 85.4510 2000.00 27 13 1450.30 85.4410 1252.80 18 10 241.31 85.4270 0.44 53 28 1054.80 85.4220 2000.00 30 16 543..38 85.4170 0.54 33 18 522.11 85.4110 0.54 29 15 5589.70 85.3940 0.54 28 14 1399.80 85.3930 0.54 55 30 1135.80 85.3930 0.72 32 17 1450.30 85.3850 400.89 196 131 1000000 .00 85.3830 2000.00 192 127 1000000.00 85.3420 2000.00 52 27 1512.00 85.3350 0.65 86 50 10874.00 85.2950 0.65 189 125 895990.00 85.2620 0.09 158 97 5021.10 85.1690 2000.00 195 130 1000000.00 85.1190 33.98 191 126 1000000.00 85.0920 2000.00 98 59 9999.00 85.0790 16.38 99 60 9999.00 85.0790 16.38 197 132 1000000.00 85.0740 2000.00 22 12 939.09 85.0000 0.00 35 19 939.09 85.0000 0.00 149 95 21609.00 85.0000 0.00 150 95 45170.00 85.0000 0.00 170 109 1000000000.00 85.0000 122. 52 171 110 1000000000.00 85.0000 122. 52 172 111 1000000000.00 85.0000 122.52 173 112 1000000000.00 85.0000 122.52 174 113 1000000000.00 85.0000 122.52 175 114 1000000000.00 85.0000 122.52 176 115 1000000000.00 85.0000 122.52 177 116 1000000000.00 85.0000 122. 52 178 117 1000000000.00 85.0000 59.43 190 125 1393100.00 85.0000 0.00 193 128 1000000.00 85.0000 93.47 194 129 1000000.00 85.0000 93.47 B.5 PB-PAB-301_T-1 Max Temperature Filename Cell Vol L Cell Volume Max Value Max Time 199 134 1 3931000.00 231.1500 72.63 80 47 6 2315.60 105.1300 1.03 78 47 4 367.50 105.0800 1.06 82 47 8 498.75 105.0200 1.05 81 47 7 698.25 105.0100 1.06 77 47 3 514.50 104.6100 0.96

Automated CALCULATION SHEET Page: B-18 of B-50 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 -Building Recovery Reviewed By: CD Henry Safety Related Yes [] No [I Date: 12/23/2008 75 47 1 2388.80 104.5000 0.00 76 47 2 1706.30 104.5000 0.00 79 47 5 3241.90 104.5000 0.00 70 42 4 2160.00 100.0100 0.79 69 42 3 2880.00 99.9970 0.79 68 42 2 .2400.00 99.9450 0.79 67 42 1 3200.00 99.5000 0.00 138 88 1 1257.30 96.3670 1.00 132 82 1 1419.30 95.6950 1.00 183 122 1 5000.00 94.9900 1000.00 184 123 1 5000.00 94.9900 1000.00 164 103 1 59208.00 94.5450 1.49 42 21 3 3392.80 94.0410 1000.00 50 25 4 3392.80 93.6170 1000.00 47 25 1 1947.70 91.8140 0.59 41 21 2 1947.70 91.8000 0.59 49 25 3 1876.90 91.7990 0.59 43 21 4 1876.90 91.7980 0.59 96 58 1 3024.00 91.7220 0.59 97 58 2 4368.00 91.6330 0.59 40 21 1 3520.80 91.5000 0.00 48 25 2 3520.80 91.5000 0.00 144 94 1 2023.40 91.3140 1000.00 198 133 1 2025000.00 91.1320 2.15 139 89 1 1070.10 89.3760 1000.00 162 101 1 38741.00 89.2180 1000.00 166 105 1 41586.00 88.9410 1000.00 163 102 1 57058.00 88.8250 1000.00 160 99 1 1169.60 88.8100 1000.00 165 104 1 59956.00 88.7120 1000.00 94 56 1 42982.00 88.4760 1000.00 131 81 1 1422.00 88.2460 31.39 90 52 1 10883.00 88.0040 1000.00 140 90 1 8612.50 87.8870 1000.00 123 73 1 5110.70 87.5960 1000.00 83 48 1 8654.10 87.5870 1000.00 95 57 1 13874.00 87.5220 1000.00 161 100 1 1251.60 87.4980 1000.00 102 62 2 4368.00 87.4120 1000.00 108 63 6 43326.00 87.2290 1000.00 101 62 1 3024.00 87.1760 1000.00 107 63 5 34362.00 87.1680 1000.00 103 63 1 33120.00 87.0780 1000.00 104 63 2 41760.00 87.0240 1000.00 71 43 1 19199.00 87.0010 1000.00 169 108 1 258090.00 86.9960 1000.00 109 63 7 28635.00 86.9860 1000.00 110 63 8 36105.00 86.9660 1000.00 106 63 4 34800.00 86.9540 1000.00 167 106 1 97427.00 86.9130 1000.00

Automated CALCULATION SHEET Page: B-19 of B-50 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes IEl No El- Date: 12/23/2008 58 33. 1 2776.80 86.8910 1000.00 105 63 3 27600.00 86.8510 1000.00 152 95 8 58302.00 86.8420 .1000.00 151 95 7 27892.00 86.8350 1000.00 93 55 1 11245.00 86.7370 1000.00 141 91 1 9934.60 86.7290 1000.00 127 77 1 98439.00 86.7180 1000.00 153 95 9 88106.00 86.7060 1000.00 168 107 1 258090.00 86.6890 1000.00 156 95 12 93727.00 86.6300 1000.00 155 95 11 44840.00 86.6190 1000.00 137 87 1 10100.00 86.5890 1000.00 120 70 1 21941.00 86.5820 1000.00 154 95 10 184160.00 86.5760 1000.00 133 83 1 10478.00 86.5060 1000.00 66 41 1 2706.90 86.4230 1000.00 147 95 3 42461.00 86.4100 1000.00 148 95 4 88754.00 86.4100 1000.00 60 35 1 2954.20 86.4030 1000.00 59 34 1 2844.50 86.3980 1000.00 145 95 1 13442.00 86.3520 1000.00 88 51 1 10874.00 86.3130 1000.00 124 74 1 5060.50 86.2920 1000.00 146 95 2 28097.00 86.2680 1000.00 100 61 1 14847.00 86.2650 1000.00 57 32 1 2771.50 86.2630 1000.00 89 51 2 10270.00 86.2550 1000.00 84 49 1 10874.00 86.2540 1000.00 74 46 1 2172.70 86.2490 1000.00 143 93 1 1778.40 86.2310 1000.00 85 49 2 10270.00 86.2260 1000.00 51 26 1 2771.50 86.2210 1000.00 56 31 1 1512.00 86.1980 1000.00 37 19 4 1151.70 86.1490 1000.00 179 118 1 2900.00 86.1330 1.22 142 92 1 7670.00 86.1250 1000.00 181 120 1 2400.00 86.1190 1.08 136 86 1 4558.20 86.1160 1000.00 73 45 1 14460.00 86.0720 1000.00 91 53 1 1719.10 86.0630 1000.00 65 40 1 2706.90 86.0550 1.04 54 29 1 29469.00 86.0470 1000.00 119 69 1 2625.90 86.0470 1000.00 135 85 1 3517.70 86.0400 1000.00 64 39 1 2954.20 86.0170 1000.00 45 23 1 9063.00 86.0120 1000.00 125 75 1 4334.30 85.9310 1000.00 10 5 1 56.25 85.8880 1.30 46 24 1 3138.80 85.8620 1.04 44 22 1 3138.80 85.8540 1.04

Automated CALCULATION SHEET Page: B-20 of B-50 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El1 No E Date: 12/23/2008 113 64 3 5620.90 85.8440 1000.00 112 64 2 25758.00 85.8360 1000.00 126 76 1 905.71 85.8350 1000.00 130 80 1 3947.40 85.8350 1000.00 114 64 4 5620.90 85.8340 1000.00 128 78 1 905.71 85.8290 1000.00 111 64 1 25758.00 85.8220 1000.00 72 44 1 1659.40 85.8170 1000.00 39 20 2 5096.00 85.7790 1000.00 87 50 2 10270.00 85.7390 3.36 24 12 3 1151.70 85.7230 383.91 63 38 1 25676.00 85.7230 1000.00 118 68 1 3951.10 85.7230 1000.00 115 65 1 1216.30 85.7180 1000.00 129 79 1 1038-80 85.6960 1000.00 117 67 1 1038.80 85.6950 1000.00 121 71 1 1507.10 85.6830 1000.00 38 20 1 10400.00 85.6790 1000.00 62 37 1 3010.20 85.6150 1000.00 25 12 4 1407.70 85.6060 659.72 180 119 1 2900.00 85.5870 1.10 116 66 1 2214.70 85.5840 1000.00 122 72 1 2214.70 85.5650 1000.00 12 7 1 291.53 85.5630 0.59 1 1 1 614.25 85.5610 0.40 4 2 1 614.25 85.5580 0.40 19 11 1 614.25 85.5580 0.44 134 84 1 1292.50 85.5570 1000.00 15 10 1 614.25 85.5560 0.44 185 124 1 627740.00 85.5500 0.09 188 125 1 629770.00 85.5440 0.09 36 19 3 1407.70 85.5320 171.73 8 3 1 1698.30 85.5280 0.59 9 4 1 1698.30 85.5280 0.59 13 8 1 1698.30 85.5280 0.59 14 9 1 1792.60 85.5270 0.59 2 1 2 614.25 85.5230 0.40 5 2 2 614.25 85.5200 0.40 20 11 2 614.25 85.5200 0.44 16 10 2 614.25 85.5180 0.44 92 54 1 1703.40 85.5180 1000.00 159 98 1 5936.10 85.4880 1000.00 182 121 1 4000.00 85.4840 1000.00 34 19 1 1147.80 85.4800 0.44 11 6 1 5404.20 85.4750 0.59 23 12 2 1147.80 85.4750 0.40 3 1 3 921.38 85.4720 0.40 21 11 3 921.38 85.4700 0.44 6 2 3 921.38 85.4690 0.40 17 10 3 921.38 85.4680 0.44

Automated CALCULATION SHEET Page: B-21 of B-50 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [ý] No Eli Date: 12/23/2008 7 2 4 241.31 85.4650 1000.00 26 13 1 1182.60 85.4560 0.40 31 17 1 1182.60 85.4560 0.44 27 13 2 1450.30 85.4440 766.62 18 10 4 241.31 85.4270 0.44 30 16 1 543.38 85.4170 0.54 33 18 1 522.11 85.4110 0.54 61 36 1 8107.80 85.4030 1000.00 29 15 1 5589.70 85.3940 0.54 28 14 1 1399.80 85.3930 0.54 55 30 1 1135.80 85.3930 0.72 53 28 1 1054.80 85.3910 0.72 32 17 2 1450.30 85.3850 405.22 52 27 1 1512.00 85.3350 0.65 86 50 1 10874.00 85.2950 0.65 186 124 2 894670.00 85.2680 0.09 189 125 2 895990.00 85.2620 0.09 157 96 1 4031.80 85.2590 1000.00 196 131 1 1000000.00 85.2560 1000.00 192 127 1 1000000.00 85.2290 1000.00 195 130 1 1000000.00 85.1190 33.21 98 59 1 9999.00 85.0790 13.51 99 60 1 9999.00 85.0790 13.51 191 126 1 1000000.00 85.0710 1000.00 197 132 1 1000000.00 85.0640 1000.00 158 97 1 5021.10 85.0410 1000.00 22 12 1 939.09 85.0000 0.00 35 19 2 939.09 85.0000 0.00 149 95 5 21609.00 85.0000 0.00 150 95 6 45170.00 85.0000 0.00 170 109 1 1000000000.00 85.0000 82.91 171 110 1 1000000000.00 85.0000 82.91 172 111 1 1000000000.00 85.0000 82.91 173 112 1 1000000000.00 85.0000 82.91 174 113 1 1000000000.00 85.0000 82.91 175 114 1 1000000000.00 85.0000 82.91 176 115 1 1000000000.00 85.0000 82.91 177 116 1 1000000000.00 85.0000 82.91 178 117 1 1000000000.00 85.0000 64.28 187 124 3 1396400.00 85.0000 0.00 190 125 3 1393100.00 85.0000 0.00 193 128 1 1000000.00 85.0000 80.00 194 129 1 1000000.00 85.0000 80.00

Automated CALCULATION SHEET Page: B-22 of B-50 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes No - Date: 12/23/2008 B.6 PB-PAB-301_T-1-s3 Max Temperature Filename Cell Vol L Cell Volume Max Value Max Time 199 134 1 3931000.00 245.0500 107.17 80 47 6 2315.60 105.1300 1.03 78 47 4 367.50 105.0800 1.06 82 47 8 498.75 105.0200 1.05 81 47 7 698.25 105.0100 1.06 77 47 3 514.50 104.6100 0.96 75 47 1 2388.80 104.5000 0.00 76 47 2 1706.30 104.5000 0.00 79 47 5 3241.90 104.5000 0.00 70 42 4 2160.00 100.0100 0-.79 69 42 3 2880.00 99.9970 0.79 68 42 2 2400.00 99.9450 0.79 67 42 1 3200.00 99.5000 0.00 138 88 1 1257.30 96.3670 1.00 132 82 1 1419.30 95.6950 1.00 164 103 1 59208.00 94.5450 1.49 42 21 3 3392.80 92.8830 200.00 50 25 4 3392.80 92.7440 200.00 184 123 1 5000.00 92.4960 200.00 183 122 5000.00 92.4930 200.00 47 25 1 1947.70 91.8140 0.59 41 21 2 1947.70 91.8000 0.59 49 25 3 1876.90 91.7990 0.59 43 21 4 1876.90 91.7980 0.59 96 58 1 3024.00 91.7220 0.59 97 58 2 4368.00 91.6330 0.59 40 21 1 3520.80 91.5000 0.00 48 25 2 3520.80 91. 5000 0.00 198 133 1 2025000.00 91. 1320 2.15 144 94 1 2023.40 89. 6760 200.00 139 89 1 1070.10 88. 3670 200.00 131 81 1* 1422.00 88. 2460 31.39 160 99 1 1169.60 87. 8650 200.00 90 52 1 10883.00 86. 8290 200.00 161 100 1 1251.60 86. 7380 200.00 140 90 1 8612. 50 86. 6800 200.00 102 62 2 4368.00 86. 6740 200.00 162 101 1 38741.00 86. 6580 200.00 166 105 1 41586.00 86.5570 200.00 94 56 1 42982.00 86. 5170 200.00 101 62 1 3024.00 86. 5170 200.00 58 33 1 2776.80 86. 2930 200.00 123 73 1 5110.70 86. 2880 200.00 83 48 1 8654.10 86. 2440 200.00

Automated CALCULATION SHEET Page: B-23 of B-50 jw Engineering Caic. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No 0i Date: 12/23/2008 71 43 1 19199.00 86.2360 200.00 57 32 1 2771.50 86.2270 143.19 51 26 1 2771.50 86.1950 134.09 163 102 1 57058.00 86.1530 200.00 179 118 1 2900.00 86.1330 1.22 165 104 1 59956.00 86.1300 200.00 66 41 1 2706.90 86.1210 200.00 181 120 1 2400.00 86.1190 1.08 95 57 1 13874.00 86.1130 200.00 65 40 1 2706.90 86.0550 1.04-93 55 1 11245.00 86.0070 200.00 64 39 1 2954.20 85.9940 1.04 141 91 1 9934.60 85.9910 200.00 89 51 2 10270.00 85.9630 200.00 85 49 2 10270.00 8.5-9450 200.00 127 77 1 98439.00 85.9320 200.00 10 5 1 56.25 85.8880 1.30 59 34 1 2844.50 85.8780 200.00 60 35 1 2954.20 85.8670 200.00 46 24 1 3138.80 85.8620 1.04 44 22 1 3138.80 85.8540 1.04 88 51 1 10874.00 85.8340 200.00 108 63 6 43326.00 85.8210 200.00 56 31 1 1512.00 85.8120 200.00 74 46 1 2172.70 85.8010 200.00 84 49 1 10874.00 85.7950 200.00 107 63 5 34362.00 85.7950 200.00 137 87 1 10100.00 85.7570 200.00 37 19 4 1151.70 85.7510 200.00 87 50 2 10270.00 85.7390 3.36 146 95 2 28097.00 85.7300 200.00 104 63 2 41760.00 85.7180 200.00 24 12 3 1151.70 85.6680 200.00 54 29 1 29469.00 85.6500 200.00 135 85 1 3517.70 85.6180 200.00 119 69 1 2625.90 85.6010 200.00 124 74 1 5060.50 85.6010 200.00 103 63 1 33120.00 85.5880 200.00 180 119 1 2900.00 85.5870 1.10 129 79 1 1038.80 85.5770 1.02 133 83 1 10478.00 85.5640 200.00 12 7 1 291.53 85.5630 0.59 1 1 1 614.25 85.5610 0.40 4 2 1 614.25 85.5580 0.40 19 11 1 614.25 85.5580 0.44 15 10 1 614.25 85.5560 0.44 185 124 1 627740.00 85.5500 0.09 188 125 1 629770.00 85.5440 0.09 25 12 4 1407.70 85.5430 200.00 125 75 1 4334.30 85.5420 200.00

ML Automated CALCULATION SHEET Page: B-24 of B-5 z xEngineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No 0 Date: 12/23/2008 120 70 21941.00 85. 5330 200.00 36 19 1407.70 85. 5320 171.98 8 3 1698.30 85. 5280 0.59 9 4 1698.30 85. 5280 0.59 13 8 1698.30 85. 5280 0.59 14 9 1792.60 85. 5270 0.59 2 1 614.25 85. 5230 0.40 5 2 614.25 85. 5200 0.40 20 11 614.25 85. 5200 0.44 136 86 4558.20 85. 5190 200.00 16 10 614.25 85. 5180 0.44 39 20 5096.00 85. 5030 200.00 117 67 1038.80 85. 5010 1.02 110 63 36105.00 85.4890 200.00 34 19 1147.80 85.4800 0.44 109- 63- 28635.00 85.4780 200-00 11 6 5404.20 85.4750 0.59 23 12 1147.80 85.4750 0.40 3 1 921.38 85.4720 0.40 21 11 921.38 85. 4700 0.44 106 63 34800.00 85.4700 200.00 6 2 921.38 85.4690 0.40 17 10 921.38 85.4680 0.44 130 80 3947.40 85.4660 200.00 26 13 1182.60 85.4560 0.40 31 17 1182.60 85.4560 0.44 72 44 1659.40 8 5.4490 200.00 100 61 14847.00 8 5.4440 200.00 113 64 5620.90 8 5.4410 200.00 91 53 1719.10 85.4390 0.72 143 93 1778.40 85.4330 200.00 7 2 241.31 85.4290 0.40 18 10 241.31 85.4270 0.44 114 64 5620.90 85.4250 200.00 73 45 14460.00 85.4210 0.96 30 16 543.38 85.4170 0.54 153 95 88106.00 85.4150 200.00 92 54 1703.40 85.4130 1.04 33 18 522.11 85.4110 0.54 115 65 1216.30 85.4080 1.05 29 15 5589.70 85.3940 0.54 28 14 1399.80 85. 3930 0.54 55 30 1135.80 85. 3930 0.72 45 23 9063.00 85. 3920 0.65 53 28 1054.80 85. 3910 0.72 182 121 4000.00 85. 3850 0.54 27 13 1450.30 85. 3810 0.40 32 17 1450.30 85. 3770 0.44 38 20 10400.00 85. 37 50 200.00 105 63 27600.00 85. 3710 200.00

I ZEngineeringAutomated Services Corp.

Client: FP&L Energy CALCULATION SHEET Page: No.:

Caic. B-25 of B-50 PBNP-994-2 1-13 Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 12/23/2008 63 38 1 25676.00 85.3620 200.00 62 37 1 3010.20 85.3530 0.65 121 71 1 1507.10 85.3480 1.02 147 95 3 42461.00 85.3470 200.00 52 27 1 1512.00 85.3350 0.65 142 92 1 7670.00 85.3330 200.00 122 72 1 2214.70 85.3280 1.03 145 95 1 13442.00 85.3230 200.00 61 36 1 8107.80 85.3200 0.65 151 95 7 27892.00 85.3140 200.00 134 84 1 1292.50 85.3130 0.72 116 66- 1 2214.70 85.3060 1.06 167 106 1 97427.00 85.3040 200.00 128 78 1 905.71 85.3000 200.00 155 95 11 44840.00 85.2990 200.00 126 76 1 905.71 85.2980 200.00 86 50 1 10874.00 85.2950 0.65 156 95 12 93727.00 85.2850 200.00 186 124 2 894670.00 85.2680 0.09 189 125 2 895990.00 85.2620 0.09 148 95 4 88754.00 85.2330 200.00 118 68 1 3951.10 85.2280 200.00 112 64 2 25758.00 85.2170 200.00 152 95 8 58302.00 85.2040 200.00 111 64 1 25758.00 85.1990 0.08 154 95 10 184160.00 85.1800 200.00 159 98 1 5936.10 85.1410 200.00 157 96 1 4031.80 85.1310 0.22 195 130 1 1000000.00 85.1190 33.21 98 59 1 9999.00 85.0790 13.51 99 60 1 9999.00 85.0790 13.51 196 131 1 1000000.00 85.0790 200.00 192 127 1 1000000.00 85.0690 200.00 191 126 1 1000000.00 85.0620 31.39 197 132 1 1000000.00 85.0270 200.00 168 107 1 258090.00 85.0180 200.00 158 97 1 5021.10 85.0080 1.00 169 108 1 258090.00 85.0010 200.00 22 12 1 939.09 85.0000 0.00 35 19 2 939.09 85.0000 0.00 149 95 5 21609.00 85.0000 0.00 150 95 6 45170.00 85.0000 0.00 170 109 1 1000000000.00 85.0000 83.03 171 110 1 1000000000.00 85.0000 83.03 172 ill 1 1000000000.00 85.0000 83.03 173 112 1 1000000000.00 85.0000 83.03 174 113 1 1000000000.00 85.0000 83.03 175 114 1 1000000000.00 85.0000 83.03 176 115 1 1000000000.00 85.0000 83.03 177 116 1 1000000000.00 85.0000 83.03

Automated CALCULATION SHEET Page: B-26 of B-50 A Engineering Calc. No.:

Services Corp. PBNP-994-21 -13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No Eli Date: 12/23/2008 178 117 1 1000000000.00 85.0000 64.28 187 124 3 1396400.00 85.0000 0.00 190 125 3 1393100.00 85.0000 0.00 193 128 1 1000000.00 85.0000 80.11 194 129 1 1000000.00 85.0000 80.11 B.7 PB-PAB-301_T-2 Max Temperature Filename Cell Vol L Cell Volume Max Value Max Time 198 133 1 2025000.00 242.8500 439.92 199 134 ,1 3931000.00 155.3700 418.55 80 47 6 2315.60 105.1300 1.03 78 747 4. 367.50 105.0800 1.06 82 47 8 498.75 105.0200 1.05 81 47 7 698.25 105.0100 1.06 77 47 3 514.50 104.6100 0.96 75 47 1 2388.80 104.5000 0.00 76 47 2 1706.30 104.5000 0.00 79 47 5 3241.90 104.5000 0.00 70 42 4 2160.00 100.0100 0.79 69 42 3 2880.00 99.9970 0.79 68 42 2 2400.00 99.9450 0.79 67 42 1 3200.00 99.5000 0.00 138 88 1 1257.30 96.3670 1.00 132 82 1 1419.30 95.6950 1.00 183 122 1 5000.00 95.0000 1999.90 184 123 1 5000.00 95.0000 1999.90 164 103 1 59208.00 94.5450 1.49 42 21 3 3392.80 94.1810 2000.00 50 25 4 3392.80 93.7080 2000.00 47 25 1 1947.70 91.8140 0.59 41 21 2 1947.70 91.8000 0.59 49 25 3 1876.90 91.7990 0.59 43 21 4 1876.90 91. 7980 0.59 96 58 1 3024.00 91. 7220 0.59 97 58 2 4368.00 91. 6330 0.59 144 94 1 2023.40 91.6330 2000.00 40 21 1 3520.80 91. 5000 0.00 48 25 2 3520.80 91. 5000 0.00 162 101 1 38741.00 89. 8690 2000.00 163 102 1 57058.00 89.7300 2000.00 166 105 1 41586.00 89. 7020 2000.00 165 104 1 59956.00 89. 6340 2000.00 139 89 1 1070.10 89. 5480 2000.00 94 56 1 42982.00 89.0710 2000.00 160 99 1 1169.60 88. 9320 2000.00 169 108 1 258090.00 88. 6050 2000.00

CALCULATION SHEET Page: B-27 Sof B-50 K Automated ZY11MEngineering Caic. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recoeym Reviewed By: CD Henry Safety Related Yes ElNo D Date: 12/23/2008 131 81 1422.00 88. 2630 29.23 90 52 10883.00 88. 13 10 2000.00 108 63 6 43326.00 88. 12 70 2000.00 107 63 5 34362.00 88. 0740 2000.00 140 90 8612. 50 88. 0420 2000.00 103 63 33120.00 88. 0150 2000.00 104 63 2 41760.00 87. 9770 2000.00 109 63 7 28635.00 87. 9620 2000.00 110 63 8 36105.00 87. 9580 2000.00 106 63 4 34800.00 87. 9440 2000.00 167 106 1 97427.00 87. 9240 2000.00 152 95 -8 58302.00 87-9110 2000.00 105 63 3 27600.00 87.8510 2000.00 151 95 7 27892.00 87. 8410 2000.00 153 95 9 88106.00 87.8310 2000 .00 83 48 8654.10 87.7770 2000.00 155 95 44840.00 87. 7770 2000.00 123 73 10 5110.70 87. 7690 2000.00 154 95 12 184160.00 87. 7650 2000.00 1 93727.00 2000.00 156 95 10 87. 7650 95 57 13874.00 87. 7640 2000.00 168 107 258090.00 87. 6440 2000.00 148 95 1 88754.00 87. 6140 2000.00 147 95 42461.00 87. 5880 2000.00 161 100 1 1251.60 87. 5770 2000.00 102 62 4 4368.00 87. 5760 2000.00 145 3 13442.00 2000.00 95 1 87. 5490 101 62 3024.00 87. 3370 2000.00 71 43 2 19199.00 87. 1130 2000.00 1 2000.00 58 33 1 2776.80 86. 9840 93 55 11245.00 86. 8910 2000.00 127 77 1 98439.00 86. 8810 2000.00 100 61 1 14847.00 86. 8440 2000.00 141 91 1 9934.60 86. 8380 2000.00 120 70 1 21941.00 86. 7820 2000.00 1 2000.00 137 87 1 10100.00 86. 7260 133 83 1 10478.00 86. 6500 2000.00 146 95 1 28097.00 86. 6500 2000.00 37 19 1 1151.70 86. 5320 1806.90 66 41 2 2706.90 86. 5250 2000.00 60 35 4 2954.20 86. 5060 2000.00 59 34 2844.50 86. 4970 2000.00 124 74 1 5060.50 86. 4070 2000.00 73 45 1 14460.00 86.3650 2000.00 1 1778.40 2000.00 143 93 1 86. 3640 88 51 10874.00 86. 3530 2000.00 1 2000.00 57 32 1 2771.50 86.3330 74 46 2172 .70 86. 3280 2000.00 89 51 10270.00 86. 3160 2000.00 51 26 2771.50 86. 2910 2000.00

Automated CALCULATION SHEET Page: B-28 of B-50 Z j-M Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes EW No [I Date: 12/23/2008 84 49 10874.00 86. 2850 2000.00 142 92 7670.00 86. 2650 2000.00 85 49 10270.00 86. 2600 2000.00 56 31 1512.00 86. 2300 2000.00 136 86 4558.20 86. 2180 2000..00 91 53 1719.10 86. 1570 2000.00 54 29 29469.00 86. 1380 2000.00 179 118 2900.00 86. 13 30 1.22 119 69 2625.90 86. 1320 2000.00 181 120 2400.00 86. 1190 1.08 135 85 3517.70 86. 1170 2000.00 45 23- 9063.00 86. 0900 1933.10 64 39 2954.20 86. 0820 2000.00 65 40 2706.90 86. 0680 2000.00 125 75 4334.30 85.9920 2000-00 126 76 905.71 8 5.9600 2000.00 128 78 905.71 85.9490 2000.00 113 64 5620.90 85.9110 2000.00 ill 64 25758.00 85.9100 1957.50 112 64 25758.00 85. 9080 1842. 50 114 64 5620.90 85. 9080 2000.00 130 80 3947.40 85.9050 2000.00 72 44 1659.40 8S.9030 2000.00 10 5 56.25 85. 8880 1.30 118 68 3951.10 85.8690 2000.00 63 38 25676.00 8 5.8640 2000.00 46 24 3138.80 85. 8620 1.,04 44 22 3138.80 85. 8540 1.04 115 65 1216.30 85.8260 2000.00 39 20 5096.00 85.8190 2000.00 117 67 1038.80 85.8050 2000.00 129 79 1038.80 85.8050 2000.00 121 71 1507.10 85.7930 2000.00 159 98 5936.10 85.7840 2000.00 87 50 10270.00 85. 7390 1.03 38 20 10400.00 85. 7260 2000.00 24 12 1151.70 85.7230 384.56 62 37 3010.20 85.6880 2000.00 116 66 2214.70 85.6830 2000.00 122 72 2214.70 85.6620 2000.00 157 96 4031.80 85. 6400 2000.00 134 84 1292.50 85. 6330 2000.00 25 12 1407.70 85. 6060 661.97 92 54 1703.40 85. 5970 2000.00 180 119 2900.00 85. 5870 1.10 182 121 4000.00 85. 5840 2000.00 12 7 291.53 85. 5630 0.59 1 1 614.25 85. 5610 0.40 4 2 614.25 85. 5580 0.40 19 11 614.25 85. 5580 0.44

Automated CALCULATION SHEET Page: B-29 of B-50 zy k Engineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

1TIELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No L-1 Date: 12/23/2008 15 10 1 614.25 85.5560 0.44 185 124 1 627740.00 85.5500 0.09 188 125 1 629770.00 85.5440 0.09 36 19 3 1407.70 85.5300 170.14 8 3 1 1698.30 85.5280 0.59 9 4 1 1698.30 85.5280 0.59 13 8 1 1698.30 85.5280 0.59 14 9 1 1792.60 85.5270 0.59 2 1 2 614.25 85.5230 0.40 5 2 2 614.25 85.5200 0.40 20 11 2 614.25 85.5200 0.44 18 10 4 241.31 85.5190 2000.00 16 10 2 614.25 85.5180 0.44 34 19 1 1147.80 85.4800 0.44 23 12 2 1147.80 85.4770 1309.40 11 6 1 5404.20 85.4750 0.59 7 2 4 241.31 85.4740 1331.20 3 1 3 921.38 85.4720 0.40 21 11 3 921.38 85.4700 0.44 6 2 3 921.38 85.4690 0.40 17 10 3 921.38 85.4680 0.44 26 13 1 1182.60 85.4560 0.40 31 17 1 1182.60 85.4560 0.44 61 36 1 8107.80 85.4510 2000.00 27 13 2 1450.30 85.4440 769.61 53 28 1 1054.80 85.4220' 2000.00 30 16 1 543.38 85.4170 0.54 33 18 1 522.11 85.4110 0.54 29 15 1 5589.70 85.3940 0.54 28 14 1 1399.80 85.3930 0.54 55 30 1 1135.80 85.3930 0.72 32 17 2 1450.30 85.3860 406.75 196 131 1 1000000.00 85.3830 2000.00 192 127 1 1000000.00 85.3420 2000.00 52 27 1 1512.00 85.3350 0.65 86 50 1 10874.00 85.2950 0.65 186 124 2 894670.00 85.2680 0.09 189 125 2 895990.00 85.2620 0.09 158 97 1 5021.10 85.1700 2000.00 195 130 1 1000000.00 85.1190 32.51 191 126 1 1000000.00 85.0920 2000.00 98 59 1 9999.00 85.0790 14.69 99 60 1 9999.00 85.0790 14.69 197 132 1 1000000.00 85.0740 2000.00 22 12 1 939.09 85.0000 0.00 35 19 2 939.09 85.0000 0.00 149 95 5 21609.00 85.0000 0.00 150 95 6 45170.00 85.0000 0.00 170 109 1 1000000000.00 85.0000 100.00 171 110 1 1000000000.00 85.0000 100.00

Automated CALCULATION SHEET Page: B-30 of B-50 Engineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No 0-- Date: 12/23/2008 172 111 1 1000000000.00 85.0000 100.00 173 112 1 1000000000.00 85.0000 100.00 174 113 1 1000000000.00 85.0000 100.00 175 114 1 1000000000.00 85.0000 100.00 176 115 1 1000000000.00 85.0000 100.00 177 116 1 1000000000.00 85.0000 100.00 178 117 1 1000000000.00 85.0000 277.05 187 124 3 1396400.00 85.0000 0.00 190 125 3 1393100.00 85.0000 0.00 193 128 1 1000000.00 85.0000 92.58 194 129 1 1000000.00 85.0000 92.58 B.8 PB-PAB-301_T-2-s3 Max Temperature Filename Cell Vol L Cell Volume Max Value Max Time 198 133 1 2025000.00 250.3400 856.75 199 134 1 3931000.00 160.5800 778.22 80 47 6 2315.60 105.1300 1.03 78 47 4 367.50 105.0800 1.06 82 47 8 498.75 105.0200 1.05 81 47 7 698.25 105.0100 1.06 77 47 3 514.50 104.6100 0.96 75 47 1 2388.80 104.5000 0.00 76 47 2 1706.30 104.5000 0.00 79 47 5 3241.90 104.5000 0.00 70 42 4 2160.00 100.0100 0.79 69 42 3 2880.00 99.9970 0.79 68 42 2 2400.00 99.9450 0.79 67 42 1 3200.00 99.5000 0.00 138 88 1 1257.30 96.3670 1.00 132 82 1 1419.30 95.6950 1.00 183 122 1 5000.00 95.0000 2999.00 184 123 1 5000.00 95.0000 2999.00 164 103 1 59208.00 94.5450 1.49 42 21 3 3392.80 94.2280 3000.00 50 25 4 3392.80 93.7510 3000.00 144 94 1 2023.40 91.8770 3000.00 47 25 1 1947.70 91.8140 0.59 41 21 2 1947.70 91.8000 0.59 49 25 3 1876.90 91.7990 0.59 43 21 4 1876.90 91.7980 0.59 96 58 1 3024.00 91.7220 0.59 97 58 2 4368.00 91.6330 0.59 40 21 1 3520.80 91.5000 0.00 48 25 2 3520.80 91.5000 0.00 162 101 1 38741.00 90.0790 3000.00 163 102 1 57058.00 90.0060 3000.00

Automated CALCULATION SHEET Page: B-3 I o B-0

/ IM Engineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energ Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 -Building Recovery Reviewed By: CD Henry Safety Related Yes No LIII Date: 12/23/2008 166 105 1 41586.00 90.0030 3000.00 165 104 1 59956.00 89.9180 3000.00 139 89 1 1070.10 89.6430 3000.00 169 108 1 258090.00 89.5890 3000.00 94 56 1 42982.00 89.2220 3000.00 160 99 1 1169.60 89.0190 3000.00 108 63 6 43326.00 88.7250 3000.00 107 63 5 34362.00 88.6740 3000.00 103 63 1 33120.00 88.6260 3000.00 104 63 2 41760.00 88.5980 3000.00 110 63 8 36105.00 88.5930 3000.00 109 63 7 28635.00 88.59-10 3000.00 106 63 4 34800.00 88.5770 3000.00 167 106 1 97427.00 88.5660 3000.00 152 95 8 58302.00 88.S600 3000.00 153 95 9 -&8-106.00 88.5200 3000.00-151 95 7 27892.00 88.5070 3000.00 154 95 10 184160.00 88.5040 3000.00 105 63 3 27600.00 88.4930 3000.00 156 95 12 93727.00 88.4810 3000.00 155 95 11 44840.00 88.4790 3000.00 148 95 4 88754.00 88.3790 3000.00 147 95 3 42461.00 88.3470 3000.00 145 95 1 13442.00 88.3140 3000.00 131 81 1 1422.00 88.2630 29.23 90 52 1 10883.00 88.1730 3000.00 140 90 1 8612.50 88.0930 3000.00 168 107 1 258090.00 88.0730 3000.00 83 48 1 8654.10 87.8400 3000.00 95 57 1 13874.00 87.8340 3000.00 123 73 1 5110.70 87.8240 3000.00 161 100 1 1251.60 87.6310 3000.00 102 62 2 4368.00 87.6030 3000.00 101 62 1 3024.00 87.3650 3000.00 100 61 1 14847.00 87.2340 3000.00 71 43 1 19199.00 87.1360 3000.00 58 33 1 2776.80 87.0140 3000.00 146 95 2 28097.00 87.0060 3000.00 93 55 1 11245.00 86.9380 3000.00 127 77 1 98439.00 86.9040 3000.00 141 91 1 9934.60 86.8800 3000.00 120 70 1 21941.00 86.8240 3000.00 137 87 1 10100.00 86.7580 3000.00 133 83 1 10478.00 86.6860 3000.00 66 41 1 2706.90 86.5570 3000.00 37 19 4 1151.70 86.5350 1802.90 60 35 1 2954.20 86.5290 3000.00 59 34 1 2844.50 86.5200 3000.00 73 45 1 14460.00 86.4390 3000.00 124 74 1 5060.50 86.4320 3000.00

/& Automated CALCULATION SHEET Page: B-32 of B-50 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No - Date: 12/23/2008 88 51 10874.00 86.4010 3000.00 143 93 1778.40 86.3940 3000.00 89 51 10270.00 86.3880 3000.00 74 46 2172.70 86.3540 3000.00 57 32 2771.50 86.3400 3000.00 51 26 2771.50 86.2990 3000.00 84 49 10874.00 86.2970 3000.00 142 92 7670.00 86.2910 3000.00 85 49 10270.00 86.2700 3000.00 56 31 1512.00 86.2430 3000.00 136 86 4558.20 86.2370 3000.00 91 53 1719.10 86.1830 3000.00 119 69 2625.90 86.1540 3000.00 54 29 29469.00 86.1470 3000.00 135 85 3517.70 86.1340 3000.00 179 118 2900-.00 86.1330 1.22 181 120 2400.00 86.1190 1.08 64 39 2954.20 86.1090 3000.00 65 40 2706.90 86.0950 3000.00 45 23 9063.00 86.0900 1932.40 159 98 5936.10 86.0810 3000.00 125 75 4334.30 86.0030 3000.00 126 76 905.71 85.9790 3000.00 128 78 905.71 85.9660 3000.00 157 96 4031.80 85.9230 3000.00 113 64 5620.90 85.9220 3000.00 112 64 25758.00 85.9210 2947.30 114 64 5620.90 85.9210 3000.00 130 80 3947.40 85.9210 3000.00 111 64 25758.00 85.9200 3000.00 72 44 1659.40 85.9120 3000.00 63 38 25676.00 85.8980 3000.00 118 68 3951.10 85.8890 3000.00 10 5 56.25 85.8880 1.30 46 24 3138.80 85.8620 1.04 44 22 3138.80 85.8540 1.04 115 65 1216.30 85.8430 3000.00 117 67 1038.80 85.8220 3000.00 129 79 1038.80 85.8220 3000.00 39 20 5096.00 85.8210 2252.40.

121 71 1507.10 85.8100 3000.00 87 5o 10270.00 85.7390 1.03 38 20 10400.00 85.7280 2481.30 24 12 1151.70 85.7230 384.83 116 66 2214.70 85.6980 3000.00 62 37 3010.20 85.6960 3000.00 122 72 2214.70 85.6760 3000.00 134 84 1292.50 85.6480 3000.00 182 121 4000.00 85.6460 3000.00 92 54 1703.40 85.6190 3000.00

Automated CALCULATION SHEET Page: B-33 of B-50 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D-] Date: 12/23/2008 25 12 4 1407.70 85.6060 661.95 180 119 1 2900.00 85.5870 1.10 18 10 4 241.31 85.5830 2032.80 12 7 1 291.53 85.5630 0.59 1 1 1 614.25 85.5610 0.40 4 2 1 614.25 85.5580 0.40 19 11 1 614.25 85.5580 0.44 15 10 1 614.25 85.5560 0.44 185 124 1 627740.00 85.5500 0.09 188 125 1 629770.00 85.5440 0.09 36 19 3 1407.70 85.5300 170.14 8 3 1 1698.30 85.5280 0.59 9 4 1 1698.30 85.5280 0.59 13 8 1 1698.30 85.5280 0.59 14 9 1 1792.60 85.5270 0.59 2 1 2 614.25 8:5.5230 0.40 5 2 2 614.25 85.5200 0.40 20 11 2 614.25 85.5200 0.44 16 10 2 614.25 85.5180 0.44 34 19 1 1147.80 85.4800 0.44 23 12 2 1147.80 85.4770 1309.40 11 6 1 5404.20 85.4750 0.59 7 2 4 241.31 85.4740 1330.90 3 1 3 921.38 85.4720 0.40 21 11 3 921.38 85.4700 0.44 6 2 3 921.38 85.4690 0.40 196 131 1 1000000.00 85.4690 3000.00 17 10 3 921.38 85.4680 0.44 26 13 1 1182.60 85.4560 0.40 31 17 1 1182.60 85.4560 0.44 61 36 1 8107.80 85.4550 3000.00 27 13 2 1450.30 85.4440 769.65 53 28 1 1054.80 85.4320 3000.00 30 16 1 543.38 85.4170 0.54 192 127 1 1000000.00 85.4170 3000.00 33 18 1 522.11 85.4110 0.54 29 15 1 5589.70 85.3940 0.54 28 14 1 1399.80 85.3930 0.54 55 30 1 1135.80 85.3930 0.72 32 17 2 1450.30 85.3860 406.30 52 27 1 1512.00 85.3350 0.65 86 50 1 10874.00 85.2950 0.65 158 97 1 5021.10 85.2840 3000.00 186 124 2 894670.00 85.2680 0.09 189 125 2 895990.00 85.2620 0.09 195 130 1 1000000.00 85.1190 32.51 191 126 1 1000000.00 85.1160 3000.00 98 59 1 9999.00 85.0790 14.69 99 60 1 9999.00 85.0790 14.69 197 132 1 1000000.00 85.0770 3000.00

Automated CALCULATION SHEET Page: B-34 Iof B-50 Engineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point-Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELD Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 12/23/2008 22 12 1 939.09 85.0000 0.00 35 19 2 939.09 85.0000 0.00 149 95 5 21609.00 85.0000 0.00 150 95 6 45170.00 85.0000 0.00 170 109 1000000000.00 85.0000 100.00 171 110 1000000000.00 85.0000 100.00 172 ill 1000000000.00 85.0000 100.00 173 112 1000000000.00 85.0000 100.00 174 113 1 1000000000.00 8 5.0000 100.00 175 114 1 1000000000.00 8 5.0000 100.00 176 115 1000000000.00 85.0000 100.00 177 116 1000000000--00 8 5.0000 100.00 178 117 1000000000.00 8 5.0000 277.05 187 124 1396400.00 8 5.0000 0.00 190 125 1393100.00 85.0000 0.00 193 128 1000000 .00* 85.0000 92.58 194 129 1000000.00 85.0000 92.58 B3.9 PB-PAB-140 T Max Temperature Filename Cell Vol L Cell Vol ume Max Value Max Time 47 25 1 1947.70 187. 7400 599.06 57 32 1 2771.50 122.2900 599.06 168 107 1 258090.00 120. 0000 0.18 169 108 1 258090.00 120. 0000 0.16 55 30 1 1135.80 115.2200 607.92 49 25 3 1876.90 114.5900 69.85 56 31 1 1512.00 108. 7600 607.92 80 47 6 2315.60 105.1300 1.03 78 47 4 367.50 10 5.0800 1.06 82 47 8 498.75 10 5.0200 1.05 81 47 7 698.25 10 5.0100 1.06 77 47 3 514.50 104.6100 0.96 116 66 1 2214.70 104. 5600 624.61 75 47 1 2388.80 104. 5000 0.00 76 47 2 1706.30 104.5000 0.00 79 47 5 3241.90 104.5000 0.00 69 42 3 2880.00 100. 2800 603.54 70 42 4 2160.00 100.0100 0.79 68 42 2 2400.00 99. 9450 0.79 67 42 1 3200.00 99. 5000 0.00 54 29 1 29469.00 98. 2490 607.92 72 44 1 1659.40 96. 6170 616.42 166 105 1 41586.00 96. 42 50 3000.00 138 88 1 1257.30 96. 3670 1.00 162 101 1 38741.00 96. 1710 3000.00 132 82 1 1419.30 95. 6950 1.00

Automated CALCULATION SHEET Page: B-35 of B-50 Zlzm Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No LI Date: 12/23/2008 51 26 1 2771.50 95.2780 616.42 183 122 1 5000.00 95.0000 2999.40 184 123 1 5000.010 95.0000 2999.40 164 103 1 59208.00 94.5460 1.49 42 21 3 3392.80 94.2390 3000.00 165 104 1 59956.00 93.8950 3000.00 163 102 1 57058.00 93.8360 3000.00-50 25 4 3392.80 93.7600 3000.00 62 37 1 3010.20 93.6800 620.55 41 21 2 1947.70 92.4960 636.42 97 58 2 4368.00 92.4750 746.09 96 518 1 3024.00 91.9880 767.41 144 94 1 2023.40 91.8780 3000.00 43 21 4 1876.90 91.7980 0.59 127 77 1 98439.00 91.6420 616.42 45 23 1 9063.00 9-1.6290 612.22 156 95 12 93727.00 91.5770 3000.00 40 21 1 3520.80 91.5000 0.00 48 25 2 3520.80 91.5000 0.00 102 62 2 4368.00 91.3490 651.40 155 95 11 44840.00 91.1490 3000.00 120 70 1 21941.00 91.1400 632.54 101 62 1 3024.00 91.0460 640.24 90 52 1 10883.00 90.1750 640.24 139 89 1 1070.10 89.5730 3000.00 71 43 1 19199.00 89.5090 636.42 108 63 6 43326.00 89.5020 3000.00 94 56 1 42982.00 89.4660 3000.00 107 63 5 34362.00 89.4450 3000.00 103 63 1 33120.00 89.3970 3000.00 110 63 8 36105.00 89.3940 3000.00 109 63 7 28635.00 89.3770 3000.00 167 106' 1 97427.00 89.3750 3000.00 104 63 2 41760.00 89.3740 3000.00 106 63 4 34800.00 89.3710 3000.00 151 95 7 27892.00 89.3660 3000.00 152 95 8 58302.00 89.3660 3000.00 153 95 9 88106.00 89.3420 3000.00 61 36 1 8107.80 89.3050 620.55 154 95 10 184160.00 89.2770 3000.00 105 63 3 27600.00 89.2200 3000.00 128 78 1 905.71 89.1390 620.55 142 92 1 7670.00 89.0590 647.73 140 90 1 8612.50 89.0470 775.05 160 99 1 1169.60 89.0440 3000.00 121 71 1 1507.10 89.0410 616.42 52 27 1 1512.00 89.0370 624.61 63 38 1 25676.00 88.9450 632.54 115 65 1 1216.30 88.9140 603.54 126 76 1 905.71 88.9110 620.55

Automated CALCULATION SHEET Page: B-36 of B-50 Z Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes ENo F-- Date: 12/23/2008 147 95 42461.00 88.7080 2455.90 118 68 3951.10 88.6390 679.36 122 72 2214.70 88.5900 640.24 133 83 10478.00 88.5820 686.00 146 95 28097.00 88.4170 3000.00 117 67 1038.80 88.4020 647.73 129 79 1038.80 88.4020 647.73 58 33 2776.80 88.3430 714.36 131 81 1422.00 88.2420 30.98 143 93 1778.40 88.1540 689.27 60 35 2954.20 88.0420 714.36 59 34 2844.50 88.0240 708.26 123 73 5110.70 87.9520 1037.40 148 95 88754.00 87.9380 2482.80 141 91 9934.60 87.9110 603.54 145 95 13442.00 87. 8-560 2966.50 83 48 8654.10 87.8400 3000.00 95 57 13874.00 87.8350 3000.00 53 28 1054.80 87.8190 624.61 38 20 10400.00 87.8050 689.27 119 69 2625.90 87.7590 705.16 100 61 14847.00 87.6810 3000.00 137 87 10100.00 87.6640 808.65 161 100 1251.60 87.6600 3000.00 44 22 3138.80 87.6190 689.27 74 46 2172.70 87. 5060 726.25 39 20 5096.00 87.4060 754.25 46 24 3138.80 87. 3960 702.04 93 55 11245.00 87. 3010 894.68 130 80 3947.40 87.1960 726.25 91 53 1719.10 87.1870 759.58 135 85 3517.70 87.0610 804.03 136 86 4558.20 86.9090 851.93 73 45 14460.00 86.8890 775.05 124 74 5060.50 86.8480 956.59 27 13 1450.30 86.7100 702.04 159 98 5936.10 86.7090 3000.00 66 41 2706.90 86.6780 603.54 37 19 1151.70 86.5380 702.04 89 51 10270.00 86.5360 3000.00 88 51 10874.00 86.4930 3000.00 32 17 1450.30 86.4910 868.00 84 49 10874.00 86.4810 603.54 134 84 1292.50 86.4770 764.82 85 49 10270.00 86.4760 603.54 64 39 2954.20 86.3290 603.54 182 121 4000.00 86.3250 3000.00 65 40 2706.90 86.3130 603.54 181 120 2400.00 86.2950 3000.00 125 75 4334.30 86.2150 603.54

Automated CALCULATION SHEET Page: B-37 of B-50 Engineering Caic. No.:

Services Corp.

PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No ElI Date: 12/23/2008 24 12 3 1151.70 86.1560 603.54 196 131 1 1000000.00 86.1540 3000.00 179 118 1 2900.00 86.1330 1.22 192 127 1 1000000.00 86.1280 3000.00 25 12 4 1407.70 86.0900 804.03 18 10 4 241.31 86.0680 808.65 112 64 2 25758.00 86.0570 603.54 111 64 1 25758.00 86.0350 603.54 113 64 3 5620.90 86.0170 603.54 114 64 4 5620.90 86.0130 603.54 31 17 1 1182.60 86.0110 603.54 7 2 4 241.31 85.9730 835.19 23 12 2 1147.80 85.9540 868.00 26 13 1 1182.60 85.9250 868.00 36 19 3 1407.70 85.9200 1017.40 3 1 3 921.38 85.9090 860.05 34 19 1 1147.80 85.9070 1037.40 6 2 3 921.38 85.8990 875.80 21 11 3 921.38 85.8940 1028.90 10 5 1 56.25 85.8910 1.30 17 10 3 921.38 85.8900 1040.20 87 50 2 10270.00 85.8640 603.54 92 54 1 1703.40 85.8450 1245.00 29 15 1 5589.70 85.8330 603.54 157 96 1 4031.80 85.8190 2725.70 16 10 2 614.25 85.7050 603.54 20 11 2 614.25 85.6690 603.54 86 50 1 10874.00 85.6440 603.54 180 119 1 2900.00 85.5870 1.10 28 14 1 1399.80 85.5850 603.54 12 7 1 291.53 85.5630 0.59 1 1 1 614.25 85.5610 0.40 2 1 2 614.25 85.5580 599.06 4 2 1 614.25 85.5580 0.40 19 11 1 614.25 85.5580 0.44 15 10 1 614.25 85.5560 0.44 185 124 1 627740.00 85.5500 0.09 188 125 1 629770.00 85.5440 0.09 11 6 1 5404.20 85.5350 469.50 8 3 1 1698.30 85.5280 0.59 9 4 1 1698.30 85.5280 0.59 13 8 1 1698.30 85.5280 0.59 14 9 1 1792.60 85.5270 0.59 5 2 2 614.25 85.5200 0.40 33 18 1 522.11 85.4420 603.54 30 16 1 543.38 85.4290 603.54 158 97 1 5021.10 85.2910 3000.00 186 124 2 894670.00 85.2680 0.09 189 125 2 895990.00 85.2620 0.09 191 126 1 1000000.00 85.2340 3000.00

/*//* Aul tomated CALCULATION SHEET Page: B-38 of B-50 Ent gineering Calc. No.:

Ser vices Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes E No Eli Date: 12/23/2008 197 132 1000000.00 85.1680 3000.00 195 130 1000000.00 85.1190 33.98 98 59 9999.00 85.0790 16.38 99 60 9999.00 85.0790 16.38 22 12 939.09 85.0000 0.00 35 19 939.09 85.0000 0.00 149 95 21609.00 85.0000 0.00 150 95 45170.00 85.0000 0.00 170 109 1000000000.00 85.0000 132.61 171 110 1000000000.00 85.0000 132.61 172 111 1000000000.00 85.0000 132.61 173 112 1000000000.00 85.0000 132.61 174 113 1000000000 .00 85.0000 132.61 175 114 1000000000 .00 85.0000 132.61 176 115 1000000000.00 85.0000 132.61 177 116 1000000000.00 85.0000 132-.61 178 117 1000000000.00 85.0000 59.43 187 124 1396400.00 85.0000 0.00 190 125 1393100.00 85.0000 0.00 193 128 1000000.00 85.0000 90.22 194 129 1000000.00 85.0000 90.22 B.10 PB-PAB-237_T Max Temperature Filename Cell Vol L Cell Volume Max Value Max Time 164 103 1 59208.00 266.9500 1801.10 147 95 3 42461.00 108. 4200 1787.50 153 95 9 88106.00 108. 3700 1801.10 80 47 6 2315.60 108. 1700 80.29 154 95 10 184160.00 108. 1100 1801.10 155 95 11 44840.00 107. 7000 1801.10 152 95 8 58302.00 107. 5600 1801.10 151 95 7 27892.00 107. 5200 1801.10 146 95 2 28097.00 107. 5000 1800.60 110 63 8 36105.00 107. 4800 1801.10 167 106 1 97427.00 107. 4800 1801.10 145 95 1 13442.00 107. 4100 1801.10 109 63 7 28635.00 107. 3700 1801.10 81 47 7 698.25 106. 9900 64.82 108 63 6 43326.00 106. 8400 1801.10 156 95 12 93727.00 106. 4800 1801.10 107 63 5 34362.00 106.3000 1801.10 148 95 4 88754.00 106. 2700 1801.10 159 98 1 5936.10 106. 0500 1801.10 82 47 8 498.75 105.7400 33.54 78 47 4 367.50 105.1200 14.98 103 63 1 33120.00 104.7400 1801.10

Automated CALCULATION SHEET Page: B-.39 of B-50 Z2?ZIW EgineringCale. No.:

Servces orp.PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

1-ELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 12/23/2008 77 47 3 514.50 104.6100 0.96 75 47 1 2388.80 104.5000 0.00 76 47 2 1706.30 104.5000 0.00 79 47 5 3241.90 104.5000 0.00 104 63 2 41760.00 104.1700 1801.10 69 42 3 2880.00 103.8900 105.92 105 63 3 27600.00 103.8100 1801.10 70 42 4 2160.00 103.6300 100.96 106 63 4 34800.00 103.5300 1801.10 196 131 1 1000000.00 103.5300 1801.10 68 42 2 2400.00 100.1300 55.58 89 51 2 10270.00 99.8700 1801,10 67 42 1 3200.00 99.5000 0.00 100 61 1 14847.00 99.2410 1801.10 88 51 1 10874.00 97.9480 1801.10 42- 21 3 3392.80 96.6170 194.99-138 88 1 1257.30 96.3670 1.00 50 25 4 3392.80 96.2810 154.29 157 96 1 4031.80 95.6980 1801.10 132 82 1 1419.30 95.6950 1.00 43 21 4 1876.90 95.2680 91.00 49 25 3 1876.90 95.2440 88.21 183 122 1 5000.00 95.0000 2999.80 184 123 1 5000.00 95.0000 2999.80 47 25 1 1947.70 94.4170 78.00 41 21 2 1947.70 94.3920 78.00 87 50 2 10270.00 94.3440 1801.10 182 121 1 4000.00 93.5880 1801.10 181 120 1 2400.00 93.5510 1801.10 192 127 1 1000000.00 93.3000 1801.20 86 50 1 10874.00 92.7940 1801.10 97 58 2 4368.00 92.6530 376.68 96 58 1 3024.00 92.5130 373.43 144 94 1 2023.40 92.0120 3000.00 102 62 2 4368.00 91.9930 504.50 127 77 1 98439.00 91.8430 378.52 94 56 1 42982.00 91.6590 467.76 40 21 1 3520.80 91.5000 0.00 48 25 2 3520.80 91.5000 0.00 101 62 1 3024.00 91.4580 381.25 120 70 1 21941.00 90.9650 175.28 90 52 1 10883.00 90.5760 267.20 71 43 1 19199.00 90.3660 194.99 140 90 1 8612.50 90.3580 289.20 10 5 1 56.25 90.1080 150.75 162 101 1 38741.00 90.0800 3000.00 142 92 1 7670.00 90.0670 351.11 141 91 1 9934.60 90.0230 245.04 57 32 1 2771.50 90.0180 124.77 123 73 1 5110.70 90.0150 201.12

Automated CALCULATION SHEET Page: B-40 of B-50 Engineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: ,Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No F-1 Date: 12/23/2008 163 102 1 57058.00 90.0130 3000.00 166 105 1 41586.00 90.0030 3000.00 58 33 1 2776.80 89.9840 122.52 51 26 1 2771.50 89.9750 122.52 54 . 29 1 29469.00 89.9720 . 170.01 165 104 1 59956.00 89.9250 3000.00 66 41 1 2706.90 89.8860 104.89 93 55 1 11245.00 89.8320 157.71 45 23 1 9063.00 89.8120 170.01 8*5 49 .2 10,270.00 89.8040 105.38 46 24 1 3138.80 89.7860 104.89 64 39 1 2954.20 89.7850 104.45.

112 64 2 25758.00 89.7820 253.67 44 22 1 3138.80 89.7810 104.89 ill 64 1 25758.00 89.7730 245.04 137 87 1 10100.00 89.7670 175-"28 65 40 1 2706.90 89.7660 101.28 60 35 1 2954.20 89.7530 105.92 59 34 1 2844.50 89.7200 104.04 63 38 1 25676.00 89.7060 170.01 169 108 1 258090.00 89.6890 3000.00 139 89 1 1070.10 89.6430 3000.00 133 83 1 10478.00 89.6120 317.67 73 45 1 14460.00 89.5720 154.29 37 19 4 1151.70 89.5570 109.54 135 85 1 3517.70 89.5390 129.98 24 12 3 1151.70 89.5310 108.68 124 74 1 5060.50 89.5220 143.52 143 93 1 1778.40 89.4960 323.39 136 86 1 4558.20 89.4910 143.52 125 75 1 4334.30 89.4760 129.98 39 20 2 . 5096.00 89.4620 129.98 38 20 1 10400.00 89.4550 136.28 72 44 1 1659.40 89.4530 164.13 36 19 3 1407.70 89.4480 122.52 25 12 4 1407.70 89.4420 122.52 84 49 1 10874.00 89.4090 122.52 74 46 1 2172.70 89.3990 111.55 12 7 1 291.53 89.3960 104.04 118 68 1 3951.10 89.3960 309.41 11 6 1 5404.20 89.3540 107.17 114 64 4 5620.90 89.3420 108.68 17 10 3 921.38 89.3370 105.38 18 10 4 241.31 89.3370 111.55 7 2 4 241.31 89.3290 107.89 6 2 3 921.38 89.3210 104.45 113 64 3 5620.90 89.3200 106.52 34 19 1 1147.80 89.3190 115.38 61 36 1 8107.80 89.3040 113.98 62 37 1 3010.20 89.2890 120.47

Automated CALCULATION SHEET Page: B-41 ofB5

/~ Engineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D1 Date: 12/23/2008 29 15 1 5589.70 89.2760 104.04 23 12 2 1147.80 89.2730 115.38 16 10 2 614.25 89.2710 103.34 5 2 2 614.25 89.2690 . 103.34 56 .31 1 1512.00 89.2570 101.28 20 11 2 614 *25 89.2320 100.96 2 1 2 614.25 .89.2240 100.79 126 76 1 905.71 89.2050 350.10 14 9 1 1792.60 89.1970 93.84 9 4 1 1698.30 89.1910 93.84 128 78 1 905.71 89.1840 341.86 8 3. 1 1698.30 89.1770 93.84 13 8 1 1698.30 89.1770 93.84 119 69 1 2625.90 89.1680 103.03 26 13 1 1182.60 89.1670 100.87 31 17 1 1182.60 89.1610 100.87 21 11 3 921.38 89.1100 105.38 129 79 1 1038.80 89.0980 88.21 10 80 1 3947.40 89.0910 101.06 32 17 2 1450.30 89.0710 103.03 3 1 3 921.38 89.0700 104.89 27 13 2 1450.30 89.0700 101.28 117 67 1 1038.80 89.0570 91.00 91 53 1 1719.10 89.0390 100.87 4 2 1 614.25 89.0370 91.00 15 10 1 614.25 89.0370 91.00 1 1 1 614.25 89.0330 88.21 19 11 1 614.25 89.0300 88.21 160 99 1 1169.60 89.0190 3000.00 55 30 1 1135.80 898085.47 52 27 1 1512.00 88.9650 91.00 53 28 1 1054.80 88.9580 85.47 121 71 1 1507.10 88.9510 88.21 122 72 1 2214.70 88.9240 88.21 116 66 1 2214.70 88.9210 91.00 92 54 1 1703.40 88.9170 88.21 28 14 1 1399.80 88.8770 85.47 115 65 1 1216.30 88.8380 85.47 134 84 1 1292.50 88.8030 88.21 30 16 1 543.38 88.7820 80.29 33 18 1 522.11 88.7810 82.80 131 81 1 1422.00 88.2420 30.93 168 107 1 258090.00 88.1610 3000.00 83 48 1 8654.10 87.8400 3000.00 95 57 1 13874.00 87.8270 3000.00 161 100 .1 1251.60 87.6310 3000-00 158 97 1 5021.10 87.4470 1900.10 179 118 1 2900.00 86.1330 1.22 180 119 1 2900.00 85.5870 1.10 185 124 1 627740.00 85.5500 0.09

I Engineering Automated Services Corp.

CALCULATION SHEET Calc.

Page: No.:

B-42 PBNP-994-2 1-13 of B-50 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes I No [I Date: 12/23/2008 188 125 629770.00 85.5440 0.09 198 133 2025000.00 85.3130 0.27 186 124 894670.00 85.2680 0.09 189 125 895990.00 85.2620 0.09 195 130 1000000.00 85.1190 33.54 191 126 1000000.00 85.1160 3000.00 98 59 9999.00 85.0790 16.38 99 60 9999.00 85.0790 16.38 197 132 1000000.00 85.0770 3000.00 22 12 939.09 85.0000 0.00 35 19 939.09 85.0000 0.00 149 95 21609.00 85.0000 0-.00 150 95 45170.00 85.0000 0.00 170 109 1000000000.00 85.0000 99.73 171 110 1000000000.00 85.0000 99.73 172 111 1000000000.00 85.0000 99.73 173 112 1000000000.00 85.0000 99.73 174 113 1000000000.00 85.0000 99.73 175 114 1000000000.00 85.0000 99.73 176 115 1000000000.00 85.0000 99.73 177 116 1000000000.00 85.0000 99.73 178 117 1000000000.00 85.0000 61.15 187 124 1396400.00 85.0000 0.00 190 125 1393100.00 85.0000 0.00 193 128 1000000.00 85.0000 85.47 194 129 1000000.00 85.0000 85.47 199 134 3931000.00 85.0000 0.00 B.11 PB-PAB-271_T Max Temperature Filename Cell Vol L Cell Volume Max Value Max Time 156 95 12 93727.00 190.9000 1801.10 154 95 10 184160.00 190.4600 1801.00 152 95 8 58302.00 189.8700 1801.00 167 106 1 97427.00 189.5600 1801.00 151 95 7 27892.00 189.4900 1801.00 110 63 8 36105.00 189.4500 1801.00 155 95 11 44840.00 189.3500 1801.10 145 95 1 13442.00 189.2500 1801.00 153 95 9 88106.00 189.2100 1801.00 109 63 7 28635.00 189.1400 1801.00 146 95 2 28097.00 188.8600 1803.40 147 95 3 42461.00 188.3500 1801.00 148 95 4 88754.00 188.0600 1801.00 108 63 6 43326.00 186.8000 1801.00 159 98 1 5936.10 186.5200 1801.00 107 63 5 34362.00 185.2700 1801.00

Automated CALCULATION SHEET Page: B-43jof B-50 jI . Engineering Caic. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Ca,1c.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No 0 Date: 12/23/2008 103 63 1 33120.00 179.9800 1801.00 104 63 2 41760.00 178.6100 1801.00 89 51 2 10270.00 177.9800 1801.10 105 63 3 27600.00 177.5600 1829.50 106 63 4 34800.00 177.4.400, 1857.80 164 103 1 59208.00 174.9900! 1802.60 88 51 1 10874.00 174.0300 1807.80 100 61 1 14847.00 169.8300 1897.70 87 50 2 10270.00 168.8200 1801.10 86 50 1 10874.00 164.5100 1804.30 157 96 1 4031.80 163.5100 1801.00 85 49 2 10270.00 131.9100 2146.50 84 49 1 10874.00 128.4000 2229.40 120 70 1 21941.00 115.2500 1801.00 127 77 1 98439.00 113.9000 1801.00 96 58 1 3024.00 111.5600 1801.10 97 58 2 4368.00 111.3500 1801.10 101 62 1 3024.00 111.3100 1801.10 102 62 2 4368.00 111.1300 1801.10 80 47 6 2315.60 106.2400 127.31 128 78 1 905.71 105.7400 1801.10 126 76 1 905.71 105.4900 1801.10 81 47 7 698.25 105.3300 34.88 82 47 8 498.75 105.1400 24.56 78 47 4 367.50 105.0800 1.06 77 47 3 514.50 104.6100 0.96 75 47 1 2388.80 104.5000 0.00 76 47 2 1706.30 104.5000 0.00 79 47 5 3241.90 104.5000 0.00 118 68 1 3951.10 104.2100 1801.10 142 92 1 7670.00 103.8000 1801.10 117 67 1 1038.80 103.5800 1801.10 129 79 1 1038.80 103.5800 1801.10 115 65 1 1216.30 103.1800 1801.10 121 71 1 1507.10 103.0300 1801.10 69 42 3 2880.00 102.2600 182.94 70 42 4 2160.00 101.8700 165.64 133 83 1 10478.00 101.3500 1801.10 119 69 1 2625.90 101.1600 1801.10 122 72 1 2214.70 101.1400 1801.10 116 66 1 2214.70 101.1100 1801.10 68 42 2 2400.00 99.9450 0.79 67 42 1 3200.00 99.5000 0.00 143 93 1 1778.40 99.1290 1801.10 140 90 1 8612.50 98.4160 1801.10 130 80 1 3947.40 98.3520 1801.10 158 97 1 5021.10 96.3650 1903.00 45 23 1 9063.00 96.2600 2749.50 138 88 1 1257.30 96.1510 1.00 54 29 1 29469.00 96.0180 2745.80

of B-50

/,Automated CALCULATION SHEET Page: B-44 Cale. No.:

Z, Engineering Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

I-IELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No ED Date: 12/23/2008 132 82 1 1419.30 95.5470 1.00 137 87 1 10100.00 95.1310 1801.10 42 21 3 3392.80 95.1270 234.52 183 122 1 5000.00 95.0000 3883.70 184 123 1 5000.00 95.0000 3867.00 168 107 1 258090.00 94.9150 5000.00 72 44 1 1659.40 94.8740 2794.00 50 25 4 3392.80 94.8100 214.25 51 26 1 2771.50 94.4960 2799.10 57 32 1 2771.50 94.3010 2803.20 53 28 1 1054.80 94.2950 2598.80 44 22 1 3138.80 94.0230 2653.60 169 108 1 258090.00 93.9910 5000.00 141 91 1 9934.60 93.8470 1801.10 55 30 1 1135.80 93.7100 2568.40 46 24 1 3138.80 93.5270 2624.80 144 94 1 2023.40 93.5150 5000.00 62 37 1 3010.20 93.5110 2834.60 135 85 1 3517.70 93.4950 2410.80 43 21 4 1876.90 93.3840 143.44 49 25 3 1876.90 93.3580 141.85 41 21 2 1947.70 92.4580 3134.70 47 25 1 1947.70 92.4190 3134.70 136 86 1 4558.20 92.3170 2501.00 123 73 1 5110.70 92.0620 2619.30 61 36 1 8107.80 91.6480 2854.00 40 21 1 3520.80 91.5000 0.00 48 25 2 3520.80 91.5000 0.00 124 74 1 5060.50 91.4330 2559.10 134 84 1 1292.50 91.0380 2617.10 38 20 1 10400.00 90.4890 3143.60 166 105 1 41586.00 90.3370 5000.00 162 101 1 38741.00 90.3070 5000.00 163 102 1 57058.00 90.2460 5000.00 165 104 1 59956.00 90.1520 5000.00 56 31 1 1512.00 90.1130 3102.00 52 27 1 1512.00 89.9080 3097.60 139 89 1 1070.10 89.7840 5000.00 90 52 1 10883.00 89.7120 3754.40 94 56 1 42982.00 89.6990 837.75 39 20 2 5096.00 89.6680 3227.30 71 43 1 19199.00 89.2260 3863.00 160 99 1 1169.60 89.1620 5000.00 182 121 1 4000.00 89.0860 977.20 181 120 1 2400.00 89.0390 977.20 63 38 1 25676.00 89.0060 3335.00 188 127 1 1000000.00 88.8410 978.02 192 131 1 1000000.00 88.5880 1801.10 58 33 1 2776.80 88.4620 194.78 93 55 1 11245.00 88.3560 219.42

Automated CALCULATION SHEET Page: B-45 Iof B-50 Engineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 -Building Recovery Reviewed By: CD Henry Safety Related Yes El No E-Z Date: 12/23/2008 66 41 2706.90 88. 3020 180.77 10 5 56.25 88. 2980 192.29 131 81 1422.00 88. 2720 30.84 64 39 2954.20 88. 1510 178.57 60 35 2954.20 88. 1500 189.76 65 40 2706.90 88. 12 50 174.03 59 34 2844.50 88. 1170 186.66 112 64 25758.00 88. 0960 249.52 ill 64 25758.00 88.0770 226.50 37 19 1151.70 88. 0240 199.64 74 46 2172.70 87. 9430 191.79 24 12 1151.70 87. 93 50 186.66 83 48 8654.10 87. 92 50 5000.00 95 57 13874.00 87. 9220 5000.00 73 45 14460.00 87. 8970 212.49 125 75 4.334 .30 87. 8920 -194.78 36 19 1407.70 87. 8780 182.40 25 12 1407.70 87. 8740 187.18 114 64 5620.90 87. 8040 183.48 113 64 5620.90 87. 7700 226.50 161 100 1251.60 87. 7280 5000.00 12 7 291.53 87. 6860 174.61 11 6 5404.20 87. 6790 179.12 34 19 1147.80 87. 6760 178.01 23 12 1147.80 87. 6740 179.12 7 2 241.31 87. 6730 179.68 18 10 241.31 87. 6680 176.89 17 10 921.38 87. 6520 177.45 6 2 921.38 87. 6400 176.32 29 15 5589.70 87. 5910 174.61 16 10 614.25 87. 5850 174.03 27 13 1450.30 87. 5800 4114.60 5 2 614.25 87. 5770 171.69 32 17 1450.30 87. 5510 186.66 20 11 614.25 87. 5490 175.18 2 1 614.25 87. 5320 172.86 14 9 1792.60 87. 5270 164.39 21 11 921.38 87. 5270 184.55 9 4 1698.30 87. 5200 164.39 26 13 1182.60 87. 5170 175.75 31 17 1182.60 87. 5150 176.32 8 3 1698.30 87. 5070 163.12 13 8 1698.30 87. 5070 163.12 3 1 921.38 87. 4970 184.55 91 53 1719.10 87. 4970 182 .94 4 2 614.25 87. 3610 157.90 15 10 614.25 87. 3610 157.90 1 1 614.25 87. 3560 156.55 19 11 614.25 87. 3540 156.55 92 54 170 3.40 87. 3240 165.64

Automated CALCULATION SHEET Page: B-46 of B-50 Z Engineering Caic. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [] No Eli Date: 12/23/2008 28 14 1399.80 87.2590 156.55 33 18 522.11 87.1550 149.50.

30 16 543.38 87.1400 145.76 179 118 2900.00 86.1250 1.22 180 119 2900.00 85.5850 1.10 187 126 1000000.00 85.1690 5000.00 191 130 1000000.00 85.1200 32.23 193 132 1000000.00 85.0810 5000.00 98 59 9999.00 85.0790 16.38 99 60 9999.00 85.0790 16.38 22 12 939.09 85.0000 0.00 35 19 939.09 85.0000 0.00 149 95 21609.00 85.0000 0.00 150 95 45170.00 85.0000 0.00 170 109 1000000000.00 85.0000 81.94 171 110 1000000000.00 85.0000 81.94 172 111 1000000000.00 85.0000 81.94 173 112 1000000000.00 85.0000 81.94 174 113 1000000000.00 85.0000 81.94 175 114 1000000000.00 85.0000 81.94 176 115 1000000000.00 85.0000 81.94 177 116 1000000000.00 85.0000 81.94 178 117 1000000000.00 85.0000 55.54 185 124 1257000.00 85.0000 35.95 186 125 1282000.00 85.0000 35.95 189 128 1000000.00 85.0000 93.66 190 129 1000000.00 85.0000 93.66 B.12 PB-PAB-272_T Max Temperature Filename Cell Vol L Cell Volume Max Value Max Time 169 108 1 258090.00 362.9400 1054.20 10 5 1 56.25 254.0600 2000.00 98 59 1 9999.00 205. 7400 2000.00 99 60 1 9999.00 205.7400 2000.00 66 41 1 2706.90 141. 0400 2000.00 65 40 1 2706.90 140.9900 2000.00 64 39 1 2954.20 140.8600 2000.00 60 35 1 2954.20 136. 8100 2000.00 58 33 1 2776.80 136. 4700 2000.00 59 34 1 2844.50 136. 3500 2000.00 46 24 1 3138.80 131. 9400 2000.00 44 22 1 3138.80 131.6500 2000.00 166 105 1 41586.00 127. 0200 2000.00 80 47 6 2315.60 125.7800 2000.00 165 104 1 59956.00 125.1700 2000.00 70 42 4 2160.00 121. 5700 2000.00

Z&

TAutomated Engineeringy Services Corp.

Client: FP&L Energy CALCULATION SHEET Page: B-47 Fof 13-50 Cale. No.:

PBNP-994-2 1-13 Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes 5J No El Date: 12/23/2008 131 81 1 1422.00 121.3700 2000.00 129 79 1 1038.80 120.5800 2000.00 68 42 2 2400.00 120.4300 2000.00 94 56 1 42982.00 120.0500 2000.00 121 71 1 1507.10 119.7100 2000.00 184 123 1 5000.00 119.3500 2000.00 69 42 3 2880.00 118.9500 2000.00 117 67 1 1038.80 117.2200 2000.00 122 72 1 2214.70 117.2100 2000.00 71 43 1 19199.00 117.0000 2000.00 85 49 2 10270.00 115.9700 2000.00 163 102 1 57058.00. 115.7200 2000.00 168 107 1 258090.00 115.4500 2000.00 77 47 3 514.50 115.1800 2000.00 78 47 4 367.50 115.1800 2000.00 82 47 8 498-.75 114.6600 2000.00 81 47 7 698.25 113.3600 2000.00 87 50 2 10270.00 112.7200 2000.00 183 122 1 5000.00 111.7000 2000.00 138 88 1 1257.30 111.4800 2000.00 84 49 1 10874.00 111.2500 2000.00 89 51 2 10270.00 111.2000 353.01 57 32 1 2771.50 109.9300 2000.00 164 103 . 1 59208.00 109.8800 2000.00 90 52 1 10883.00 109.0100 2000.00 179 118 1 2900.00 108.3400 2000.00 86 50 1 10874.00 108.1600 2000.00 144 94 1 2023.40 107.9000 2000.00 83 48 1 8654.10 107.7300 2000.00 54 29 . 1 29469.00 107.6400 2000.00 135 85 1 3517.70 107.4100 2000.00 55 30 1 1135.80 107.2600 2000.00 88 51 1 10874.00 107.1400 2000.00 51 26 1 2771.50 106.6800 2000.00 62 37 1 3010.20 106.6200 2000.00 47 25 1 1947.70 106.1600 2000.00 132 82 1 1419.30 105.8800 2000.00 41 21 2 1947.70 105.4600 2000.00 115 65 1 1216.30 105.4600 2000.00 72 44 1 1659.40 105.1100 2000.00 53 28 1 1054.80 105.0100 2000.00 73 45 1 14460.00 105.0000 2000.00 125 75 1 4334.30 104.9200 2000.00 75 47 1 2388.80 104.5000 0.00 76 47 2 1706.30 104.5000 0.00, 79 47 5 3241.90 104.5000 0.00 116 66 1 2214.70 104.3200 2000.00 45 23 1 9063.00 103.3900 2000.00 95 57 1 13874.00 103.2800 2000.00 162 101 1 38741.00 102.4900 2000.00

IAutomated Engineering Services Corp.

Client: FP&L Energy CALCULATION SHEET Page: B-48 Cale. No.: of B-50 PBNP-994-.21-13 Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [] No [II Date: 12/23/2008 43 21 1876.90 102.0 500 2000.00 56 31 1512.00 101.7800 2000.00 133 83 10478.00 101.6300 2000.00 49 25 1876.90 101. 5300 2000.00 96 58 3024.00 101. 4700 2000.00 101 62 3024.00 101.3900 2000.00 42 21 3392.80 101.3000 2000.00 97 58 4368.00 101.1900 2000.00 61 36 8107.80 101. 0700 2000.00 102 62 4368.00 100.7 500 2000.00 91 53 1719.10 100. 5500 2000.00 52 27 1512.00 100.4800 2000.00 127 77 98439.00 100.3600 2000.00 120 70 21941.00 99. 8500 2000.00 119 69 2625.90 99. 8320 2000.00

'67 42 3200.00 99. 5000 0.00 134 84 1292.50 99. 4540 2000.00 128 78 905.71 99. 0640 2000.00 126 76 905.71 98. 7510 2000.00 118 68 3951.10 98. 6610 2000.00 12 7 291.53 98. 5510 2000.00 s0 25 3392.80 97. 9530 2000.00 124 74 5060.50 97. 8220 2000.00 130 80 3947.40 97. 8030 2000.00 140 90 8612.50 97. 3990 2000.00 93 55 11245.00 97. 0430 2000.00 100 61 14847.00 95.9010 2000.00 123 73 5110.70 95.8830 2000.00 38 20 10400.00 95.7880 2000.00 142 92 7670.00 95.4550 2000.00 92 54 1703.40 94.9410 2000.00 27 13 1450.30 94.6740 1296.70 39 20 5096.00 94.6010 2000.00 30 16 543.38 93 .9990 2000.00 143 93 1778.40 93.9290 2000.00 160 99 1169.60 93.7920 2000.00 136 86 4558.20 93. 5580 2000.00 33 18 522.11 93. 5390 2000.00 26 13 1182.60 93. 2930 2000.00 9 4 1698.30 93.2430 2000.00 8 3 1698.30 93. 2030 2000.00 13 8 1698.30 93 .2030 2000.00 145 95 13442.00 93 .1380 2000.00 14 9 1792.60 93.1360 2000.00 137 87 10100.00 92 .7780 2000.00 11 6 5404.20 92.4920 2000.00 147 95 42461.00 92.4830 2000.00 161 100 1251.60 92.4790 2000.00 32 17 1450. 30 92. 3390 1219.30 29 15 5589.70 92.2180 2000.00

Automated CALCULATION SHEET Page: B-49 of B-50 Engineering Calc. No.:

ZServices Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [El No [D Date: 12/23/2008 153 95 9 88106.00 92.2040 2000.00 154 95 10 184160.00 92.1930 2000.00 31 17 1 1182.60 92.1830 2000.00 148 95 4 88754.00 92.1550 2000.00 155. 95 11 44840.00 92.0000 2000.00

23. 12 2 1147.80 91.8330 2000.00 151 95 7 27892.00 91.7570 2000.00 25 12 4 1407.70 91.7560 624.36 156 95 .12 93727.00 91.7210 2000.00 110 63 8 36105.00 91.6220 2000.00 167 106 1 97427.00 91.5780 2000.00 106 63 4 34800.00 91.5700 2000.00 104 63 2 41760.00 91.5380 2000.00 152 95 8 58302.00 91.5220 2000.00 40 21 1 3520.80 91.5000 0.00 48 25 2 3520.80 91.5000 0.00 109 63 7 28635.00 91.4710 2000.00 6 2 3 921.38 91.4320 2000.00 7 2 4 241.31 91.4240 2000.00 103 63 1 33120.00 91.4210 2000.00 159 98 1 5936.10 91.4070 2000.00 24 12 3 1151.70 91.3830 2000.00 108 63 6 43326.00 91.3330 2000.00 107 63 5 34362.00 91.3000 2000.00 105 63 3 27600.00 91.2730 2000.00 3 1 3 921.38 91.2660 2000.00 2 1 2 614.25 91.2320 2000.00 28 14 1 1399.80 91.2300 2000.00 5 2 2 614.25 91.1880 2000.00 146 95 2 28097.00 90.9900 2000.00 74 46 1 2172.70 90.8870 2000.00 34 19 1 1147.80 90.7700 2000.00 36 19 3 1407.70 90.7200 2000.00 37 19 4 1151.70 90.7010 2000.00 18 10 4 241.31 90.6830 2000.00 17 10 3 921.38 90.6340 2000.00 20 11 2 614.25 90.6140 2000.00 16 10 2 614.25 90.6110 2000.00 21 11 3 921.38 90.5350 2000.00 111 64 1 25758.00 90.2190 2000.00 112 64 2 25758.00 90.2160 2000.00 1 1 1 614.25 89.7850 2000.00 113 64 3 5620.90 89.6470 2000.00 114 64 4 5620.90 89.6350 2000.00 139 89 1 1070.10 89.2310 2000.00-19 11 1 614.25 89.0190 2000.00 4 2 1 614.25 88.5150 2000.00 15 10 1 614.25 88.5150 2000.00 157 96 1 4031.80 88.5040 2000.00 63 38 1 25676.00 88.0740 2000.00

Automated CALCULATION SHEET Page: B-50 1of B-50 SEngineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes ElI No 0 Date: 12/23/2008 158 97 1 5021.10 87.8370 2000.00 141 91 1 9934.60 87.5720 339.97 187 126 1 1000000.00 85.9600 2000.00 181 120 1 2400.00 85.4700 0.30 182 121 1 4000.00 85.3750 0.54 180 119 1 2900.00 85.2770 0.54 193 132 1 1000000.00 85.2640 2000.00 191 130 1 1000000.00 85.1470 2000.00 188 127 1 1000000.00 85.0200 1.87 192 131 1 1000000.00 85.0140 0.79 22 12 1 939.09 85.0000 0.00 35 19 2 939.09 85-0000 0.00 149 95 5 21609.00 85.0000 0.00 150 95 6 45170.00 85.0000 0.00 170 109 1 1000000000.00 85.0000 134.73 171 4110 1 1000000000.00 .0000 134.73 172 il1 1 1000000000.00 85.0000 134.73 173 112 1 1000000000.00 85.0000 134.73 174 113 1 1000000000.00 85.0000 134.73 175 114 1 1000000000.00 85.0000 134.73 176 115 1 1000000000.00 85.0000 134.73 177 116 1 1000000000.00 85.0000 134.73 178 117 1 1000000000.00 85.0000 59.15 185 124 1 1257000.00 -85.0000 212.66 186 125 1 1282000.00 85.0000 212.66 189 128 1 1000000.00 85.0000 91.36 190 129 1 1000000.00 85.0000 91.36

Automated CALCULATION SHEET Page: C-i of C-49 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No El Date: 12/23/2008 Attachment C Temperature Responses in the HELB Rooms The time dependent temperature responses within the rooms where the HELB is located are contained in this attachment. The room is identified in the case name as noted in Section 7, and the corresponding volume is identified in the table in Attachment A.

GOTHIC control volume descriptions are given in Attachment D. Note that these responses were obtained from the .GOT files and the -maximum and minimum values together with their times of occurrence are also included. The maximum values and corresponding times are slightly different relative to the values given in Section 7 and Attachment B, since they are based only on the graphical data.

Section C.2, corresponding to case PB-PAB-596_T-1-s3, also contains the time dependent response for Volume 124 Cell 2, which corresponds to the middle section of the fagade, since this is the limiting response for that region.

C.1 PB-PAB-596_T-1 Vapor Temperature for Volume 124 Cell 3 Time F(t) Time F(t) Time F(t) seconds (F) seconds (F) seconds (F) 0 85 le-006 85 0. 1082 84.68 0.2213 84.74 0.329 84.57 0.4416 84.42 0.5914 84.19 0.7179 84 0.871 83.83 1 83.72 1.108 88.73 2.163 135.7 3.277 161.2 4.338 185 5.447 206.5 6.922 229.7 8.169 245.7 9.676 261.4 11.5 276.2 12. 55 283.1 13.71 289.4 14.98 295.2 16.38 300.5 17.92 305 19.61 309 21.47 312.2 23.52 314.6 25.77 316.6 28.25 318.2 30.98 319.4 33.98 320.2 37.28 320.7 40.91 320 44.9 320.3 49.29 320.5 54.12 320.6 59.43 327.4 65.28 340.1 71.71 353.7 78.58 359.8 85.66 355.1 93.44 347.9 97.05 344 100 340.7 101.1 339.6 102.1 338.5 103.3 337.1 104.4 335.9 105.9 334.3 107.2 333 108.7 331.3

Automated CALCULATION SHEET Page: C-2 of C-49 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [K] No [LI Date: 12/23/2008 110.5 329.3 111.6 328.1 112.7 326.8 114 325.4 115.4 323.7 116.9 322 118.6 320 120.5 317.9 122.5 315.5 124.8 313 127.3 310.1 130 307 133 303.6 136.3 300 139.9 295.9 143.9 291.5 148.3 286.8 153.1 281.7 158.4 276.3 164.3 270.5 170.2 264.8 175.9 259.5 181.4 254.5 186.8 249.8 192 245.3 197.1 241.2 202 237.2 206.8 233. 5 211.6 229.9 216.2 226.6 220.7 223.3 225.2 220.3 229.5 217.4 233 .8- 214.6 238 211.9 242.2 209.4 246.3 206.9 250.3 204.6 254.3 202.3 258.2 200.2 262.1 198.1 266 196 269.8 194.1 273.6 192.2 277.4 190.3 281.1 188.5 284.9 186.8 288-.6 185.1 292. 3 183.5 295.9 181.9 299.6 180.3 303. 3 178.8 306.9 177.3 310.6 175.9 314. 3 174.5 317.9 173.1 321.6 171.7 325.3 170.4 329 170.7 332.7 171.5 336.4 171.8 340.1 171.7 343.9 171.8 347.6 171.9 351.4 172 355.3 172 359.1 172.1 363 172.2 367 172.3 370.9 170.7 374.9 171.7 379 172.6 383.1 173. 1 387.2 173.4 391.4 173.7 395.6 174.1 399.9 174.5 404.2 174.9 408.6 175. 3 413.1 175.6 417.6 176 422.1 176.3 426.7 176.7 431.3 177 436 177.3 440.7 177.7 445.5 178 450.3 178.3 455.2 178.6 460.2 178.9 465.2 179.2 470.2 179.5 475.3 179.7 480.4 180 485.6 180.3 490.9 180.5 496.1 180.8 501.5 181 506.8 181.3 512.2 181.5 517.6 181.8 522.9 182 528.2 182.2 533.5 182.4 538.7 182.6 543.9 182.8 549 182.9 554.1 183.1 559.2 183.3 564.3 183.4 569.3 183.6 574.3 183.7 579.2 183.9 584.2 184 589.1 184.2 594 184.3 598.8 184.4 603.6 184.5 608.4 182.2 613.2 180.1 618 178.1 622.7 176.1 627.4 174.2 632.1 172.4 636.8 170.7 641.4 169 646.1 167.4 650.7 165.8 655.3 164.3 659.8 162.9 664.4 161.4 668.9 160.1 673.4 158.7 677.9 157.5 682.4 156.2 686.9 155 691.3 153.8 695.7 152.7 700.2 151.6 704.6 150.5 708.9 149.5 713.3 148.5 717.6 147.5 722 146.5 726.3 145.6 730.6 144.7 734.9 143.8 739.1 143 743.4 142.1 747.6 141.3

Automated CALCULATION SHEET Page: C-3 of C-49 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 12/23/2008 751.8 140.5 756 139.7 760.2 139 764.3 138.2 768.4 137.5 772.5 136.8 776.6 136.2 780.6 135.5 784.6 134.9 788.6 134.2 792.6 133.6 796.6 133 800.5 132.4 804.4 131.9 808.3 131.3 812.2 130.8 816.1 130.2 819.9 129.7 823.8 129.2 827.6 128.7 831.4 128.2 835.2 127.7 839 127.3 842.7 126.8 846.5 126.4 850.2 125.9 854 125.5 857.7 125.1 861.4 124.6 865.1 124.2 868.8 123.8 872.4 123.4 876.1 123 879.7 122.7 883.3 122.3 887 121.9 890.6 121.6 894.2 121.2 897.8 120.9 901.3 120.5 904.9 120.2 908.5 119.8 912 119.5 915.6 119.2 919.1 118.9 922.6 118.6 926.1 118.3 929.6 118 933.1 117.7 936.6 117.4 940.1 117.1 943.5 116.8 947 116.5 950.4 116.3 953.9 116 957.3 115.7 960.7 115. 5 964.1 115.2 967.5 115 970.9 114.7 974.3 114.5 977.7 114.2 981 114 984.4 113.8 987.8 113.5 991.1 113.3 994.4 113.1 997.8 112.9 1000 112.7 F max = 359.8 at time = 78.58 seconds.

F min = 83.72 at time = 1 seconds.

C.2 PB-PAB-596_T-1-s3 Vapor Temperature for Volume 124 Cell 2 Time F(t) Time F(t) Time F(t) seconds (F) seconds (F) seconds (F) 0 85 le-006 85 0.1082 85.22 0.2213 84.99 0.329 84.91 0.4416 84.73

0. 5914 84.5 0. 7179 84.32 0.871 84.14 1 84.04 1. 108 85.6 2.163 97.55 3.277 100.6 4.338 107.3 5.447 119.3 6.922 132.4 8.169 142.2 9.676 152.4 11.5 163.6 12.55 172.8 13. 71 182.7 14.98 193.2 16.38 204.4 17.92 216 19.61 227.7 21.47 239.2 23.52 249.7 25.77 259.4 28.25 268.1 30.98 276.1

I Engineering Automated Services Corp.

CALCULATION SHEET Calc.

Page: No.:

C-4 of C-49 PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 12/23/2008 33.98 283.3 37.28 289.7 40.91 291.1 44.9 293.2 49.29 295.4 54.12 297.5 59.43 299.7 65.28 301.7 71.71 302.3 78.78 300.9 86.56 285.2 95.11 263.5 100 250.4 101.1 247.6 102.1 245 103.3 241.9 104.4 239.2 105.9 235.7 107.2 232.8 108.7 229.4 110.5 225.4 111.6 223.1 112.7 220.6 114 218 115.4 215.1 116.9 212 118.6 208.7 120.5 205.2 122.5 201.4 124.8 197.5 127.3 193.2 130 188.7 133 184.1 136.3 179.2 139.9 174.2 143.9 169 148.3 163.7 153.1 158.3 158.4 153 164.3 147.2 170.2 142.2 175.9 138 11..84 134.4 186.8 131.3 192 128.4 197.1 125 .-9 200 124.6 F max = 302.3 at time = 71.71 seconds.

F min = 84.04 at time = 1 seconds.

Vapor Temperature for Volume 124 Cell 3 Time F(t) Time F(t) Time F(t) seconds (F) seconds (F) seconds (F) 0 85 le-006 85 0.1082 84.68 0.2213 84.74 0.329 84.57 0.4416 84.42

0. 5914 84.19 0.7179 84 0.871 83.83 1 83.72 1.108 88.73 2.163 135.7 3.277 161.2 4.338 185 5.447 206.5 6.922 229.7 8.169 245.7 9.676 261.4 11.5 276.2 12.55 283.1 13 .71 289.4 14.98 295.2 16.38 300.5 17.92 305.1 19.61 309 21.47 312.2 23. 52 314.7 25.77 316.6 28.25 318.2 30.98 319.8 33.98 321.5 37.28 323.2 40.91 325.1 44.9 329.1 49.29 334.2 54.12 340.4 59.43 347.6 65.28 356 71.71 365.3 78.78 374.8 86.56 381.9 95.11 386.2 100 386.2 101.1 386 102.1 385.8 103.3 385.5 104.4 385.3 105.9 384.8 107.2 384.4 108.7 383.9 110.5 383.2 111.6 382.8 112.7 382.3 114 381.7 115.4 380.9 116.9 380.2 118.6 379.2 120.5 378.2 122.5 376.9 124.8 375.7

Automated CALCULATION SHEET Page: C-5 of C-49 Z Engineering Calc. No.:

Services Corp. PBN P-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes EW No D Date: 12/23/2008 127.3 374 130 372.2 133 370.2 136. 3 368 139.9 365.6 143.9 363 148 3 360.2 153.1 357.2 158.4 354.2 164.3 351.1 170.2 348.3 175.9 345.9 181A4 343.7 186.8 341.6 192 339.8 197.1 338.1 200 337.1 F max = 386.2 at time = 100 seconds.

F min = 83.72 at time = 1 seconds.

C.3 PB-PAB-596_T-2 Vapor Temperature for Volume 124 Cell 2 Time F(t) Time F(t) Time F(t) seconds (F) seconds (F) seconds (F) 0 85 le-006 85 0.1082 85.22 0.2213 84.99 0.329 84.91 0.4416 84.73 0.5914 84.5 0.7179 84.32 0.871 84.14 1 84.04 1.108 84.03 2. 163 86.58 3.277 87.93 4.338 89.75 5.447 91.55 6.922 93.84 8.169 95.79 9.676 99.38 11.5 103.9 12. 55 106.6 13.71 108.8 14,98 111.5 16.38 113.9 17.92 116.7 19.61 119.4 21.47 122.2 22.77 124.1 24.2 126 25.71 127.9 27.54 130.2 28.59 131.5 29.76 132.8 31.03 134.3 32A44 135.8 33.98 137.4 35.68 139.1 37.55 140.9 39.61 142.8 41.87 144.6 44.35 146.5 47.09 148.3 50.1 150.2 53,41 152.2 57.06 154.1 61.06 156 65,47 157.8 70.32 159.7 75.65 161.6 81,52 163.4 87.97 166.9 95.07 170.5 100 172.6 101.1 173 102.1 173.4 103.4 173.9 104.5 174.2 106 174.7 107.3 175.1 108.8 175.6 110.6 176.2 111.7 176.5 112.9 176.8 114.1 177.1 115.6 177.5 117.1 177.8 118.8 178.2 120.7 178.6 122.8 179 125.1 179.4 127.6 179.8 130.3 180.2 133.3 180.6 136.7 181 140.4 181.3 144.4 181.6 148.8 181.8 153.7 182 159.1 182.2

Automated CALCULATION SHEET Page: C-6 oC-9 SEngineering Calc. No.:

Services Corp. PBN P-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No L-I Date: 12/23/2008 165 182 .3 170.*8 182.4 176.4 182.4 181.9 182.4 187.2 182.3 192.4 182.2 197.4 182 202.3 181.9 207.1 181.7 211.8 181.6 216.4 181.4 220.9 181.2 225.3 181.1 229.6 180.9 233.9 180.7 238.1 180.6 242 .2 180.4 246.3 180.2 250.3 180 254.2 179.9 258.2 179.7 262.1 179.5 265.9 179.4 269.7 179.2 273. 5 179.1 277.3 178.9 281 178.8 284.7 178.6 288.4 178.5 292.1 178.3 295.7 178.2 299.4 178.1 303.1 177.9 306.7 177.8 310.4 177.7 314 177.6 317.7 177.5 321.3 177.3 325 177.2 328.7 177.1 332.4 177 336.1 176.9 339.8 176.8 343.6 176.7 347.4 176.6 351.2 176.5 355 176.5 358.8 176.4 362.7 176.3 366.7 176.2 370.6 176.1 374.6 176.1 378.7 176 382.8 175.9 386.9 175.8 391.1 175.8 395.3 175.7 399.6 175.6 404 175.6 408.4 175.5 412.8 175. 5 417.3 175.4 421.8 175.4 426.4 175.3 431.1 175 .3 435.8 175.2 440.5 175.2 445.3 175.1 450.1 175.1 455 175 460 175 465 175 470 174.9 475.1 174.9 480.3 174.9 485.5 174.8 490.7 174.8 496 174.8 501.4 174.8 506.7 174.7 512.1 174.7 517.5 174.7 522.8 174.7 528.1 174.7 533.4 174.6 538.6 174.6 543.8 174.6 548.9 174.6 554 174.6 559.1 174.6 564.1 174.6 569.2 174.5 574.2 174.5 579.1 174.5 584.1 175 .2 585.1 175.4 586.2 175.6 587.5 175.8 588.9 176.1 590.1 176.3 591.5 176.5 593.2 176.8 595 .3 177.1 596.5 177.3 597.8 177.5 599.3 177.7 600.9 177.9 602.6 178.1 604.6 178.3 606.7 178.6 609 178.8 611.6 179.1 614.4 179.4 617.5 179.6 621 179.9 624.7 180.2 628.9 180.5 633.4 180.8 637.9 181.1 642.1 181.3 646.7 181.6 651.1 181.8 655.3 182 659.9 182.2 664.4 182.4 668.6 182.6 673.1 182.7 677.6 182.9 681.9 183 686.4 183.2 690.8 183.3 695 .3 183.4 699.7 183.6 704.1 183.7 708.5 183.8 712.8 183.9 717.2 184 721.5 184.2 725.8 184.3 730.1 184.4 734.4 184.5 738.7 184.6 742.9 747.1 184.8 751.4 184.9 755.6 185 759.7 185.1 763.9 185.2 768 185.3 772.1 185.4

Automated CALCULATION SHEET Page: C-7 ofC4 SEngineering Cale. No.:

,/I Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

I{ELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D- Date: 12/23/2008 776.1 185. 5 780.2 185.6 784.2 185.8 788.2 185.9 792.2 186 796.1 186.1 800.1 186.2 803.4 186.3 807.1 186.5 811 186.7 814.6 186.9 818.3 187.2 822.1 187.4 825.2 187.6 827.9 187.9 830.7 188.1 833.9 188.4 837.3 188.7 840.2 188.9 843.4 189.2 846.8 189.6 849.4 189.9 851.3 190.1 853. 5 190.3 855.8 190.6 858.4 191 861.2 191.3 863.6 191.6 866.2 192 869 192.4 871.4 192.7 873.8 193.1 875.8 193.4 877.9 193.7 880.3 194.1 882. 5 194.5 884.7 194.8 886.8 195 .2 888.7 195.5 890.9 195.9 893 196.2 895 196.5 897.1 -196- 9 899.1 197.2 900.8 197.5 902.6 197.7 904-6 198 906.6 198.3 908.4 198.5 910.4 198.8 912.4 199 914.3 199.2 916.3 199.4 918.3 199.6 920.2 199.7 922.3 199.9 924.3 200 926.2 200.1 928.3 200.2 930.4 200.3 932.3 200.3 934.4 200.3 936.5 200.3 938.4 200.3 940.6 200.2 942 .7 200.1 944.9 200 947.2 199.8 949.3 199.6 951.5 199.4 953.8 199.1 956 198.8 958.3 198.5 960.6 198.1 962.9 197.7 965.3 197.3 968 196.7 970.3 196.2 972.8 195.7 975.6 195 978.1 194.4 980.8 193 .7 983.7 192.9 986.2 192.2 989 191.4 992.1 190.5 994.9 189.6 997.8 188.7 1001 187.7 1004 186.7 1007 185 .7 1010 184.5 1014 183.4 1017 182.3 1020 181.1 1023 179.9 1027 178.7 1030 177.6 1033 176.4 1036 175.2 1040 174 1043 172.8 1046 171.6 1049 ý170.4 1052 169.2 1056 168 1059 166.8 1062 165.6 1065 164.5 1068 163.3 1072 162 .1 1075 161 1078 159.9 1081 158.7 1084 157.6 1087 156.5 1090 155.4 1093 154.3 1097 153.3 1100 152.2 1103 151.2 1106 150.2 1109 149.1 1112 148.1 1115 147. 2 1118 146.2 1121 145.2 1124 144.3 1127 143.4 1130 142.4 1133 141. 5 1136 140.6 1139 139.8 1142 138.9 1145 138.1 1148 137.2 1151 136.4 1154 135.6 1157 134.8 1160 134 1163 133.2 1166 132. 5 1169 131.7 1172 131 1175 130.3 1178 129.6 1181 128.9 1184 128.2 1187 127.5 1190 126.8

/j j~

Automated Engineering t CALCULATION SHEET Page: C-8 Calc. No.:

of C-49 Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No ElI Date: 12/23/2008 1193 126.2 1196 125.5 1199 124.9 1202 124.3 1205 123 .7 1207 123.1 1210 122. 5 1213 121.9 1216 121.3 1219 120.8 1222 120.2 1225 119.7 1228 119.1 1230 118.6 1233 118.1 1236 117.6 1239 117.1 1242 116.6 1245 116.1 1248 115.6 1250 115 .1 1253 114.7 1256 114.2 1259 113 .7 1262 113 .3 1264 112.9 1267 112.4 1270 112 1273 111.6 1276 111. 1 1278 110.7 1281 110.3 1284 109.9

.1287 109.5 1289 109.1 1292 108.7 1295 108.3 1298 107.9 1300 107. 5 1303 107.1 1306 106.6 1309 106.1 1311 105-.7 1314 105 .2 1317 104.8 1320 104.4 1322 104 1325 103.6 1328 103.2 1330 102.8 1333 102.4 1336 102.1 1338 101.7 1341 101.4 1344 101 1347 100.7 1349 100.4 1352 100.1 1355 99.8 1357 99.51 1360 99.23 1363 98.95 1365 98.68 1368 98.42 1370 98.17 1373 97.92 1376 97.68 1378 97.44 1381 97.21 1384 96.98 1386 96.76 1389 96.55 1391 96.34 1394 96.14 1397 95.94 1399 95 .74 1402 95. 55 1405 95 .36 1407 95.18 1410 95 1412 94.83 1415 94.66 1417 94.49 1420 94.33 1423 94.17 1425 94.02 1428 93.87 1430 93.72 1433 93.57 1435 93.43 1438 93.29 1441 93.15 1443 93.02 1446 92.89 1448 92 .76 1451 92.64 1453 92.S52 1456 92.4 1458 92.28 1461 92.17 1463 92.05 1466 91.94 1468 91.83 1471 91.73 1473 91.63 1476 91.52 1478 91.42 1481 91.33 1483 91.23 1486 91.14 1488 91.05 1491 90.96 1493 90.87 1496 90.78 1498 90.7 1501 90.61 1503 90.53 1506 90.45 1508 90.37 1511 90.3 1513 90.22 1516 90.15 1518 90.07 1520 90 1523 89.93 1525 89.86 1528 89.79 1530 89.73 1533 89.66 1535 89.6 1537 89.54 1540 89.47 1542 89.41 1545 89.35 1547 89.3 1550 89.24 1552 89.18 1554 89.13 1557 89.07 1559 89.02 1562 88.97 1564 88.91 1567 88.86 1569 88.81 1571 88.76 1574 88.72 1576 88.67 1578 88.62 1581 88.58 1583 88.53

IAutomated Z&Engineering Services Corp.

Client: FP&L Energy CALCULATION SHEET Page: C-9 Cale. No.: of C-49 PBNP-994-2 1-13 Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [El No LI-I Date: 12/23/2008 1586 88.49 1588 88.44 1590 88.4 1593 88.36 1595 88.32 1598 88.27 1600 88.23 1602 88.2 1605 88.16 1607 88.12 1609 88.08 1612 88.04 1614 88.01 1617 87.97 1619 87.94 1621 87.9 1624 87.87 1626 87.83 1628 87.8 1631 87.77 1633 87.73 1635 87.7 1638 87.67 1640 87.64 1642 87.61 1645 87.58 1647 87.55 1649 87.52 1652 87.49 1654 87.47 1656 87.44 1659 87.41 1661 87.39 1663 87.36 1666 87.33 1668 87.31 1670 87.28 1673 87.26 1675 87.23 1677 87.21 1680 87.18 1682 87.16 1684 87.14 1686 87.12 1689 87.09 1691 87.07 1693 -87.05 1696 87.03 1698 87.01 1700 86.99 1703 86.97 1705 86.94 1707 86.93 1709 86.91 1712 86.89 1714 86.87 1716 86.85 1719 86.83 1721 86.81 1723 86.79 1725 86.77 1728 86.76 1730 86.74 1732 86.72 1735 86.71 1737 86.69 1739 86.67 1741 86.66 1744 86.64 1746 86.62 1748 86.61 1750 86.59 1753 86.58 1755 86.56 1757 86.55 1759 86.53 1762 86.52 1764 86.51 1766 86.49 1768 86.48 1771 86.46 1773 86.45 1775 86.44 1777 86.42 1780 86.41 1782 86.4 1784 86.'39 1786 86.37 1789 86.36 1791 86.35 1793 86.34 1795 86.32 1797 86.31 1800 86.3 1802 86.29 1804 86.28 1806 86.27 1809 86.26 1811 86.25 1813 86.24 1815 86.22 1817 86.21 1820 86.2 1822 86.19 1824 86.18 1826 86.17 1829 86.16 1831 86.15 1833 86.14 1835 86.14 1837 86.13 1840 86.12 1842 86.11 1844 86.1 1846 86.09 1848 86.08 1851 86.07 1853 86.06 1855 86.06 1857 86.05 1859 86.04 1862 86.03 1864 86.02 1866 86.01 1868 86.01 1870 86 1872 85.99 1875 85.98 1877 85.98 1879 85.97 1881 85.96 1883 85.95 1886 85.95 1888 85.94 1890 85.93 1892 85.93 1894 85.92 1896 85.91 1899 85.91 1901 85.9 1903 85.89 1905 85.89 1907 85.88 1909 85.87 1912 85.87 1914 85.86 1916 85.85 1918 85.85 1920 85.84 1922 85.84

Automated CALCULATION SHEET Page: C-10 of C-49 I Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No --1 Date: 12/23/2008 1924 85.83 1927 85.83 1929 85.82 1931 85.81 1933 85.81 1935 85.8 1937 85.8 1940 85.79 1942 85 .79 1944 85.78 1946 85.78 1948 85 .77 1950 85.77 1952 85.76 1954 85.76 1957 85.75 1959 85.75 1961 85.74 1963 85.74 1965 85.73 1967 85.73 1969 85.72 1972 85.72 1974 85 .71 1976 85.71 1978 85.7 1980 85.7 1982 85.7 1984 85.69 1986 85.69 1988 85.68 1991 85.68 1993 85.68 1995 85.67 1997 85.67 1999 85.66 2000 85.66 F max = 200.3 at time = 934.4 seconds.

F min = 84.03 at time = 1.108 seconds.

C.4 PB-PAB-596_T-3 Vapor Temperature for Volume 124 Cell 1 Time F(t) Time F(t) Time F(t) seconds (F) seconds (F) seconds (F) 0 85 le-006 85 0. 1082 85.5 0.2213 85.18 0.329 85.13 0.4416 84.94

0. 5914 84.71 0.7179 84.53 0.871 84.35 1 84.25 1.108 84.33 2.163 86.26 3.277 87.35 4.338 88.72 5.447 90.12 6.922 95.68 8.169 99.58 9.676 103.8 11.5 108.5 12. 55 110.4 13.71 113.5 14.98 115.7 16.38 118.8 17.92 121.2 19.61 124.5 21.47 127.1 23.52 130.4 25.77 133.2 28.25 136.5 30.98 139.5 33.98 142.8 37.28 145.9 40.91 149.3 44.9 152.5 49.29 155.7 54.12 159 59.43 162.3 65.28 165.5 71.24 168.5 76.15 170.7 81. 56 173 87.5 175.2 93.48 177.4 99.05 179.2 100.1 179.5 101.1 179.8 102.1 180.1 103.3 180.5 104.4 180.8 105.9 181.2 107.2 181.6 108.7 182 110.5 182. 5 111.6 182.8 112.7 183.1 114 183.4 115.4 183.8 116.9 184.2 118.6 184.6 120.5 185.1 122.5 185.5 124.8 186.1 127.3 186.6

Cale. No.:

PBNP -994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No [II Date: 12/23/2008 130 187.2 133 187.9 136.3 188.6 139.9 189.3 143.9 190 148.3 190.8 153.1 191.7 158.4 192.6 164.3 193. 5 170.2 194.4 175.9 195.1 181.4 195.9 186.7 196.5 191.9 197.2 197 197.7 201.9 198.3 206 *8 198.8 207. 198.9 209.-2 199. 210.6 199.1 212.1 199.3 213.8 199.4 215.7 199.6 217.7 199.8 220 200 222. 5 200.2 225.2 200.4 228.2 200.7 231.5 201 235.1 201.3' 239.1 201.6 243.2 201.9 247.3 202.2 251.3 2.02.4 255.3 202.7 259.2 202.9 263.1 203.2 266.9 203.4 270.7 203.6 274. 5 203.8 278.3 204.1 282 204.2 285.7 204.4 2&9-.4 204.6 293.1 204.8 296.8 205 300.5 205.1 304-.1 205.3 307.8 205. 5 311.4 205.6 315.1 205.8 318.8 205.9 322.4 206 326.1 206.2 329.8 206.3 333.5 206.4 337.2 206.6 340.9 206.7 344.7 206.8 348.5 206.9 352.3 207 356.1 207.1 360 207.3 363.9 207.4 367.8 207.5 371.8 207.6 375.8 207.7 379.9 207.8 S384 207.9 388.1 208 392.3 208.1 396.6 208.1 400.9 208.2 405.2 208.3 409.7 208.4 414.1 208.5 418.6 208.6 423 .2 208.6 427.8 208.7 432. 5 208.8 437.2 208.9 441.9 208.9 446.8 209 451.6 209.1 456.5 209.1 461.5 209.2 466.5 209.3 471.6 209.3 476.7 209.4 481.9 209.4

.487.1 209.5 492.4 209.5 497.7 209.6 503 209.6 508.5 209.7 513.8 209.7 519.2 209.8 524.5 209.8 529.8 209.9 535 209.9 540.2 209.9 545.4 210 550.5 210 555.6 210 560.7 210.1 565.7 210. 1 570.7 210. 1 575 .7 210.1 580.7 210. 2 585.6 210. 2 590.5 210.2 595.4 210. 2 600.2 210. 3 605.1 210.3 609.9 210. 3 614.6 210.3 619.4 210.3 624.1 210. 3 628.8 210.4 633.5 210.4 638.2 210.4 642.8 210.4 647.4 210.4 652 210.4 656.6 210.4 661.2 210. 5 665.7 210. 5 670.2 210. 5 674.8 210. 5 679.2 210.S5 683 .7 210. 5 688.2 210. 5 692.6 210. 5 697 210. 5 701.4 210. 5 705.8 210.6 710.2 210.6 714-.6 210.6 718.9 210.6 723.2 210. 6 727.5 210.6 731.8 210. 6 736.1 210.6 740.4 210 .6 744.6 210 .6 748.9 210.6 753.1 210.6 757.3 210. 6 761.4 210.6 765.5 210.6

Automated CALCULATION SHEET Page: C-12 of C-49 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No [LI Date: 12/23/2008 769.7 210. 6 773.7 210.6 777.8 210.7 781.8 210. 7 785.8 210.7 789.8 210.7 793.8 212. 2 797.8 213.7 801.7 215.1 805.6 216.3 809.5 217.4 813.4 218.4 817.3 219.3 821.1 220.2 825 221 828.8 221.8 832.6 222.6 836.4 223.3 840.2 224 844 224.6 847.7 225.2 851.4 225.8 855.2 226.4 858.9 226.9 862.6 227.4 866.3 227.9 870 228.4 873.6 228.9 877.3 229.3 880.9 229.7 884.6 230.2 888.2 229.3 891.8 228.4 895.4 227. 6 899 226.8 902.6 226.1 906.1 225.5 909.7 224.9 913.3 224.3 916.8 223.8 920.3 223.4 923.9 223 927.4 222.6 930.9 222.2 934.4 221.9 937.8 221.6 941.3 221.4 944.8 221.1 948.2 220.9 951.7 220.7 955.1 220.5 958.6 220.3 962 220.1 965.4 220 968.8 219.8 972.2 219.6 975.6 219.5 979 219.3 982.3 219.2 985.7 219 989 218.9 992.4 218.7 995.7 218.6 999.1 218.4 1002 218.3 1006 218.2 1009 218 1012 217.9 1016 217.8 1019 217.6 1022 217.5 1025 217.4 1029 217.2 1032 217.1 1035 217 1038 216.9 1042 216.8 1045 216.7 1048 216.5 1051 216.4 1055 216.3 1058 216.2 1061 216.1 1064 216 1067 215.9 1070 215.8 1074 215.7 1077 215.7 1080 215.6 1083 215.5 1086 215.4 1089 215.3 1092 215.2 1096 215.1 1099 215.1 1102 215 1105 214. 9 1108 214.8 1111 214.7 1114 214. 7 1117 214.6 1120 214.5 1123 214. 5 1126 214.4 1130 214.3 1133 214. 3 1136 214.2 1139 214.1 1142 214. 1 1145 214 1148 214 1151 213.9 1154 213.9 1157 213.8 1160 213.8 1163 213.7 1166 213.7 1169 213.6 1172 213.6 1175 213.5 1178 213.5 1181 213.4 1183 213.4 1186 213.3 1189 213.3 1192 213.3 1195 213.2 1198 213.2 1201 213.1 1204 213.1 1207 213.1 1210 213 1213 213 1216 212.9 1219 212.9 1221 212.9 1224 212.8 1227 212.8 1230 212.8 1233 212. 7 1236 212.7 1239 212.7 1241 212.7 1244 212.6 1247 212.6 1250 212.6 1253 212.5 1256 212.5 1258 212.5 1261 212.5

of C-49 L Automated CALCULATION SHEET Page: C-13 Cale. No.:

Z /w Engineering Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELD Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No DI Date: 12/23/2008 1264 212.4 1267 212.4 1270 212.4 1273 212.4 1275 212.3 1278 212.3 1281 212. 3 1284 212.3 1286 212 .2 1289 212 .2 1292 212.2 1295 212.2 1298 212 .2 1300 212.1 1303 212.1 1306 212.1 1309 212.1 1311 212.1 1314 212 1317 212 1320 212 1322 212 1325 212 1328 211.9 1330 211.9 1333 211.9 1336 211.9 1339 211.9 -1341 211.9 1344 211.8 1347 211.8 1349 211.8 1352 211.8 1355 211.8 1357 211.8 1360 211.8 1363 211.7 1365 211.7 1368 211.7 1371 211.7 1373 211.7 1376 211.7 1379 211.7 1381 2.11.-7 1384 211.6 1387 211.6 1389 211.6 1:392 211.6 1394 211.6 1397 211.6 1400 211.6 1402 211.5 1405 211. 5 1407 211.5 1410 211.5 1413 211. 5 1415 211.5 1418 211.5 1420 211. 5 1423 211.5 1426 211.4 1428 211.4 1431 211.4 1433 211.4 1436 211.4 1438 211.4 1441 211.4 1444 211.4 1446 211.4 1449 211.3 1451 211.3 1454 211.3 1456 211.3 1459 211.3 1461 211.3 1464 211.3 1466 211.3 1469 211.3 1471 211.2 1474 211.2 1477 211.2 1479 211.2 1482 211.2 1484 211.2 1487 211.2 1489 211.2 1492 211.2 1494 211.2 1497 211.1 1499 211.1 1502 211.1 1504 211.1 1506 211.1 1509 211.1 1511 211.1 1514 211.1 1516 211.1 1519 211.1 1521 211.1 1524 211 1526 211 1529 211 1531 211 1534 211 1536 211 1538 211 1541 211 1543 211 1546 211 1548 211 1551 211 1553 210.9 1555 210.9 1558 210.9 1560 210. 9 1563 210. 9 1565 210.9 1568 210. 9 1570 210. 9 1572 210.9 1575 210. 9 1577 210. 9 1580 210.9 1582 210.9 1584 210.8 1587 210.8 1589 210. 8 1592 210.8 1594 210.8 1596 210 .8 1599 210.8 1601 210.8 1604 210. 8 1606 210.8 1608 210.8 1611 210. 8 1613 210.8 1615 210.8 1618 210. 7 1620 210.7 1623 210. 7 1625 210. 7 1627 210. 7 1630 210.7 1632 210.7 1634 210. 7 1637 210.7 1639 210. 7 1641 210. 7 1644 210.7

Automated CALCULATION SHEET Page: C-14 of C-49 Engineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

1-ELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No 0ii Date: 12/23/2008 1646 210. 7 1648 210.7 1651 210. 7 1653 210.6 1655 210. 6 1658 210. 6 1660 210. 6 1662 210. 6 1665 210. 6 1667 210. 6 1669 210.6 1672 210. 6 1674 210.6 1676 210. 6 1679 210.6 1681 210.6 1683 210. 6 1686 210.6 1688 210.6 1690 210. 6 1693 210.6 1695 210. 5 1697 210. 5 1700 210. 5 1702 210. 5 1704 210. 5 1707 210. 5 1709 210. 5 1711 210.5 1713 210. 5 1716 210. 5 1718 210.5 1720 210. 5 1723 210.5 1725 210.5 1727 210. 5 1729 210. 5 1732 210.5 1734 210. 5 1736 210. 5 1739 210.4 1741 210.4 1743 210.4 1745 210-.4 1748 210.4 1750 210.4 1752 210 .4 1754 210.4 1757 210.4 1759 210 .4 1761 210.4 1764 210.4 1766 210.4 1768 210.4 1770 210.4 1773 210.4 1775 210.4 1777 210.4 1779 210.4 1782 210.4 1784 210.4 1786 210.4 1788 210. 3 1791 210. 3 1793 210. 3 1795 210. 3 1797 210. 3 1800 210. 3 1802 210. 3 1804 210. 3 1806 210. 3 1808 210. 3 1811 210. 3 1813 210. 3 1815 210.3 1817 210. 3 1820 210.3 1822 210. 3 1824 210. 3 1826 210. 3 1828 210.3 1831 210 '3 1833 210.3 1835 210.3 1837 210. 3 1840 210.3 1842 210.3 1844 210. 3 1846 210. 2 1848 210.2 1851 210. 2 1853 210. 2 1855 210 .2 1857 210. 2 1859 210. 2 1862 210.2 1864 210. 2 1866 210. 2 1868 210. 2 1870 210. 2 1873 210.2 1875 210. 2 1877 210. 2 1879 210.2 1881 210.2 1884 210. 2 1886 210.2 1888 210.2 1890 210 .2 1892 210.2 1894 210.2 1897 210. 2 1899 210.2 1901 210. 2 1903 210. 2 1905 210.2 1907 210.2 1910 210. 2 1912 210 .2 1914 210. 1 1916 210. 1 1918 210. 1 1920 210. 1 1923 210. 1 1925 210. 1 1927 210.1 1929 210. 1 1931 210. 1 1933 210. 1 1936 210. 1 1938 210. 1 1940 210. 1 1942 210. 1 1944 210. 1 1946 210. 1 1948 210. 1 1951 210. 1 1953 210. 1 1955 210. 1 1957 210.1 1959 210. 1 1961 210. 1 1963 210.1 1966 210. 1 1968 210. 1 1970 210. 1 1972 210. 1 1974 210. 1 1976 210.1 1978 210.1

Automated CALCULATION SHEET Page: C-15 of C-49 Engineering Calc. No.:

Services Corp.

PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes 51 No - Date: 12/23/2008 1981 210.1 1983 210.1 1985 210.1 1987 210.1 1989 210.1 1991 210.1 1993 210.1 1995 210 1998 210 2000 210 2000 210 F max = 230.2 at time = 884.6 seconds.

F min = 84.25 at time = 1 seconds.

C.5 PB-PAB-301_T-1 Vapor Temperature for Volume 134 Cell 1 Time F(t) Time F(t) Time F(t) seconds (F) seconds (F) seconds (F) 0 85 le-006 85 0. 1082 84.94 0.2213 84.85 0.329 84.85 0.4416 84.91

0. 5914 84.94 0.7179 84.92 0.871 84.9 1 84.9 1.108 86.03 2.116 98.43 3.213 102.5 4.326 112.1 5.511 121.1 6.749 128.2 7.795 133.2 9.06 138.7 10.59 144.4 12.44 150 13.51 152.8 14.68 155.7 15.98 158.5 17.4 162.1 18.96 168.1 20.68 174.2 22.57 180.4 24.65 186.5 26.93 192.4 29.33 197.9 31.39 202.1 33.21 205. 5 34.85 208.4 36.36 209.1 37.77 210.3 39.15 211.3 40.42 212.2 41.64 212.9 42.8 213.6 43.92 214.3 44.99 214. 9 46.03 215.5 47.04 216.1 48.99 217.2 50.87 218.2 52.69 219.3 54.45 220.5 56.18 221.7 57.86 223 59.5 224.3 61.12 225.5 62.71 226.7 64.28 227.8 65.83 228.7 67.36 229.6 68.88 230.3 70.38 230.8 71.88 231.1 73.37 231.1 74.85 230.9 76.33 230.6 77.8 230 79.27 229.5 80.73 228.9 82.18 228.3 83.63 227.8 85.07 227.2 86.51 226.6 87.94 226.1 89.36 225.5 90.78 224.9 92.2 224.4 93.61 223.8 95.02 223.2 96.43 222.7 97.84 222.1 99.25 221.6 100.3 221.2 101.3 220.8 102.5 220.3 103.7 219.9 104.9 219.4 105.9 219 107.2 218.5 108.6 218 110 217.5 111.4 217

{Automated Engineering CALCULATION SHEET Page: C-16 Cale. No.:

of C-49 Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El-No LI Date: 12/23/2008 112.9 216.4 114.3 215.9 115 .7 215.4 117.1 214. 9 118.5 214.4 120 213.9 121.4 213.4 122.8 212.9 124.2 212.4 125.7 211.9 127.1 211.4 128.5 211 130 210. 5 131.4 210 132.9 209.5 134.3 209.1 135.7 208.6 137.2 208.1 138.6 207.7 140.1 207.2 141.5 206.8 143 206.3 144.4 205.9 145 .9 205.4 147.4 205 148.8 204.6 150.3 204.1 151.7 203.7 153.2 203.3 154.7 202.8 156.2 202.4 157.6 202 159.1 201.6 160.6 201.2 162.1 200.8 163 .5 200.3 165 199.9 166.5 199.5 168 199.1 169.5 198.7 171 198.3 172 .5 197.9 174 197.6 175. 5 197.2 177 196.8 178.5 196.4 180 196 181.5 195.6 183 195.3 184.5 194.9 186 194.5 187.5 194.1 189.1 193.8 190.6 193.4 192 .1 193.6 192 .7 195.2 192.3 196.7 192 198.2 191.6 199.7 191.3 201.3 190.9 202.8 190.6 204.4 190.2 205.9 189.9 207.4 189.5 209 189.2 210. 5 188.8 212.1 188.5 213.6 188.2 215.2 187.8 216.8 187.5 218.3 187.2 219.9 186.8 221.4 186.5 223 186.2 224.6 185.8 226.1 185. 5 227.7 185.2 229.3 184.9 230.9 184.6 232.4 184.2 234 183.9 235.6 183.6 237.2 183.3 238.8 183 240.4 182 .7 242 182.4 243.6 182 .1 245.2 181.7 246.8 181.4 248.4 181.1 250 180.8 251.6 180.5 253.2 180.2 254.8 179.9 256.4 179.6 258 179.4 259.6 179.1 261.2 178.8 262.9 178.5 264.5 178.2 266.1 177.9 267.7 177.6 269.4 177.3 271 177 272.6 176.8 274.3 176.5 275.9 176.2 277.5 175.9 279.2 175.6 280.8 175.4 282.5 175.1 284.1 174.8 285.8 174.5 287.4 174.3 289.1 174 290.8 173.7 292.4 173.4 294.1 173.2 295 .7 172.9 297.4 172.6 299.1 172.4 300.8 172.1 302.4 171.8 304.1 171.6 305.8 171.3 307.5 171.1 309.2 170.8 310 .8 170.5 312.5 170.3 314. 2 170 315.9 169.8 317.6 169.5 319.3 169.3 321 169 322.7 168.8 324.4 168.5 326.1 168.3 327.8 168.3 329.5 168.2 331.2 168.1 332.9 168.1 334.6 168 336.3 167.8 338 167.7 339.7 167.6 341.4 167.4 343.1 167.3 344.9 167.2 346.6 167.1

Automated CALCULATION SHEET Page: C-17 of C-49 z ,Engineering Caic. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No F-1 Date: .12/23/2008 348.3 167 350 166.9 351.8 166.7 353.5 166.6 355.2 166.5 357 166.4 358.7 166.3 360.5 166.1 362.2 166 364 165.9 365.7 165.8 165.6 369.2 165.4 370.9 165.3 372.7 165.2 374.4 165.2 376.1 165.2 377.8 165.1 379.5 165 381.3 165 383 164.9 384.8 164.8 386.5 164.7 388.3 164.6 390.1 164.5 391.9 164.4 393.6 164.3 395.4 164.2 397.2 164.2 399 164.1 400.8 164 402.5 163.9 404.3 163.8 406.1 163 .7 407.9 163 .7 409.7 163.6 411. 5 163. 5 413.3 163.4 415 .1 163.3 416.9 163.2 418.7 163 .2 420.5 163.1 422 .3 163 424.1 162.9 425- 162.8 4-2-7.7 162.7 429.6 162 .7 431.4 162.6 433.2 162.5 435 162.4 436.8 162.3 438.6 162.3 440.5 162.2 442 .3 162 .1 444.1 162 445.9 161.9 447.8 161.9 449.6 161.8 451.4 161.7 453.3 161.6 455.1 161.5 456.9 161. 5 458.8 161.4 460.6 161.3 462. 5 161.2 464.3 161.2 466.2 161.1 468 161 469.9 160.9 471.7 160.9 473.6 160.8 475.4 160.7 477.3 160.6 479.1 160.6 481 160.5 482.8 160.4 484.7 160.3 486.5 160.3 488.4 160.2 490.3 160.1 492 .1 160 494 160 495.9 159.9 497.7 159.8 499.6 159.8 501.4 159.7 503 .3 159.6 505.2 159.6 507 159.5 508.9 159.4 510.8 159.3 512.6 159.3 514. 5 159.2 516.4 159.1 518.2 159.1 520.1 159 521.9 158.9 523.8 158.9 525.7 158.8 527.5 158.7 529.4 158.7 531.3 158.6 533.1 158.6 535 158.5 536.9 158.4 538.7 158.4 540.6 158.3 542 .5 158.2 544.3 158.2 546.2 158.1 548.1 158 549.9 158 551.8 157.9 553.7 157.9 555.5 157.8 557.4 157.7 559.3 157.7 561.1 157.6 563 157.6 564.9 157.5 566.7 157.4 568.6 157.4 570.5 157.3 572.3 157.3 574.2 157.2 576.1 157.1 577.9 157.1 579.8 157 581.6 157 583.5 156.9 585.4 156.9 587.2 156.8 589.1 156.8 591 156.7 592.8 156.6 594.7 156.6 596.6 156.5 598.4 156.5 600.3 156.4 602.2 156.4 604 156.2 605.9 156 607.7 155.8 609.5 155.6 611.4 155.3 613.2 155.1 615 154.9 616.9 154.7 618.7 154.5 620.6 154.2

AutmaedCALCULATION SHEET Pae -8Of C-49 j/x Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

H4ELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D- Date: 12/23/2008 622.4 154 624.3 153.8 626.1 153.6 628 153.4 629.8 153.2 631.7 153 633.6 152.8 635.4 152.6 637.3 152.4 639.2 152.2 641 152 642.9 151.8 644.8 151.6 646.6 151.4 648.5 151.2 650.4 151 652.2 150 *8 654.1 150.6 656 150.4 657.9 150.2 659.7 150 661.6 149.8 663. 5 149.6 665.3 149.5 667.2 149.3 669.1 149.1 670.9 148.9 672.8 148.7 674.7 148.5 676.5 148.4 678.4 148.2 680.3 148 682.2 147.8 684 147.6 685-.9 147-5 687.8 147.3 689.6 147.1 691.5 146.9 693.4 146.8 695.2 146.6 697.1 146.4 699 146.3 700.9 146.1 702.7 145 .9 704.6 145 .8 706. 14-5 .6 708.3 145 .4 710.2 145. 3 712 .1 145 .1 713.9 144.9 715.8 144.8 717.7 144.6 719.6 144.5 721.4 144.3 723 .3 144.1 725.2 144 727 143.8 728.9 143.7 730.8 143. 5 732.6 143.4 734.5 143.2 736.4 143.1 738.3 142.9 740.1 142 .7 742 142.6 743.9 142.4 745.7 142 .3 747.6 142.1 749.5 142 751.3 141.9 753.2 141.8 755 141.7 756.8 141.7 758.6 141.6 760.4 141.5 762.2 141.4 764 141. 3 765.7 141.2 767.5 141.1 769.3 141 771 140.9 772.8 140.8 774.6 140.7 776.4 140.6 778.2 140.5 780 140.5 781.7 140.4 783. 5 140.3 785 .3 140.2 787.1 140.1 788.9 140 790.7 139.9 792. 5 139.8 794.3 139.7 796.1 .139.6 797.9 139.5 799.7 139.4 801. 5 139.4 803 .3 139.3 805.2 139.2 807 139.1 808.8 139 810.6 138.9 812.4 138.8 814.2 138.7 816 138.6 817.9 138.5 819.7 138.4 821.5 138.4 823.3 138.3 825.2 138.2 827 138.1 828.8 138 830.7 137.9 832.5 137.8 834.3 137.7 836.2 137.6 838 137.5 839.8 137.5 841.7 137.4 843.5 137.3 845.4 137.2 847.2 137.1 849.1 137 850.9 136.9 852.8 136.8 854.6 136.7 856.5 136.6 858.3 136.6 860.2 136.5 862 136.4 863.9 136.3 865.7 136.2 867.6 136.1 869.4 136 871.3 135.9 873.1 135.9 875 135.8 876.8 135.7 878.7 135.6 880.5 135.5 882.4 135.4 884.2 135.3 886.1 135.2 887.9 135.2 889.8 135.1 891.6 135 893.5 134.9 895.3 134.8 897.2 134.7

Automated CALCULATION SHEET Page: C-i19 of C-49 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No -II Date: 12/23/2008 899 134.6 900.9 134.6 902.7 134.5 904.6 134.4 906.5 134.3 908.3 134.2 910.2 134.1 912 134 913.9 134 915.8 133.9 917.6 133.8 919.5 133.7 921.4 133.6 923.2 133.5 .925.1 133.4 926.9 133.4 928.8 133.3 930.6 133.2 932.5 133.1 934.3 133 936.1 132.9 938 132.9 939.8 132.8 941.6 132.7 943.5 132.6 945.3 132.5 947.1 132.5 948.9 132.4 950.8 132.3 952.6 132.2 954.4 132.1 956.2 132.1 958 132 959-.8 131.9 961.6 131.8 963.5 131.7 965.3 131.7 967.1 131.6 968.9 131. 5 970.6 131.4 972.4 131.3 974.2 131.3 976 131.2 977.8 131.1 979.6 131 981.4 131 983. 1 130.9 984.9 130.8 986.7 130.7 988.5 130.7 990.2 130.6 992 130.5 993.8 130.4 995.6 130.4 997.3 130.3 999.1 130.2 1000 130.2 F max = 231.1 at time= 73.37 seconds.

F min = 84.85 at time = 0.329 seconds.

C.6 PB-PAB-301_T-1-s3 Vapor Temperature for Volume 134 Cell 1 Time F(t) Time F(t) Time F(t) seconds (F) seconds (F) seconds (F) 0 85 le-006 85 0. 1082 84.94 0.2213 84.85 0.329 84.85 0.4416 84.91 0.5914 84.94 0.7179 84.92 0.871 84.9 1 84.9 1.108 86.03 2. 116 98.43 3.213 102.5 4.326 112.1 5.511 121.1 6.749 128.2 7.795 133.2 9.06 138.7 10.59 144.4 12.44 150 13.51 152.8 14.68 155.7 15.98 158.6 17.4 162.1 18.96 168.1 20.68 174.2 22.57 180.4 24.65 186.5 26.93 192.4 29.33 198 31.39 202.3 33.21 205.8 34.85 208.7 36.36 209.6 37.77 210.9 39.15 212.1 40.42 213.1 41.63 214 42.8 214.9 43.91 215.7 44.98 216.5 46.02 217.2

Automated CALCULATION SHEET Page: C-20 of C-49 1 Engineering Calc. No.:

Services Corp. PBN P-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes No 1 Date: 12/23/2008 47.03 218 48.98 219.4 50.85 220.7 52.66 222 54.42 223.3 56.14 224.5 57.82 225.6 59.47 226.7 61.09 227.8 62.69 228.9 64.28 229.9 65.84 230.9 67.39 231.9 68.92 232.8 70.44 233.7 71.95 234.6 73.45 235.4 74.94 236.2 76.43 237 77.91 237.7 79.38 238.4 80.84 239.1 82.3 239.8 83.76 240.4 85.22 241 86.67 241.5 88.12 242 89.56 242.5 91.01 243 92.45 243.4 93.89 243.7 95.33 244 96.77 244.3 98.21 244.5 99.65 244.7 100.7 244.8 101.7 244.9 102.8 244.9 104 245 105.4 245 106.5 245 107.9 245 109.3 245 110.7 245 112.2 244.9 113.6 24-4-. 9 115 244.8 116.4 244.7 117.9 244.6 119.3 244.5 120.7 244.4 122.1 244.3 123.5 244.2 124.9 244.1 126.4 243.9 127.8 243.8 129.2 243.7 130.6 243.5 132 243.4 133.4 243. 3 134.8 243.2 136.2 243 137.6 242.9 139 242.8 140.4 242.6 141.8 242. 5 143.2 242.4 144.6 242.3 146 242.1 147.4 242 148.8 241.9 150.2 241.8 151.6 241.7 153 241.5 154.4 241.4 155.8 241.3 157.2 241.2 158.6 241.1 160 241 161.4 240.9 162.8 240.8 164.2 240.7 165.6 240.6 167 240.5 168.5 240.4 169.9 240.3 171.3 240.2 172.7 240.1 174.1 240 175.5 240 176.9 239.9 178.3 239.8 179.8 239.7 181.2 239.6 182.6 239.6 184 239.5 185.4 239.4 186.9 239.3 188.3 239.3 189.7 239.2 191.1 239.1 192.5 239 194 239 195.4 238.9 196.8 238.8 198.3 238.8 199.7 238.7 200 238.7 F max = 245 at time = 107.9 seconds.

F min = 84.85 at time = 0.329 seconds.

C.7 PB-PAB-301_T-2 Vapor Temperature for Volume 133 Cell 1

C-21 I of C-49 Calc. No.:

PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No El Date: 12/23/2008 Time F(t) Time F(t) Time F(t) seconds (F) seconds (F) seconds (F) 0 85 le-006 85 0. 1082 85.11 0.2213 85.29 0.329 85.29 0.4416 85.18 0.5914 85.11 0. 7179 85.15 0.871 85.2 1 85.19 1.108 85.33 2.163 86.88 3.277 88.56 4.338 90.12 5.447 91.73 6.922 93.83 8.169 95.56 9.676 97.59 11.5 99.99 12.55 101.3 13.71 102.8 14.8 100.7 15.93 101.4 17.01 104.6 18,13 105.9 19.63 106.9 20.9 108.7 22.43 110.7 24.28 112.8 25.35 114.1 26,52 115.3 27.81 116.7 29.23 118.1 30.8 119.7 32.51 121.2 34.4 123 36A48 124.7 38.77 126.6 41.29 128.5 44,06 130.5 47.1 132.7 50.45 134.9 54.13 137.3 58.19 139.7 62.65 142.3 67.55 144.9 72.94 147.7 78.88 150.5 85.4 153.3 92.58 156.2 100 160.2 101.1 160.8 102.1 161.3 103.3 162 104.4 162.6 105.9 163.4 107.2 164 108.7 164.8 110.5 165.8 111.6 166.3 112.7 166.9 114 167.5 115.4 168.2 116.9 169 118.6 169.8 120.5 170.7 122.5 171.7 124.8 172.7 127.3 173.9 130 175.1 133 176.4 136.3 177.8 139.9 179.3 143.9 180.9 148.3 182.6 153.1 184.4 158.4 186.3 164.3 188.6 170.1 190.9 175.8 193.1 181.3 195 186.6 196.8 191.8 198.5 196.9 200 201.8 201.5 206.6 202.8 211.3 204 215.9 205.2 220.4 206.4 224.9 207.5 229.2 208.6 233.5 209.6 237.7 210.6 241.8 211.5 245.9 212.4 250 213.2 253.9 214.1 257.9 214.8 261.8 215.6 265.6 216.4 269.5 217.2 273.3 217.9 277.1 218.7 280.8 219.4 284.5 220.2 288.3 220.9 292 221.6 295.7 222.3 299.4 223 303 223.7 306.1 224.3 308.3 224.7 310.1 225.1 311.7 225.3 313.2 225.6 314.5 225.9 315.8 226.1 317 226.3 318.2 226.5 319.3 226.8 320.5 227 321.6 227.2 322.6 227.3 323.7 227.5 324.8 227.7 325.8 227.9 326.9 228.1 327.9 228.3 328.9 228.5 330 228.6 331 228.8 332 229 333 229.2 334 229.4 335.1 229.5 336.1 229.7 337.1 229.9 338.1 230.1

Automated CALCULATION SHEET Page: C-22 ofC-4 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prep ared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D- Date: 12/23/2008 339.1 230.2 340.1 230.4 341.1 230.6 342.2 230.8 343.2 230.9 344.2 231.1 345.2 231.3 346.2 231.4 347.3 231.6 348.3 231.8 .349.3 232 350.3 232.1 351.4 232.3 352.4 232.5 353.5 232.6 354.5 232.8 355.5 233 356.6 233.2 357.6 233.3 358.7 233.5 359.8 233.7 360.8 233.8 361.9 234 362.9 234.2 364 234.4 365.1 234.5 366.2 234.7 367.2 234.9 368.3 235.1 369.4 235.2 370.5 235.4 371.5 235.6 372.6 235.7 373.7 23S-. 9 374-. 8 236.1 375.9 236.3 377 236.4 378 236.6 379.1 236.8 380.2 236.9 381.3 237.1 382.4 237.3 383. 5 237.5 384.6 237.6 385.6 237.8

-386.7 238 387 .8 238.1 388.9 238.3 390 238.5 391 238.6 392.1 238.8 393.2 238.9 394.2 239.1 395.3 239.2 396.4 239.4 397.4 239.6 398.5 239.7 399.5 239.8 400.6 240 401.6 240.1 402.6 240.3 403.7 240.4 404.7 240.5 405.7 240.7 406.7 240.8 407.8 240.9 408.8 241 409.8 241.1 411.8 241.4 413 .7 241.6 415 .7 241.7 417.6 241.9 419.5 242.1 421.4 242.2 423.2 242 .3 425.1 242.4 426.9 242. 5 428.7 242.6 430.4 242.7 432.2 242 .7 433.9 242.8 435.7 242.8 437.4 242.8 439.1 242.8 440.8 242.8 442.4 242.8 444.1 242.8 445.8 242.8 447.4 242.8 449.1 242.7 450.7 242.7 452.3 242.7 454 242.6 455.6 242.5 457.2 242.5 458.8 242.4 460.4 242.4 462 242.3 463.6 242.3 465.2 242.2 466.7 242.1 468.3 242 .1 469.9 242 471.4 242 473 241.9 474.5 241.9 476.1 241.8 477.6 241.8 479.2 241.7 480.7 241.6 482.2 241.6 483.7 241.6 485.3 241.5 486.8 241. 5 488.3 241.4 489.8 241.4 491.3 241.3 492.8 241.3 494.3 241.3 495.8 241.2 497.2 241.2 498.7 241.1 500.2 241.1 501.7 241.1 503.1 241 504.6 241 506.1 241 507.5 240.9 509 240.9 510.4 240.9 511.9 240.9 513 .3 240.8 514. 8 240.8 516.2 240.8 517.7 240.8 519.1 240.7 520.5 240.7 522 240.7 523.4 240.7 524.8 240.7 526.3 240.7 527.7 240.7 529.1 240.7 530.5 240.6 531.9 240.6 533.4 240.6 534.8 240.6 536.2 240.6 537.6 240.6 539 240.6

Automated CALCULATION SHEET Page: C-23 of C-49

,1 Engineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [El No EL] Date: 12/23/2008 540.4 240.6 541.9 240.6 543 .3 240.6 544.7 240.6 546.1 240.6 547.5 240.6 548.9 240.6 550.3 240.6 551.8 240.6 553.2 240.6 554.6 240.7 556 240.7 557.4 240.7 558.8 240. 7 560.3 240.7 561.7 240.7 563.1 240.7 564.5 240.7 565.9 240.7 567.3 240.8 568.8 240.8 570.2 240.8 571.6 240.8 573 240.8 574.4 240.8 575.9 240.8 577.3 240.9 578.7 240.9 580.1 240.9 581.6 240.9 583 240.9 584.4 240.9 585.9 241 587.3 241 588..7 241 590.2 241 591.6 241 593 241.1 594.5 241.1 595.9 241.1 597.3 241.1 598.8 241.1 600.2 241.2 601.7 241.2 603.1 241.2 604.6 241.2 606 241.2 607.4 241.2 608.9 241.2 610.3 241.2 611.8 241.2 613.2 241.1 614.7 241.1 616.1 241 617.5 240.9 619 240.8 620.5 240.7 622 240.6 623.5 240.5 624.9 240.4 626.4 240.2 627.9 240.1 629.3 239.9 630.8 239.8 632.2 239.6 633.6 239.4 635 239.2 636.4 239.1 637.8 238.9 639.2 238.7 640.6 238.5 642 238.3 643.4 238.1 644.8 237.9 646.2 237.7 647.6 237.6 649 237.4 650.3 237.2 651.7 237 653.1 236.8 654.5 236.5 655.8 236.3 657.2 236.1 658.6 235.9 659.9 235.7 661.3 235.4 662 .7 235.2 664 234.9 665.4 234.7 666.7 234.5 668.1 234.2 669.4 234 670.8 233.8 672 .2 233.6 673. 5 233.4 674.9 233.2 676.2 233 677.6 232.7 679 232.5 680.3 232.3 681.7 232.1 683 231.9 684.4 231.7 685.8 231.5 687.1 231.4 688.5 231.2 689.9 231 691.3 230.8 692.6 230.6 694 230.4 695.4 230.2 696.7 230.1 698.1 229.9 699.5 229.7 700.9 229.5 702 .3 229.4 703.6 229.2 705 229 706.4 228.8 707.8 228.7 709.2 228.5 710.6 228.3 712 228.2 713.4 228 714.8 227.9 716.2 227.7 717.5 227.5 718.9 227.4 720.3 227.2 721.7 227.1 723.2 226.9 724.6 226.7 726 226.6 727.4 226.4 728.8 226.3 730.2 226.1 731.6 226 733 225.8 734.4 225.7 735.9 225. 5 737.3 225.4 738.7 225.2 740.1 225.1 741.5 225 743 224.8 744.4 224.7 745.8 224.5 747.2 224.4 748.7 224.2 750.1 224.1

Automated CALCULATION SHEET Page: C-24 oC-9 jAA Engineering Caic. No.:

Services Corp. PBN P-994-2 1-1.3 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

1-ELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes Wý No [II Date: 1.2/23/2008 751. 5 224 753 223.8 754.4 223.7 755.9 223.6 757.3 223.4 758.7 223.3 760.2 223.1 761.6 223 763.1 222.9 764.5 222.7 766 222.6 767.4 222.5 768.9 222.3 770.3 222.2 771.8 222.1 773.2 221.9 774.7 221.8 776.2 221.7 777.6 221.6 779.1 221.4 780.5 221.3 782 221.2 783.5 221 784.9 220.9 786.4 220.8 787.8 220.7 789.3 220.5 790.8 220.4 792.2 220.3 793.7 220.2 795.1 220.1 796.6 219.9 798.1 219.8 799.5 219.7 801 219.6 802.. 5 219-.4 803.9 219.3 805.4 219.2 806.9 219.1 808.3 219 809.8 218.9 811.2 218.7 812.7 218.6 814.2 218.5 815.6 218.4 817.1 218.3 818.6& 218. 2 820 218 821.5 217.9 823 217.8 824.4 217.7 825.9 217.6 827.4 217.5 828.8 217.4 830.3 217.3 831.8 217.1 833 .3 217 834.7 216.9 836.2 216.8 837.7 216.7 839.1 216.6 840.6 216.5 842.1 216.4 843.5 216. 3 845 216.2 846.5 216.1 847.9 215.9 849.4 215.8 850.9 215.7 852.3 215.6 853.8 215. 5 855.3 215.4 856.8 215. 3 858.2 215.2 859.7 215.1 861.2 215 862.6 214.9 864.1 214.8 865.6 214. 7 867.1 214.6 868.5 214. 5 870 214.4 871. 5 214. 3 872.9 214.2 874.4 214. 1 875.9 214 877.4 213.9 878.8 213.8 880.3 213.7 881.8 213.6 883. 3 213. 5 884.7 213.4 886.2 213. 3 887.7 213.2 889.2 213.1 890.6 213 892 .1 212.9 893.6 212.8 895 212 .7 896.5 212.6 898 212. 5 899.5 212.4 900.9 212 .3 902.4 212.2 903.9 212.1 905.4 212 906.9 211.9 908.3 211.8 909.8 211.8 911.3 211.7 912.8 211.6 914.2 211.5 915 .7 211.4 917.2 211.3 918.7 211.2 920.1 211.1 921.6 211 923.1 210. 9 924.6 210.8 926 210.7 927.5 210. 7 929 210.6 930.5 210. 5 932 210.4 933.4 210. 3 934.9 210. 2 936.4 210. 1 937.9 210 939.3 209.9 940.8 209.9 942.3 209.8 943.8 209.7 945.3 209.6 946.7 209.5 948.2 209.4 949.7 209.3 951.2 209.2 952.7 209.2 954.1 209.1 955.6 209 957.1 208.9 958.6 208.8 960.1 208.7 961.5 208.6 963 208.6 964.5 208.5 966 208.4 967.5 208.3 968.9 208.2 970.4 208.1

IAutomated Engineering Services Corp.

CALCULATION SHEET Page: C-25 Caic. No.:

of C-49 PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No Eli Date: 12/23/2008 971.9 208.1 973.4 208 974.9 207.9 976.4 207.8 977.8 207.7 979.3 207.6 980.8 207.6 982 .3 207.5 983.8 207.4 985.3 207.3 986.7 207.2 988.2 207.2 989.7 207.1 991.2 207 992.7 206.9 994.1 206.8 995.6 206.8 997.1 206.7 998.6 206.6 1000 206.5 1002 206.5 1003 206.4 1005 206.3 1006 206.2 1008 206.1 1009 206.1 1010 206 1012 205.9 1013 205.8 1015 205.8 1016 205.7 1018 205.6 1019 205. 5 1021 205.4 1022 20-5.4 1024 205.3 1025 205.2 1027 205.1 1028 205.1 1030 205 1031 204.9 1033 204.8 1034 204.8 1036 204.7 1037 204.6 1039 204.6 1040- 204.5 1042 204.4 1043 204.3 1045 204.3 1046 204.2 1048 204.1 1049 204 1051 204 1052 203.9 1054 203.8 1055 203.8 1057 203 .7 1058 203.6 1060 203. 5 1061 203. 5 1063 203.4 1064 203.3 1066 203 .3 1067 203.2 1069 203.1 1070 203.1 1071 203 1073 202.9 1074 202.8 1076 202.8 1077 202 .7 1079 202.6 1080 202.6 1082 202. 5 1083 202.4 1085 202.4 1086 202 .3 1088 202 .2 1089 202.2 1091 202.1 1092 202 1094 202 1095 201.9 1097 201.8 1098 201.8 1100 201.7 1101 201.6 1103 201.6 1104 201. 5 1106 201.4 1107 201.4 1109 201.3 1110 201.2 1112 201.2 1113 201.1 1115 201 1116 201 1118 200.9 1119 200.9 1121 200.8 1122 200.7 1124 200.7 1125 200.6 1127 200.5 1128 200.5 1130 200.4 1131 200.3 1133 200.3 1134 200.2 1136 200.2 1137 200.1 1139 200 1140 200 1142 199.9 1143 199.8 1145 199.8 1146 199.7 1148 199.7 1149 199.6 1151 199.5 1152 199.5 1154 199.4 1155 199.4 1157 199.3 1158 199.2 1160 199.2 1161, 199.1 1163 199.1 1164 199 1166 198.9 1167 198.9 1169 198.8 1170 198.8 1172 198.7 1173 198.6 1175 198.6 1176 198.5 1178 198.5 1179 198.4 1181 198.4 1182 198.3 1183 198.2 1185 198.2 1186 198.1 1188 198.1 1189 198 1191 198 1192 197.9 1194 197.8

Automated CALCULATION SHEET Page: C-26 of C-49 Engineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related IYes [1 No F-1 Date: 12/23/2008 1195 197.8 1197 197.7 1198 197.7 1200 197.6 1201 197.6 1203 197.5 1204 197.4 1206 197.4 1207 197.3 1209 197.3 1210 197.2 1212 197.2 1213 197.1 1215. 197.1 1217 197 1218 196.9 1220 196.9 1222 196.8 1224 196.7 1226 196.6 1227 196.6 1228 196.6 1229 196.5 1230 196.5 1231 196.4 1233 196.4 1234 196.4 1235 196.3 1236 196.3 1238 196.2 1240 196.2 1241 196.1 1243 196 1245 196 1247 195.9 1248 195.8 1250 195.8 1252 195.7 1253 195.7 1255 195.6 1256 195.6 1258 195.5 1260 195.4 1261 195.4 1263 195. 3 1264 195.3 1266 19S:. 2 1268 195.2 1269 195.1 1271 195 1273 195 1274 194.9 1276 194.9 1278 194.8 1279 194.8 1281 194.7 1283 194.6 1284 194.6 1286 194.5 1288 194.5 1289 194.4 1291 194.4 1293 194.3 1294 194.2 1296 194.2 1298 194.1 1300 194.1 1301 194 1303 193.9 1305 193.9 1307 193.8 1308 193.8 1310 193.7 1312 193.7 1314 193.6 1316 193. 5 1317 193.5 1319 193.4 1321 193.4 1323 193 .3 1325 193.2 1327 193 .2 1328 193.1 1330 193.1 1332 193 1334 192.9 1336 192.9 1338 192.8 1340 192.8 1341 192.7 1343 192.6 1345 192.6 1347 192.5 1349 192. 5 1351 192.4 1353 192.3 1355 192 .3 1357 192.2 1359 192.2 1361 192.1 1363 192 1365 192 1367 191.9 1369 191.9 1370 191.8 1371 191.8 1372 191.8 1373 191.7 1374 191.7 1375 191.7 1376 191.6 1377 191.6 1378 191.6 1379 191.6 1380 191. 5 1381 191.S5 1382 191.5 1383 191.4 1384 191.4 1385 191.4 1386 191.3 1387 191.3 1388 191.3 1389 191.2 1390 191.2 1391 191.2 1392 191.2 1393 191.1 1394 191.1 1396 191.1 1397 191 1398 191 1399 191 1400 190.9 1401 190.9 1402 190.9 1403 190.8 1404 190.8 1405 190.8 1406 190.7 1407 190.7 1408 190.7 1409 190.7 1411 190.6 1412 190.6 1413 190.6 1414 190.5 1415 190.5 1416 190.5 1417 190.4

Automated CALCULATION SHEET Page: C-27] of C-49 ZZM Engineering Cale. No.:

Services Corp. PBNP-994-21-1 3 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

1HELB Reconstitution Pro~zram Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 12/23/2008 1418 190.4 1419 190.4 1420 190.3 1422 190.3 1423 190.3 1424 190.2 1425 190.2 1426 190.2 1427 190.2 1428 1429 190.1 1431 190.1 1432 190 1433 190 1434 190 1435 189 '9 1436 189.9 1437 189.9 1439 189.8 1440 189.8 1441 189.8 1442 189.7 1443 189.7 1444 189.7 1445 189.6 1447 189.6 1448 189.6 1449 189.5 1450 189.5 1451 189.5 1452 189.5 1454 189.4 1455 189.4 1456 189.4 1457 189.3 1458 189.-3 1460 189.3 1461 189.2 1462 189.2 1463 189.2 1464 189.1 1466 189.1 1467 189.1 1468 189 1469 189 1471 189 1472 188-. 9 1473 188.9 1474 188.9 1475 188.8 1477 188.8 1478 188.8 1479 188.7 1480 188.7 1482 188.7 1483 188.6 1484 188.6 1485 188.6 1487 188.6 1488 188.5 1489 188.5 1490 188.5 1492 188.4 1493 188.4 1494 188.4 1496 188.3 1497 188.3 1498 188.3 1499 188.2 1501 188.2 1502 188.2 1503 188.1 1505 188.1 1506 188.1 1507 188 1509 188 1510 188 1511 187.9 1513 187.9 1514 187.9 1515 187.9 1517 187.9 1518 187.9 1519 187.9 1521 187.9 1522 187.8 1523 187.8 1525 187.8 1526 187.8 1527 187.8 1529 187.8 1530 187.7 1531 187. 7 1533 187.7 1534 187.7 1536 187.7 1537 187.7 1538 187.7 1540 187.7 1541 187.6 1543 187.6 1544 187.6 1545 187.6 1547 187.6 1548 187.6 1550 187.5 1551 187.5 1552 187. 5 1554 187.5 1555 187.5 1557 187.5 1558 187.5 1560 187. 5 1561 187.4 1563 187.4 1564 187.4 1566 187.4 1567 187.4 1568 187.4 1570 187.3 1571 187.3 1573 187.3 1574 187.3 1576 187.3 1577 187.3 1579 187.3 1580 187.3 1582 187.2 1583 187.2 1585 187.2 1586 187.2 1588 187.2 1589 187.2 1591 187.1 1593 187.1 1594 187.1 1596 187.1 1597 187.1 1599 187.1 1600 187 1602 187 1603 187 1605 187 1607 187 1608 187 1610 186.9 1611 186.9 1613 186.9 1615 186.9 1616 186.9

Automated CALCULATION SHEET Page: C-28 of C-4 Engineering Caic. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energ~y Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

I-ELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No E-Z Date: 12/23/2008 1618 186.9 1619 186.8 1621 186.8 1623 186.8 1624 186.8 1626 186.8 1628 186.8 1629 186.7 1631 186.7 1633 186.7 1634 186.7 1636 186.7 1637 186.7 1639 186.6 1641 186.6 1643 186.6 1644 186.6 1646 186.6 1648 186.6 1649 186.5 1651 186.5 1653 186.5 1654 186.5 1656 186.5 1658 186.5 1660 186.4 1661 186.4 1663 186.4 1665 186.4 1667 186.4 1668 186.4 1670 186.3 1672 186.3 1674 186.3 1676 186.3 1677 186.3 1679 186.3 1681 186.2 1683 186.2 1685 186.2 1686 186.2 1688 186.2 1690 186.2 1692 186.1 1694 186.1 1696 186.1 1697 186.1 1699 186.1 1701 186 1703 186 1705 186 1707 186 1709 186 1711 185.9 1713 185.9 1715 185.9 1716 185.9 1718 185.9 1720 185 .9 1722 185.8 1724 185.8 1726 185 .8 1728 185.8 1730 185.8 1732 185.7 1734 185.7 1736 185 .7 1738 185.7 1740 185 .7 1742 185.6 1744 185.6 1746 185 .6 1748 185.6 1750 185 .6 1752 185. 5 1754 185.5 1756 185.5 1759 185. 5 1761 185.5 1763 185.4 1765 185.4 1767 185.4 1769 185.4 1771 185.4 1773 185.3 1775 185.3 1777 185.3 1780 185. 3 1782 185.3 1784 185.2 1786 185.2 1788 185.2 1790 185.2 1792 185.2 1794 185.1 1796 185.1 1799 185.1 1801 185.1 1803 185.1 1805 185 1807 185 1809 185 1811 185 1813 185 1815 184.9 1817 184.9 1820 184.9 1822 184.9 1824 184.9 1826 184.8 1828 184.8 1830 184.8 1832 184.8 1834 184.8 1836 184.7 1838 184.7 1840 184.7 1842 184.7 1845 184.7 1847 184.6 1849 184.6 1851 184.6 1853 184.6 1855 184.6 1857 184.6 1859 184.5 1861 184.5 1863 184.5 1865 184.5 1867 184.4 1869 184.4 1871 184.4 1874 184.4 1876 184.4 1878 184.4 1880 184.3 1882 184.3 1884 184.3 1886 184.3 1888 184.3 1890 184.2 1892 184.2 1894 184.2 1896 184.2 1898 184.2 1900 184.1 1902 184.1 1904 184.1 1906 184.1 1909 184.1

Automated Page: C-29 of C-49 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No EL* Date: 12/23/2008 1911 184.1 1913 184 1915 184 1917 184 1919 184 1921 184 1923 183.9 1925 183.9 1927 183.9 1929 183.9 1931 183.9 1933 183.8 1935 183.8 1937 183.8 1939 183.8 1941 183.8 1943 183.8 1945 183.7 1947 183.7 1949 183.7 1951 183.7 1953 183.7 1955 183.6 1957 183.6 1960 183.6 1962 183.6 1964 183.6 1966 183.5 1968 183.5 1970 183.5 1972 183.5 1974 183.5 1976 183.5 1978 183.4 1980 183.4 1982 183.4 1984 183.4 1986 183.4 1988 183.4 1990 183.3 1992 183.3 1994 183.3 1996 183. 3 1998 183.3 2000 183.2 2000 183.2 F max = 242.8 at time = 440.8 seconds.

F min = 85 at time = le-006 seconds.

C.8 PB-PAB-301_T-2-s3 Vapor Temperature for Volume 133 Cell 1 Time F(t) Time F(t) Time F(t) seconds (F) seconds (F) seconds (F) 0 85 le-006 85 0. 1082 85.11 0.2213 85.29 0.329 85.29 0.4416 85.18 0.5914 85.11 0. 7179 85.15 0.871 85.2 1 85.19 1.108 85.33 2. 163 86.88 3.277 88.56 4.338 90.12 5.447 91.73 6.922 93.83 8.169 95.56 9.676 97.59 11.5 99.99 12.55 101.3 13.71 102.8 14.8 100.7 15.93 101.4 17.01 104.6 18.13 105. 9 19.63 106.9 20.9 108.7 22.43 110.7 24.28 112.8 25.35 114.1 26.52 115. 3 27.81 116.7 29.23 118.1 30.8 119.7 32.51 121.2 34.4 123 36.48 124.7 38.77 126.6 41.29 128.5 44.06 130.5 47.1 132.7 50.45 134.9 54.13 137.3 58.19 139.7 62.65 142.3 67.55 144.9 72.94 147.7 78.88 150.5 85.4 153. 3 92.58 156.2 100 160.2

IL Automated CALCULATION SHEET Page: C-30 Ca c No.:-4 ofC4 Engineering Servces orp.PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELD Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes ElI No [I Date: 12/23/2008 101.1 160.8 102 .1 161.3 103 .3 162 104.4 162.6 105 .9 163.4 107.2 164 108.7 164.8. 110.5* 165 .8 111.6 166.3 112.7 166.9 114 167.5 115.4 168.2 116.9 169 118.6 169.8 120.5 170.7 122. 5 171.7 124.8 172.7 127.3 173.9 130 175.1 133 176.4 136.3 177.8 139.9 179.3 143.9 180.9 148.3 182.6 153.1 184.4 158.4 186.3 164. 3 188.6 170.1 190.9 175.8 193.1 181.3 195 .1 186.6 197 191.8 198.7 196.9 200.4 201.8 201.9 206.6 203.4 211.3 -204.7 215.9 206.1 220.4 207.4 224.9 208.6 229.2 209.8 233.5 210.9 237.7 212 241.8 213 245.9 214 250 214.9 253.9 215.8 257.9 216.6 261.8- 21-7-5 265.6 218.2 269.5 219 273 .3 219.7 277.1 220.4 280.8 221.1 284 221.6 286.3 222 288.2 222.3 289.9 222.6 291.4 222.8 292.9 223 294.2 223.3 295. 5 223.4 296.7 223.6 297.9 223.8 299 224 300.1 224.1 301.2 224.3 302 .3 224.5 303.3 224.6 304.3 224.7 305 .3 224.9 307.3 225.2 309.2 225.4 311.1 225.7 313 225.9 314 .8 226.2 316.6 226.4 318.4 226.6 320.2 226.8 321.9 227.1 323.7 227.3 325. 5 227.5 327.3 227.7 329.1 227.9 330.9 228.1 332.7 228.3 334.5 228.5 336.3 228.7 338.2 228.9 340 229.1 341.9 229.3 343.7 .229.5 345.6 229.7 347.5 229.9 349.4 230 351.3 230.2 353.2 230.4 355.1 230.6 357 230.7 358.9 230.9 360.9 231.1 362.8 231.2 364.8 231.4 366.8 231.6 368.7 231.7 370.7 231.9 372 .7 232 373.7 232.1 374.7 232.2 375.7 232.2 376.7 232.3 377.7 232.4 378.8 232. 5 379.8 232. 5 380.8 232.6 381.8 232.7 382.8 232.7 383.8 232.8 384.8 232.9 385.8 232.9 386.9 233 387.9 233.1 388.9 233.1 389.9 233.2 390.9 233.3 392 233.3 393 233.4 394 233.5 395 233.5 396.1 233.6 397.1 233.6 398.1 233.7 399.1 233.'8 400.2 233.8 401.2 233.9 402 .2 233.9 403 .2 234 404.3 234 405.3 234.1 406.3 234.2 407.3 234.2 408.4 234.3 409.4 234.3 410.4 234.4 411.4 234.4 412.5 234.5 413. 5 234.6 414.5 234.6 415.5 234.7 416.6 234.7 417.6 234.8

ZI L Automated Engineering I CALCULATION SHEET Page: C-31 Cale. No.:

of CL-4 Services Corp._ PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovey Reviewed By: CD Henry Safety Related Yes [] No DLI Date: 12/23/2008 418.6 234.8 419.6 234.9 420.7 234.9 421.7 235 422.7 235 423 .7 235.1 424.7 235.1 425.8 235.2 426.8 235.2 427.8 235.3 428.8 235.3 429.9 235.4 430.9 235.4 431.9 235.5 432.9 235.6 433.9 235.6 435 235.7 436 235.7 437 235.8 438 235.8 439 235.9 440.1 235.9 441.1 236 442.1 236 443.1 236.1 444.1 236.1 445.2 236.2 446.2 236.2 447.2 236.3 448.2 236.3 449.2 236.4 450.3 236.4 451.3 236.4 45.2.3 236.5 453.3 236.5 454-3 236-.6 455.3 236.6 456.4 236.7 457.4 236.7 458.4 236.8 459.4 236.8 460.4 236.9 461.4 236.9 462. 5 237 463. 5 237 464.5 237.1 465. 5 237.1 466.5 237.2 467.5 237.2 468.5 237.2 469.6 237.3 470.6 237.3 471.6 237.4 472.6 237.4 473.6 237.5 474.6 237.5 475.6 237.6 476.6 237.6 477.7 237.6 478.7 237.7 479.7 237.7 480.7 237.8 481.7 237.8 482.7 237.9 483.7 237.9 484.7 237.9 485.7 238 486.7 238 487.7 238.1 488.7 238.1 489.7 238.1 490.7 238.2 491.7 238.2 492.8 238.3 493.8 238.3 494.8 238.3 495.8 238.4 496.8 238.4 497.8 238.5 498.8 238.5 499.8 238.5 501.8 238.6 503.8 238.7 505.7 238.8 507.7 238.8 509.7 238.9 511.7 239 513.7 239.1 515.7 239.1 517.7 239.2 519. 6 239.3 521.6 239.3 523.6 239.4 525.6 239.5 527.5 239.5 529.5 239.6 531.5 239.7 533.4 239.7 535.4 239.8 537.4 239.9 539.3 239.9 541.3 240 543 .2 240 545 .2 240.1 547.1 240.2 549.1 240.2 551 240.3 552.9 240.3 554.9 240.4 556.8 240.4 558.7 240.5 560.7 240.5 562.6 240.6 564.5 240.6 566.5 240.7 568.4 240.8 570.3 240.8 572.2 240.8 574.1 240.9 576 240.9 577.9 241 579.9 241 581.8 241.1 583.7 241.1 585.6 241.2 587.5 241.2 589.4 241.3 591.3 241.3 593.2 241.3 595 241.4 596.9 241.4 598.8 241.5 600.7 241.5 602.6 241.5 604.5 241.6 606.4 241.6 608.2 241.7 610.1 241.7 612 241.8 613.9 241.8 615.7 241.9 617.6 241.9 619.5 242 621.3 242 623 .2 242.1 625 242.1 626.9 242.2 628.8 242.2 630.6 242.3 632. 5 242.3

Automated CALCULATION SHEET Page: C-32 of C-49 j ~Engineering Cale. No.:

ZServices Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D- Date: 12/23/2008 634.3 242.4 636.2 242. 5 638 242. 5 639.9 242.6 641.7 242.6 643.6 242.7 645.4 242.8 647.3 242.8 649.1 242.9 650.9 243 652.8 243 654.6 243.1 656.5 243 .1 658.3 243.2 660.1 243. 3 662 243.4 663.8 243.4 665.6 243. 5 667.4 243.6 669.3 243.6 671.1 243.7 672.9 243.8 674.7 243.8 676.5 243.9 678.4 244 680.2 244.1 682 244.1 683.8 244.2 685.6 244.3 687.4 689.2 244.4 691 244.5 692.8 244.4 694.6- 244.7 696.5 244.7 698.3 244.6 700.1 244.9 701.9 245 703.6 244.

705.4 245.1 707.2 245 .2 709 245.

710.8 245.3 712.6 245.4 714.4 245. 5 716.2 245.6 718 245.-6 719.7 24:5. 7 721.5 245.8 723. 3 245.9 725.1 245.9 726.8 246 728.6 246.1 730.4 246.1 732.1 246.2 733.9 246.3 735.7 246.4 737.4 246.4 739.2 246.5 740.9 246.6 742 .7 246.7 744.5 246.7 746.2 246.8 748 246.9 749.7 246.9 751.4 247 753.2 247.1 754.9 247.2 756.7 247.2 758.4 247.3 760.1 247.4 761.9 247.4 763.6 247.5 765. 3 247.6 767.1 247.7 768.8 247.7 770.5 247.8 772.2 247.9 773.9 247.9 775.7 248 777.4 248.1 779.1 248.1 780.8 248.2 782. 5 248.3 784.2 248.3 785.9 248.4 787.6 248.5 789.3 248.5 791 248.6 792 .7 248.7 794.4 248.7 796 248.8 797.7 248.9 799.4 248.9 801.1 249 802 .7 249 804.4 249.1 806.1 249.2 807.7 249.2 809.4 249.3 811.1 249.3 812 .7 249.4 814.4 249.5 816 249.5 817.7 249.6 819.3 249.6 820.9 249.7 822.6 249.7 824.2 249.8 825.8 249.8 827.5 249.9 829.1 249.9 830.7 250 832. 3 250 833.9 250 835.S5 250.1 837.1 250.1 838.7 250.1 840.3 250.2 841.9 250.2 843.5 250.2 845.1 250.3 846.6 250.3 848.2 250.3 849.8 250.3 851.3 250.3 852.9 250.3 854.4 250.3 856 250.3 857.5 250.3 859.1 250.3 860.6 250.3 862 .1 250.3 863.6 250.3 865.2 250.3 866.7 250.3 868.2 250.2 869.7 250.2 871.2 250.2 872 .7 250.1 874.2 250.1 875.7 250 877.2 250 878.6 249.9 880.1 249.9 881.6 249.8 883.1 249.7 884.5 249.7 886 249.6 887.4 249.5

Automated CALCULATION SHEET Page: C-33 of C-49 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 12/23/2008 888.9 249.4 890.4 249.3 891.8 249.1 893.3 249 894.8 248.9 896.3 248.8 897.8 248.6 899.3 248.4 900.8 248.3 902.2 248.1 903.7: 248 905.1 247.8 906.5 247.6 907..9 247.4 909.4 247.2 910.8 247.1 912.2 246.9 913.6 246.7 914.9 246.5 916.3 246.3 917.7 246.1 919.1 246 920.4 245.8 921.8 245.6 923.1 245.4 924.5 245.2 925.8 245 927.2 244.8 928.5 244.6 929.8 244.4 931.2 244.2 932.5 244 933.8 243.8 935.1 243.6 936.4 243.4 937.7 243.2 939.1 243 940.4 242.8 941.7 242.5 943 242.4 944.3 242.2 945.6 242 946.8 241.8 948.1 241.6 949.4 241.4 950.7 241.2 952 241 953.3 240.8 954.6 240.7 955.9 240.5 957.2 240.3 958.5 240.1 959.7 240 961 239.8 962.3 239.6 963.6 239.5 964.9 239.3 966.2 239.1 967.5 239 968.8 238.8 970.1 238.7 971.4 238.5 972.7 238.3 974 238.2 975.3 238 976.6 237.9 977.9 237.7 979.2 237.6 980.5 237.4 981.8 237.3 983.1 237.1 984.4 237 985. 7 236.8 987 236.7 988.3 236.5 989.6 236.4 990.9 236.3 992.2 236.1 993. 5 236 994.8 235.8 996.2 235.7 997.5 235.6 998.8 235.4 1000 235.3 F max = 250.3 at time = 856 seconds.

F min = 85 at time = le-006 seconds.

C.9 PB-PAB-140_T Vapor Temperature for Volume 25 Cell 1 Time F(t) Time F(t) Time F(t) seconds (F) seconds (F) seconds (F) 0 91.5 le-006 91.5 0.1082 91.56 0.2213 91.67 0.329 91.75 0.4416 91.8

0. 5914 91.81 0. 7179 91.81 0.871 91.78 1 91.76 1.108 92 11.5 129.2

Automated CALCULATION SHEET Page: C-34 of C-49 Engineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

I-ELI3 Reconstitution Program Task 13 - Building &ecovery Reviewed By: CD Henry Safety Related Yes [K] No LII Date: 12/23/2008

23. 52 152.7 33.98 162.9 44.9 169.7 59.43 174.5 69.85 178.7 81.42 180 93.76 181 106.6 182.2 116.7 182.8 127.3 183.3 138 183.7 148.8 184.1 159.5 184.4 170.1 184.7 180.7 185 191.2 185.2 201.4 185.4 215.7 185.3 229.1 185.8 241.8 185.6 254 186.1 265.7 185.9 277.1 186.3 288.3 186.1 299.4 186.5 310.4 186.3 321.5 186.7 332.6 186.5 343.9 186.9 355.5 186.6 367.3 187 379.6 186.8 392.4 187.2 405.7 186.9 419.6 187.3 434.1 187 449.1 187.4 459.4 187.2 469.5 187.3 479.7 187.3 489.8 187.4 499.8 187.4 510 187.5 520.1 187. 5 530.3 187.6 540.4 18.7.6 550.4 187.6 560.4 187.6 575.2 187.4 589.8 187.7 603. 5 187.4 616.4 179.3 628.6 172.8 640.2 168.4 651.4 164.8 662.2 162.4 672.6 160.2 682.7 158.9 695.7 157.4 708.3 156.3 720.4 155.4 732 154.8 743 .3 154.2 754.2 153.8 764.8 153.4 775 .1 153.1 787.4 152.5 799.4 152 .3 810.9 151.8 822.1 151.7 833 151.3 843.6 151.2 854 150.8 864 150. 7 875.8 150.4 887.2 150.2 898.4 149.9 909.2 149.7 919.8 149.5 930.1 149.3 940.2 149 951.7 148.6 963 148.6 974 148.2 984.8 148.1 995.3 147. 9 1006 147. 7 1016 147. 5 1026 147.3 1037 147. 1 1049 146.9 1060 146.7 1071 146.5 1081 146.3 1092 146.1 1103 145 .9 1113 145. 7 1123 145.5 1134 145 .4 1144 145.2 1155 145 1166 144.8 1177 144.6 1187 144.4 1198 144.2 1209 144.1 1219 143.9 1229 143 .7 1239 143.6 1249 143 .4 1261 143.2 1272 143.1 .12 82 142.9 1293 142 .7 1304 142. 5 1315 142.4 1325 142.2 1335 142 .1 1346 141.9 1356 141.7 1366 141.6 1376 141.4 1386 141.3 1397 141.1 1408 141 1419 140.8 1430 140.7 1441 140.5 1451 140.4 1462 140.2 1472 140.1 1483 139.9 1493 139.8 1503 139.6 1514 139.5 1524 139.4 1534 139.2 1544 139.1 1555 138.9 1565 138.8 1575 138.7 1585 138.5 1595 138.4 1605 138.3 1616 138.1 1627 138 1638 137.9 1648 137.7 1659 137.6 1670 137.5

Automated CALCULATION SHEET Page: C-35 of C-49

/ ZM Engineering Cale. No.:

_______jServices Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes N1Z No 0I Date: 12/23/2008 1681 137.3 1692 137.2 1702 137.1 1713 136.9 1724 136.8 1734 136.7 1745 136.5 1756 136.4 1766 136.3 1777 136.2 1787 136 1798 135.9 1809 135.8 1819. 135.7 1830 135.6 1840 135.4 1851 135.3 1861 135.2 1872 135.1 1882 135 1893 134.9 1903 134.7 1914 134.6 1924 134.5 1935 134.4 1945 134.3 1955 134.2 1966 134.1 1976 133.9 1987 133.8 1997 133.7 2008 133.6 2018 133.5 2028 133-.4 2039 133.3 2049 133.2 2060 133.1 2070 133 2080 132.9 2091 132.8 2101 132.7 2112 132.6 2122 132.5 2132 132.4 2143 132.3 2153 '132.2 2164 132.1 2174 132 2184 131.9 2195 131.8 2205 131.7 2216 131.6 2226 131.5 2236 131.4 2247 131.3 2257 131.2 2267 131.1 2278 131 2288 130.9 2299 130.8 2309 130.7 2319 130.6 2330 130.5 2340 130.4 2350 130.3 2361 130.2 2371 130.1 2382 130 2392 130 2402 129.9 2413 129.8 2423 129.7 2433 129.6 2444 129.5 2454 129.4 2465 129.3 2475 129.2 2485 129.2 2496 129.1 2506 129 2517 128.9 2527 128.8 2537 128.7 2548 128.6 2558 128.6 2569 128.5 2579 128.4 2589 128.3 2600 128.2 2610 128.1 2621 128.1 2631 128 2641 127.9 2652 127.8 2662 127.7 2673 127.6 2683 127.6 2694 127.5 2704 127.4 2714 127.3 2725 127.2 2735 127.2 2746 127.1 2756 127 2767 126.9 2777 126.8 2787 126.8 2798 126.7 2808 126.6 2819 126.5 2829 126.5 2840 126.4 2850 126.3 2861 126.2 2871 126.2 2881 126.1 2892 126 2902 125.9 2913 125.9 2923 125.8 2934 125.7 2944 125.6 2954 125.6 2965 125.5 2975 125.4 2986 125.4 2996 125.3 3000 125.3 F max = 187.7 at time= 589.8 seconds.

F min = 91.5 at time = 1le-006 seconds.

7, Z ZM Automated Engineering Services Corp.

CALCULATION SHEET Page: C-36 Cale. No.:

of C-49 PBNP-994-21 -13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D- Date: 12/23/2008 C.10 PB-PAB-237_T Vapor Temperature for Volume 103 Cell 1 Time F(t) Time F(t) Time F(t) seconds (F) seconds (F) seconds (F) 0 94.5 le-006 94.5 0.1082 94.52 0.2213 94.53 0.329 94.52 0.4416 94.51 0.5914 94.51 0.7179 94.51 0.871 94.52 1 94.53 1.108 99.28 11.5 138.5 23.52 168.7 33.54 189 44.68 205.9 55.22 217 .- S' 65.79 219.4 75 .92 226 88.22 233.7 99.73 239.4 112 .3 244.1 122.S5 247.1 133.1 249.6 144 251.7 154.6 253.3 167.3 254.8 177.6 255.9 187.8 256.9 199.2 257.9 210 258.7 220.6 259.6 231.1 260.3 241.6 261 252 261.6 262 .5 262.1 273.1 262. 5 283.7 262.9 294.3 263.3 304.4 263.6 314.6 263.8 324.9 264 335.3 264.2 345.8 264.4 355.9 264.6 366.2 264.7 376.5 264.8 386.9 264.9 397.2 265 407.3 265.1 417.3 265.2 427.4 265.2 437.5 265.3 447.5 265 .3 457.6 265.4 467.7 265.4 477.8 265.5 487.9 265. 5 498.1 265. 5 508.2 265.6 518.4 265.6 528.5 265.6 538.7 265.6 548.8 265.7 558.8 265.7 569 265.7 579.1 265.7 589.3 265.8 599.3 265.8 609.4 265.8 619.6 265.'8 629.7 265.8 639.7 265.9 649.9 265.9 *660 265.9 670 265.9 680.1 265.9 690.1 265.9 700.2 266 710.3 266 720.3 266 730.3 266 740.5 266 750.6 266 760.8 266 771 266.1 781.1 266.1 791.3 266.1 801.4 266.1 811.6 266.1 821.7 266.1 831.9 266.1 842 .1 266.1 852.2 266.2 862.4 266.2 872.4 266.2 882.6 266.2 892.6 266.2 902.8 266.2 913 266.2 923 266.2 933.1 266.2 943. 3 266.3 953. 5 266.3 963.6 266.3 973.7 266.3 983.9 266.3 993.9 266.3 1004 266.3 1014 266.3 1024 266.3 1034 266.4 1044 266.4 1054 266.4 1065 266.4 1075 266.4 1085 266.4 1095 266.4 1105 266.4 1115 266.4 1125 266.4

Automated CALCULATION SHEET Page: C-37 of C-49 Engineering Cale. No.:

ZServices Corp. PBNP-994-21 -13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [] No [II Date: 12/23/2008 1135 266.5 1145 266.5 1155 266.5 1165 266.5 1175 266.5 1185 266.5 1195 266.5 1205 266.5 1215 266.5 1226 266.5 1236 266.5 1246 266.6 1256 266.6 1266 266.6 1276 266.6 1286 266.6 1296 266.6 1306 266.6 1316 266.6 1326 266.6 1336 266.6 1346 266.6 13.56 266.6 1366 266.7 1376 266.7 1386 266.7 1396 266.7 1406 266.7 1416 266.7 1427 266.7 1437 266.7 1447 266.7 1457 266.7 1467 266.7 1477 266.7 1487 266.7 1497 266.8 1507 266.8 1517 266.8 1527 266.8 1537 266.8 1547 266.8 1557 266.8 1567 266.8 1577 266.8 1587 266.8 1597 266.8 1607 266.8 1617 266.8 1628 266.8 1638 266.8 1648 266.9 1658 266.9 1668 266.9 1678 266.9 1688 266.9 1698 266.9 1708 266.9 1718 266.9 1728 266.9 1738 266.9 1748 266.9 1758 266.9 1768 266.9 1778 266.9 1788 266.9 1799 266.9 1809 241.3 1819 217.2 1829 199.7 1839 186.5 1849 176.9 1859 172 1869 167.6 1879 163.S5 1889 159.7 1899 156.2 1909 153 1919 150.1 1929 147.4 1939 145.1 1949 143 .1 1959 141.1 1969 139.2 1979 137.5 1989 136 1999 134.7 2009 133.8 2019 133.4 2029 133 .3 2040 133 .2 2050 133.2 2060 133.2 2070 133.4 2080 133.6 2090 133.8 2100 134.2 2110 134.6 2120 135 2130 135.5S 2140 136.1 2150 136.7 2160 137.4 2170 138.1 2180 138.8 2190 139.5 2200 140.1 2210 140.7 2220 141.2 2231 141.7 2241 142 .1 2251 142. 5 2261 142.8 2271 143.1 2281 143. 3 2291 143.6 2301 143.8 2311 144 2321 144.1 2331 144.3 2341 144.4 2351 144.5 2361 144.5 2372 144.6 2382 144.7 2392 144.7 2402 144.7 2412 144.7 2422 144.7 2432 144.7 2442 144.7 2452 144.7 2462 144.7 2472 144.6 2483 144.6 2493 144.5 2503 144.5 2513 144.4 2523 144.3 2533 144.2 2543 144.2 2553 144.1 2563 144 2573 143.9 2583 143.8 2593 143 .7 2603 143 .6 2614 143.6 2624 143. 5 2634 143 .4

  • M Automated CALCULATION SHEET Page: C-38 of C-49 A Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 12/23/2008 2644 143.3 2654 143.2 2664 143.1 2675 143 2685 143 2695 143 2705 143 2715 143 2725 143 2735 143 2745 143.1 2755 143.2 2765 143.2 2775 143.3 2785 143.4 2796 143.5 2806 143.5 2816 143.6 2826 143.7 2836 143.8 2846 143.9 2856 144 2866 144.1 2876 144.2 2886 144.3 2896 144.3 2907 144.4 2917 144.5 2927 144.6 2937 144.7 2947 144.7 2957 144.8 2967 144.9 2978 144.9 2988 145 2998 145 3000 145.1 F max = 266.9 at time = 1799 seconds.

F min= 94.5 at time = le-006 seconds.

C.11 PB-PAB-271_T Vapor Temperature for Volume 95 Cell 12 Time F(t) Time F(t) Time F(t) seconds (F) seconds (F) seconds (F) 0 85 le-006 85 0. 1082 84.92 0.2213 84.86 0.329 84.84 0.4416 84.84

0. 5914 84.79 0.7179 84.77 0.871 84.78 1 84.79 1.108 84.79 11.5 89.48 22.72 91.35 33.03 93.25 44.55 95.16 55.54 96.82 66.48 98.4 77.37 100.8 87.88 102.5 98.67 104.9 109.4 106.5 120.1 108.2 130.5 110 140.6 111.4 151 112.9 161.2 114.2 171.4 115.4 181.6 116.6 191.8 117.8 202 118.9 212 120 222.2 121 232.3 122.1 242.4 123 252.4 124 262.6 124.9 272.6 125.7 282.6 126.6 292.8 127.4 302.9 128.2 313 129 323.1 129.8 333.2 130.5 343.3 131.2 353.4 131.9 363.5 132.6 373.6 133.2 383.6 133.9 393.6 134.6 403.7 135.2 413.8 135.8 423.9 136.4 433.9 137 443.9 137.6 454 138.2 464 138.8 474.1 139.3 484.1 139.9 494.2 140.4 504.2 140.9

Automated CALCULATION SHEET Page: C-39 of C-49 SEngineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 S tation: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No Dl Date: 12/23/2008 514. 3 141.4 524.3 141.9 534.4 142.4

ý544.4 142.8 554.4 143.3 564.4 143.7 574.4 144.2 584.5 144.6 594.5 145 604.5 145. 5 614.6 146.2 624.6 146.9 634.7. 147.7 644.8 148.4. 654.8 149.1 664.9 149.7 675 150.4 685.1 151 695.1 151.6 705.1 152.2 715 .3 152.8 725.3 153.4 735.4 153.9 745.4 154.5 755.4 .155 7.65. 5 155.5 775. 5 156 785.7 156.5 795.8 157 805.8 157.5 815.9 158 826 158.4 836.1 158.9 846.1 159.4 856.2 159.8 866.2 160.3 876.3 160.7 886.3 161.1 896.4 161.6 906.5 162 916.6 162. 5 926.6 162.9 936.7 163.4 946.8 163.9 956.9 164.4 966.9 164.9 977.1 165.4 987.1 165.9 997.1 166.4 1007 166.9 1017 167.3 1027 167.8 1037 168.2 1047 168.6 1058 169 1068 169.4 1078 169. 9 1088 170.2 1098 170.6 1108 171 1118 171.4 1128 171.8 1138 172.1 1148 172.5 1158 172.9 1168 173.2 1178 173.6 1188 .173.9 1198 174.3 1208 174.6 1218 174.9 1229 175 .3 1239 175.6 1249 175.9 1259 176.3 1269 176.6 1279 176.9 1289 177.2 1299 177.6 1309 177.9 1319 178.2 1329 178.5 1339 178.8 1349 179.1 1359 179.4 1369 179.7 1379 180 1389 180.3 1399 180.5 1409 180.8 1419 181.1 1429 181.4 1439 181.7 1449 181.9 1459 182.2 1470 182.5 1480 182.8 1490 183 1500 183.3 1510 183.6 1520 183.8 1530 184.1 1540 184.3 1550 184.6 1560 184.8 1570 185.1 1580 185.3 1590 185.6 1600 185.8 1610 186.1 1620 186.3 1630 186.6 1640 186.8 1650 187 1660 187.3 1671 187.5 1681 187.7 1691 187.9 1701 188.2 1711 188.4 1721 188.6 1731 188.8 1741 189.1 1751 189.3 1761 189.5 1771 189.8 1781 190.1 1791 190.3 1801 190.7 1811 188.4 1821 187.4 1831 186.6 1841 185.8 1851 185 1861 184.4 1871 183.8 1881 183.2 1891 182 .7 1901 182 .3 1911 182 1921 181.6 1932 181.3 1942 181 1952 180.7 1962 180.5 1972 180.3 1982 180.1 1992 179.8 2002 179.7 2012 179.6

IAutomated SEngineering Services Corp.

Client: FP&L Energy CALCULATION SHEET Page: C-40 of Cale. No.:

PBNP-994-2 1-13 Revision:

C-49 0

Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D- Date: 12/23/2008 2022 179.5 2032 179.4 2042 179.3 2052 179.2 2062 179.1 2072 179 2082 178.9 2092 178.8 2102 178.7 2112 178.6 2122 178.5 2132 178.4 2142 178.3 2152 178.2 2162 178.1 2172 178 2182 177.9 2192 177.8 2202 177.7 2212 177.6 2222 177.5 2232 177.5 2242 177.4 2252 177.3 2262 177.2 2272 177.1 2282 177 2292 176.9 2302 176.8 2312 176.7 2322 176.6 2333 176.5 2343 176.4 2353 176.3 2363 176.2 2373 176.1 2383 176 2393 175.9 2403 175.8 2413 175. 7 2423 175.6 2433 175. 5 2443 175.4 2453 175. 3 2463 175.2 2473 175.1 2483 175 2493 175 2503 174.9 2513 174.8 2523 174.7 2533 174.6 2543 174.5 2553 174.4 2563 174.3 2573 174.2 2583 174.1 2593 174 2603 173.9 2613 173.8 2623 173.8 2633 173.7 2644 173.6 2654 173. 5 2664 173.4 2674 173. 3 2684 173.2 2694 173.1 2704 173 2714 173 2724 172.9 2734 172.8 2744 172.7 2754 172.6 2764 172. 5 2774 172.4 2784 172.4 2794 172 .3 2804 172.2 2814 172.1 2824 172 2834 171.9 2844, 171.8 2854 171.8 2864 171.7 2874 171.6 2884 171. 5 2894 171.4 2904 171.4 2914 171.3 2924 171.2 2934 171.2 2944 171.1 2955 171 2965 171 2975 171 2985 170.9 2995 170.9 3005 170.9 3015 170.9 3025 170.8 3035 170.8 3045 170.7 3055 .170.6 3065 170.5 3075 170.4 3085 170.2 3095 169.9 3105 169.6 3115 169.3 3125 168.9 3135 168.6 3145 168.3 3155 168 3166 167.9 3176 167.8 3186 167.7 3196 167.6 3206 167.6 3216 167.5 3226 167.4 3236 167.3 3246 167.3 3256 167.2 3266 167.1 3276 167 3286 167 3296 166.9 3306 166.8 3316 166.8 3326 166.7 3336 166.6 3346 166.5 3356 166.5 3367 166.4 3377 166. 3 3387 166.2 3397 166.2 3407 166.1 3417 166 3427 166 3437 165.9 3447 165.8 3457 165.7 3467 165.7 3477 165.6 3487 165.5 3497 165. 5 3507 165.4 3517 165.3

Automated CALCULATION SHEET Page: C-41 of C.-49 z -Z Engineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [El No L-] Date:' 12/23/2008 3527 165.3 3537 165.2 3547 165.1 3557 165 3567 165 3578 164.9 3588 164.8 3598 164.8 3608 164.7 3618 164.6 3628 164.6 3638 164.5 3648 164.4 3658 164.4 3668 164.3 3678 164.2 3688 164.2 3698 164.1 3708 164 3718 164 3728 163.9 3738 163.8 3749 163.8 3759 163.7 3769 163.6 3779 163.6 3789 163.5 3799 163.4 3809 163.4 3819 163.3 3829 163.2 3839 163.2 3849 163.1 3859 163 3869 163 3879 162.9 3889 162.8 3899 162.8 3909 162.7 3919 162 .7 3929 162.6 3940 162.5 3950 162.5 3960 162.4 3970 162.3 3980 162.3 3990 162 .2 4000 162 .1 4010 162.1 4020 162 4030 162 4040 161.9 4050 161.8 4060 161.8 4070 161.7 4080 161.7 4091 161.6 4101 161. 5 4111 161.5 4121 161.4 4131 161.4 4141 161.3 4151 161.2 4161 161.2 4171 161.1 4181 161.1 4191 161 4201 160.9 4211 160.9 4221 160.8 4231 160.8 4241 160.7 4252 160.6 4262 160.6 4272 160.5 4282 160.5 4292 160.4 4302 160.3 4312 160.3 4322 160.2 4332 160.2 4342 160.1 4352 160.1 4362 160 4372 159.9 4382 159.9 4392 159.8 4403 159.8 4413 159.7 4423 159.7 4433 159.6 4443 159.5 4453 159.5 4463 159.4 4473 159.4 4483 159.3 4493 159.3 4503 159.2 4513 159.2 4523 159.1 4533 159 4544 159 4554 158.9 4564 158.9 4574 158.8 4584 158.8 4594 158. 7 4604 158.7 4614 158.6 4624 158.6 4634 158.5 4644 158.4 4654 158.4 4664 158.3 4674 158.3 4685 158.2 4695 158.2 4705 158.1 4715 158.1 4725 158 4735 158 4745 157.9 4755 157.9 4765 157.8 4775 157.8 4785 157.7 4796 157.7 4806 157.6 4816 157.6 4826 157.5 4836 157.4 4846 157.4 4856 157.3 4866 157.3 4876 157.2 4886 157.2 4896 157.1 4906 157.1 4916 157 4926 157 4937 156.9 4947 156.9 4957 156.8 4967 156.8 4977 156.7 4987 156.7 4997 156.6 5000 156.6

Automated CALCULATION SHEET Page: C-42 of C-49 SEngineering Caic. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No li-i Date: 12/23/2008 F max = 190.7 at time 1801 seconds.

F min= 84.77 at time 0.7179 seconds.

C.12 PB-PAB-272_T Vapor Temperature for Volume 108 Cell 1 Time F(t) Time F(t) Time F(t) seconds (F) seconds (F) seconds (F) 0 85 le-006 85 0. 1082 85.01

0. 2213 85.02 0.329 85.04 0.4416 85.06 0.5914 85.1 0. 7179 85.13 0.871 85.18 1 85.22 1.108 85. 57 11.5 112 23.52 135.1 33.98 148.4 44.9 162. 5 59.15 180 73.35 194.9 86.95 206.7 99.97 216.2 112 .2 224 123 .7 230.5 134.7 235.9 145.2 240.4 155.3 244.2 168.2 248.5 180.6 252.3 192.6 255.5 204.2 258.4 215. 5 260.9 226.4 263 237.1 264.9 247.6 266.6 257.8 268.1 267.9 269.4 280.1 270.9 292 .1 272.1 303.8 273. 3 315.4 274.2 326.7 275.1 337.8 275.9 348.7 276.6 359.4 277.3 370 277.9 380.4 278.4 392.2 279 4.03.3 279.4 413.9 279.9 423.9 280.3 435.2 280.7 446.1 281 456.5 281.4 466.5 281.7 477.6 282 488.3 282. 3 498.6 282. 5 509.7 282.8 520.4 283 530.7 283.2 541.7 283.4 552.3 283.6 562.6 283.8 573. 5 284 584 283.8 594.1 281.5 604.8 279.2 615.1 277.5 625.2 276.2 635.7 275.3 646 274.6 656.7 274.1 667.1 273.7 677.3 273. 5 687.9 273.4 698.3 273.3 708.6 273.3 718.6 273.3 729.2 273.4 739.6 273. 5 749.9 273.6 760 273.8 770.1 274.4 780.6 275.3 791 276.6 801.3 278.1 811.6 279.8 821.7 281.6 831.7 283.7 842.3 286.1 852.7 288.9 863 .1 292 873 .3 295.5 883. 5 299.5 893.6 304 904.1 309.4 914. 6 315. 3 924.9 321.5 935.2 327.8 945.4 333.8 955.5 339.3 965. 5 344.3 976 348.8 986.3 352.6 996.6 355. 7 1007 358.2 1017 360.1

TAutomated CALCULATION SHEET Page: C-43 Caic. No.:

of C-49

________{Services Corp.

Z XEngineering PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - B~uildingz Recovery Reviewed By: CD Henry Safety Related Yes El No D- Date: 12/23/2008 1027 361.5 1038 362.4 1048 362.9 1058 362.9 1068 362.6 1079 361.9 1089 360.9 1099 359.7 1109 358.3 1119 356.7 1130 355 1140 353.1 1150 351.1 1161 349 1171 346.9 1181 344.7 1191 342.4 1201 340.2 1211 337.9 1222 335.6 1232 333.2 1242 330.9 1252 328.7 1263 326.3 1273 324.1 1283 321.8 1293 319.6 1304 317.3 1314 314 .8 1324 *311-.7 1334 308.8 1345 305.9 1355 303. 3 1365 300.7 1375 298.3 1385 295.9 1396 293.7 1406 291.6 1416 289.5 1426 287.5 1436 285.6 1447 283.8 1457 282 1467 280.3 1477 278.6 1487 277 1497 275.5 1507 274 1518 272.5 1528 271.1 1538 269.8 1548 268.5 1558 267.2 1568 266 1578 264.7 1589 263.6 1599 262.4 1609 261.3 1619 260.3 1629 259.2 1639 258.2 1650 257.2 1660 256.3 1670 255.3 1680 254.4 1690 253.6 1701 252.7 1711 251.8 1721 251 1731 250.2 1741 249.5 1751 248.7 1761 248 1771 247.2 1782 246.5 1792 245.8 1802 245.2 1812 244.5 1822 243.8 1833 243.2 1843 242.6 1853 242 1863 241.4 1873 240.8 1883 240.2 1893 239.6 1903 239.1 1913 238.5 1923 238 1934 237.5 1944 236.9 1954 236.4 1964 235.9 1974 235.4 1984 234.9 1995 234.5 2005 234 2015 233.5 2025 233.1 2035 232.6 2045 232.2 2055 231.7 2065 231.3 2076 230.9 2086 230.5 2096 230.1 2106 229.7 2116 229.3 2126 228.9 2136 228.5 2146 228.1 2156 227.7 2166 227.4 2176 227 2186 226.6 2197 226.3 2207 225.9 2217 225.6 2227 225.3 2237 224.9 2248 224.6 2258 224.3 2268 223.9 2278 223.6 2288 223.3 2298 223 2308 222.7 2318 222.4 2328 222.1 2338 221.8 2348 221.5 2358 221.3 2368 221 2378 220.7 2388 220.4 2399 220.2 2409 219.9 2419 219.6 2429 219.4 2440 219.1 2450 218.9 2460 218.6 2470 218.4 2480 218.1 2490 217.8 2500 217.6 2511 217.3 2521 217 2531 216.7 2541 216.4

Automated CALCULATION SHEET Page: C-44 of C-49 Engineering Caic. No.:

-- O miZ Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D- Date: 12/23/2008 2551 216.1 2561 215.8 2571 215. 5 2581 215.2 2591 214.8 2601 214. 5 2611 214. 2 2622 213.9 2632 213.6 2642 213 .3 2652 213 2662 212.8 2672 212. 5 2682 212 .2 2692 211.9 2702 211.7 2712 211.4 2722 211.2 2732 210 .9 2742 210. 7 2753 210. 5 2763 210 .2 2773 210 2783 209.8 2793 209.5 2804 209.3 2814 209.1 2824 208.9 2834 208.7 2844 208.5 2854 208.3 2864 208.1 2875 207.9 2885 207.7 2895 207.5 2905 207.3 2915 207.1 2925 207 2935 206.8 2946 206.6 2956 206.4 2966 206.3 2976 206.1 2986 205.9 2996 205.8 3006 205 .6 3016 205. 5 3026 205.3 3036 205.1 3046 205 3057 204.8 3067 204.7 3077 204.5 3087 204.4 3097 204.3 3107 204.1 3117 204 3127 203.8 3137 203.7 3147 203.6 3157 203.4 3167 203.3 3177 203.2 3187 203 3197 202.9 3208 202.8 3218 202.6 3228 202. 5 3238 202.4 3248 202 .3 3258 202.1 3268 202 3279 201.9 3289 201.8 3299 201.7 3309 201.6 3319 201.4 3329 201.3 3339 201.2 3349 201.1 3359 201 3369 200.9 3379 200.8 3390 200.7 3400 200.5 3410 200.4 3420 200.3 3430 200.2 3440 200.1 3450 200 3460 199.9 3470 199.8 3480 199.7 3491 199.6 3501 199.5 3511 199.4 3521 199.3 3531 199.2 3541 199.1 3551 199 3561 198.9 3571 198.8 3581 198.7 3591 198.6 3602 198.5 3612 198.4 3622 198.3 3632 198.2 3642 198.2 3652 198.1 3662 198 3672 197.9 3682 197.8 3692 197.7 3702 197.6 3712 197. 5 3723 197.4 3733 197.3 3743 197.2 3753 197.1 3763 197 3773 196.9 3783 196.8 3793 196.7 3803 196.6 3813 196.5 3823 196.4 3834 196.3 3844 196.2 3854 196.1 3864 196.1 3874 196 3884 195.9 3894 195.8 3904 195.7 3914 195.6 3924 195.5 3934 195 .4 3944 195.3 3954 195.2 3964 195.2 3975 195.1 3985 195 3995 194.9 4005 194.8 4015 194.7 4025 194.6 4035 194.6 4045 194.5 4055 194.4

IAutomated Engineering Services Corp.

Client: FP&L Energy CALCULATION SHEET Page: C-45 Caic. No.: of C-49 PBNP-994-2 1-13 Revision: 0 Station: Point Beach Nuclear Plant Prepared BY: RC Kern Calc.

Title:

I{ELB Reconstitution Program Task 13 - Bugilding Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 12/23/2008 4065 194.3 4075 194.2 4085 194.1 4095 194.1 4105 194 4115 193.9 4126 193.8 4136 193.7 4146 193.7 4156 193.6 4166 193 .5 4176 193.4 4186 193.3 4196 193.3 4206 193.2 4216 193.1 4226 193 4236 193 4246 192.9 4256 192.8 4267 192.7 4277 192.7 4287 192.6 4297 192. 5 4307 192.4 4317 192.4 4327 192. 3 4337 192.2 4347 192 .1 4357 192. 1 4367 192 4377 191.9 4387 191.8 4398 191.8 4408 191.7 4418 191.6 4428 191.5 4438 191. 5 4448 191.4 4458 191.3 4468 191.3 4478 191.2 4488 191.1 4498 191 4508 191 4518 190.9 4528 190.8 4539 190.8 4549 190.7 4559 190.6 4569 190.5 4579 190.5 4589 190.4 4599 190.3 4609 190.3 4619 190.2 4629 190.1 4639 190.1 4649 190 4659 189.9 4669 189.9 4680 189.8 4690 189.7 4700 189.6 4710 189.6 4720 189.5 4730 189.4 4740 189.4 4750 189.3 4760 189.2 4770 189.2 4780 189.1 4790 189 4800 189 4810 188.9 4820 188.8 4830 188.8 4841 188.7 4851 188.6 4861 188.6 4871 188.5 4881 188.4 4891 188.4 4901 188.3 4911 188.2 4921 188.2 4931 188.1 4941 188.1 4951 188 4961 187.9 4971 187.9 4981 187.8 4991 187.7 5002 187.7 5012 187.6 5022 187.5 5032 187.5 5042 187.4 5052 187. 3 5062 187.3 5072 187.2 5082 187.2 5092 187.1 5102 187 5112 187 5122 186.9 5132 186.8 5142 186.8 5152 186.7 5162 186.6 5173 186.6 5183 186.5 5193 186.5 5203 186.4 5213 186.3 5223 186.3 5233 186.2 5243 186.1 5253 186.1 5263 186 5273 186 5283 185.9 5293 185. 8

.5303 185.8 5313 185.7 5323 185.7 5333 185.6 5343 185.5 535.3 185.5 5363 185.4 5373 185.4 5383 185.3 5394 185.2 5404 185.2 5414 185.1 5424 185 5434 185 5444 184.9 5454 184.9 5464 184.8 5474 184.7 5484 184.7 5494 184.6 5504 184.6 5514 184.5 5524 184.4 5534 184.4 5545 184.3 5555 184.3 5565 184.2

CALCULATION SHEET Page: C '-46 of C-49 l la W Automated Engineering Caic. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El1 No 0I Date: 12/23/2008 5575 184.1 5585 184.1 5595 184 5605 184 5615 183.9 5625 183.9 5635 183.8 5645 183 .7 5655 183.7 5665 183.6 5675 183.6 5685 183. 5 5695 183. 5 5706 183.4 5716 183.3 5726 183.3 5736 183.2 5746 183.2 5756 183.1 5766 183.1 5776 183 5786 182.9 5796 182.9 5806 182.8 5816 182.8 5826 182 .7 5836 182.7 5847 182.6 5857 182.5- 5867 182.5 5877 182.4 5887 182.4 5897 182.3 5907 182.3 5917 182.2 5927 182.1 5937 182 .1 5947 182 5957 182 5967 181.9 5977 181.9 5988 181.8 5998 181.8 6008 181.7 6018 181.6 6028 181.6 6038 181. 5 6048 181. 5 6058 181.4 6068 181.4 6078 181.3 6088 181.2 6098 181.2 6108 181.1 6118 181.1 6129 181 6139 181 6149 180.9 6159 180.9 6169 180.8 6179 180.8 6189 180.7 6199 180.6 6209 180.6 6219 180.5 6229 180.5 6239 180.4 6249 180.4 6259 180.3 6269 180.3 6279 180.2 6290 180.1 6300 180.1 6310 180 6320 180 6330 179.9 6340 179.9 6350 179.8 6360 179.8 6370 179.7 6380 179.7 6390 179.6 6400 179.6 6410 179.5 6421 179.4 6431 179.4 6441 179.3 6451 179.3 6461 179.2 6471 179.2 6481 179.1 6491 179.1 6501 179 6511 179 6521 178.9 6531 178.9 6541 178.8 6551 178.8 6561 178.7 6572 178.6 6582 178.6 6592 178.5 6602 178.5 6612 178.4 6622 178.4 6632 178.3 6642 178.3 6652 178.2 6662 178.2 6672 178.1 6682 178.1 6692 178 6703 178 6713 177.9 6723 177.9 6733 177.8 6743 177.8 6753 177.7 6763 177.7 6773 177.6 6783 177.5 6793 177.5 6803 177.4 6813 177.4 6823 177.3 6834 177.3 6844 177.2 6854 177.2 6864 177.1 6874 177.1 6884 177 6894 177 6904 176.9 6914 176.9 6924 176.8 6934 176.8 6944 176.7 6954 176.7 6965 176.6 6975 176.6 6985 176.5 6995 176.5 7005 176.4 7015 176.4 7025 176.3 7035 176.3 7045 176.2 7055 176.2 7065 176.1 7075 176.1

Automated CALCULATION SHEET Page: C-47 of C-49 SEngineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [K] No 0I Date: 12/23/2008 7085 176 7096 176 7106 175.9 7116 175.9 7126 175.8 7136 175.8 7146 175.7 7156 175 .7 7166 175.6 7176 175.6 7186 175. 5 7196 175. 5 7207 175.4 7217 175.4 7227 175. 3 7237 175 .3 7247 175.2 7257 175.2 7267 175.1 7277 175.1 7287 175 7297 175 7307 174.9 7317 174.9 7327 174.8 7337 174.8 7347 174.7 7358 174.7 7-368 174.6 7378 174.6 7388 174.5 7398 174.5 7408 174.4 7418 1.74.4 74-28 174.3 7438 174-.3 7448 174.2 7458 174.2 7469 174.1 7479 174.1 7489 174 7499 174 75 Q9 174 7519 173.9 7529 173.9 7539 173-8 7549 173.8 7559 173. 7 7569 173. 7 7579 173.6 7589 173.6 7600 173. 5 7610 173. 5 7620 173.4 7630 173.4 7640 173.3 7650 173.3 7660 173.2 7670 173.2 7680 173.1 7690 173.1 7700 173 7710 173 7720 173 7731 172.9 77.41 172.9 7751 172.8 7761 172.8 7771 172. 7 7781 172.7 7791 172.6 7801 172.6 7811 172. 5 7821 172.5 7831 172.4 7841 172.4 7851 172.3 7862 172.3 7872 172. 2 7882 172.2 7892 172.2 7902 172. 1 7912 172.1 7922 172 7932 172 7943 171.9 7953 171.9 7963 171.8 7973 171.8 7983 171.7 7993 171.7 8003 171.6 8013 171.6 8023 171.6 8033 171.5 8043 171.5 8053 171.4 8063 171.4 8073 171.3 8083 171.3 8093 171.2 8103 171.2 8113 171.1 8124 171.1 8134 171.1 8144 171 8154 171 8164 170.9 8174 170.9 8184 170.8 8194 170.8 8204 170.7 8214 170.7 8225 170.6 8235 170.6 8245 170.6 8255 170.5 8265 170.5 8275 170.4 8285 170.4 8296 170.3 8306 170.3 8316 170.2 8326 170.2 8336 170.2 8346 170.1 8356 170.1 8366 170 8376 170 8386 169.9 8396 169.9 8406 169.8 8416 169.8 8426 169.8 8436 169.7 8446 169.7 8456 169.6 8466 169.6 8476 169.5 8486 169.5 8496 169.4 8507 169.4 8517 169.4 8527 169.3 8537 169.3 8547 169.2 8557 169.2 8567 169.1 8577 169.1 8587 169.1

Automated CALCULATION SHEET Page: C-48 of C-49 Engineering Cale. No.:

Z-L ý Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes W No E-l Date: 12/23/2008 8597 169 8607 169 8618 168.9 8628 168.9 8638 168.8 8648 168.8 8658 168.7 8668 168.7 8678 168.7 8688 168.6 8699 168.6 8709 168.5 8719 168.5 8729 168.4 8739 168.4 8749 168.4 8759 168.3 8770 168.3 8780 168.2 8790 168.2 8800 168.1 8810 168.1 8820 168.1 8830 168 8840 168 8850 167.9 8860 167.9 8870 167.8 8880 167.8 8890 167.8 8900 167.7 8910 167.7 8920 167.6 8930 167.6 8940 167.6 8950 167.5 8960 167.5 8970 167.4 8980 167.4 8990 167.3 9001 167.3 9011 167.3 90.21 167.2 9031 167.2 9041 167.1 9051 167.1 9061 167.1 9071 167 9081 167 9091 166.9 9101 166.9 9111 166.8 9121 166.8 9132 166.8 9142 166.7 9152 166.7 9162 166.6 9172 166.6 9182 166.6 9192 166.5

'9202 166.5 9212 166.4 9222 166.4 9232 166.4 9242 166.3 9252 166.3 9262 166.2 9273 166.2 9283 166.2 9293 166.1 9303 166.1 9313 166 9323 166 9333 165.9 9343 165 .9 9353 165.9 9363 165.8 9373 165.8 9383 165.7 9393 165.7 9404 165.7 9414 165.6 9424 165.6 9434 165. 5 9444 165. 5 9454 165.5 9464 165.4 9474 165.4 9484 165.3 9494 165.3 9504 165.3 9514 165.2 9525 165.2 9535 165.1 9545 165.1 9555 165.1 9565 165 9575 165 9585 164.9 9595 164.9 9605 164.9 9616 164.8 9626 164.8 9636 164.7 9646 164.7 9656 164.7 9666 164.6 9676 164.6 9687 164.6 9697 164.5 9707 164.5 9717 164.4 9727 164.4 9737 164.4 9747 164.3 9758 164.3 9768 164.2 9778 164.2 9788 164.2 9798 164.1 9808 164.1 9818 164 9828 164 9838 164 9848 163.9 9858 163.9 9868 163.9 9878 163.8 9888 163.8 9898 163.7 9908 163.7 9918 163.7 9928 163.6 9938 163.6 9948 163. 5 9958 163.5 9968 163.5 9978 163.4 9988 163.4 9998 163.4 le+004 163.4

Automated CALCULATION SHEET Page: C-49 of C-49 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes E No [l Date: 12/23/2008 F max = 362.9 at time = 1058 seconds.

F min = 85 at time = le-006 seconds.

Automated CALCULATION SHEET Page: D-1 of D-5 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No El Date: 12/23/2008 Attachment D GOTHIC Control Volume Descriptions In the following list, the.volumes given for subdivided volumes are not necessarily the actual total volumes used in the GOTHIC calculations. The following list presents the volumes as entered in Table 1 of the Volume Parameters which are not used. The actual total volume is obtained by summing the calculated volumes for each of the subdivision volumes based on the overall volume dimensions and the grid lines. These volumes are used in GOTH-IC-and are the ones shown-in the tables presented in Attachment B.

Control Volumes Vol Vol Elev Ht

  1. Description (ft3) (ft) (ft) is Rm 111 Pipeway U2 RHR 1767.15 -19.25 24.5 2s Rm 110 Pipeway U2 RHR 1972.27 -19.25 27.25 3 Rm 109 RHR Pmp 2P1OB 1698.27 -19.25 11.

4 Rm 108 RHR Pmp 2P10A 1698.27 -19.25 11.

5 Rm 102 Vlv Pit 56.25 -21.75 2.5 6 Rm 101 Sump Pmp Room 5404.16 719.25 11.

7 Rm 103 Sump 291.53 -25.42 6.17 8 Rm 105 RHR Pmp IPIOB 1698.27 -19.25 11.

9 Rm 104 RHR PMP IPIOA 1792.62 -19.25 11.

10s Rm 106 Pipeway U1 RHR 1972.27 -19.25 27.25 1ls RM 107 Pipeway U1 RHR 1767.15 -19.25 24.5 12s Rm 119A/133 RHR 2HXI1B Rm 2825.88 -5.25 29.5 13s Rm 119/134 RHR 2HX11A Rm 2237.94 -5.25 29.5 14 Rm 118 RC Drain Tk - U2 1399.78 -5.25 10.5 15 Rm 113 RHR HX Corridor 5589.68 -5.25 10.5 16 Rm 117 Sump Tk & Pmp Rm 543.38 -5.25 10.5 17s Rm 115/135 RHR 1HX11B Rm 2237.94 -5.25 29.5 18 Rm 114 RC Drain Tk - U1 522.11 -5.25 10.5 19s Rm 116/136 RHR 1HX1lA Rm 2825.88 -5.25 29.5 20s Rm 131/132 HUT Pmp & Vlv Galle 13403.34 8. 16.

21s Rm 137E/137W 14ft Vlv Glry & 6158.9 5.67 17.83 22 Rm 138 Evap Rm U2 3138.75 8. 15.5 23 Rm 142A Cond Ret Pmp Rm 9063. 8. 15.

Automated CALCULATION SHEET Page: D-2 of D-5 Engineering Calc. No.:

Services Corp.

PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No El Date: 12/23/2008 24 Rm 139 Evap Rm U1 3138.75 8. 15.5 25s Rm 140E/W Vlv Glry & PW #2 6158.9 5.67 17.83 26 Rm 141 Corridor North 2771.5 5.17 18.33 27 Rm 144 Seal Wtr HX Rm North 1512. 8. 16.

28 Rm 145 Non-Regen Rm Nth 1054.8 8. 16.

29 Rm 142 CCW Pmp Rm 29468.77 8. 16.5 30 Rm 146 Non-Regen Rm Sth 1135.8 8. 16.

31 Rm 147 Seal Wtr HX Rm Sth 1512. 8. 16.

32- Rm 143 Corridor Sth 2771.5 5 .17 18.33 33 Rm 163 2P2C Charging 2776.82 8. 15.5

{Automated Engineering CALCULATION SHEET Page: D-3 Calc. No.:

of D-5 Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes E- No [-I Date: 12/23/2008 Vol Vol Elev Ht Description (ft3) (ft) (ft) 34 Rm 164 2P2B Charging 2844.54 8. 15.5 35 Rm 165 2P2A Charging 2954.15 8. 15.25 36 Rm 148 Waste Holdup Tk Rm 8107.84 8. 14.75 37 Rm 149 Waste Evap Rm 3010.19 8. 14.75 38 Rm 151 CS & SI Rm 25675.65 8. 16.5 39 Rm 152 CH Pmp Rm lP2C 2954.15 8. 15.25 40 Rm 153 CH Pmp Rm 1P2B 2706191 8. 14 .75 41 Rm 154 CH Pmp Rm 1P2A 2706.91 8. 14 .75 42s Rm 162E/W Vlv Glry & PW#4 6696.32 5. 19.

43 Rm 166 MCC Rm 2B32 19199.15 8. 16.5 44 Rm 150 Waste Cond Tk Area 1659.38 8. 14.75 45 Rm 156 MCC Rm 1B32 14459.69 --8-. 1:5.25 46 Rm 156A front of MCC Rm 1B32 2172.65 8. 15.25 47s Rm 155E/W Vlv Glry & PW #1 4050.1 8. 16.5 48 Rm 160 Stk Ex Fan Rm 8654.13 8. 16.5 49s Rm 128/200 Hold-up Tk T8A Rm 9870.76 8. 35.

50s Rm 129/201 Hold-up Tk T8B Rm 9870.76 8. 35.

51s Rm 130/202 Hold-up Tk T8C Rm 9870.76 8. 35.

52 Rm 167 Cryogenic Rm 10883.49 8. 16.5 53 Rm 168 Decay Tk Rm 1719.13 8. 16.5 54 Rm 157 RCP Seal Wtr Fltr 1703.36 8. 16.5 55 Rm 158 Laundry Tk Rm 11244.57 8. 16.5 56 Rm 159 HVAC Equip Rm 42981.77 8. 16.5 57 Rm 161 Fltr Ex Fan Rm 13873.61 8. 16.5 58s Rm 137W 26ft/36ft Vlv Glry & P 6203.29 26. 22.

59 (Not Used) 9999. 26. 8.2 60 (Not Used) 9999. 26. 8.2 61 Rm 208/208A RW Solidif 14847.3 26. 22 .5 62s Rm 219U/L Vlv Glry & PW #2 6203.29 26. 22.

63s Rm 209/210/243 Truck Bay & Eq 213107.1 26. 81.5 64s Rm 205/206/203/204 SFP & Xfer 56243.83 24.67 41.33 65 Rm 189 Demin Rm U2B 1216.35 26. 17.

66 Rm 188 Demin Rm U2A 2214.68 26. 17.

67 Rm 190 Gas Strpr Eq Rm 1038.83 26. 18.5 68 Rm 192 Vlv Glry 39.51.09 26. 17.

69 Rm 195 Ion Ex Rm Nth 2625.86 26. 17.

70 Rm 196 Boric Acid Eq Rm 21941.38 26. 18.5 71 Rm 193 Demin Rm UlA 1507.05 26. 17.

72 Rm 194 Demin Rm UlB 2214.68 26. 17.

73 Rm 214 U2 Sample Rm 5110.69 26. 18.5 74 Rm 213 U2 Conc Hld Tk Rm 5060.48 26. 17.5 75 Rm 212 VCT 2T4 Rm 4334.27 26. 16.5

IEngineering Automated Services Corp.

CALCULATION SHEET Calc.

Page: No.:

D-4 of D-5 PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El] No ED Date: 12/23/2008 Vol Vol Elev Ht Description (ft3) (ft) (ft) 76 Rm 198 Ul RC Filter Rm 905.71 27. 15.75 77 Rm 187 Monitor TkRm 98438.92 26. 18.5 78 Rm 199 U2 RC Filter Rm 905.71 27. 15.75 79 Rm 191 Gas Strpr Eq Rm 1038.83 26. 18.5 80 Rm 197 Ion Ex Rm Sth 3947.4 26. 17.

81 Rm 228 Batt Rm DI05 1422.04 35. 9.5 82 Rm 227 125 VDC EE Rm D03 1419.26 26. 8.

83 Rm 215 Ul Conc Hld Tk Rm 10477.91 26. 18.5 84 Rm 2-16 Vlv Glry 1292.46 26. 18.5 85 Rm 186 VCT 1T4 Rm 3517.67 26. 16.5 86 Rm 182 Ul Sample Rm 4558.19 26. 16.5 87 Rm 181 Gas Decay Tk Rm 10099.78 26. 16.5 88 Rm 226 125VDC EE Rm D04 1257.35 26. 8.

89 Rm 225 Batt 'Rm D106 1070.1 26. 8.

90 Rm 217 U2 Corridor 8612.49 26. 18.5 91 Rm 184 Corridor 9934.63 26. 18.5 92 Rm 185 Chem Mix Tk Rm 7669.97 26. 18.5 93 Rm 183 Vlv Glry 1778.39 26. 18.5 94 Rm 242 Walkway 2023.4 48. 9.33 95s Rm 238/274/271 Gas Strpr Eq Rm 645605.9 46. 61.5 96 Rm 239 Ion Ex Fltr Rm 4031.8 46. 18.5 97 Rm 241 New Fuel Storage 5021.13 46. 20.

98 Rm 240 Waste Gas Eq Rm 5936.12 46. 17.5 99 Rm 253 Day Tank Rm U2 1169.64 52. 10.

100 Rm 252 Day Tank Rm Ul 1251.59 52. 10.

101 Rm 251 HVAC Eq Rm U2 38741.09 52. 13.5 102 Rm 246 Elect Equip Rm Ul 57058.11 46. 19.5 103 Rm 237 CCW HX & BA Tk Rm 59207.73 46. 18.5 104 Rm 245 Elect Equip Rm U2 59955.87 46. 19.5 105 Rm 250 HVAC Equip Rm Ul 41586.29 52. 13.5 106 Rm 275 Above SFP & Xfer C*anal 97427.48 66. 41.5 107 Rm 273 HVAC Eq Area U2 258090.7 66. 41.5 108 Rm 272 HVAC Eq Area Ul 258090.7 66. 41.5 109 El 8 - BC le+009 8. 50.

110 El 8 - BC le+009 8. 50.

ill El 26 - BC le+009 26. 50.

112 El 26 - BC le+009 26. 50.

113 El 46 - BC le+009 46. 50.

114 El 46 - BC le+009 46. 50.

115 El 66 - BC le+009 66. 50.

116 El 66 - BC le+009 66. 50.

117 Outdoor - BC le+009 26. 100.

Automated CALCULATION SHEET Page: D-5 of D-5 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No ED Date: 12/23/2008 Vol Vol Elev Ht 4 Description (ft3) (ft) (ft) 118 VNBI FC (W-85/86) Inlet 2900. 26. 8.

119 VNBI FC (W785/86) Outlet 2900. 26. 8.

120 FC HX-99/W-68 Outlet 2400. 8. 16.25 121 FC HX-98/W-67 Outlet 4000. -5.25 10.5 122 FC 1HX-70/1W-51 5000. 46. 19.5 123 FC 2HX-70/2W-51 5000. 46. 19.5 124s Rm 596 - Unit 2 Cont Facade 1257000. 6.5 152.5 125s Rm 524 - Unit 1 Cont Facade 1282000. 6.5 152.5 126 Turbine Building 1000000. -100. 300.

127 Service Building 1000000. -100. 300.

128 Rm 207 - Drum Storage Area 1000000. -100. 300.

129 Outside Atmosphere 1000000. -100. 300.

130 Rm 224 1000000. -100. 300.

131 Rm 218 - Unit 2 MS Pipe Chase 1000000. -100. 300.

132 Pretreatment & Boiler Rm 1000000. -100. 300.

133 Room 301 TB Below Deck 2025000. 8. 36.

134 Room 301 TB Above Deck 3931000. 44. . 65.

Automated CALCULATION SHEET Page: E-1 of E-18 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes Eli No El Date: 12/23/2008 Attachment E Representative Values from Attachment C Room Temperature Time History PAB ROOMS 271 &

238 MS TO AFWPT CRACK CASE PB-PAB-271_T SECONDS HOURS TEMP 1 0.0 85 12 0.0 90 78 0.0 101 130 0.0 110 212 0.1 120 323 0.1 130 484 0.1 140 665 0.2 150 856 0.2 160 1,078 0.3 170 1,379 0.4 180 1,771 0.5 190 1,801 0.5 191 1,982 0.6 180 3,095 0.9 170 4,362 1.2 160 5,000 1.4 157

Automated Engineering Cale. No.:

Services Corp. PBNP-994-2 1-13 1 ____ ____

Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No [L Date: 12/23/2008 PAB ROOM 140 CVCS LETDOWN LINE BREAK CASE PB-PAB-140 T SECONDS HOURS TEMP 1 0.0 92 11 0.0 129 24 0.0 153 34 0.0 163 60 0.0 175 81 0.0 180 181 0.1 185 367 0.1 187 590 0.2 188 616 0.2 179 672 0.2 160 898 0.2 150 1,483 0.4 140 2,392 0.7 130

Z& Automated Engineering CALCULATION SHEET Page: E-3 Calc. No.:

of E-18 Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No El Date: 12/23/2008 PAB ROOM 237 MS TO AFWPT BREAK CASE PB-PAB-237_T SECONDS HOURS TEMP 1 0.0 95 2 0.0 99 12 0.0 139 24 0.0 169 34 0.0 189 45 0.0 206 88 0.0 234 112 0.0 244 167 0.0 255 231 0.1 260 397 0.1 265 700 0.2 266 1,658 0.5 269 1,799 0.5 267 1,809 0.5 241 1,819 0.5 217 1,829 0.5 200 1,859 0.5 172 1,919 0.5 150 2,382 0.7 145

Automated CALCULATION SHEET Page: E-4 of E-18 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No 0 Date: 12/23/2008 PAB ROOMS 272 AND 273 MS CRACK CASE PB-PAB-272_T SECONDS HOURS I TEMP 1 0.0 85 11 0.0 112

-23 0.0 135 34 0.0 149 45 0.0 163 59 0.0 180 74 0.0 195 123 0.0 230 135 0.0 236 180 0.1 252 280 0.1 271 392 0.1 279 520 0.1 283 573 0.2 284 894 0.2 304 914 0.3 315 976 0.3 349 1,048 0.3 363 1,089 0.3 361 1,201 0.3 340 1,293 0.4 320 1,365 0.4 301 1,883 0.5 240 3,450 1.0 200 8,366 2.3 170 10,000 2.8 164

Automated CALCULATION SHEET Page: E-5 of E-18 Engineering Cale. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant' Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes E No D Date: 12/23/2008 TURBINE HALL UPPER MS BREAK CASE PB-PAB-301 T1 S3 SECONDS HOURS TEMP 1 0.0 85 2 0.0 98 5 0.0 121 12 0.0 150 22 0.0 180 29 0.0 198 51 0.0 221 64 0.0 230 88 0.0 242 95 0.0 244 104 0.0 245 125 0.0 244 193 0.1 239

Automated CALCULATION SHEET Page: E-6 of E-18 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No Eli Date: 12/23/2008 TURBINE HALL LOWER MS BREAK CASE PB-PAB-301_T2_S3 SECONDS HOURS TEMP 1 _0.0. 85 11 0.0 100 34 0.0 123 107 0.0 164 144 0.0 181 238 0.1 212 305 0.1 225 541 0.2 240 831 0.2 250 926 0.3 245 984 0.3 237 1,000 0.3 235

Automated CALCULATION SHEET Page: E-7 of E-18 jI Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No L-- Date: 12/23/2008 FAQADE UPPER MS BREAK CASE 596 T 1_S3 SECONDS HOURS TEMP 1 0.0 85 2 0.0 135 3 0.0 161 4 0.0 185 5 0.0 206 8 0.0 245 11 0.0 276 15 0.0 295 21 0.0 312 45 0.0 329 87 0.0 382 95 0.0 386 106 0.0 385 117 0.0 380

.133 0.0 370 164 0.0 351 192 0.1 340 200 0.1 337

Automated CALCULATION SHEET Page: E-8 of E-18 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes No L-1 Date: 12/23/2008 FAQADE MIDDLE MS BREAK CASE 596_T-1_S3 SECONDS HOURS TEMP 1 0.0 85 2 0.0 97 4 0.0 107 8 0.0 142 11 0.0 163 16 0.0 204 21 0.0 239 28 0.0 268 37 0.0 290 59 0.0 300 72 0.0 302 79 0.0 301 87 0.0 285 100 0.0 250 104 0.0 239 114 0.0 218 121 0.0 205 130 0.0 189 158 0.0 153 187 0.1 131 192 0.1 128

Automated CALCULATION SHEET Page: E-9 of E-18 Engineering Calc. No.:

Services Corp. P.BNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No 0 Date: 12/23/2008 FAQADE LOWER SGB BREAK CASE 596_T-3 SECONDS HOURS TEMP 1 0.0 85 5 0.0 90 13 0.0 110 28 0.0 136 49 0.0 155 104 0.0 180 227 0.1 200 567 0.2 210 849 0.2 225 878 0.2 229 885 0.2 230 907 0.3 225 963 0.3 220 1,102 0.3 215 1,530 0.4 211 2,000 0.6 210

Automated CALCULATION SHEET Page: E-10 of E-18 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

FHELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No [I Date: 12/23/2008 POINT BEACH NUCLEAR PLANT HELB RECONSTITUTION PROGRAM TASK 13 PAB ROOMS 271 AND 238 TEMPERATURE TIME HISTORY 2M A-I 1. 00 1.01

-4F 090-I-0 1.E+O0 1. E+OO1.E+01 1.E+02 I.E+03 .E0 1.E+04 Seconds

Automated CALCULATION SHEET Page: E-11 of E-18 Engineering Cale. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes WZ No' [I Date: 12/23/2008 POINT BEACH NUCLEAR PLANT HELB RECONSTITUTION PROGRAM TASK 13 PAB ROOM 140 TEMPERATURE TIME HISTORY IN I-w U

a 1.E+00 1. ~+OO1.E+01 1.E+02 .+31E0 1.E+03 1.E+04 Seconds

Automated CALCULATION SHEET Page: E-12 of E-18 Z Engineering Calc. No.:

Services Corp. PBNP-994-21 -13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes ElZ No [-I Date: 12/23/2008 POINT BEACH NUCLEAR PLANT HELB RECONSTITUTION PROGRAM ROOM 237 TEMPERATURE TIME.HISTORY odý ii-a o

1.E+00 1. E+OO1.E+01 1.E+02 E03.E 1.E+03 1.E+044 Seconds

Automated CALCULATION SHEET Page: E-13 of E-18 j/ Engineering Calc. No.:

Services Corp. PBN P-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D-- Date: 12/23/2008 POINT BEACH NUCLEAR PLANT HELB RECONSTITUTION PROGRAM ROOMS 272 AND 273 TEMPERATURE TIME HISTORY

'u-W 1.E+00 I .E+OOI.E+OI 1.E+02 1.E+03I.E0 1.E+04 Seconds

Automated CALCULATION SHEET Page: E-14 of E-18 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes E No El Date: 12/23/2008 POINT BEACH NUCLEAR PLANT HELB RECONSTITUTION PROGRAM TURBINE HALL UPPER TEMPERATURE TIME HISTORY Iim M

a $=

1. E+00 1.E+01 1.E+02 1.E+03 Seconds

Automated CALCULATION SHEET Page: E-15 of E-18 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No El Date: 12/23/2008 POINT BEACH NUCLEAR PLANT HELB RECONSTITUTION PROGRAM TURBINE HALL LOWER TEMPERATURE TIME HISTORY man vp JI~. 7P U

1a ..........

1.E+00 I.E+01 I.E+02 1.E+03 Seconds

Automated CALCULATION SHEET Page: E-16 of E-18 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes No LI] Date: 12/23/2008 POINT BEACH NUCLEAR PLANT HELB RECONSTITUTION PROGRAM TASK 13 FAQADE UPPER TEMPERATURE TIME HISTORY rB I-al 1.E+00 1.E+OO

.E+01 1.E+02 .E0 1.E+03 Seconds

Automated CALCULATION SHEET Page: E-17 of E-18 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes Ed No L-- Date: 12/23/2008 POINT BEACH NUCLEAR PLANT HELB RECONSTITUTION PROGRAM TASK 13 FA9ADE MIDDLE TEMPERATURE TIME HISTORY I.iU U.

1.E+O00 1. E+OO1.E+01 I.E+02 .E0 1.E+03 Seconds

Automated CALCULATION SHEET Page: E-18 of E-18 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D-- Date: 12/23/2008 POINT BEACH NUCLEAR PLANT HELB RECONSTITUTION PROGRAM TASK 13 FA(QADE LOWER TEMPERATURE TIME HISTORY I.

I- ............ - ...........

......... .I- OI I 44-4- I-i .::::: *-I i-i ~

4 4-4.--4--4--4-4-4-4.4

.I U

a 1.E+O0 1. E+OO1.E+01 1.E+02 I.E+03 .E0 1.E+04 Seconds

a Automated CALCULATION SHEET Page: F-1 of F-2 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

IIELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes E] No E- Date: 12/23/2008 Attachment F Rooms above 1300 F for Each Case

PBNP-994-21-13 Rev. 0 Page F-2 of F-2 Point Beach Nuclear Plant HELB Reconstitution Program Task 13 - Room Temoerature Time History Gothic Case ID PB-PAB- HELB Event Volume/Room Above 1300 F Description Comments 596_-1 MS Break at Containment 124 Cell 187/596 Facade Upper 124 Cell 186/596 Facade Middle 596_T-2 MS to AFWPT Break 124 Cell 186/596 Facade Middle Bounde ed by 596_T-1 124 Cell 187/596 Facade Upper Bounded by 596_T-1 596_T-3 SG Blowdown Break 124 Cell 185/596 Facade Lower 124 Cell 186/596 Facade Middle Bounded by 596 T-1 124 Cell 187/596 Facade Upper Bounded by 596_T-1 301_T-1 MS Break at Turbine 134 Cell 199/301 Turbine Hall Upper 301_T-2 MS to Condenser Break 133 Cell 198/301 Turbine Hall Lower 134 Ce11199/301 Turbine Hall Upper Bounded by 301_T-I 140_T CVCS Letdown Break 25 Cell 47/140 Pipe Chase 237_T MS to AFWPT Break 103 Cell 164/237 CCW Heat Exchangers 271_T MS to AFWPT Crack 95 Cell 156+/271 & 238 BAB Tank Area Numerous Cells/Rooms Only Room 238 has required equipment 272_T MS Crack 108 Cell 169/272 HVAC Room Same for Room 273 (Unit 2)

F-2

Automated CALCULATION SHEET Page: AA-1 of AA-31 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [K] No El Date: 02/14/2010 Addendum A Additional Case A-A.1 Introduction After completion of this calculation,KCI Engineering requested additional information (References A-A.2.1 through A-A.2-3) for the case with HELB in Room 272; this case is designated PB-PAB-272_T. This information was provided in References A.A.2 .4 and A.A12.5.

However, after utilizing this data in the thermal lag analyses for cables within this room, the results showed that unacceptable results were obtained for meeting the cable EQ requirements. As a consequence, an additional case was set up and run to reduce one of the overly conservative assumptions in the original case. This conservatism is associated with the amount of relief for the HELB mass and energy to be exhausted out of the room. The original case was based on assuming an arbitrary relief path area of 10 ft2 associated with the vent for W-35; however, a review of the current plant configuration revealed that the pins for Door 191 which connects Room 272 to the fagade have been removed and therefore this door will open into the fagade immediately after the onset of the HELB. Door 191 is a 7 ft high double door which has an approximate area of 42 ft2 . The revised case documented in this addendum replaces the vent Flow Path (FP435) data with values that are appropriate for Door 191. Additional changes were made to obtain outputs for the data required by KCI for input to their thermal lag analyses, similar to those of References A.A.2.4 and A.A.2.5.

A-A.2 References A.A.2.1 E-mail from Kevin Baby to Dan Henry dated Monday, Nov. 12, 2009 7:50 pm (see Section A.A.5).

A.A.2.2 E-mail from Kevin Baby to R. C. Kern dated Tuesday, Nov. 17, 2009 12:27 pm (see Section A.A.5).

A.A.2.3 E-mail from Kevin Baby to R. C. Kern dated Tuesday, Nov. 24, 2009 12:15 pm (see Section A.A.5).

A.A.2.4 Letter from C. D. Henry, AES, to Harv Hanneman, Nextera Energy - Point Beach Nuclear Plant, "KCI Requested Point Beach HELB Data", November 20, 2009.

A.A.2.5 Letter from C. D. Henry, AES, to Harv Hanneman, Nextera Energy - Point Beach Nuclear Plant, "Point Beach Uchida Heat Transfer Coefficient Data", November 30, 2009

/j' Automated CALCULATION SHEET Page: AA-2 of AA-31 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes E No 0 Date: 02/1.4/2010 A.A.3 GOTHIC Model Changes The revised GOTHIC case is denoted as PB-PAB-272 T -REV1. As noted in A.A.1 above, the major revision to the base case PB-PAB-272_T consisted of replacing the data for Flow Path 435 with values appropriate for Door 191. In the base case, Door 191 is represented by FP 600 through 602;.however these FP have infinite forward and reverse loss coefficients to prevent any flow through them. Instead of activating these FP, the following parameters were changed for FP 435 which now represents the equivalent of allowing flow through FP 600 through 602.

Elevation = 66 ft (Bottom of FP 600)

Height = 7.052 ft (Height of FP 602)

Area 42.53 ft2 (Sum of FP 600-602 areas)

Dh = 6.46 ft (Hydraulic Diameter of FP 600)

L = 6.23 ft ( Inertial length for FP 600)

K = 1.5 (Typical forward and reverse loss coefficients)

In addition, the thermal conductor input was changed as follows. TC 761 was added to Volume 108 (which represents Room 272) with a small area (1 ft2), and the area of TC 760 which represents Door 191 was also reduced to 1 ft 2 . Heat Transfer Coefficient (HTC) 112 was added and used on the Volume A side of TC 761 to obtain the Uchida. TC Type 42 was selected for TC 761 which corresponds to TC 760. HTC 4 was used on the Volume B side of TC 761 to represent an insulated boundary condition. The initial temperature for TC 761 is 85F which is the same as the initial temperature of Volume 108.

The following graphs were added. Graph 35 contains the vapor velocity for FP 435, Graph 36 contains the Uchida HTC, and Graph 37 contains the pressure in the HELB volume.

The following is a listing of the differences between the revised and base case EXP files.

Comparing files PB-PAB-272_T-REVI\pb-pab-272_t-revl.EXP and PB-PAB-272_T\PB-PAB-272 T.EXP

          • PB-PAB-272_T-REVl\pb-pab-272_t-revl.EXP 123F VNEERM Rm 245 2W-34 Exh 14.389 95 v-35.08 N N 29 64.5 124P Rm 272 Vent (UNVERIFIED) 14.389 95 N N 29 66.

125F HELB 14.389 el 66 1 65 N N 36 66.

          • PB-PAB-272_T\PB-PAB-272_T.EXP 123F VNEERM Rm 245 2W-34 Exh 14.389 95 v-35.08 N N 29 64.5

Automated CALCULATION SHEET Page: AA-3 of AA-31 Engineering Cale. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No E] Date: 02/14/2010 124P Rm 272 Vent (UNVERIFIED) 14.389 95 N N 29 106.5 125F HELB 14.389 el 66 1 65 N N 36 66.

          • PB-PAB-272_T-REV1\pb-pab-272_t-revl.EXP 434 VNEERM RM 245 vent 104 64.5 1. 123 64.5 1.

435 Door 191 - Rm 272 Exhaust 108 66. 7. 052 124P 66. 7.052 436 106-U - 136-S (11) 10s4 7.596 0. 273 19s4 8.016 0.

          • PB-PAB-272_T\PB-PAB-272_T.EXP 434 VNEERM RM 245 vent 104 64.5 1. 123 64.5 1.

435 Rm 272 Exhaust 108 106.5 1. 124P 106.5 1.

436 106-U - 136-S (11) 10s4 7.596 0. 273 19s4 8.016 0.

PB-PAB-272_T-REV1\pb-pab-272_t-revl.EXP 434 10. 3. 19.5 - NONE 435 42.53 6.46 6.23 - NONE 436 70.88 8.22 9.5 - NONE

          • PB-PAB-272_T\PB-PAB-272_T.EXP 434 10. 3. 19.5 - NONE 435 10. 3. 41.5 - NONE 436 70.88 8.22 9.5 - NONE
          • PB-PAB-272_T-REV1\pb-pab-272_t-revl.EXP 434 0. 0. OFF OFF 0. OFF 435 1.5 1.5 OFF OFF 0. OFF 436 1.5S 1.05 OFF OFF 0. OFF
          • PB-PAB-272_T\PB-PAB-272_T.EXP 434 0. 0. OFF OFF 0. OFF 435 0. 0. OFF OFF 0. OFF 436 1.5S 1.05 OFF OFF 0. OFF
          • PB-PAB-272_T-REV1\pb-pab-272_ t-revl. EXP 759 Rm 272 West-i 108 3 108 56 27 4398.5 85. I 760 Rm 272 W-2 Door 191 108 3 108 56 42 1. 85. I 761 Dummy - Uchida HTC 108 112 108 4 42 1. 85. I
          • PB-PAB-272_T\PB-PAB-272_T.EXP 759 Rm 272 West-i 108 3 108 56 27 4398.5 85. I 760 Rm 272 W-2 Door 191 108 3 108 56 42 42. 85. I

Automated CALCULATION SHEET Page: AA-4 of AA-31 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No ED Date: 02/14/2010

          • PB-PAB-272_T-REV1\pb-pab-272_t-revl.EXP 760 No No 761 No No PB-PAB-272_T\PB-PAB-272_T.EXP 760 No No PB-PAB-272_T-REV1\pb-pab-272_t-revl.EXP 111 Sp Ambient and HTC 1. 9T 110 112 Direct ADD UCHIDA VERT SURF PIPE FLOW ON
          • PB-PAB-272_T\PB-PAB-272_T.EXP 111 Sp Ambient and HTC 1. 9T 110
  • PB-PAB-272_T-REV1\pb-pab-272_t-revl.EXP 111 112 VAP Tg-Tf Tb-Tw PB-PAB-272_T\PB-PAB-272_T.EXP iii PB-PAB-272_T-REV1\pb-pab-272_t-revl.EXP 11i DEFAULT DEFAULT 112 DEFAULT DEFAULT PB-PAB-272_T\PB-PAB-272_T.EXP ill DEFAULT DEFAULT PB-PAB-272_T-REV1\pb-pab-272_t-revl.EXP 112 PB-PAB-272_T\PB-PAB-272_T.EXP iii

Automated CALCULATION SHEET Page: AA-5 of AA-31 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [K] No [I- Date: 02/14/2010

          • PB-PAB-272_T-REVI\pb-pab-272_t-revl.EXP 34 Pressure in HELB Volume PR103 35 Room 272 Vapor Velocity VV435 36 Room 272 Uchida HTC HA761 HA755 37 Room 272 Pressure PR108
          • PB-PAB-272_T\PB-PAB-272_T.EXP 34 Pressure in HELB Volume PR103 A.A.4 Results The following results were obtained from the GOT file after exercising the "replace all graph data" option. These results are for the Vapor Temperature in Volume 108 (Room 272), the Vapor Velocity for FP 435 (Door 191) and the Heat Transfer Coefficient for side A for TC 761 (Uchida HTC). The temperature response in Room 272 is essentially the same as for the original case which is due to the fact that the larger vent area is not a significant factor for this parameter.

However the larger vent area does have a significant impact on the vapor velocity (a reduction factor of about 1/4) and on the Uchida HTC (a reduction factor of about 40%) relative to the results reported in References A.A.2.4 and A.A.2.5, respectively. The peak pressure in Room 272 is 14.44 psia at 11.55 sec.

Vapor Temperature for Volume 108 Cell 1 Time F (t) Time F (t) Time F (t) seconds (F) seconds (F) seconds (F) 0 85 le-006 85 0.1082 85.02 0.2213 85.04 0.329 85.07 0.4416 85.09 0.5914 85.09 0.7179 85.08 0.871 85.07 1 85.07 1.108 85.38 11.5 112 23.52 135.1 33 .98 148.3 44.9 158.3 59.15 175.6 73.35 191.3 86.95 204.1 99.97 214.4 112.2 222 .6 123.7 229.3 134.7 234.9 145.2 239.6 155.3 243 .5 168.2 247.9 180.6 251.7 192.6 255.1 204.2 258 215.5 260.5 226.4 262.7 237.1 264.7 247.6 266.4 257.8 267.9

jjjX Automated Engineering I CALCULATION SHEET Page: AA-6 Calc. No.:

of AA-31 Services Corp._ PBN P-994-2 1-13 Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D- Date: 02/14/2010 267.8 269.2 280.1 270.7 292.1 303.8 273.1 315.3 274.1 326.6 275 337.7 275.8 348.7 276.6 359.4 277.2 370 277.8 380.3 278.3 392.1 278.9 403 .2 279.4 413.8 279.9 423.9 280.2 435.2 280.7 446 281 456.4 281.4 466.5 281.7 477.5 282 488.2 282.3 498.5 282.5 509.6 282.8 520.3 283 530.6 283.2 541.6 283.5 552 .3 283 .7 562.5 283.8 573 .4 284 583 .8 283.9 594 281.7 604.7 279.4 615 277.7 625.1 276.4 635.6 275.4 645.9 274.7 656 .6 274.2 667 273.8 677.1 273.6 687.8 273.4 698 .2 273.3 708.4 273 .3 718 .5 273.3 729 273.4 739.5 273.5 749.7 273.6 759.9 273.8 769.9 274.4 780.4 275.3 790.9 276.6 801.2 278.1 811.4 279.8 821.5 281.6 831.6 283.6 842.1 286.1 852.5 288.9 862.9 292 873.1 295.4 883.3 299.4 893.4 303.9 903 .4 309 913.9 314.8 924 .2 321 934 .5 327.2 944 .7 333 .2 954 .8 338.8 964.8 343 .8 975.3 348.3 985.6 352.2 995.9 355.4 1006 357.9 1016 359.8 1027 361.3 1037 362.2 1047 362.7 1057 362.8 1067 362.5 1078 361.8 1088 360.9 1099 359.7 1109 358.3 1119 356.7 1129 355 1140 353 .1 1150 351.1 1160 349.1 1170 347 1180 344.8 1191 342.5 1201 340.3 1211 338 1221 335.6 1231 333.3 1242 331 1252 328.7 1262 326.4 1272 324.1 1283 321.9 1293 319.6 1303 317.4 1313 315 1323 312 1333 309.1 1343 306.4 1354 303.7 1364 301.2 1374 298.8 1384 296.5 1394 294.3 1404 292.1 1414 290.1 1425 288 1435 286.1 1445 284.2 1455 282.4 1466 280.7 1476 279 1486 277.4 1496 275.8 1506 274.3 1516 272.8 1527 271.4 1537 270.1 1547 268.7 1557 267.4 1567 266.2 1577 265 1587 263.8 1598 262.6 1608 261.5 1618 260.5 1628 259.4

Automated Engineering Calc. No.:

Services Corp. PBNP-994-21-13 f

Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant. Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No [D Date: 02/14/2010 1638 258.4 1648 257.4 1658 256.4 1669 255.5 1679 254.6 1689 253.7 1699 252.8 1709 252 1719 251.2 17,29 250.4 1740 249.6 1750 248.8 1760 248.1 1770 247.3 1780 246.6 1790 245.9 1801 245.2 1811 244 .6 1821 243 .9 1831 243.3 1841 242 .7 1851 242 1861 241.4 1871 240.8 1882 240.3 1892 239.7 1902 239.1 1912 238.6 1922 238 1932 237.5 1942 237 1952 236.5 1962 236 1973 235.5 1983 235 1993 234.5 2003 234 2013 233.6 2023 233.1 2033 232.7 2043 2.32.2 2053 231.8 2064 231.3 2074 230.9 2084 230.5 2094 230.1 2104 229.7 2114 229.3 2124 228.9 2134 228.5 2144 228.1 2155 227.7 2165 227.4 2175 227 2185 226.7 2195 226.3 2205 226 2215 225.6 2225 225.3 2235 224.9 2245 224.6 2255 224.3 2266 224 2276 223 .6 2286 223 .3 2296 223 2306 222 .7 2316 222 .4 2326 222.1 2336 221.8 2346 221.5 2357 221.2 2367 221 2377 220.7 2387 220.4 2397 220.1 2407 219.9 2417 219.6 2427 219.4 2437 219.1 2447 218.8 2458 218.6 2468 218.4 2478 218.1 2488 217.8 2498 217.6 2508 217.3 2518 217 2528 216.7 2538 216.4 2548 216.1 2558 215.8 2568 215.5 2578 215.2 2589 214.8 2599 214.5 2609 214.2 2619 213.9 2629 213.6 2639 213.3 2649 213 2660 212.7 2670 212.4 2680 212.2 2690 211.9 2700 211.6 2710 211.4 2720 211.1 2730 210.9 2740 210.6 2750 210.4 2761 210.2 2771 209.9 2781 209.7 2791 209.5 2801 209.3 2811 209.1 2821 208.9 2831 208.6 2841 208.4 2851 208.2 2861 208 2871 207.8 2881 207.7 2892 207.5 2902 207.3 2912 207.1 2922 206.9 2932 206.7 2942 206.6 2952 206.4 2963 206.2

Automated CALCULATION SHEET Page: AA-8 of AA-31 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: I Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 02/14/2010 2973 206 2983 205.9 2993 205.7 3003 205.5 3014 205.4 3024 205.2 3034 205.1 3044 204.9 3054 204.8 3064 204.6 3074 204.5 3084 204.3 3094 204 .2 3104 204 3114 203.9 3124 203.8 3134 203.6 3145 203.5 3155 203 .3 3165 203.2 3175 203.1 3185 202. 9 3195 202.8 3205 202.7 3215 202.6 3225 202.4 3235 202.3 3245 202.2 3256 202.1 3266 201.9 3276 201.8 3286 201.7 3296 201.6 3306 201.5 3316 201.3 3326 201.2 3337 201.1 3347 201 3357 200.9 3367 200.8 3377 200.7 3387 200.5 3398 200.4 3408 200.3 3418 200.2 3428 200.1 3438 200 3448 199.9 3459 199.8 3469 199.7 3479 199.6 3489 199.5 3499 199.4 3509 199.3 3520 199.2 3530 199.1 3540 199 3550 198.9 3560 198 .8 3571 198.7 3581 198.6 3591 198.5 3601 198.4 3611 198.3 3621 198.2 3632 198.1 3642 198 3652 197.9 3662 197.8 3672 197.7 3683 197.6 3693 197.5 3703 197.4 3713 197.3 3723 197.2 3733 197.1 3744 197 3754 196.9 3764 196.8 3774 196.8 3784 196.7 3795 196.6 3805 196.5 3815 196.4 3825 196.3 3835 196.2 3845 196.1 3856 196 3866 195.9 3876 195.8 3886 195.7 3896 195.6 3907 195.5 3917 195.4 3927 195.3 3937 195.2 3947 195.1 3958 195.1 3968 195 3978 194.9 3988 194.8 3998 194.7 4008 194.6 4019 194.5 4029 194.5 4039 194.4 4049 194.3 4059 194.2 4069 194.1 4079 194 4089 193.9 4099 193.9 4110 193.8 4120 193.7 4130 193.6 4140 193.5 4150 193.5 4160 193.4 4170 193.3 4180 193.2 4190 193.1 4200 193.1 4210 193 4221 192.9 4231 192.8 4241 192.8 4251 192.7 4261 192.6 4271 192.5 4281 192.4 4291 192.4 4301 192.3

Automated CALCULATION SHEET Page: AA-9 of AA-31, Engineering Caic. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 1 Station: Point Beach N~uclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No ED Date: 02/14/201.0 4311 192.2 4321 192.1 4332 192 .1 4342 192 4352 191.9 4362 191.8 4372 191.8 4382 191.7 4392 191.6 4402 191.5 4412 191.5 4422 191.4 4433 191.3 4443 191.2 4453 191.2 4463 191.1 4473 191 4483 191 4493 190.9 4503 190.8 4513 190.7 4523 190.7 4534 190.6 4544 190.5 4554 190.5 4564 190.4 4574 190.3 4584 190.2 4594 190.2 4604 190.1 4614 190 4624 190 4634 189.9 4644 189.8 4654 189.8 4664 189.7 4675 189.6 4685 189.6 4695 189.5 4705 189.4 4715 189 .3 4725 189.3 4735 189.2 4745 189.1 4755 189.1 4765 189 4775 188.9 4785 188.9 4795 188.8 4806 188.7 4816 188.7 4826 188.6 4836 188.5 4846 188.5 4856 188.4 4866 188.3 4876 188.3 4886 188.2 4896 188.1 4906 188.1 4916 188 4926 187.9 4937 187.9 4947 187.8 4957 187.7 4967 187.7 4977 187.6 4987 187.5 4997 187.5 5007 187.4 5017 187.4 5027 187.3 5037 187.2 5047 187.2 5057 187.1 5068 187 5078 187 5088 186.9 5098 186.8 5108 186.8 5118 186.7 5128 186.6 5138 186.6 5148 186.5 5158 186.5 5168 186.4 5178 186.3 5188 186.3 5198 186.2 5209 186.1 5219 186.1 5229 186 5239 186 5249 185.9 5259 185.8 5269 185.8 5279 185.7 5289 185.6 5299 185.6 5309 185.5 5319 185.5 5329 185.4 5339 185.3 5350 185.3 5360 185.2 5370 185.1 5380 185.1 5390 185 5400 185 5410 184.9 5420 184 .8 5430 184 .8 5440 184.7 5451 184.7 5461 184 .6 5471 184 .5 5481 184 .5 5491 184 .4 5501 184.3 5511 184 .3 5521 184 .2 5531 184.2 5541 184 .1 5551 184 5562 184 5572 183 .9 5582 183.9 5592 183.8 5602 183 .8 5612 183.7 5622 183.6 5632 183 .6

,/~ TAutomated ZEngineering CALCULATION SHEET Page: AA-10 Cale. No.:

of AA-3 1 Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No 0I Date: 02/14/2010 5642 183 .5 5652 183 .5 5662 183 .4 5672 183 .3 5682 183 .3 5692 183 .2 5702 183 .2 5712 183.1 5723 183 .1 5733 183 5743 182 .9 5753 182 .9 5763 182 .8 5773 182 .8 5783 182 .7 5793 182.7 5803 182.6 5813 182 .5 5823 182.5 5833 182.4 5843 182.4 5853 182.3 5864 182 .2 5874 182 .2 5884 182.1 5894 182.1 5904 182 5914 182 5924 181.9 5934 181.8 5944 181.8 5954 181.7 5964 181.7 5974 181.6 5984 181.6 5994 181.5 6005 181.4 6015 181.4 6025 181.3 6035 181.3 6045 181.2 6055 181.2 6065 181.1 6075 181.1 6085 181 6095 180.9 6105 180.9 6115 180 .8 6125 180.8 6136 180.7 6146 180.7 6156 180.6 6166 180.6 6176 180.5 6186 180.4 6196 180.4 6206 180.3 6216 180.3 6226 180.2 6236 180.2 6246 180.1 6257 180.1 6267 180 6277 179.9 6287 179.9 6297 179.8 6307 179.8 6317 179.7 6327 179.7 6337 179.6 6347 179.6 6357 179.5 6367 179.4 6377 179.4 6387 179.3 6397 179.3 6408 179.2 6418 179.2 6428 179.1 6438 179.1 6448 179 6458 179 6468 178.9 6478 178.8 6489 178.8 6499 178.7 6509 178.7 6519 178 .6 6529 178.6 6539 178.5 6549 178 .5 6559 178 .4 6569 178 .4 6579 178 .3 6589 178 .3 6599 178 .2 6609 178 .2 6619 178 .1 6629 178 6639 178 6649 177.9 6659 177. 9 6669 177.8 6680 177.8 6690 177 .7 6700 177.7 6710 177.6 6720 177.6 6730 177.5 6740 177.5 6750 177.4 6761 177.4 6771 177.3 6781 177.3 6791 177.2 6801 177.1 6811 177.1 6821 177 6831 177 6841 176.9 6851 176 .9 6861 176 .8 6871 176.8 6881 176 .7 6891 176 .7 6901 176 .6 6911 176 .6 6921 176 .5 6931 176 .5 6942 176.4 6952 176 .4 6962 176 .3

Automated CALCULATION SHEET Page: AA-i II of AA-31 Engineering Caic. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No L-1 Date: 02/14/2010 6972 176.3 6982 176.2 6992 176.2 7002 176.1 7012 176 .1 7022 176 7032 176 7042 175. 9 7053 175. 9 7063 175.8 7073 175.8 7083 175.7.

7093 175.7 7103 175 6 7113 175.6 7124 175.5 7134 175.5 7144 175.4 7154 175.3 7164 175.3 7174 175.2 7184 175.2 7194 175.1 7204 175.1 7214 175 7224 175 7234' 174.9 7244 174.9 7254 174.8 7264 174.8 7274 174 .7 7284 174 .7 7294 174.7 7304 174 .6 7315 174 .6 7325 174 .5 7335 174 .5 7345 174.4 7355 174 .4 7-36 174.3 7375 174 .3 738-5 174.2 7395 174.2 7405 174.1 7415 174.1 7425 174 7436 174 7446 173 .9 7456 173 .9 7466 173 .8 7476 173 .8 7486 173 .7 7496 173 .7 7506 173 .6 7516 173 .6 7527 173 .5 7537 173 .5 7547 173 .4 7557 173 .4 7567 173 .3 7577 17 3 .3 7587 173 .2 7598 173 .2 7608 173.1 7618 173 .1 7628 173 7638 173 7648 172 .9 7658 172 .9 7668 172 .8 7678 172 .8 7688 172 .7 7698 172 .7 7708 172 .6 7718 172 .6 7728 172 .6 7738 172 .5 7748 172 .5 7758 172.4 7768 172 .4 7778 172 .3 7788 172 .3 7798 172 .2 7808 172 .2 7818 172.1 7829 172 .1 7839 172 7849 172 7859 171. 9 7869 171. 9 7879 171.8 7889 171.8 7899 171.7 7909 171.7 7919 171.7 7929 171.6 7939 171.6 7950 171.5 7960 171.5 7970 171.4 7980 171.4 7990 171.3 8000 171.3 8010 171.2 8020 171.2 8030 171.1 8041 171.1 8051 171 8061 171 8071 171 8081 170.9 8091 170.9 8101 170.8 8111 170.8 8122 170.7 8132 170.7 8142 170.6 8152 170.6 8162 170.5 8172 170.5 8182 170.4 8193 170.4 8203 170.3 8213 170.3 8223 170.3 8233 170.2 8243 170.2 8253 170.1 8263 170.1 8273 170 8283 170 8293 169.9

/I m Automated Engineering I C L U A INS E TPage: AA-1 Cale. No.:

ofA-31 Services Corp._ PBNP-994-2 1-13 Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HIELD Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No DI Date: 02/14/20 10 8303 169.9 8313 169.9 8323 169.8 8333 169.8 8343 169.7 8353 169.7 8363 169.6 8373 169.6 8383 169.5 8393 169.5 8403 169.4 8413 169.4 8424 169.4 8434 169 .3 8444 169.3 8454 169.2 8464 169.2 8474 169.1 8484 169.1 8494 169 8504 169 8514 169 8524 168.9 8534 168.9 8544 168.8 8554 168.8 8564 168.7 8574 168.7 8584 168.6 8595 168.6 8605 168.6 8615 168.5 8625 168.5 8635 168.4 864S5 168.4 8655 168.3 8665 168.3 8675 168.3 8685 168.2 8695 168.2 8706 168.1 8716 168.1 8726 168 8736 168 8746 167.9 8756 167.9 8766 167.9 8776 167.8 8786 167.8 8796 167.7 8807 167.7 8817 167.6 8827 167.6 8837 167 .6 8847 167.5 8857 167.5 8867 167.4 8877 167.4 8888 167.3 8898 167.3 8908 167.3 8918 167.2 8928 167.2 8938 167.1 8948 167.1 8959 167 8969 167 8979 167 8989 166.9 8999 166.9 9009 166.8 9019 166.8 9030 166.7 9040 166.7 9050 166.7 9060 166.6 9070 166.6 9080 166.5 9091 166.5 9101 166.4 9111 166.4 9121 166.4 9131 166.3 9141 166.3 9151 166.2 9161 166.2 9171 166.1 9181 166 .1 9191 166.1 9201 166 9211 166 9221 165.9 9231 165 .9 9241 165.9 9251 165.8 9261 165.8 9271 165.7 9281 165.7 9291 165.7 9301 165.6 9311 165.6 9321 165.5 9331 165.5 9341 165.4 9351 165.4 9361 165.4 9371 165.3 9381 165.3 9391 165.2 9402 165.2 9412 165.2 9422 165.1 9432 165.1 9442 165 9452 165 9462 165 9472 164 .9 9482 164 .9 9492 164 .8 9502 164 .8 9512 164 .8 9522 164 .7 9532 164 .7 9542 164.6 9552 164.6 9562 164 .6 9572 164.5 9583 164.5 9593 164 .4 9603 164 .4 9613 164.4 9623 164 .3

Automated CALCULATION SHEET Page: AA-13 of AA-31 Engineering Calc. No.:

Services Corp. PBNP-994-2l-13 Client: FP&L Energy Revision: I Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task, 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 02/14/2010 9633 164.3 9643 164.2 9653 164.2 9663 164.2 9673 164.1 9683 164.1 9693 164 9703 164 9714 164 9724 163.9 9734 163 .9 9744 163 .8 9754 163 .8 9764 163 .8 9774 163.7 9784 16.3.7 9794 163 .6 9804 163 .6 9814 163..6 9825 163 .5 9835 163.5 9845 163.4 9855 163 .4 9865 163 .4 9875 163.3 9885 163 .3 9895 163 .2 9905 163%2 991:5 163.2 9926 163 .1 9936 163.1 9946 163 .1 9956 163 9966 163 9976 162.9 9986 162.9 9996 162.9 le+004 162 .8 F max = 362.8 at time = 1057 seconds.

F min = 85 at time = le-006 seconds.

Vapor Velocity for Junction 435 Time F (t) Time F(t) Time F (t) seconds (ft/s) seconds (ft/s) seconds (ft/s) 0 0 le-006 -4.035e-005 0.1082 -3.823 0.2213 -5.332 0.329. -4.094 0.4416 -1.086 0.5914 3.1 0.7179 4.694 0.871 3.926

. .1 2.208 1.108 7.041 11.5 72.93 23.52 65.67 33.98 62.04 44.9 60.58 59.15 63.73 73.35 62.85 86.95 62.05 99.97 61.39 112.2 60.85 123.7 60.45 134.7 60.14 145.2, 59.87 155.3 59.67 168.2 59.51 180.6 59.47 192.6 59.43 204,.2 59.4 215.5 59.36 226.4 59.33 237'1 59.3. 247:.6 59.28 257.8 59.27 267.8 59.27, 280..1 59.27 292.1 59.28 303 8 59 .3 315ý-.3 59.33 326.6 59.36 337.7 59-.4 348.-7' 59.44 359.4 59.48 370 59.52 380.3 59.57 392.1 59.62 403.2 59.67 413.8 59.73 423.9 59.78 435.2 59.83 446 59.89 456.4 59.94 466.5 59.99 477.5 60.04 488.2 60.09 498.5 60.13 509.6 60.18 520.3 60.23 530.6 60.27 541.6 60.32 552.3 60.36

/~ Automated CALCULATION SHEET Page: AA1 ofAAI j~~ Engineering Ci.N.

Servces orp.PBNP-994-2 1-13 Client: FP&L Energy Revision: I Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No [I I Date: 02/14/2010 562.5 60.39 573.4 60.43 583.8 77.06 594 85.2 604.7 86.08 615 85.52 625.1 84.96 635.6 84.39 645.9 83.99 656.6 83.57 667 83.16 677.1 82.78 687.8 82.56 698.2 82.31 708.4 82.09 718.5 81.85 729 81.6 739.5 81.36 749.7 81.12 759.9 81 769.9 80.96 780.4 80.91 790.9 80.84 801.2 80.8 811.4 80.71 821.5 80.58 831.6 80.09 842.1 79.62 852.5 79.16 862.9 78.26 873.1 77.14 883.3 75.62 893.4 73.55 903.4 71.09 913.9 67.48 924.2 63.39 934.5 58.74 944.7 53.92 954.8 49.45 964.8 44.9 975.3 40-.51 985.6 36.43 995.9 32.92 1006 29.59 1016 26.57 1027 23.82 1037 21.27 1047 19.11 1057 16.95 1067 15.03 1078 13.35 1088 11.75 1099 10.37 1109 9.139 1119 8.111 1129 7.149 1140 6.249 1150 5.465 1160 4.774 1170 4.159 1180 3.635 1191 3.127 1201 2.657 1211 2.29 1221 1.909 1231 1.603 1242 1.342 1252 1.115 1262 0.8902 1272 0.6767 1283 0.4517 1293 0.2177 1303 -0.1592 1313 -2.383 1323 -2.142 1333 -4.813 1343 -1.88 1354 -1.767 13'64 -1.664 1374 -1.571 1384 -1.486 1394 -3.086 1404 -1.329 1414 -0.7525 1425 -0.7074 1435 -0.6705 1445 -0.6358 1455 -0.6033 1466 -0.572 1476 -0.5419 1486 -0.5134 1496 -0.4864 1506 -0.4598 1516 -0.4344 1527 -0.4102 1537 -0.3872 1547 -0.3646 1557 -0.3431 1567 -0.3225 1577 -0.3029 1587 -0.2836 1598 -0.2651 1608 -0.2474 1618 -0.2305 1628 -0.2138 1638 -0.1978 1648 -0.1825 1658 -0.1673 1669 -0.1528 1679 -0.1388 1689 -0.1254 1699 -0.1121 1709 -0.09934 1719 -0.08706 1729 -0.07524 1740 -0.06355 1750 -0.05229 1760 -0.04143 1770 -0.03096 1780 -0.0206 1790 -0.01059 1801 -0.0009368 1811 0.008737 1821 0.01847 1831 0.02797 1841 0.03723 1851 0.04626 1861 0.05527 .1871 0.06406 1882 0.07261 1892 0.08095 1902 0.08927

Automated C L U A INS ETPage: AA-15 of AA-31I SEngineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D- Date: 02/14/2010 1912 0.09737 1922 0.1053 1932 0.113 1942 0.1206 19S2 0.1281 1962 0.1354 1973 0.1425 1983 0.1496 1993 0.1565 2003 0.1632 2013 0.1697 2023, 0.1763 2033 0.1827 2043 0.1889 2053 0.1949 2064 0.2009 2074 0.2068 2084 0.2125 2094 0.2182 2104 0.2237 2114 0.2292 2124 0.2345 2134 0.2398 2144 0.2451 2155 0.2503 2165 0.2553 2175 0.2603 2185 0.2653 2195 0.2701 2205 0.275 2215 0.2797 2225 0 .2-844 2235 0.289 2245 0.2935 2255 0.298 2266 0.3024 22,76 0.3068 2286 0.3111 2296 0.3153 2306 0.3194 2316 0. 3235 2326 0.3275 2336 0.3315 2346 0.3354 2357 0.3393 2367 0.3431 2377 0.3469 2387 0.3506 2397 0.3542 2407 0.3578 2417 0.3613 2427 0.3648 2437 0.3682 2447 0.3716 2458 0.3747 2468 0.3779 2478 0.3812 2488 0.357 2498 0.3607 2508 0.3651 2518 0.3694 2528 0.3476 2538 0.3519 2548 0.3571 2558 0.3622 2568 0.3296 2578 0.3359 2589 0.3427 2599 0.3491 2609 0.3552 2619 0.3611 2629 0.3668 2639 0.3724 2649 0.3777 2660 0.3829 2670 .0.3879 2680 0.3928 2690 0.3975 2700 0.4021 2710 0.4066 2720 0.4108 2730 0.415 2740 0.4191 2750 0.423 2761 0.4269 2771 0.4307 2781 0.4343 2791 0.4379 2801 0.4414 2811 0.4449 2821 0.4482 2831 0.4515 2841 0.4547 2851 0.4578 2861 0.4609 2871 0.4639 2881 0.4668 2892 0.4697 2902 0.4725 2912 0.4753 2922 0.478 2932 0.4806 2942 0.4832 2952 0.4857 2963 0.4882 2973 0.4907 2983 0.4931 2993 0.4954 3003 0.4977 3014 0.5 3024 0.5022 3034 0.5044 3044 0.5065 3054 0.5085 3064 0.5106 3074 0.5126 3084 0.5145 3094 0.5165 3104 0.5184 3114 0.5203 3124 0.5221 3134 0.5239 3145 0.5257 3155 0.5275 3165 0.5292 3175 0.5309

Automated CALCULATION SHEET Page: AA-16 of AA-31 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 02/14/2010 3185 0.5326 3195 0.5342 3205 0.5359 3215 0.5374 3225 0.539 3235 0.5406 3245 0.5421 3256 0.5436 3266 0.5451 3276 0.5465 3286 0.548 3296 0.5494 3306 0.5508 3316 0.5522 3326 0.5535 3337 0.5549 3347 0.5562 3357 0.5575 3367 0.5588 3377 0.5601 3387 0.5614 3398 0.5626 3408 0.5639 3418 0.5651 3428 0.5663 3438 0.5675 3448 0.5686 3459 0.5698 3469 0.5709 3479 0.5721 3489 0.5732 3499 0.5743 3509 0.5754 3520 0.5765 3530 0.5775 3540 0.5786 3550 0.5796 3560 0.5807 3571 0.5817 3581 0.5827 35.91 0.5837 3:601 0.5847 3611 0.5857 3621 0.5866 3632 0.5876 3642 0.584 3652 0.5846 3662 0.5858 3672 0.5869 3683 0.588 3693 0.5891 3703 0.5901 3713 0.5911 3723 0.5922 3733 0.5932 3744 0.5942 3754 0.5951 3764 0.5961 3774 0.5946 3784 0.5928 3795 0.5939 3805 0.5951 3815 0.5962 3825 0.5973 3835 0.5983 3845 0.5994 3856 0.6004 3866 0.6014 3876 0.6024 3886 0.6034 3896 0.6043 3907 0.6053 3917 0.6062 3927 0.6071 3937 0.608 3947 0.6089 3958 0.6098 3968 0.6107 3978 0.6115 3988 0.6124 3998 0.6132 4008 0.614 4019 0 .6148 4029 0.6156 4039 0.6164 4049 0.6172 4059 0.618 4069 0.6187 4079 0.6195 4089 0.6203 4099 0.621 4110 0.6217 4120 0.6224 4130 0.6232 4140 0.6239 4150 0.6246 4160 0.6253 4170 0.626 4180 0.6266 4190 0.6273 4200 0.628 4210 0.6287 4221 0.6293 4231 0.63 4241 0.6306 4251 0.6313 4261 0.6319 4271 0.6325 4281 0.6332 4291 0.6338 4301 0.6344 4311 0.635 4321 0.6356 4332 0.6362 4342 0.6368 4352 0.6374 4362 0.638 4372 0.6386 4382 0.6392 4392 0.6397 4402 0.6403 4412 0.6409 4422 0.6414 4433 0.642 4443 0.6426 4453 0.6431

Automated CALCULATION SHEET Page: AA-17 of AA-31 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

IELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 02/14/2010 4463 0.6436 4473 0.6442 4483 0.6447 4493 0.6453 4503 0.6458 4513 0.6463 4523 0.6469 4534 0.6474 4544 0.6479 4554 0.6484 4564 0.6489 4574 0.6494 4584 0.65 4594 0.6505 4604 0.651 4614 0.6515 4624 0.652 4634 0.6524 4644 0.6529 4654 0.6534 4664 0.6539 4675 0.6544 4685 0.6549 4695 0 .6553 4705 0.6558 4715 0.6563 4725 0.6567 4735 0.6572 4745 0.6577 4755 0.6581 4765 0.6586 4775 0.6591 4785 0.6595 4795 0.66 4806 0.6604 4816 0.6609 4826 0.6613 4836 0.6617 4846 0.6622 4856 0.6626 4866 0.6631 4876 0.-6635 4886 0.6639 4896 0.6644 4906 0.6648 4916 0.6652 4926 0.6656 4937 0.6661 4947 0.6665 4957 0.6669 4967 0.6673 4977 0.6677 4987 0.6681 4997 0.6685 5007 0.6689 5017 0.6694 5027 0.6698 5037 0.6702 5047 0.6706 5057 0.671 5068 0.6714 5078 0.6718 5088 0.6722 5098 0.6725 5108 0.6729 5118 0.6733 5128 0.6737 5138 0.6741 5148 0.6745 5158 0.6749 5168 0.6753 5178 0.6756 5188 0.676 5198 0.6764 5209 0.6768 5219. 0.6771 5229 0.6775 5239 0.6779 5249 0.6782 5259 0.6786 5269 0.679 5279 0.6793 5289 0.6797 5299 0.6801 5309 0.6804 5319 0.6808 5329 0.6812 5339 0.6815 5350 0 .6819 5360 0.6822 5370 0.6826 5380 0.6829 5390 0.6833 5400 0.6836 5410 0.684 5420 0.6843 5430 0.6847 5440 0.685 5451 0.6854 5461 0.6857 5471 0.686 5481 0.6864 5491 0.6867 5501 0.687 5511 0.6874 5521 0.6877 5531 0.688 5541 0.6902 5551 0.6903 5562 0.6905 5572 0.6907 5582 0.691 5592 0.6912 5602 0.6915 5612 0.6918 5622 0.692 5632 0.6923 5642 0.6926 5652 0.6929 5662 0.6932 5672 0.6935 5682 0.6937 5692 0.694 5702 0.6943 5712 0.6946 5723 0.6949 5733 0.6952 5743 0.6955 5753 0.6958 5763 0.6961 5773 0.6964 5783 0.6967

Automated CALCULATION SHEET Page: AA-18 of AA-31 SEngineering Caic. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: I Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No [II Date: 02/14/2010 5793 0.6969 5803 0.6972 5813 0.6975 5823 0.6978 5833 0.6981 5843 0.6984 5853 0.6987 5864 0.699 5874 0.6993 5884 0.6995 5894 0.6998 5904 0.7001 5914 0.7004 5924 0.7007 5934 0.701 5944 0.7012 5954 0.7015 5964 0.7018 5974 0.7021 5984 0.7024 5994 0.7026 6005 0.7029 6015 0.7032 6025 0.7035 6035 0.7038 6045 0 .704 6055 0.7043 6065 0.7046 6075 0.7049 6085 0.7051 6095 0.7054 6105 0.7057 61 15 0.7059 6125 0.7062 6136 0.7065 6146 0.7067 6156 0.707 6166 0.7073 6176 0.7075 6186 0.7078 6196 0.7081 620 6- 0.7083-6216 0.7086 6226 0.7089 6236 0.7091 6246 0 .7094 6257 0.7096 6267 0.7099 6277 0.7102 6287 0.7104 6297 0.7107 6307 0.7109 6317 0.7112 6327 0.7114 6337 0.7117 6347 0.7119 6357 .0.7122 6367 0.7124 6377 0.7127 6387 0.713 6397 0.7132 6408 0.7135 6418 0.7137 6428 0.7139 6438 0.7142 6448 0.7144 6458 0.7147 6468 0.7149 6478 0.7152 6489 0.7154 6499 0.7157 6509 0.7159 6519 0.7162 6529 0.7164 6539 0.7166 6549 0.7169 6559 0.7171 6569 0.7173 6579 0.7176 6589 0.7178 6599 0.718 6609 0.7183 6619 0. 7185 6629 0.7188 6639 0.719 6649 0.7192 6659 0.7195 6669 0.7197 6680 0.7199 6690 0.7201 6700 0.7204 6710 0.7206 6720 0.7208 6730 0.7211 6740 0.7213 6750 0.7215 6761 0.7217 6771 0.722 6781 0.7222 6791 0.7224 6801 0.7226 6811 0.7229 6821 0.7231 6831 0.7233 6841 0.7235 6851 0.7237 6861 0.724 6871 0.7242 6881 0.7244 '6891 0.7246 6901 0.7248 6911 0.725 6921 0.7253 6931 0.7255 6942 0.7257 6952 0.7259 6962 0.7261 6972 0.7263 6982 0.726S 6992 0.7267 7002 0.727 7012 0.7272 7022 0.7274 7032 0.7276 7042 0.7278 7053 0.728

Automated Engineering I CALCULATION SHEET Page: AA-19 Caic. No.:

of AA-31 z/ A Services Corp. {PBN P-994-2 1-13 Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D- Date: 02/14/2010 7063 0.7282 7073 0.7284 7083 0.7286 7093 0.7288 7103 0.729 7113 0.7292 7124 0.7294 7134 0.7297 7144 0.7299 7154 0.7301 7164 0.7303 7174 0.7305 7184 0.7307 7194 0.7309 7204 0.7311 7214 0.7313 7224 0.7314 7234 0.7316 7244 0.7318 7254 0.732 7264 0.7322 7274 0.7324 7284 0.7326 7294 0.7328 7304 0.733 7315 0.7332 7325 0.7334 7335 0.7336 7.345 0.7338 7355 0.734 7365 0.7342 7375 0.7343 7385 0. 7345 7395 0.7347 7405 0.7349 7415 0.7351 7425 0.7353 7436 0.7355 7446 0.7357 7456 0.7358 7466 0.736 7476 0 .7-362 7486 0.7364 7496 0.7366 7506 0.7368 7516 0.737 7527 0.7371 7537 0.7373 7547 0.7375 7557 0.7377 7567 0.7379 7577 0.738 7587 0.7382 7598 0.7384 7608 0.7386 7618 0.7388 7628 0.7389 7638 0.7391 7648 0.7393 7658 0.7395 7668 0.7396 7678 0.7398 7688 0 .74 7698 0.7401 7708 0.7403 7718 0.7405 7728 0.7407 7738 0.7408 7748 0.741 7758 0.7412 7768 0.7413 7778 0.7415 7788 0.7417 7798 0.7418 7808 0.742 7818 0.7422 7829 0.7423 7839 0.7425 7849 0.7427 7859 0.7428 7869 0.743 7879 0.7432 7889 0.7433 7899 0.7435 7909 0.7437 7919 0.7438 7929 0.744 7939 0.7441 7950 0.7443 7960 0.7445 7970 0.7446 7980 0.7448 7990 0.745 8000 0.7451 8010 0.7453 8020 0.7454 8030 0.7456 8041 0.7457 8051 0.7459 8061 0.7461 8071 0.7462 8081 0.7464 8091 0.7465 8101 0.7467 8111 0.7468 8122 0.747 8132 0.7472 8142 0.7473 8152 0.7475 8162 0.7476 8172 0.7478 8182 0.7479 8193 0.7481 8203 0.7482 8213 0.7484 8223 0.7485 8233 0.7487 8243 0 .7488 8253 0.749 8263 0.7491 8273 0.7493 8283 0.7494 8293 0.7496 8303 0.7497 8313 0.7499 8323 0.75

Automated Engineering t CALCULATION SHEET Page: AA-20 Caic. No.:

of AA-31 Services Corp._ PBNP-994-2 1-13 Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No [I Date: 02/14/2010 8333 0.7501 8343 0.7503 8353 0.7504 8363 0.7506 8373 0.7507 8383 0.7509 8393 0.751 8403 0.7511 8413 0.7513 8424 0.7514 8434 0.7516 8444 0.7517 8454 0.7519 8464 0.752 8474 0.7521 8484 0.7523 8494 0.7524 8504 0.7526 8514 0.7527 8524 0.7528 8534 0.753 8544 0.7531 8554 0.7532 8564 0.7534 8574 0.7535 8584 0.7537 8595 0.7538 8605 0.7539 8615 0.7541 8625 0.7542 8635 0.7543 8645 0.7545 8655 0.7546 8665 0.7547 8675 0.7549 8685 0.755 8695 0.7551 8706 0.7553 8716 0.7554 8726 0.7555 8736 0.7557 8746 0.755,8 8756 0.7559 8766 0.7561 8776 0.7562 8786 0.7563 8796 0.7564 8807 0.7566 8817 0.7567 8827 0.7568 8837 0.757 8847 0.7571 8857 0.7572 8867 0.7574 8877 0.7575 8888 0.7576 8898 0.7577 8908 0.7579 8918 0.758 8928 0.7581 8938 0.7582 8948 0.7S84 8959 0.7585 8969 0.7587 8979 0.7588 8989 0.7589 8999 0.759 9009 0.7591 9019 0.7593 9030 0.7594 9040 0.7595 9050 0.7596 9060 0.7598 9070 0.7599 9080 0.76 9091 0.7601 9101 0.7602 9111 0.7604 9121 0.7605 9131 0.7606 9141 0.7607 9151 0.7608 9161 0.7609 9171 0.7611 9181 0.7612 9191 0.7613 9201 0.7614 9211 0.7615 9221 0.7616 9231 0.7617 9241 0.7619 9251 0.762 9261 0.7621 9271 0.7622 9281 0.7623 9291 0.7624 9301 0.7625 9311 0.7626 9321 0.7628 9331 0.7629 9341 0.763 9351 0.7631 9361 0.7632 9371 0.7633 9381 0.7634 9391 0.7635 9402 0.7636 9412 0.7638 9422 0.7639 9432 0.764 9442 0.7641 9452 0.7642 9462 0 .7643 9472 0.7644 9482 0.7645 9492 0.7646 9502 0.7647 9512 0.7648 9522 0.7649 9532 0.765 9542 0.7652 9552 0.7653 9562 0.7654 9572 0 .7655 9583 0.7656 9593 0.7657 9603 0.7658 9613 0.7659 9623 0.766 9633 0.7661 9643 0.7662 9653 0.7663

Automated CALCULATION SHEET Page: AA-21 of AA-31 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes - No L-I Date: 02/14/2010 9663 0.7664 9673 0.7665 9683 0.7666 9693 0.7667 9703 0.7668 9714 0.7669 9724 0.767 9734 0.7671 9744 0.7672 9754 0.7673 9764 0.7674 9774 0.7675 9784 0.7676 9794 0.7677 9804 0.7678 9814 0.7679 9825 0.768 9835 0.7681 9845 0.7682 9855 0.7683 9865 0.7684 9875 0.7685 9885 0.7686 9895 0.7687

'9905 0.7688 9915 0.7689 9926 0.769 9936 0.7691 9946 0.7692 9956 0.7693 9966 0.7694 9976 0.7695 9986 0.7-696 9996 0.7697 le+004 0.7697 F max = 86.08 at time =

  • 604.7 seconds.

F min = -5.332 at time = 0.2213 seconds.

Vapor Heat Transfer Coeff. for Conductor 761 Side A Time F(t) Time F(t) Time F (t) seconds (B/h-ft2-F) seconds (B/h-ft2-F) seconds (B/h-f t2 F) 0 0 le-006 2.787e-005 0.1082 0.3568 0.2213 0.3587 0.329 0.359 0.4416 0.3591 0.5914 0.3591 0.7179 0.3591 0.871 0.359 1 0.359 1.108 0.4093 11.5 9.033 23.52 15.48 33.98 17.97 44.9 20.28 59.15 6.319 73.35 2.386 86.95 1.633 99.97 1.723 112.2 1.789 123.7 1.84 134.7 1.88 145.2 1.912 155.3 1.716 168.2 1.7 180.6 1.691 192.6 1.687 204.2 1.686 215.5 1.687 226.4 1.688 237.1 1.689 247.6 1.691 257.8 1.692 267.8 1.694 280.1 1.695 292.1 1.696 303.8 1.697 315.3 1.697 326.6 1.698 337.7 1.698 348.7 1.698 359.4 1.698 370 1.698 380.3 1.697 392.1 1.697 403.2 1.696 413.8 1.696 423.9 1.695 435.2 1.694 446 1.693 456.4 1.692 466.5 1.692 477.5 1.691 488.2 1.689 498.5 1.688 509.6 1.687 520.3 1.686 530.6 1.685 541.6 1.683 552.3 1.682 562.5 1.681 573.4 1.679 583.8 1.675 594 1.626 604.7 1.573 615 1.536 625.1 1.52 635.6 1.519 645.9 1.525

IAutomated Engineering Services Corp.

Client: FP&L Energy

-PBNP-994-2 CALCULATION SHEET Page: AA-22 Cale. No.: of AA-3 1 1-13 Revision: I Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes W No D Date: 02/14/2010 656 .6 1.533 667 1.541 677.1 1.548 687.8 1.554 698.2 1.558 708.4 1.562 718 .5 1.564 729 1.566 739.5 1.568 749.7 1.57 759.9 1.572 769.9 1.583 780.4 1.6 790.9 1.618 801.2 1.636 811.4 1.655 821.5 1.673 831.6 1.691 842 .1 1.712 852.5 1.735 862.9 1.76 873.1 1.788 883 .3 1.819 893.4 1.853 903.4 1.89 913 . 9 1.932 924 .2 1.975 934.5 2 .016 944 .7 2 .053 954 .8 2.086 964 .8 2 .114 975 .3 2.137 985 .6 2.155-995.9 2 .168 1006 2.176 1016 2.179 1027 2.179 1037 2.175 1047 2.167 1057 2 .157 1067 2.143 1-078 2.125 1088 2.105 1099 2 .082 1109 2.057 1119 2.028 1129 1.995 1140 2 .051 1150 2.136 1160 2 .12 1170 2 .042 1180 1.924 1191 1.929 1201 1.93 1211 1.928 1221 1.924 1231 1.918 1242 1. 912 1252 1.904 1262 1.896 1272 1.887 1283 1.879 1293 1.87 1303 1.862 1313 1.855 1323 1.854 1333 1.847 1343 1.837 1354 1.825 1364 1.812 1374 1.8 1384 1.787 1394 1.775 1404 1.763 1414 1.752 1425 1.741 1435 1.73 1445 1.72 1455 1.71 1466 1.7 1476 1.691 1486 1.682 1496 1.673 1506 1.665 1516 1.656 1527 1.648 1537 1.641 1547 1.633 1557 1.626 1567 1.619 1577 1.612 1587 1.605 1598 1.598 1608 1.592 1618 1.586 1628 1.58 1638 1.574 1648 1.568 1658 1.562 1669 1.556 1679 1.551 1689 1.546 1699 1.54 1709 1.535 1719 1.53 1729 1.525 1740 1 .52 1750 1.516 1760 1.511 1770 1.506 1780 1.502 1790 1.497 1801 1.493 1811 1.489 1821 1.485 1831 1.481 1841 1.477 1851 1.473 1861 1.469 1871 1.465 1882 1.461 1892 1.458 1902 1.S45 1912 1.45 1922 1.447 1932 1.443 1942 1.44 1952 1.436 1962 1.433 1973 1.43 1983 1.427 1993 1.423

Automated CALCULATION SHEET Page: AA-23 of AA-3 1 I& Engineering Caic. No.:

z ll ý Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes Wl No El' Date: 02/14/2010 2003 1.42 2013 1.417 2023 1.414 2033 1.411 2043 1.408 2053 1.405 2064 1.402 2074 1.399 2084 1.396 2094 1.393 2104 1.39 2114 1.387 2124 1.385 2134 1.382 2144 1.379 2155 1.376 2165 1.374 2175 1.371 2185 1.368 2195 1.366 2205 1.363 2215 1.361 2225 1.358 2235 1.356 2245 1.353 2255 1.351 2266 1.349 2276 1.346 2286 1.344 2296 1.341 2306 1.339 2316 1.337 2326 1.335 2336 1.332 2346 1.33 2357 1.328 2367 1.326 2377 1.324 2387 1.321 2397 1.319 2407 1.317 2417 1.315 2427 1.313 2437 1.311 2447 1.309 2458 1.307 2468 1.305 2478 1.303 2488 1.302 2498 1.301 2508 1.299 2518 1.298 2528 1.297 2538 1.296 2548 1.295 2558 1.293 2568 1.292 2578 1.292 2589 1.291 2599 1.289 2609 1.288 2619 1.286 2629 1.284 2639 1.282 2649 1.28 2660 1.278 2670 1.276 2680 1.274 2690 1.272 2700 1.27 2710 1.268 2720 1.266 2730 1.264 2740 1.262 2750 1.26 2761 1.259 2771 1.257 2781 1.255 2791 1.253 2801 1.251 2811 1.25 2821 1.248 2831 1.246 2841 1.244 2851 1.243 2861 1.241 2871 1.239 2881 1.238 2892 1.236 2902 1.234 2912 1.233 2922 1.231 2932 1.23 2942 1.228 2952 1.226 2963 1.225 2973 1.223 2983 1.222 2993 1.22 3003 1.219 3014 1.217 3024 1.216 3034 1.214 3044 1.213 3054 1.212 3064 1.21 3074 1.209 3084 1.207 3094 1.206 3104 1.205 3114 1.203 3124 1.202 3134 1.201 3145 1.199 3155 1.198 3165 1.197 3175 1.196 3185 1.194 3195 1.193 3205 1.192 3215 1.191 3225 1.189 3235 1.188 3245 1.187 3256 1.186 3266 1.185 3276 1.183 3286 1.182 3296 1.181 3306 1.18 3316 1.179 3326 1.178

Automated Engineering Calc. No.:

Services Corp. PBNP-994-21-13

+

Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No 0-- Date: 02/14/2010 3337 1.177 3347 1.176 3357 1.174 3367 1.173 3377 1.172 3387 1.171 3398 1.17 3408 1.169 3418 1.168 3428 1.167 3438 1.166 3448 1.165 3459 1.164 3469 1.163 3479 1.162 3489 1.161 3499 1.16 3509 1.159 3520 1.158 3530 1.157 3540 1.156 3550 1.155 3560 1.155 3571 1.154 3581 1.153 3591 1.152 3601 1.151 3611 1.15 3621 1.149 3632 1.148 3642 1.148 3652 1.147 3662 1.146 3672 1.146 3683 1.145 3693 1. 144 3703 1.145 3713 1.146 3723 1.147 3733 1.148 3744 1.149 3754 1.15 3764 1.151 3774 1.152 3784 1.151 3795 1.151 3805 1.151 3815 1.151 3825 1.152 3835 1.152 3845 1.153 3856 1.153 3866 1.154 3876 1.155 3886 1.155 3896 1.156 3907 1.157 3917 1.157 3927 1.158 3937 1.158 3947 1.159 3958 1.159 3968 1.16 3978 1.16 3988 1.161 3998 1.161 4008 1.162 4019 1.162 4029 1.162 4039 1.163 4049 1.163 4059 1.164 4069 1.164 4079 1.164 4089 1.164 4099 1.165 4110 1.165 4120 1.165 4130 1.165 4140 1.166 4150 1.166 4160 1.166 4170 1.166 4180 1.166 4190 1.166 4200 1.167 4210 1.167 4221 1.167 4231 1.167 4241 1.167 4251 1.167 4261 1.167 4271 1.167 4281 1.167 4291 1.167 4301 1.167 4311 1.167 4321 1.167 4332 1.167 4342 1.167 4352 1.167 4362 1.167 4372 1.167 4382 1.167 4392 1.167 4402 1.167 4412 1.167 4422 1.167 4433 1.167 4443 1.167 4453 1.167 4463 1.167 4473 1.167 4483 1.167 4493 1.166 4503 1.166 4513 1.166 4523 1.166 4534 1.166 4544 1.166 4554 1.166 4564 1.166 4574 1.166 4584 1.165 4594 1.165 4604 1.165 4614 1.165 4624 1.165 4634 1.165 4644 1.165 4654 1.164 4664 1.164

Automated CALCULATION SHEET Page: AA-25 of AA-31 Z Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No EZ Date: 02/14/2010 4675 1.164 4685 1.164 4695 1.164 4705 1.164 4715 1.163 4725 1.163 4735 1.163 4745 1.163 4755 1.163 4765 1.162 4775 1.162 4785 1.162 4795 1.162 4806 1.162 4816 1.162 4826 1.161 4836 1.161 4846 1.161 4856 1.161 4866 1.161 4876 1.16 4886 1.16 4896 1.16 4906 1.16 4916 1.159 4926 1.159 4937 1.159 4947 1.159 4957 1.159 4967 1.158 4977 1.158 4987 1.158 4997 1.158 5007 1.158 5017 1.157 5027 1.157 5037 1.157 5047 1.157 5057 1.156 5068 1.156 5-078 1.156 5088 1.156 5098 1.156 5108 1.155 5118 1.155 5128 1.155 5138 1.155 5148 1.154 5158 1.154 5168 1.154 5178 1.154 5188 1.153 5198 1.153 5209 1.153 5219 1.153 5229 1.152 5239 1.152 5249 1.152 5259 1.152 5269 1.152 5279 1.151 5289 1.151 5299 1.151 5309 1.151 5319 1.15 5329 1.15 5339 1.15 5350 1.15 5360 1.149 5370 1.149 5380 1.149 5390 1.149 5400 1.148 5410 1.148 5420 1.148 5430 1.148 5440 1.147 5451 1.147 5461 1.147 5471 1.147 5481 1.147 5491 1.146 5501 1.146 5511 1.146 5521 1.146 5531 1.145 5541 1.124 5551 1.124 5562 1.123 5572 1.123 5582 1.123 5592 1.122 5602 1.122 5612 1.122 5622 1.121 5632 1.121 5642 1.121 5652 1.12 5662 1.12 5672 1.12 5682 1.119 5692 1.119 5702 1.119 5712 1.118 5723 1.118 5733 1.118 5743 1.117 5753 1.117 5763 1.117 5773 1.116 5783 1.116 5793 1.116 5803 1.115 5813 1.115 5823 1.115 5833 1.114 5843 1.114 5853 1.114 5864 1.113 5874 1.113 5884 1.113 5894 1.112 5904 1.112 5914 1.112 5924 1.ill 5934 1.ill 5944 1. il 5954 1.11 5964 1.11 5974 1.11 5984 1.109 5994 1.109

Automated Engineering Services Corp. PBNP-994-21-13

+

Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes E No D-- Date: 02/14/2010 6005 1.109 6015 1.108 6025 1.108 6035 1.108 6045 1.107 6055 1.107 6065 1.107 6075 1.106 6085 1.106 6095 1.106 6105 .1.105 6115 1.105 6125 1.105 6136 1.104 6146 1.104 6156 1.104 6166 1.103 6176 1.103 6186 1.103 6196 1.102 6206 1.102 6216 1.102 6226 1.101 6236 1.101 6246 1. 101 6257 1.1 6267 1.1 6277 1.1 6287 1.099 6297 1.099 6307 1.099 6317 1.098 6327 1.098 6337 1.098 6347 1.097 6357 1.097 6367 1.097 6377 1.096 6387 1.096 6397 1.096 6408 1.095 6418 1.095 6428 1.095 6438 1.094 6448 1.094 6458 1.094 6468 1.093 6478 1.093 6489 1.093 6499 1.092 6509 1.092 6519 1.092 6529 1.091 6539 1.091 6549 1.091 6559 1.09 6569 1.09 6579 1.09 6589 1.089 6599 1.089 6609 1.089 6619 1.088 6629 1.088 6639 1.088 6649 1.087 6659 1.087 6669 1.087 6680 1.086 6690 1.086 6700 1.086 6710 1.085 6720 1. 085 6730 1.085 6740 1.084 6750 1. 084 6761 1.084 6771 1.083 6781 1.083 6791 1.083 6801 1.082 6811 1.082 6821 1.082 6831 1.081 6841 1.081 6851 1.081 6861 1.08 6871 1.08 6881 1.08 6891 1.079 6901 1.079 6911 1.079 6921 1.078 6931 1.078 6942 1.078 6952 1.077 6962 1.077 6972 1.077 6982 1.076 6992 1.076 7002 1.076 7012 1.075 7022 1. 075 7032 1.075 7042 1.074 7053 1. 074 7063 1.074 7073 1. 073 7083 1.073 7093 1. 073 7103 1.072 7113 1.072 7124 1. 072 7134 1.071 7144 1.071 7154 1.071 7164 1.07 7174 1.07 7184 1.07 7194 1.069 7204 1.069 7214 1.069 7224 1.068 7234 1.068 7244 1.068 7254 1.067 7264 1.067 7274 1.067 7284 1.066 7294 1.066 7304 1.066 7315 1.065 7325 1.065

Automated CALCULATION SHEET Page: AA-27 of AA-31 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [E No E-l Date: 02/14/2010 7335 1.065 7345 1.064 7355 1.064 7365 1.064 7375 1.063 7385 1.063 7395 1.063 7405 1.062 7415 1.062 7425 1.062 7436 1.061 7446 1.061 7456 1.061 7466 1.06 7476 1.06 7486 1.06 7496 1.059 7506 1.059 7516 1.059 7527 1.058 7537 1.058 7547 1.058 7557 1.057 7567 1. 057 7577 1.057 7587 1.056 7598 1.056 7608 1.056 7618 1.055 7628 1.055 7638 1.055 7648 1.054 7658 1.054 7668 1.054 7678 1.053 7688 1. 053 7698 1.053 7708 1.052 7718 1.052 7728 1. 052 7738 1.051 7748 1.051 7758 1. 051 7768 1.05 7778 1.05 7788 1.05 7798 1.049 7808 1.049 7818 1.049 7829 1.048 7839 1.048 7849 1.048 7859 1.047 7869 1.047 7879 1.047 7889 1.046 7899 1.046 7909 1.046 7919 1.045 7929 1.045 7939 1.045 7950 1. 044 7960 1.044 7970 1. 044 7980 1.043 7990 1.043 8000 1.043 8010 1.042 8020 1.042 8030 1.042 8041 1.041 8051 1.041 8061 1.041 8071 1.04 8081 1.04 8091 1.04 8101 1.039 8111 1.039 8122 1.039 8132 1.038 8142 1.038 8152 1.038 8162 1.037 8172 1.037 8182 1.037 8193 1.036 8203 1.036 8213 1.036 8223 1.035 8233 1.035 8243 1.035 8253 1.034 8263 1.034 8273 1.034 8283 1.033 8293 1.033 8303 1.033 8313 1.032 8323 1.032 8333 1.032 8343 1.031 8353 1.031 8363 1.031 8373 1.03 8383 1.03 8393 1.03 8403 1.029 8413 1.029 8424 1.029 8434 1.028 8444 1.028 8454 1.028 8464 1.028 8474 1.027 8484 1.027 8494 1.027 8504 1.026 8514 1.026 8524 1.026 8534 1.025 8544 1.025 8554 1.025 8564 1. 024 8574 1.024 8584 1.024 8595 1. 023 8605 1.023 8615 1.023 8625 1. 022 8635 1. 022 8645 1.022 8655 1.021

Automated CALCULATION SHEET Page: AA-28 of AA-31 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 1 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No El Date: 02/14/2010 8665 1.021 8675 1.021 8685 1.02 8695 1.02 8706 1.02 8716 1.019

.8726 1.019 8736 1.019 8746 1.0.18 8756 1.018 8766 1.018 8776 1.017 8786 1.017 8796 1.017 8807 1.016 8817 1.016 8827 1.016 8837 1.015 8847 1.015 8857 1.015 8867 1.014 8877 1.014 8888 1.014 8898 1.013 8908 1.013 8918 1.013 8928 1.012 8938 1.012 8948 1.012 8959 1.011 8969 1.011 8979 1.011 8989 1.01 8999 1.01 9009 1.01 9019 1.01 9030 1.009 9040 1.009 9050 1.009 9060 1.008 9070 1.0.08 9080 1.008 9091 1.007 9101 1.007 9111 1.007 9121 1.006 9131 1.006 9141 1.006 9151 1.005 9161 1.005 9171 1.005 9181 1.004 9191 1.004 9201 1.004 9211 1.003 9221 1.003 9231 1.003 9241 1.002 9251 1.002 9261 1.002 9271 1.001 9281 1.001 9291 1.001 9301 1.001 9311 1 9321 0.9999 9331 0.9995 9341 0.9992 9351 0.9989 9361 0.9986 9371 0.9983 9381 0.9979 9391 0. 9976 9402 0.9973 9412 0.997 9422 0.9967 9432 0.9964 9442 0.996 9452 0.9957 9462 0.9954 9472 0.9951 9482 0.9948 9492 0.9944 9502 0.9941 9512 0.9938 9522 0.9935 9532 0.9932 9542 0.9928 9552 0. 9925 9562 0.9922 9572 0.9919 9583 0.9916 9593 0.9913 9603 0.9909 9613 0.9906 9623 0.9903 9633 0.99 9643 0.9897 9653 0.9894 9663 0.989 9673 0.9887 9683 0.9884 9693 0.9881 9703 0.9878 9714 0.9874 9724 0.9871 9734 0.9868 9744 0.9865 9754 0.9862 9764 0.9859 9774 0.9855 9784 0. 9852 9794 0.9849 9804 0.9846 9814 0.9843 9825 0.984 9835 0.9836 9845 0.9833 9855 0.983 9865 0.9827 9875 0 .9824 9885 0.9821 9895 0.9818 9905 0 .9814 9915 0.9811 9926 0.9808 9936 0.9805 9946 0.9802 9956 0.9799 9966 0.9795 9976 0.9792 9986 0.9789

L Automated Engineering CALCULATION SHEET Page: No.:

Calc. AA-29 of AA-31 Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: I Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El] No D Date: 02/14/2010 9996 0.9786 le+004 0.9785 F max = 20.28 at time = 44.9 seconds.

F min = 0 at time = 0 seconds.

A.A 5 Copies of Selected References Reference A.A.2.1 From: Kevin Baby <kbaby@kciconsultants.com>

Subject:

Request of data from GOTHIC Model for Point Beach To: dhenry@aesengineering.com Date: Thursday, November 12, 2009, 7:50 PM Hi Dan, The information I'm looking for Point Beach PAB building, Room 272 at elevation 66' are:

  • Areas of junction connected to Room 272.
  • Flow densities through these junctions.

These values will be used to obtain Heat Transfer Coefficient of the steam at the given time profile. I thought of attaching the pdf of an old request (for Prairie Island) made about 10 years ago in case I'm not very clear.

From an AES calculation, PBNP-994-21-13, there is a GOTHIC Case ID mentioned against Room 272 which is PB-PAB-272 T. Ijust noticed that, when I was confirming the Room number. Hope this helps.

Thanks a lot for your help Dan!

Kevin Baby KCI Engineering (630) 515-2650 x 11 Reference A.A.2.2 Original Message -----

From: Kevin Baby <kbaby@kciconsultants.com>

To: rckem@aol.com Cc: harv.hanneman@fpl.com; tom.esper@nexteraenergy.com; Saravanan Makayee <smakayee@kciconsultants.com>;

joe.loor@fpl.com; Dan Henry <dhenry@aesengineering.com>

Automated CALCULATION SHEET Page: AA-30 of AA-31 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: I Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [K] No El Date: 02/14/2010 Sent: Tue, Nov 17, 2009 12:27 pm

Subject:

Request of data for thermal lag analysis of Room 272 Hi Kern, This is to follow up with our earlier conversation that we had today regarding the data required for thermal lag analysis in Room 272.

Please provide the data along with the signed cover sheet to Harv Hanneman (EPU Project Manager) and please cc KCI.

Thanks a lot for your help.

Kevin Baby KCI Eng-ineering (630) 515-2650 x 11 Reference A.A.2.3

-- M essage -----

---Original From: Kevin Baby <kbaby@kciconsultants.com>

To: rckern@aol.com Sent: Tue, Nov 24, 2009 12:15 pm

Subject:

Uchida Correlation Hi Kern, Few calculations that I used as examples to obtain and use uchida heat transfer coefficient value until the environment temperature exceeds saturation temperature, referenced NRC standard review plan 6.2.1.5 in taking the conservative value of uchida correlation of 280 BTU/hr. ft2. F. I was planning to follow the same footstep but when I browsed through the reference, the standard review plan 6.2.1.5 had been revised and they took out the entire section that gives all the numbers.

So I went through a calculation done in D.C Cook and they had the values of uchida coefficient obtained through GOTHIC. Is there a way I could get the values of uchida coefficient and the peak pressure of the fan room 272 compartment?

Thanks for your help,

Automated CALCULATION SHEET Page: AA-31 of AA-31 Engineering Caic. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: I Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No El Date: 02/14/2010 Kevin Baby KCI Engineering (630) 515-2650 x 1.1.

Automated CALCULATION SHEET Page: AB-1 of AB-38 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes ElZ No L] Date: 04/14/2010 Addendum B Swing Battery Room and Switchgear Room Temperature Responses A.B.1 Introduction After completion of this calculation, Point Beach requested that an additional case be run. This case involved determining the temperature response in the Swing Battery Room, which was not included in the original Primary Auxiliary Building model. The Swing Battery Room is adjacent to the Turbine Building and occupies space surrounded by the Turbine Building, so that its

-environment will be impacted by a HELB in the Turbine Building. In addition, KCI Engineering (Reference A.B.2.3) made a further comment that the Switchgear Room which contains EQ equipment should also be included in this additional case. One of the sub-models of the Control Building did include these rooms which are designated as Rooms 321 and 323. The modeling aspects of these rooms during normal operation are given in Reference A.B.2.1 which located them on Elevation 26'-0". Based on the initial analyses in this calculation, the limiting case is the HELB located in the Turbine Building below the Turbine Deck. This case is designated as PB-PAB-301 T-2 which was used as the base case for this additional calculation.

A.B.2 References A.B.2.1 AES Calculation 2005-0052 Rev. 1 A.B.2.2 E-mail from Tom George (NAI) to Dick Kern Dated Mar. 19, 2010 5:36 pm, "Re: FW: Point Beach GOTHIC Models" - Copy Include in Section A.B.5.

A.B.2.3 E-mail from Saravanan Makayee to Tom Esper Dated April 06, 2010 9:16 AM

,"RE: Point Beach Revised HELB Calculation" - Copy Included in Section A.B.5 A.B.3 GOTHIC Model Changes The revised GOTHIC case is denoted as PB-PAB-301_T-2 -Revl. The model changes are as follows.

As noted in A.B.1 above, the major revision to the base case consisted of adding the models for the Swing Battery Room (SBR) and the Switchgear Room (SGR). During normal operation, the exhaust fan room is operating in the SBR and the HVAC Equipment is operating resulting in flow from HX-282 into the SGR, however for HELB, this equipment is assumed to be inoperable. Note

a Automated CALCULATION SHEET Page: AB-2 ' of AB-38 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No El Date: 04/14/2010 that the air flow rates are relatively small and thus do not have a significant impact on the results of this analysis. Thus, the changes involve adding two volumes:(135 and 136), four boundary conditions (144P, 145F, 146P and 147F), six flow paths (637-642), three thermal conductors,(768-770), two heaters (418H and 419H), and three graphs (40-42). Also, the initial temperature in the HELB volume (133) was changed to 102F for consistency with the initial temperatures in the SBR and SGR for proper initialization of the thermal conductors. It should be noted that when these changes were added initially, a problem occurred with running this case. The problem was that as the transient progressed, the internally calculated time step began to reduce at approximately 550 sec. The time step was reduced to a very small value and would have required an abnormally long and unnecessary computational time. The code vendor was contacted for resolution which

-required additional changes to the flow paths connected to the subdivided Volume 10. See Reference A.B.2.2. Note that an informal case was run with these latter changes only, and the results showed negligible impact on the response in the HELB volume. There was one other minor error identified in the base case which was the area, the hydraulic diameter, and the inertia and friction lengths for Flow Path 34 which represents a door gap and does not impact the results significantly.

The data associated 3with added Volume 135 is:

Volume = 1560.17 ft Bottom Elevation = 26.0 ft Height = 9.17 ft Hydraulic Diameter = 5.74 ft and the data associated 3

with added Volume 136 is:

Volume = 1021.20 ft Bottom Elevation = 28.42 ft Height = 6.75 ft Hydraulic Diameter = 4.00 ft The foliowing tables list the data associated with the added flow paths.

Flow Description Volume Elevation Height Volume B Elevation B Height B Path A A (ft) A (ft) (ft) (f) 637 Duct-TB 133 33.75 1.42 135 33.75 1.42 638 Dr.Gap-CB 135 26.0 7.0 144P 26.0 7.0 639 FanExhaust 135 26.0 1.0 145F 26.0 1.0 640 Duct-TB 133 36.2 0.01 135 34.91 0.01 641 Dr.Gap-CB 136 28.42 6.56 146P 28.42 6.56 642 HX-282 Air 136 34.9 0.01 147F 34.9 0.01

Automated CALCULATION SHEET Pare: AB-3 of AB-38 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No EI Date: 04/14/2010 Flow Flow Area Hyd. Inertia Friction Forward Loss Reverse Loss Coeff.

Path (ft2) Diam. (ft) Len. (ft) Len. (ft) Coeff.

637 1.67 0.76 14.84 1.0 1.62 1.62 638 0.73 0.04 8.67 1.0 1.50 1.52 639 1.0 1.0 1.0 0.0 0.0 0.0 640. 1.56 1.25 14.38 1.0 1.91 1.91 641 0.73 0.04 8.67 1.0 1.50 1.52 642 1.0 1.0 1.0 0.0 0.0 0.0 The-data-associated with the added-Boundary Conditions 144P andc1-45F is:

B. C. Description Pressure Temperature Flow Elevation Steam Vol. Air Vol.

(psia) (F) (Ibm/s) (ft) Fraction Fraction 144P C.B Press. 14.375 102.0 NA 26.0 h50 1.0 145F FanExhaust 14.375 102.0 0.0 26.0 1.0 1.0 146P C.B Press. 14.375 102.0 NA 26.0 h50 1.0 147F HX-282 14.375 102.0 0.0 26.0 1.0 1.0 Flow The data associated with the added external thermal conductor TC 768 is:

Description = Room 321 Walls - TB Volume A = 133 Volume A Heat Transfer Coefficient Type = 3 Volume B = 135 Volume B Heat Transfer Coefficient Type = 3 Thermal Conductor Type = 3 (1 ft Concrete Slab)

Area = 743.51 ft2 (Sum of all Wall Surfaces between Room 321 and Turbine Building in the Reference A.B.2.1 Model)

Initial Temperature = 102F The data associated with the added external thermal conductor TC 769 is:

Description = Room 323 Walls - TB Volume A = 133 Volume A Heat Transfer Coefficient Type = 3 Volume B = 136 Volume B Heat Transfer Coefficient Type = 3

/ Automated CALCULATION SHEET Page: AB-4 of AB-38 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El] No [lI Date: 04/14/2010 Thermal Conductor Type = 3 (1 ft Concrete Slab)

Area = 271.69 ft2 (Sum of all Room 323 Wall Surfaces)

Initial Temperature = 102F The data associated with the added external thermal conductor TC 770 is:

Description = Room 323 Ceiling - TB Volume A = 133 Volume A Heat Transfer Coefficient Type = 1 Volume B = 136 Volume B Heat Transfer Coefficient Type = 2 Thermal Conductor Type = 3 (1 ft Concrete Slab)

Area = 191.03_ft2 Initial Temperature = 102F The data associated with the added Heater 418H is:

Description = Rm 321 Heater Volume Number = 135 Heat Rate = 0.78 Btu/s Option = Vapor/Time The data associated with the added Heater 419H is:

Description = Rm 323 Heater Volume Number = 136 Heat Rate = 10.0 Btu/s Option = Vapor/Time The initial conditions that have been changed/added for Volumes 133, 135 and 136 are:

Pressure = 14.375 psia Liquid and Vapor Temperatures = 102F Humidity = 50.0%

Gas #1 (Air) Volume Fraction = 1.0 Graphs 40-42 which contain the vapor temperature, total pressure and humidity for Volumes 135 and 136 were added.

The following is a listing of the differences between the revised case and base case EXP files.

Automated CALCULATION SHEET Page: AB-5 of AB-38 Z Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 04/14/2010 Comparing files PB-PAB-301_T-2-REV1\pb-pab-301_t-2-revl.EXP and PB-PAB-301_T- 2\PB-PAB-301 T-2.EXP,

          • PB-PAB-301_T-2-REV1\pb-pab-301_t-2-revl.EXP 134 TB Above Deck 3931000. 44. 65. 66.1 DEFAULT 1. NONE 135 Room 321 Swing Battery Rm 1560.17 26. 9.17 5.74 DEFAULT 1. NONE 136 Room 323 1021.2 28.42 6.75 4. DEFAULT i. NONE
          • PB-PAB-301_T-2\PB-PAB-301_T-2.EXP 134 TB Above Deck 3931000. 44. 65. 66.1 DEFAULT 1. NONE
  • PB-PAB-301_T-2-REV1\pb-pab-301_t-2-revl.EXP 134 0. CNST T UNIFORM DEFAULT 135 0. CNST T UNIFORM DEFAULT 136 0. CNST T UNIFORM DEFAULT
          • PB-PAB-301_T=2\PB-PAB-301_T-2.EXP 134 0. CNST T UNIFORM DEFAULT PB-PAB-301_T-2-REV1\pb-pab-301_t -revl.EXP 134 0. CNST T UNIFORM DEFAULT 135 0. CNST T UNIFORM DEFAULT 136 0. CNST T UNIFORM DEFAULT
          • PB-PAB-301 T-2\PB-PAB-301_T-2.EXP 134 0. CNST T UNIFORM DEFAULT PB-PAB-301_T-2-REV1\pb-pab-301_t-2-revl.EXP 134 NO NO 1. 1. VAPOR 135 NO NO 1. 1. VAPOR 136 NO NO 1. 1. VAPOR
          • PB-PAB-301_T-2\PB-PAB-301_T-2.EXP 134 NO NO 1. 1. VAPOR PB-PAB-301_T-2-REV1\pb-pab-301_t-2-revl.EXP 143P TB BOP - Upper 14.2985 85 N N 50.

144P Control Bldg Pressure BC 14.375 102 N N 26.

145F Rm 321 Fan Exhaust 14.375 102 N N 26.

146P Control Bldg Pressure BC 14.375 102 N N 28.42 147F Rm 323 HX-282 Air Flow 14.375 102 N N 34.9

          • PB-PAB-301_T-2\PB-PAB-301_T-2.EXP 143P TB BOP - Upper 14.2985 85 N N 50.

PB-PAB-301_T-2-REV1\pb-pab-301_t-2-revl.EXP 143P h50 NONE DEFAULT

Automated CALCULATION SHEET Page: AB-6 of AB-38 S

Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No ED Date: 04/14/2010 144P h50 NONE DEFAULT 145F 1 NONE DEFAULT 146P h50 NONE DEFAULT 147F 1 NONE DEFAULT

          • PB-PAB-301JT-2\PB-PAB-301_T-2.EXP 143P h50 NONE DEFAULT PB-PAB-301 T-2-REV1\pb-pab-301_t-2-revl.EXP 143P 1.

144P 1.

145F 1.

146P 1.

147F 1.

          • PB-PAB-301_T-2\PB-PAB-301_T-2.EXP 143P 1.

PB-PAB-301_T-2-REV1\pb-pab-301_t-2-revl.EXP 143P 144P 145F 146P 147F

          • PB-PAB-301 T-2\PB-PAB-301_T-2.EXP 143P
          • PB-PAB-301_T-2-REV1\pb-pab-301 _t-2-revl.EXP 636 TB BOP - Upper 134 50. 6. 143P 50. 6.

637 Rm 321 - Duct from TB 133 33.75 1.42 135 33.75 1.42 638 Rm 321 Door Gaps to CB Rm 135 26. 7. 144P 26. 7.

639 Rm 321 Fan Exhaust 135 26. 1. 145F 26. 1.

640 Rm 323 - Duct from TB 133 36.2 0.01 136 34.91 0.01 641 Rm 323 Door Gaps to CB Rm 136 28.42 6.56 146P 28.42 6.56 642 Rm 323 HX-282 Air Flow 136 34.9 0.01 147F 34.9 0.01

    • -* PB-PAB-301_T-2\PB-PAB-301_T-2.EXP 636 TB BOP - Upper 134 50. 6. 143P 50. 6.

PB-PAB-301_T-2-REV1\pb-pab-301_t-2-revl.EXP 33 10.S 4.2 54. - NONE 34 0.73 0.04 8.67 1. - NONE 35 7. 3.11 14.25 - NONE

          • PB-PAB-301_T-2\PB-PAB-301_T-2.EXP 33 10.5 4.2 54. - NONE 34 7. 3.11 14.25 - NONE

SAutomated CALCULATION SHEET Page: AB-7 of AB-38 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No El Date: 04/14/2010 35 7. 3.11 14.25 NONE

-- PB-PAB- 301_T- 2-REV1\pb-pab-301_t-2-revl.EXP 636 1000. 31. 168. NONE 637 1.67 0.76 14.84 1. NONE 638 0.73 0.04 8.67 1. NONE 639 1. 1. 1. NONE 640 1.56 1.25 14.38 1. NONE 641 0.73 0.04 8.67 1. NONE 642 1. 1. 1. NONE

          • PB-PAB-301_T-2\PB-PAB-301_T-2.EXP 636 1000. 31. 168. NONE
          • PB-PAB- 301_T-2-REV1\pb-pab-301 _t revl. EXP 636 1.5 1.5 OFF OFF 0. OFF 637 1.62 1.62 OFF OFF 0. OFF 638 1.5 1.5 OFF OFF 0. OFF 639 OFF OFF 0. OFF 640 1.91 1.91 OFF OFF 0. OFF 641 1.5 1.5 OFF OFF 0. OFF 642 OFF OFF 0. OFF
          • PB-PAB-301_T-2\PB-PAB-301_T-2.EXP 636 1.5 1.5 OFF OFF 0. OFF
        • PB-PAB-301_T-2-REV1\pb- -pab-301 _t-2-revl.EXP 767 TB Upper Steel 134 3 134 3 48 122600. 85. I 768 Rm 321 Walls - TB 133 3 135 3 3 743.51 102. x 769 Rm 323 Walls - TB 133 3 136 3 3 271.69 102. x 770 Rm 323 Ceiling - TB 133 1 136 2 3 191.03 102. x
          • PB-PAB-301_T-2\PB-PAB-301_T-2.EXP 767 TB Upper Steel 134 3 134 3 48 122600. 85. I PB-PAB-301_T-2-REV1\pb-pab-301_t-2-revl.EXP 767 No No 768 No No 769 No No 770 No No
          • PB-PAB-301_T-2\PB-PAB-301_T-2.EXP 767 No No PB-PAB-301_T-2-REV1\pb-pab-301_t-2-revl.EXP 417H Rm 273 555F Equip 107 36 S2.36 59T VTE 107

Automated CALCULATION SHEET Page: AB-8 of AB-38 Engineering Calc. No.:

Services Corp.

PBNP-994-21-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No LI] Date: 04/14/2010 418H Rm 321 Heater 135 0.78 VTI 135 419H Rm 323 Heater 136 10. VTI 136

          • PB-PAB-301_T-2\PB-PAB-301_T-2.EXP 417H Rm 273 555F Equip 107 36 52.36 59T VTE 107 PB-PAB-301_T-2-REV1\pb-pab-301_t -revl.EXP 103 14.375 94.5 94.5 37. 0. 0.

133 14.375 102. 102. 50. 0. 0.

135 14.375 102. 102. 50. 0. 0.

          • PB-PAB-301_T-2\PB-PAB-301_T-2.EXP 103 14.375 94.5 94.5 37. 0. 0.

PB-PAB-301_ _T-2-REV1\pb-pab-301_t -revl. EXP 103 1. 0. 0. 0. 0. 0. 0. 0.

133 1. 0. 0. 0. 0., 0. 0. 0.

135 1. 0. 0. 0. 0. 0. 0. 0.

          • PB-PAB-301_T-2\PB-PAB-301_T-2.EXP 103 1. 0. 0. 0. 0. 0. 0. 0.

PB-PAB-301_T-2-REV1\pb-pab- 301_t-2-revl.EXP 39 TB Temperatures TV133 TV134 40 Rms 321 323 Vapor Tempera TV135 TV136 41 Rms 321 323 Pressures PR135 PR136 42 Rms 321 323 Humidity RH135 RH136

          • PB-PAB-301_T-2\PB-PAB-301_T-2.EXP 39 TB Temperatures TV133 TV134 A.B.4 Results A.B.4.1 The following is the vapor temperature response in Room 321 (Volume 135) as obtained from the GOT file.

Point Beach Primary Auxiliary Buliding GOTHIC Version 7.2a(QA) Base Case Model -

File: PB-PAB-Base.G GOTHIC 7.2a(QA) January 2006 Run - Apr/09/2010 at 11:36:55 Vapor Temperature for Volume 135 Cell 1 Time F (t) Time F (t) Time F (t)

Automated CALCULATION SHEET Page: AB-9 of AB 38 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

H-ELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [] No F-I Date: 04/14/2010 seconds (F) seconds (F) seconds (F) 0 102 le-006 102 0.1082 102 0.2213 102.1 0.329 102.2. 0.4416 102.2 0.5914 102 .1 0.7179 102.1 0.871 102.2 1 102.2 1.108 102.2 2.163 102.6 3 .277 103 .1 4.338 103.7 5.447 104.3 6 . 922 105.2 8.169 106.1 9.676 107.3 11.5 108.9 12.55 109.9 13.71 ill 14 .8 106.4 15.93 103.4 17.01 106.2 18.13 107.2 19.63 105.6 20.9 105.6 22.43 105.7 24.28 105.5 25.35 105.4 26.52 105.3 27.81 105.2 29.23 105.1 30.8 105 32.51 104.8 34.4 104.7 36.48 104.6 38.77 104.4 41.29 104.3 44.06 104.2 47.1 104 50.45 103.9 54.13 103.8 58.19 103.7 62.65 103 .5 67.55 103.4 72.94 103.3 78.88 103 .3 85.4 103.2 92.58 103.1 100 103 .1 101.1 103.1 102.1 103.1 103 .3 103 .1 104.4 103.1 -105.9 103 .1 107.2 103 .1 108.7 103 110.5 103 111.6 103 112.7 103 114 103 115.4 103 116.9 103 118.6 103 120.5 103 122.5 103 124.8 103 127.3 103 130 103 133 103 136.3 103 139.9 103 143.9 103 148.3 103 153.1 103 158.4 103 164.3 103 170.7 103 177.8 103 185.6 103 194.1 103 203.5 103 212.9 103 222.1 103 231.2 103 240.3 103 249.2 103 258 103 266.8 103 275.4 103 284 103 292.4 103 300.8 103 309.1 103 317.3 103 325.4 103 333.3 103 341 103 348.6 103 356 103 363.4 103 370.6 103 377.7 103 384.6 103 388 103 391.7 103 395.7 103 399.4 103 402.7 103 405.4 103 407.8 103 410.1 103 412.1 103 414 103 415.8 103 417.5 103 419.1 103 420.6 103 422.1 103 423.5 103 424.9 103 426.2 103 427.5 103 428.7 103 429.9 103 431 103 432.2 103 433.2 103

Automated CALCULATION SHEET Page: AB-10 of AB-38 Engineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No ED Date: 04/14/2010 434.3 103 435.4 103 436.4 103 437.4 103 439.4 103 441.3 103 443 .2 103 445 103 446.7 103 448.5 103 450.2 103 451.9 103 453.5 103 455.2 103 456.8 103 458.4 103 460 103 461.6 103 463 .1 103 464.7 103 466.2 103 467.8 103 469.3 103 470.9 103 472 .4 103 473.9 103 475.4 103 476.9 103 478.4 103 479.9 103 4:81. 4 103 482.9 103 484.4 103 485.9 103 487.4 103 488.9 103 490.3 103 491.8 103 493.3 103 494.7 103 496.2 103 497.7 103 499.1 103 500.6 103 502 103 503.5 103 504.9 103 506.4 103 507.8 103 509.3 103 510.7 103 512 .2 103 513.6 103 515 103 516 .5 103 517.9 103 519.3 103 520.8 103 522 .2 103 523.6 103 525 103 526.5 103 527.9 103 529.3 103 530.7 103 532.1 103 533.5 103 535 103 536.4 103 537.8 103 539.2 103 540.6 103 542 103 543.5 103 544. 9 103 546.3 103 547.7 103 549.1 103 550.5 103 552 103 553 .4 103 554.8 103 556 .2 103 557.6 103 559.1 103 560.5 103 561.9 103 563.3 103 564.8 103 566.2 103 567.6 103 569 103 570.5 103 571.9 103 573 .3 103 574.7 103 576.2 103 577.6 103 579 103 580.5 103 581.9 103 583.3 103 584 .8 103 586.2 103 587.7 103 589.1 103 590.5 103 592 103 593.4 103 594.9 103 596.3 103 597.7 103 599.2 103 600.6 103 602.1 103 603.5 103 605 103 606.4 103 607.9 103 609.3 103 610.8 103 612.2 103 613.7 103 615.1 103 616.6 103 618 103 619.4 103 620.9 103 622.3 103 623.8 103 625.3 103 626.8 103

I Engineering Automated Services Corp.

CALCULATION SHEET Calc.

Page: No.:

AB-1i PBNP-994-21-13 of AB-38 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [K] No D-- Date: 04/14/2010 628.3 103 629.7 103 631.2 103 632.7 103 634 .1 103 635.6 103 637 103 638.4 103 639.9 103 641.3 103 642.7 103 644.1 103 645.5 103 646.9 103 648.3 103 649.7 103 651 103 652.4 103 653 .8 103 655.2 103 656.6 103 657.9 103 659.3 103 660.7 103 662.1 103 663.4 103 664.8 103 666.2 103 667.5 103 668.9 103 670.2 103 671.6 103 673 103 674.3 103 675.7 103 677 103 678.4 103 679.8 103 681.1 103 682.5 103 683 .9 103 -685 .2 103 686.6 103 688 103 689.3 103 690.7 103 692 .1 103 693.5 103 694.8 103 696.2 103 697.6 103 699 103 700.3 103 701.7 103 703 .1 103 704.5 103 705.9 103 707.3 103 708.7 103 710.1 103 711.4 103 712. 8 103 714.2 103 715.6 103 717 103 718.4 103 719.8 103 721.2 103 722 .6 103 724 103 725.4 103 726.9 103 728.3 103 729.7 103 731.1 103 732.5 103 733.9 103 735.3 103 736.8 103 738.2 103 739.6 103 741 103 742 .5 103 743. 9 103 745.3 103 746.7 103 748.2 103 749.6 103 751 103 752 .5 103 753. 9 103 755.4 103 756 .8 103 758.2 103 759.7 103 761.1 103 762.6 103 764 103 765.5 103 766.9 103 768.4 103 769.9 103 771.3 103 772 .8 103 774.2 103 775.7 103 777.2 103 778.6 103 780.1 103 781.6 103 783 103 784.5 103 786 103 787.5 103 788.9 103 790.4 103 791.9 103 793 .4 103 794.8 103 796.3 103 797.8 103 799.3 103 800.7 103 802.2 103 803.7 103 805.2 103 806.7 103 808.1 103 809.6 103 811.1 103 812 .6 103 814.1 103

Automated CALCULATION SHEET Page: AB-1-2 of AB-38

/,M Engineering Cale. No.:-

//ý Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

I-WLB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 04/14/20 10 815.5 103 817 103 818.5 103 820 103 821.5 103 822.9 103 824 .4 103 825.9 103 827.4 103 828.9 103 830.4 103 831.8 103 833 .3 103 834.8 103 836.3 103 837.8 103 839.3 103 840.7 103 842 .2 103 843 .7 103 845.2 103 846.7 103 848.2 103 849.7 103 851.1 103 852 .6 103 854.1 103 855.6 103 857.1 103 858.6 103 860.1 103 861.5 103 863 103 864.5 103 866 103 867.5 103 869 103 870.5 103 871.9 103 873 .4 103 874 .9 103 876-.4 103 877.9 103 879.4 103 880. 9 103 882 .4 103 883.8 103 885.3 103 886.8 103 888.3 103 889.8 103 891.3 103 892.8 103 894.3 103 895.8 103 897.2 103 898.7 103 900.2 103 901.7 103 903.2 103 904.7 103 906.2 103 907.7 103 909.2 103 910.7 103 912.1 103 913 .6 103 915.1 103 916.6 103 918.1 103 919.6 103 921.1 103 922.6 103 924 .1 103 925.6 103 927.1 103 928 .6 103 930 103 931.5 103 933 103 934 .5 103 936 103 937.5 103 939 103 940.5 103 942 103 943 .5 103 945 103 946.S5 103 948 103 949.5 103 951 103 952.4 103 953 .9 103 955.4 103 956.9 103 958.4 103 959.9 103 961.4 103 962 .9 103 964 .4 103 965. 9 103 967.4 103 968.9 103 970.4 103 971.9 103 973 .4 103 974 .9 103 976.4 103 977. 9 103 979.4 103 980.9 103 982 .4 103 983 .9 103 985.4 103 986.9 103 988.4 103 989.9 103 991.4 103 992.8 103 994.3 103 995.8 103 997.3 103 998.8 103 1000 103 1002 103 1003 103 1005 103 1006 103 1008 103 1009 103 1011 103

Automated CALCULATION SHEET Page: AB-13 of AB-38 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes E] No ED] Date: 04/14/2010 1012 103 1014 103 1015 103 1017 103 1018 103 1020 103 1021 103 1023 103 1024 103 1026 103 1027 103 1029 103 1030 103 1032 103 1033 103 1035 103 1036 103 1038 103 1039 103 1041 103 1042 103 1044 103 1045 103 1047 103 1048 103 1050 103 1051 103 1053 103 1054 103 1056 103 1057 103 1059 103 1060 103 1062 103 1063 103 1065 103 1066 103 1068 103 1069 103 1071 103 107-3 103 1074 103 1076 103 1077 103 1079 103 1080 103 1082 103 1083 103 1085 103 1086 103 1088 103 1089 103 1091 103 1092 103 1094 103 1095 103 1097 103 1098 103 1100 103 1101 103 1103 103 1104 103 1106 103 1107 103 1109 103 1110 103 1112 103 1113 103 1115 103 1116 103 1118 103 1119 103 1121 103 1122 103 1124 103 1125 i03 1127 103 1128 103 1130 103 1131 103 1133 103 1134 103 1136 103 1137 103 1139 103 1140 103 1142 103 1143 103 1145 103 1146 103 1148 103 1149 103 1151 103 1152 103 1154 103 1155 103 1157 103 1159 103 1160 103 1162 103 1163 103 1165 103 1166 103 1168 103 1169 103 1171 103 1172 103 1174 103 1175 103 1177 103 1178 103 1180 103 1181 103 1183 103 1184 103 1186 103 1187 103 1189 103 1190 103 1192 103 1193 103 1195 103 1196 103 1198 103 1199 103 1201 103 1202 103 1204 103 1205 103 1207 103 1208 103 1210 103

Automated CALCULATION SHEET Page: A13-1 ofA-38 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No LI-I Date: 04/14/2010 1211 103 1213 103 1214 103 1216 103 1217 103 1219 103 1221 103 1222 103 1224 103 1225 103 1227 103 1228 103 1230 103 1232 . 103 1233 103 1235 103 1237 103 1238 103 1240 103 1241 103 1242 103 1243 103 1244 103 1246 103 1247 103 1248 103 1250 103 1251 103 1252 103 1253 103 1254 T03 1255 103 1256 103 1258 103 1260 103 1262 103 1264 103 1266 103 1268 103 12-70 103 1272 103 1274 103 1275 103 1277 103 12.79 103 1281 103 1283 103 1285 103 1287 103 1289 103 1290 103 1291 103 1292 103 1293 103 1294 103 1295 103 1296 103 1297 103 1298 103 1299 103 1300 103 1301 103 1302 103 1304 103 1305 103 1306 103 1307 103 1308 103 1309 103 1310 103 1311 103 1312 103 1313 103 1314 103 1315 103 1316 103 1317 103 1318 103 1319 103 1320 103 1322 103 1323 103 1324 103 1325 103 1326 103 1327 103 1328 103 1329 103 1330 103 1331 103 1332 103 1334 103 1335 103 1336 103 1337 103 1338 103 1339 103 1340 103 1341 103 1343 103 1344 103 1345 103 1346 103 1347 103 1348 103 1349 103 1351 103 1352 103 1353 103 1354 103 1355 103 1356 103 1358 103 1359 103 1360 103 1361 103 1362 103 1364 103 1365 103 1366 103 1367 103 1368 103 1370 103 1371 103 1372 103 1373 103 1374 103 1376 103 1377 103 1378 103 1379 103 1381 103

Automated CALCULATION SHEET Page: AB-15 of AB-38 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No El Date: 04/14/2010 1382 103 1383 103 1384 103 1386 103 1387 103 1388 103 1389 103 1391 103 1392 103 1393 103 1394 103 1396 103 1397 103 1398 103 1400 103 1401 103 1402 103 1404 103 1405 103 1406 103 1408 103 1409 103 1410 103 1412 103 1413 103 1414 103 1416 103 1417 103 1418 103 1420 103 1421 103 1422 103 1424 103 1425 103 1426 103 1428 103 1429 103 1431 103 1432 103 1433- 103 1435 103 1436 103 1438 103 1439 103 1441 103 1442 103 1443 103 1445 103 1446 103 1448 103 1449 103 1451 103 1452 103 1454 103 1455 103 1457 103 1458 163 1460 103 1461 103 1463 103 1464 103 1466 103 1467 103 1469 103 1470 103 1472 103 1473 103 1475 103 1476 103 1478 103 1480 103 1481 103 1483 103 1484 103 1486 103 1487 103 1489 103 1491 103 1492 103 1494 103 1495 103 1497 103 1499 103 1500 103 1502 103 1504 103 1505 103 1507 103 1509 103 1510 103 1512 103 1514 103 1515 103 1517 103 1519 103 1521 103 1522 103 1524 103 1526 103 1528 103 1529 103 1531 103 1533 103 1535 103 1536 103 1538 103 1540 103 1542 103 1544 103 1545 103 1547 103 1549 103 1551 103 1553 103 1555 103 1557 103 1558 103 1560 103 1562 103 1564 103 1566 103 1568 103 1570 103 1572 103 1574 103 1576 103 1578 103 1580 103 1582 103 1584 103 1586 103 1588 103

Automated CALCULATION SHEET Page: AB-16 of AB-38 Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes No No L Date: 04/14/2010 1590 103 1592 103 1594 103 1596 103 1598 103 1600 103 1602 103 1604 103 1606 103 1608 103 1610 103 1613 103 1615 103 1617 103 1619 103 1621 103 1623 103 1625 103 1628 103 1630 103 1632 103 1634 103 1636 103 1639 103 1641 103 1643 103 1645 103 1647 103 1649 103 1652 103 1654 103 1656 103 1658 103 1660 103 1662 103 1664 103 1667 103 1669 103 1671 103 1673 103 1675 103 1677 103 1679 103 1682 103 1684 103 1686 103 1688 103 1690 103 1692 103 1694 103 1697 103 1699 103 1701 103 1703 103 1705 103 1707 103 1709 103 1711 103 1714 103 1716 103 1718 103 1720 103 1722 103 1724 103 1726 103 1728 103 1731 103 1733 103 1735 103 1737 103 1739 103 1741 103 1743 103 1745 103 1747 103 1749 103 1752 103 1754 103 1756 103 1758 103 1760 103 1762 103 1764 103 1766 103 1768 103 1770 103 1772 103 1775 103 1777 103 1779 103 1781 103 1783 103 1785 103 1787 103 1789 103 1791 103 1793 103 1795 103 1797 103 1800 103 1802 103 1804 103 1806 103 1808 103 1810 103 1812 103 1814 103 1816 103 1818 103 1820 103 1822 103 1824 103 1826 103 1828 103 1830 103 1833 103 1835 103 1837 103 1839 103 1841 103 1843 103 1845 103 1847 103 1849 103 1851 103 1853 103 1855 103 1857 103 1859 103 1861 103 1863 103 1865 103

Automated CALCULATION SHEET Page: AB-17 of AB-38 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Programn Task 13- Building Recovery Reviewed By: CD Henry Safety Related Yes El No L-] Date: 04/14/2010 1867 103 1869 103 1871 103 1873 103 1875 103 1877 103 1880 103 1882 103 1884 103 1886 103 1888 103 1890 103 1892 103 1894 103 1896 103 1898 103 1900 103 1902 103 1904 103 1906 103 1908 103 1910 103 1912 103 1914 103 1916 103 1918 103 1920 103 1922 103 1924 103 1926 103 1928 103 1930 103 1932 103 1934 103 1936 103 1938 103 1940 103 1942 103 1944 103 1946 103 1948 103 1950 103 1952 103 1954 103 1956 103 1958 103 1960 103 1962 103 1964 103 1966 .103 1968 103 1970 103 1972 103 1974 103 1976 103 1978 103 1980 103 1982 103 1984 103 1986 103 1988 103 1990 103 1992 103 1994 103 1996 103 1998 103 2000 103 2000 103 F max = 111 at time = 13.71 seconds.

F min = 102 at time = 0.1082 seconds.

A.B.4.2 The following is the vapor temperature response in Room 323 (Volume 136) as obtained from the GOT file.

Point Beach Primary Auxiliary Buliding GOTHIC Version 7.2a(QA) Base Case Model -

File: PB-PAB-Base.G GOTHIC 7.2a(QA) January 2006 Run - Apr/09/2010 at 11:36:55 Vapor Temperature for Volume 136 Cell 1 Time F(t) Time F(t) Time F (t) seconds (F) seconds (F) seconds (F) 0 85 le-006 85 0.1082 85.07 0.2213 85.26 0.329 85.45 0.4416 85.49 0.5914 85.5 0.7179 85.63 0.871 85.82 1 85.95 1.108 86.04 2.163 87.53

Automated CALCULATION SHEET Page: AB-18 f A-3 A L Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes No EZDate: 04/14/2010 3.277 89.41 4.338 91.38 5.447 93 .57 6 .922 96 .62 8.169 99.25 9.676 102 .4 11.5 106.2 12 .55 108 .3 13 .71 110.6 14 .8 106.9 15.93 104 .5 17 .,01 107.6 18 .13 109.2 19.63 108.1 20.9 108.5 22.43 109.1 24.28 109.4 25.35 109.6 26.52 109.8 27.81 110 29.23 110.2 30.8 110.4 32.51 110.6 34.4 110.9 36.48 i11. 1 38.77 111.3 41.29 111.6 44 .06 111.8 47.1 112 50.45 112 .2 54.13 112.4 58.19 112 .6 62.65 112 .7 67.55 112.9 72 .94 113 78.88 113 .1 85.4 113 .2 92.58 113 .2 100 113 .3 101.1 113 .3 102 .1 113 .3 103 .3 113 .3 104 .4 113 .3 105.9 113.3 107.2 113 .3 108.7 113 .3 110.5 113 .3 111.6 113 .3 112 .7 113 .3 114 113 .3 115.4 113 .3 116 .9 113 .3 118.6 113 .3 120.5 113 .3 122 .5 113 .3 124.8 113 .4 127.3 113 .3 130 113 .4 133 113 .3 136.3 113 .4 139.9 113 .3 143.9 113 .4 148.3 113 .4 153 .1 113 .4 158.4 113 .4 164 .3 113 .4 170.7 113 .4 177.8 113 .4 185.6 113 .4 194.1 113.4 203.5 113 .4 212.9 113 .4 222.1 113 .4 231.2 113.4 240.3 113 .4 249.2 113.4 258 113.4 266.8 113 .4 275.4 113 .4 284 113 .4 292.4 113 .4 300.8 113 .4 309.1 113 .4 317.3 113 .4 325.4 113 .4 333 .3 113 .4 341 113 .4 348.6 113 .4 356 113.4 363.4 113 .4 370.6 113.4 377.7 113 .4 384.6 113 .4 388 113 .4 391.7 113 .4 395.7 113 .4 399.4 113.4 402.7 113 .4 405.4 113 .4 407.8 113 .4 410.1 113 .4 412 .1 113 .4 414 113 .4 415.8 113 .4 417.5 113 .4 419.1 113 .4 420.6 113 .4 422 .1 113 .4 423 .5 113 .4 424 .9 113.4 426.2 113 .4 427.5 113 .4 428.7 113 .4 429.9 113 .4 431 113 .4 432.2 113 .4 433 .2 113 .4 434.3 113 .4 435.4 113 .4 436.4 113 .4 437.4 113 .4 439.4 113 .4 441.3 113 .4 443 .2 113 .4 445 113.4 446.7 113 .4 448.5 113 .4 450.2 113 .4 451.9 113 .4 453.5 113 .4 455.2 113 .4 456.8 113 .4

Automated CALCULATION SHEET Page: AB-19 of AB-38 SEngineering Caic. No.:

z ziý Services Corp. PB3NP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D- Date: 04/14/20 10 458.4 113 .4 460 113 .4 461.6 113 .4 463.1 113 .4 464.7 113 .4 466.2 113.4 467.8 113 .4 469.3 113 .4 470.9 113.4 472.4 113 .4 473.9 113 .4 475.4 113.4 476 .9 113.4 478.4 113 .4 479.9 113 .4 481.4 113 .4 482.9 113 .4 484.4 113 .4 485.9 113 .4 487.4 113 .4 488.9 113.4 490.3 113 .4 491.8 113 .4 493.3 113 .4 494.7 113 .4 496.2 113.4 497.7 113 .4 499.1 113 .4 500.6 113.4 502 113 .4 503 .5 113 .4 504.9 113 .4 506.4 113 .4 507.8 113 .4 509.3 113 .4 510.7 113.4 512.2 113 .4 513 .6 113 .4 515 113 .4 516.5 113 .4 517.9 113 .4 519.3 113.4 520.8 113.4 522.2 113 .4 523 .6 113.4 525 113.4 526.5 113 .4 527.9 113.4 529.3 113 .4 530.7 113 .4 532.1 113 .4 533.5 113.4 535 113 .4 536.4 113 .4 537.8 113 .4 539.2 113 .4 540.6 113 .4 542 113 .4 543.5 113.4 544 .9 113 .4 546.3 113 .4 547.7 113.4 549.1 113 .4 550.5 113 .4 552 113 .4 553 .4 113 .4 554 .8 113 .4 556.2 113 .4 557.6 113 .4 559.1 113 .4 560.5 113 .4 561.9 113 .4 563.3 113 .4 564.8 113 .4 566.2 113 .4 567.6 113.4 569 113 .4 570.5 113.4 571.9 113 .4 573 .3 113 .4 574.7 113 .4 576.2 113 .4 577.6 113 .4 579 113.4 580.5 113 .4 581.9 113 .4 583.3 113.4 584 .8 113 .4 586.2 113 .4 587.7 113.4 589.1 113 .4 590.5 113 .4 592 113 .4 593.4 113.4 594.9 113 .4 596.3 113 .4 597.7 113 .4 599.2 113 .4 600.6 113 .4 602.1 113 .4 603.5 113 .4 605 113 .4 606.4 113 .4 607.9 113 .4 609.3 113 .4 610.8 113 .4 612.2 113 .4 613 .7 113 .4 615.1 113 .4 616.6 113 .4 618 113.4 619.4 113.4 620.9 113.4 622.3 113.4 623 .8 113 .4 625.3 113 .4 626.8 113 .4 628.3 113 .4 629.7 113 .4 631.2 113 .4 632.7 113 .4 634.1 113 .4 635.6 113.4 637 113 .4 638.4 113 .4 639.9 113 .4 641.3 113 .4 642 .7 113 .4 644 .1 113 .4 645.5 113 .4 646.9 113 .4 648.3 113 .4

Automated CALCULATION SHEET Page: AB-20 of AB-38 SEngineering Caic. No.:

Z-Lý Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

1HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes [] No LIIDate: 04/14/2010 649.7 113 .4 651 113 .4 652.4 113.4 653 .8 113 .4 655.2 113 .4 656. 6 113 .4 6S7.9 113 .4 659.3 113 .4 660.7 113.4 662.1 113.4 663.4 113 .4 664 .8 113 .4 666.2 113 .4 667.5 113 .4 668.9 113.4 670.2 113 .4 671.6 113 .4 673 113 .4 674.3 113.4 675.7 113 .4 677 113 .4 678.4 113 .4 679.8 113 .4 681.1 113 .4 682.5 113 .4 683.9 113 .4 685.2 113 .4 686.6 113 .4 688 113 .4 689.3 113 .4 690.7 113 .4 692.1 113 .4 693 .5 113 .4 694.8 113.4 696.2 113 .4 697.6 113 .4 699 113 .4 700.3 113 .4 701.7 113 .4 703 .1 113 ý4 704 .5 113 .4 705.9 113 .4 707.3 113 .4 708.7 113 .4 710.1 113 .4 711.4 113 .4 712.8 113 .4 714 .2 113 .4 715.6 113 .4 717 113 .4 718.4 113 .4 719.8 113 .4 721.2 113 .4 722 .6 113 .4 724 113 .4 725.4 113 .4 726.9 113.4 728.3 113 .4 729.7 113 .4 731.1 113 .4 732.5 113 .4 733.9 113 .4 735.3 113 .4 736.8 113 .4 738.2 113 .4 739.6 113 .4 741 113 .4 742 .5 113 .4 743.9 113 .4 745.3 113 .4 746.7 113 .4 748.2 113 .4 749.6 113 .4 751 113 .4 752 .5 113 .4 753.9 113 .4 755.4 113 .4 756.8 113 .4 758.2 113 .4 759.7 113 .4 761.1 113 .4 762.6 113 .4 764 113 .4 765.5 113 .4 766.9 113 .4 768.4 113 .4 769.9 113 .4 771.3 113 .4 772.8 113 .4 774 .2 113 .4 775.7 113 .4 777.2 113 .5 778 .6 113 .5 780.1 113.5 781.6 113 .5 783 113 .5 784.5 113 .5 786 113 .5 787.5 113 .5 788.9' 113 .5 790.4 113 .5 791.9 113 .5 793.4 113 .5 794.8 113 .5 796.3 113 .5 797.8 113 .5 799.3 113 .5 800.7 113 .5 802.2 113 .5 803.7 113 .5 805.2 113 .5 806.7 113 .5 808.1 113 .5 809.6 113 .5 811.1 113 .5 812.6 113 .5 814.1 113 .5 815.5 113 .5 817 113 .5 818.5 113 .5 820 113 .5 821.5 113 .5 822.9 113 .5 824.4 113 .5 825.9 113 .5 827.4 113 .5 828.9 113 .5 830.4 113 .5 831.8 113 .5 833 .3 113.5 834.8 113 .5 836.3 113 .5

Automated CALCULATION SHEET Page: AB-21 of AB-38 Engineering Calc. No.:

Services Corp.

PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 04/14/2010 837.8 113.5 839.3 113 .5 840.7 113 .5 842.2 113.5 843.7 113 .5 845.2 113 5 846.7 113.5 848.2 113 .5 849.7 113 5 851.1 113.5 852.6 113 .5 854.1 113 .5 855.6 113 .5 857.1 113 .5 858.6 113 .5 860.1 113 .5 861.5 113 .5 863 113 .5 864.5 113 .5 866 113.5 867.5 113 .5 869 113 .5 870.5 113 .5 871.9 113 .5 873.4 113 .5 874.9 113.5 876.4 113.5 877.9 113 .5 879.4 113.5 880.9 113 .5 882.4 11-3 .5 883.8 113.5 885.3 113 .5 886.8 113. 5 888.3 113.5 889.8 113 .5 891.3 113 .5 892.8 113.5 894.3 113 .5 895.8 113.5 897.22 113.5 898.7 113 .5 900.2 113.5 901.7 113.5 903.2 113 .5 904.7 113.5 906.2 113.5 907.7 113 .5 909.2 113.5 910.7 113.5 912.1 113 .5 913.6 113 .5 915.1 113.5 916.6 113 .5 918 .1 113 .5 919.6 113.5 921.1 113.5 922.6 113.5 924.1 113.5 925.6 113.5 927.1 113 .5 928.6 113 .5 930 113.5 931.5 113 .5 933 113 .5 934.5 113.5 936 113 .5 937.5 113.5 939 113.5 940.5 113.5 942 113.5 943.5 113.5 945 113.5 946.5 113.5 948 113.5 949.5 113 .5 951 113.5 952.4 113.5 953. 9 113 .5 955.4 113.5 956.9 113.5 958 .4 113 .5 959.9 113.5 961.4 113.5 962.9 113 .5 964.4 113.5 965.9 113.5 967.4 113.5 968.9 113.5 970.4 113.5 971.9 113.5 973.4 113.5 974.9 113.5 976.4 113.5 977.9 113.5 979.4 113.5 980.9 113.5 982.4 113.5 983 .9 113.5 985.4 113.5 986.9 113.5 988.4 113.5 989.9 113.5 991.4 113.5 992.8 113.5 994.3 113 .5 995.8 113.5 997.3 113.5 998.8 113 .5 1000 113 .5 1002 113.5 1003 113.5 1005 113 .5 1006 113.5 1008 113 .5 1009 113 .5 1011 113.5 1012 113 .5 1014 113 .5 1015 113.5 1017 113 .5 1018 113 .5 1020 113.5 1021 113 .5 1023 113 .5 1024 113.5 1026 113 .5 1027 113 .5 1029 113.5 1030 113 .5 1032 113 .5 1033 113.5

Automated CALCULATION SHEET Page: AB-22 of AB-38

,k Engineering Calc. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 -Building Recovery Reviewed By: CD Henry Safety Related Yes . El No D Date: 04/14/2010 1035 113 .5 1036 113 .5 1038 113 .5 1039 113.5 1041 113.5 1042 113 .5 1044 113 .5 1045 113.5 1047 113 .5 1048 113 .5 1050 113.5 1051 113.5 1053 113 .5 1054 113 .5 1056 113 .5 1057 113.5 1059 113.5 1060 113 .5 1062 113 .5 1063 113 .5 1065 113 .5 1066 113 .5 1068 113 .5 1069 113 .5 1071 113 .5 1073 113 .5 1074 113 .5 1076 113 .5 1077 113 .5 1079 113 .5 1080 113 .5 1082 113 .5 1083 113 .5 1085 113 .5 1086 113 .5 1088 113 .5 1089 113 .5 1091 113 .5 1092 113 .5 10:94 113 .5 1095 113 .5 1097 113.5 1098 113.5 1100 113.5 1101 113.5 1103 113.5 1104 113.5 1106 113.5 1107 113.5 1109 113.5 1110 113.5 1112 113.5 1113 113.5 1115 113.5 1116 113.5 1118 113.5 1119 113.5 1121 113.5 1122 113.5 1124 113.5 1125 113.5 1127 113.5 1128 113.5 1130 113 .5 1131 113.5 1133 113.5 1134 113 .5 1136 113.5 1137 113.5 1139 113 .5 1140 113.5 1142 113 .5 1143 113 .5 1145 113.5 1146 113 .5 1148 113 .5 1149 113.5 1151 113 .5 1152 113 .5 1154 113 .5 1155 113 .5 1157 113 .5 1159 113 .5 1160 113 .5 1162 113.5 1163 113 .5 1165 113 .5 1166 113 .5 1168 113.5 1169 113 .5 1171 113 .5 1172 113.5 1174 113.5 1175 113 .5 1177 113 .5 1178 113 .5 1180 113 .5 1181 113 .5 1183 113 .5 1184 113 .5 1186 113 .5 1187 113 .5 1189 113 .5 1190 113 .5 1192 113 .5 1193 113 .5 1195 113 .5 1196 113 .5 1198 113.5 1199 113 .5 1201 113 .5 1202 113.5 1204 113 .5 1205 113 .5 1207 113.5 1208 113.5 1210 113 .5 1211 113.5 1213 113.5 1214 113 .5 1216 113.5 1217 113.5 1219 113 .5 1221 113.5 1222 113.5 1224 113 .5 1225 113.5 1227 113.5 1228 113 .5 1230 113.5 1232 113.S 1233 113 .5

Automated CALCULATION SHEET Page: AB-23 of AB-38 SEngineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No LII Date: 04/14/2010 1235 113 .5 1237 113 .5 1238 113 .5 1240 113 .5 1241 113 .5 1242 113 .5 1243 113 .5 1244 113 .5 1246 113 .5 1247 113 .5 1248 113 .5 1250 113 .5 1251 113 .5 1252 113 .5 1253 113 .5 1254 113 .5 1255 113 .5 1256 113 .5 1258 113 .5 1260 113 .5 1262 113 .5 1264 113 .5 1266 113 .5 1268 113 .5 1270 113 .5 1272 113 .5 1274 113 .5 1275 113 .5 1277 113 .5 1279 113 .5 1281 113 .5 1283 113 .5 1:28 5 11 3.5 1287 113 .5 1289 113 .5 1290 113 .5 1291 113 .5 1292 113 .5 1293 113 .5 1294 113 .5 1295 113 .5 1296 113.5 1297 113 .5 1298 113 .5 1299 113 .5 1300 113 .5 1301 113 .6 1302 113.6 1304 113 .6 1305 113 .6 1306 113 .6 1307 113.6 1308 113 .6 1309 113 .6 1310 113 .6 1311 113 .6 1312 113 .6 1313 113 .6 1314 113 .6 1315 113 .6 1316 113 .6 1317 113 .6 1318 113 .6 1319 113 .6 1320 113 . 6 1322 113 .6 1323 113 .6 1324 113 .6 1325 113 .6 1326 113 .6 1327 113 .6 1328 113 .6 1329 113 .6 1330 113 .6 1331 113 .6 1332 113 .6 1334 113 .6 1335 113 .6 1336 113 .6 1337 113 .6 1338 113 .6 1339 113.6 1340 113 .6 1341 113 .6 1343 113 .6 1344 113 .6 1345 113 .6 1346 113 .6 1347 113 .6 1348 113 .6 1349 113 .6 1351 113 .6 1352 113 .6 1353 113 .6 1354 113 .6 1355 113 .6 1356 113 .6 1358 113 .6 1359 113 .6 1360 113 .6 1361 113 .6 1362 113 .6 1364 113 .6 1365 113.6 1366 113 .6 1367 113 .6 1368 113 .6 1370 113 .6 1371 113.6 1372 113 .6 1373 113 .6 1374 113 .6 1376 113 .6 1377 113 .6 1378 113 .6 1379 113 .6 1381 113 .6 1382 113 .6 1383 113 .6 1384 113 .6 1386 113 .6 1387 113 .6 1388 113 .6 1389 113 .6 1391 113 .6 1392 113 .6 1393 113 .6 1394 113 .6 1396 113 .6 1397 113 .6 1398 113 .6 1400 113 .6

Automated CALCULATION SHEET Page: AB-24 of AB3-38 Engineering Cale. No.:

zozm Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No LI Date: 04/14/2010 1401 113 .6 1402 113 .6 1404 113 .6 1405 113 .6 1406 113 .6 1408 113 .6 1409 113 .6 1410 113 .6 1412 113 .6 1413 113 .6 1414 113 .6 1416 113 .6 1417 113 .6 1418 113 .6 1420 113 .6 1421 113 .6 1422 113 .6 1424 113.6 1425 113 .6 1426 113 .6 1428 113 .6 1429 113 .6 1431 113 .6 1432 113 .6 1433 113.6 1435 113 .6 1436 113 .6 1438 113 .6 1439 113 .6 1441 113 .6 1442 113 .6 1r443 113 .6 1445 113 .6 1446 113 .6 1448 113 .6 1449 113 .6 1451 113 .6 1452 113 .6 1454 113 .6 1455 113 .6 14 5-7 113 .6 1458 113 .6 1460 113 .6 1461 113 .6 1463 113 .6 1464 113 .6 1466 113 .6 1467 113 .6 1469 113 . 6 1470 113 .6 1472 113 .6 1473 113 .6 1475 113 .6 1476 113 .6 1478 113 .6 1480 113 .6 1481 113 .6 1483 113 .6 1484 113 .6 1486 113 .6 1487 113 .6 1489 113 .6 1491 113 .6 1492 113 .6 1494 113 .6 1495 113 .6 1497 113 .6 1499 113 .6 1500 113 .6 1502 113 .6 1504 113 .6 1505 113 .6 1S07 113 .6 1509 113 .6 1510 113 .6 1512 113 .6 1514 113 .6 1515 113 .6 1517 113 .6 1519 113 .6 1521 113 .6 1522 113 .6 1524 113.6 1526 113 .6 1528 113 .6 1529 113 .6 1531 113 .6 1533 113 .6 1535 113 .6 1536 113 .6 1538 113 .6 1540 113 .6 1542 113 .6 1544 113 .6 1545 113 .6 1547 113 .6 1549 113 .6 1551 113 .6 1553 113 .6 1555 113 .6 1557 113 .6 1558 113 .6 1560 113 .6 1562 113 .6 1564 113 .6 1566 113 .6 1568 113 .6 1570 113 .6 1572 113 .6 1574 113 .6 1576 113 .6 1578 113 .6 1580 113 .6 1582 113 .6 1584 113 .6 1586 113 .6 1588 113 .6 1590 113 .6 1592 113 .6 1594 113 .6 1596 113 .6 1598 113 .6 1600 113 .6 1602 113 .6 1604 113 .6 1606 113 .6 1608 113 .6 1610 113 .6 1613 113 .6 1615 113 .6 1617 113-.6 1619 113 .6

Automated CALCULATION SHEET Page: AB-25 of AB-38 SEngineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes N] No 0I Date: 04/14/2010 1621 113 .6 1623 113 .6 1625 113 .6 1628 113 .6 1630 113 .6 1632 113 .6 1634 113 .6 1636 1i3 . 6 1639 113 .6 1641 113 .6 1643 113 .6 1645 113 .6 1647 113 .6 1649 113 .6 1652 113 .6 1654 113 .6 1656 113 .6 1658 113 .6 1660 113 .6 1662 113 .6 1664 113 .6 1667 113 .6 1669 113 .6 1671 113 .6 1673 113 .6 1675 113 .6 1677 113 .6 1679 113.6 1682 113 .6 1684 113.6 1686 113.6 1688 113 .6 1690 113 .6 1692 113 .6 1694 113.6 1697 113 .6 1699 113 .6 1701 113 .6 1703 113 .6 1705 11-3.6 1707 113.6 1709 113 .6 1711 113 .6 1714 113 .6 1716 113 .6 1718 113 .6 1720 113 .6 1722 113 .6 1724 113 .6 1726 113 .6 1728 113 .6 1731 113 .6 1733 113 .6 1735 113 .6 1737 113 .6 1739 113 .6 1741 113 .6 1743 113 .6 1745 113 .6 1747 113 .6 1749 113 .6 1752 113 .6 1754 113 .6 1756 113 .6 1758 113 .6 1760 113.6 1762 113 .6 1764 113 .6 1766 113 .6 1768 113 .6 1770 113 .6 1772 113 .6 1775 113.6 1777 113 .6 1779 113 .6 1781 113 .6 1783 113 .6 1785 113 .6 1787 113 .6 1789 113 .6 1791 113 .6 1793 113 .6 1795 113 .6 1797 113 .6 1800 113 .6 1802 113 .6 1804 113 .6 1806 1131.6 1808 113 .6 1810 113 .6 1812 113 .6 1814 113 .6 1816 113 .6 1818 113 .6 1820 113.6 1822 113 .6 1824 113 .6 1826 113 .6 1828 113 .6 1830 113 .6 1833 113 .6 1835 113 .6 1837 113 .6 1839 113 .6 1841 113 .6 1843 113 .6 1845 113 .6 1847 113 .6 1849 113 .6 1851 113 .6 1853 113 .6 1855 113 .6 1857 113 .6 1859 113 .6 1861 113 .6 1863 113 .6 1865 113 .6 1867 113 .6 1869 113 .6 1871 113 .6 1873 113.6 1875 113 .6 1877 113 .6 1880 113 .6 1882 113 .6 1884 113 .6 1886 113 .6 1888 113 .6 1890 113 .6 1892 113 .6 1894 113 .6 1896 113 .6

Z i Automated CALCULATION SHEET Page: AB-26 of AB-38 l Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El1 No E- Date: 04/14/2010 1898 113.6 1900 113.6 1902 113.6 1904 113.6 1906 113.6 1908 113.6 1910 113.6 1912 113.6 1914 113.6 1916 113.6 1918 113.6 1920 113.6 1922 113.6 1924 113.6 1926 113.6 1928 113.6 1930 113.6 1932 113.6 1934 113.6 1936 113.6 1938 113.6 1940 113.6 1942 113.6 1944 113.6 1946 113.6 1948 113.6 1950 113.6 1952 113.6 1954 113.6 1956 113.6 1958 113.6 1960 113.6 1962 113 .6 1964 113.6 1966 113.6 1968 113.6 1970 113 .6 1972 113.6 1974 113.6 1976 113.6 1978 113 .6 1980 113.6 1982 113.6 1984 113.6 1986 113.6 1988 113.6 1990 113.6 1992 113.6 1994 113.6 1996 113.6 1998 113.6 2000 113.6 2000 113.6 F max = 113.6 at time = 2000 seconds.

F min = 85 at time = le-006 seconds.

A.B.4.3 The following is the relative humidity response in Room 321 (Volume 135) as obtained from the GOT file Point Beach Primary Auxiliary Building GOTHIC Version 7.2a(QA) Base Case Model -

File: PB-PAB-Base.G GOTHIC 7.2a(QA) January 2006 Run - Apr/09/2010 at 11:36:55 Relative Humidity for Volume 135 Cell 1 Time F(t) Time F (t) Time F (t) seconds (%) seconds (%) seconds (%)

0 50 le-006 50 0.1082 50 0.2213 49.88 0.329 49.72 0.4416 49.73 0.5914 49.89 0.7179 49.89 0.871 49.8 1 49.77 1.108 49.76 2.163 49.34 3.277 49.02 4.338 48.93 5.447 49.06 6.922 49.6 8.169 50.36 9.676 51.6 11.5 53.47 12.55 54.7 13.71 56.14 14.8 63.86 15.93 67.08 17.01 62.14 18.13 61.79 19.63 63.29 20.9 62.55

Automated CALCULATION SHEET Page: AB-27 of AB-38 SEngineering Caic. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

1-ELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes Wý No El Date: 04/14/2010 22.43 61.74 24.28 61.27 25.35 60.97 26.52 60.63 27.81 60.26 29.23 59.87 30.8 59.45 32.51 59 34.4 58.52 36.48 58 .02 38.77 57.48 41.29 56.92 44 .06 56 .34 47.1 55.74 50.45 55.12 54 .13 54 .5 58.19 53.87 62.65 53 .24 67.55 52 .63 72 .94 52 .03 78.88 51.46 85.4 50.93 92.58 50.45 100 50.04 101.1 50 102.1 49.95 103 .3 49.89 104 .4 49.85 105.9 49.8 107.2 49.75 108.7 49.69 110.5 4-9.63 111.6 49.59-112.7 49.56 114 49.51 115.4 49.48 116.9 49.42 118 .6 49.39 120.5 49.33 122.5 49.28 124 .8 49 .22 127.3 49.17 130 49.11 133 49.05 136.3 48.99 139.9 48.93 143 .9 48.87 148.3 48.81 153 .1 48.75 158.4 48.7 164.3 48.64 170.7 48.59 177.8 48.55 185.6 48.52 194.1 48.48 203.5 48.45 212.9 48.43 222.1 48.42 231.2 48.41 240.3 48.4 249.2 48.39 258 48.39 266.8 48.38 275.4 48.38 284 48.38 292 .4 48.38 300.8 48.38 309.1 48.38 317.3 48.38 325.4 48.38 333 .3 48.38 341 48.38 348.6 48.37 356 48.37 363.4 48.37 370.6 48.37 377.7 48.37 384.6 48.37 388 48.38 391.7 48.38 395.7 48.38 399.4 48.38 402.7 48.38 405.4 48.38 407.8 48.38 410.1 48.38 412 .1 48.38 414 48.38 415.8 48.38 417.5 48.38 419.1 48.38 420.6 48.38 422.1 48.38 423.5 48.38 424.9 48.38 426.2 48.38 427.5 48.38 428.7 48.38 429.9 48.38 431 48.38 432.2 48.38 433 .2 48.38 434.3 48.38 435.4 48.38 436.4 48.38 437.4 48.38 439.4 48.38 441.3 48.38 443 .2 48.38 445 48.38 446.7 48.38 448.5 48.38 450.2 48.38 451.9 48.38 453.5 48.38 455.2 48.38 456.8 48.37 458.4 48.37 460 48.37 461.6 48.37 463 .1 48.38 464.7 48.38 466.2 48.38 467.8 48.38 469.3 48.37 470.9 48.37 472.4 48.37 473.9 48.37 475.4 48.37 476.9 48.37 478.4 48.37 479.9 48.37

Automated CALCULATION SHEET Page: AB-2 oAB38 fUI Engineering Caic. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.

Title:

HELD Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No LI-I Date: 04/14/2010 481.4 48.37 482 .9 48.37 484.4 48.37 485.9 48.37 .487.4 48.37 488.9 48.37 490.3 48.37 491.8 48.37 493.3 48.37 494.7 48.37 496.2 48.37 497.7 48.37 499.1 48.37 500.6 48.37 502 48.37 503 .5 48.37 504.9 48.37 506.4 48.37 507.8 48.37 509.3 48.37 510.7 48.37 512 .2 48.37 513 .6 48.37 515 48.37 516.5 48.37 517 .9 48.37 519.3 48.37 520.8 48.37 522 .2 48.37 523.6 48.37 525 48.37 526.5 48. 37 527.9 48.37 529.3 48.37 530.7 48.37 532 .1 48.37 533.5 48.37 535 48.37 536.4 48.37 537.8 48.37 S39-.2 48.37 540.6 48.37 542 48.37 543.5 48.37 544 .9 48.37 546 .3 48.37 547.7 48.37 549.1 48.37 550.5 48.37 552 48.37 553 .4 48.37 554 .8 48.37 556.2 48.37 557.6 48.37 559.1 48.37 560.5 48.37 561.9 48.37 563 .3 48.37 564.8 48.37 566 .2 48.37 567.6 48.37 569 48.37 570.5 48.37 571.9 48.37 573.3 48.37 574.7 48.37 576.2 48.37 577.6 48.37 579 48.37 580.5 48.37 581.9 48.37 583.3 48.37 584. 8 48.37 586.2 48.37 587.7 48.37 589.1 48.37 590.5 48.37 592 48.37 593.4 48.37 594.9 48.37 596.3 48.37 597.7 48.37 599.2 48.37 600.6 48.37 602.1 48.37 603.5 48.37 605 48.37 606.4 48.37 607.9 48.37 609.3 48.38 610.8 48.38 612.2 48.37 613.7 48.38 615.1 48.38 616.6 48.37 618 48.37 619.4 48.37 620.9 48.37 622 .3 48.37 623.8 48.37 625.3 48.37 626.8 48.37 628.3 48.37 629.7 48.37 631.2 48.37 632 .7 48.37 634.1 48.37 635.6 48.37 637 48.37 638.4 48.37 639.9 48.37 641.3 48.37 642.7 48.37 644 .1 48.37 645.5 48.37 646.9 48.37 648.3 48.37 649.7 48.37 651 48.37 652.4 48.37 653.8 48.37 655.2 48.37 656 .6 48.37 657.9 48.37 659.3 48.38 660.7 48.37 662.1 48.37 663.4 48.37 664.8 48.37 666.2 48.37 667.5 48.37 668.9 48.37

IAutomated Engineering CALCULATION SHEET Page: AB-29 Caic. No.:

of AB-38 Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No LI Date: 04/1.4/2010 670.2 48.37 671.6 48.37 673 48.37 674.3 48.37 675.7 48.37 677 48.37 678.4 48.37 679.8 48.37 681.1 48.37 682.5 48.37 683.9 48.37 685.2 48.37 686.6 48.37 688 48.37 689.3 48.37 690.7 48.37 692.1 48.37 693.5 48.37 694.8 48.37 696.2 48.37 697.6 48.37 699 48.37 700.3 48.37 701.7 48.37 703 .1 48.37 704.5 48.37 705 .9 48.37 707.3 48.37 708.7 48.37 710.1 48.37 711.4 48.37 712.8 48.37 714.2 48.37 715.6 48.37 717 48.37 718.4 48.37 719.8 48.37 721.2 48.37 722.6 48.37 724 48.37 725.4 48.37 726.9 48.37 728.3 48.37 729.7 48.37 731.1 48.37 732.5 48.37 733.9 48.37 735.3 48.37 736.8 48.37 738.2 48.37 739.6, 48.37 741 48.37 742 .5 48.37 743 .9 48.37 745.3 48.37 746.7 48.37 748.2 48.37 749.6 48.37 751 48.37 752 .5 48.37 753.9 48.37 755.4 48.37 756.8 48.37 758.2 48.37 759.7 48.37 761.1 48.37 762.6 48.37 764 48.37 765.5 48.37 766.9 48.37 768.4 48.37 769.9 48.37 771.3 48.37 772 .8 48.37 774.2 48.37 775.7 48.37 777.2 48.37 778.6 48.37 780.1 48.37 781.6 48.37 783 48.37 784 .5 48.37 786 48.37 787.5 48.37 788.9 48.37 790.4 48.37 791.9 48.37 793 .4 48.37 794.8 48.37 796.3 48.37 797.8 48.37 799.3 48.37 800.7 48.37 802.2 48.37 803.7 48.37 805.2 48.37 806.7 48.37 808.1 48.37 809.6 48.37 811.1 48.37 812.6 48.37 814.1 48.37 815.5 48.37 817 48.37 818.5 48.37 820 48.37 821.5 48.37 822 .9 48.37 824 .4 48.37 825.9 48.37 827.4 48.37 828.9 48.37 830.4 48.37 831 ..8 48.37 833 .3 48.37 834.8 48.37 836.3 48.37 837.8 48.37 839.3 48.37 840 .7 48.37 842.2 48.37 843.7 48.37 845.2 48.37 846.7 48.37 848.2 48.37 849.7 48.37 851.1 48.37 852.6 48.37 854.1 48.37 855.6 48.37 857.1 48.37 858.6 48.37

IAutomated Engineering Services Corp.

Client: FP&L Energy CALCULATION SHEET Page: AB-30 [of AB-38 Caic. No.:

PBNP-994-2 1-13 Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes No No 1E1 Date: 04/14/2010 860.1 48.37 861.5 48.37 863 48.37 864.5 48.37 866 48.37 867.5 48.37 869 48.37 870.5 48.37 871.9 48.37 873.4 48.37 874.9 48.37 876.4 48.37 877.9 48.37 879.4 48.37 880.9 48.37 882.4 48.37 883.8 48.37 885.3 48.37 886.8 48.37 888.3 48.37 889.8 48.37 891.3 48.37 892.8 48.37 894.3 48.37 895.8 48.37 897.2 48.37 898.7 48.37 900.2 48.37 901.7 48.37 903.2 48.37 904.7 48.37 906.2 48.37 9-07.7 48.37 909.2 48.37 910.7 48.37 912.1 48.37 913 .6 48.37 915.1 48.37 916 .6 48.37 918 .1 48.37 919.6 48.37 921. 1 48.37 922.6 48.37 924.1 48.37 925.6 48.37 927.1 48.37 928.6 48.37 930 48.37 931.5 48.37 933 48.37 934.5 48.37 936 48.37 937.5 48.37 939 48.37 940.5 48.37 942 48.37 943 .5 48.37 945 48.37 946.5 48.37 948 48.37 949.5 48.37 951 48.37 952 .4 48.37 953 .9 48.37 955.4 48.37 956.9 48.37 958 .4 48.37 959.9 48.37 961.4 48.37 962.9 48.37 964.4 48.37 965.9 48.37 967.4 48.37 968.9 48.37 970.4 48.37 971.9 48.37 973.4 48.37 974.9 418.37 976.4 48.37 977.9 48.37 979.4 48.37 980.9 48.37 982.4 48.37 983.9 48.37 985.4 48.37 986 .9 48.37 988.4 48.37 989.9 48.37 991.4 48.37 992.8 48.37 994.3 48.37 995.8 48.37 997.3 48.37 998.8 48.37 1000 48.37 1002 48.37 1003 48.37 1005 48.37 1006 48.37 1008 48.37 1009 48.37 1011 48.37 1012 48.37 1014 48.37 1015 48.37 1017 48.37 1018 48.37 1020 48.37 1021 48.37 1023 48.37 1024 48.37 1026 48.37 1027 48.37 1029 48.37 1030 48.37 1032 48.37 1033 48.37 1035 48.37 1036 48.37 1038 48.37 1039 48.37 1041 48.37 1042 48.37 1044 48.37 1045 48.37 1047 48.37 1048 48.37 1050 48.37 1051 48.37 1053 48.37 103 10548.7 48.37 1056 48.37

Automated CALCULATION SHEET Page: AB-31 of AB-38 Z Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 04/14/2010 1057 48.37 1059 48.37 1060 48.37 1062 48.37 1063 48.37 1065 48.37 1066 48.37 1068 48.37 1069 48.37 1071 48.37 1073 48.37 1074 48.37 1076 48 .37 1077 48.37 1079 48.37 1080 48.37 1082 48.37 1083 48.37 1085 48.37 1086 48.37 1088 48.37 1089 48.37 1091 48.37 1092 48.37 1094 48.37 1095 48.37 1097 48.37 1098 48.37 1100 48.37 1101 48.37 1103 48.37 1104 48.37 110-6 48.37 1107 48.37 1109 48.37 1110 48.37 1112 48.37 1113 48.37 1115 48.37 1116 48.37 1118 48-.37 1119 48.37 1121 48.37 1122 48.37 1124 48.37 1125 48.37 1127 48.37 1128 48.37 1130 48.37 1131 48.37 1133 48.37 1134 48.37 1136 48.37 1137 48.37 1139 48.37 1140 48.37 1142 48.37 1143 48.37 1145 48.37 1146 48.37 1148 48.37 1149 48.37 1151 48.37 1152 48.37 1154 48.37 1155 48.37 1157 48.37 1159 48.37 1160 48.37 1162 48.37 1163 48.37 1165 48.37 1166 48.37 1168 48.37 1169 48.37 1171 48.37 1172 48.37 1174 48.37 1175 48.37 1177 48.37 1178 48.37 1180 48.37 1181 48.37 1183 48.37 1184 48.37 1186 48.37 1187 48.37 1189 48.37 1190 48.37 1192 48.37 1193 48.37 1195 48.37 1196 48.37 1198 48.37 1199 48.37 1201 48.37 1202 48.37 1204 48.37 1205 48.37 1207 48 .37 1208 48.37 1210 48.37 1211 48.37 1213 48.37 1214 48.37 1216 48.37 1217 48-.37 1219 48.37 1221 48.37 1222 48.37 1224 48.37 1225 48.37 1227 48.37 1228 48.37 1230 48.37 1232 48.37 1233 48.37 1235 48.37 1237 48.37 1238 48.37 1240 48.37 1241 48.37 1242 48.37 1243 48.37 1244 48.37 1246 48.37 1247 48.37 1248 48.37 1250 48.37 1251 48.37 1252 48.37 1253 48.37

Automated CALCULATION SHEET Page: AB-32 of AB-38 fI . Engineering Caic. No.:

Services Corp. PBN P-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes ElZ No F-] Date: 04/14/2010 1254 48.37 1255 48.37 1256 48.37 1258 48.37 1260 48.37 1262 48.37 1264 48.37 1266 48.37 1268 48.37 1270 48.37 1272 48.37 1274 48.37 1275 48.37 1277 48.37 1279 48.37 1281 48.37 1283 48.37 1285 48.37 1287 48.37 1289 48.37 1290 48.37 1291 48.37 1292 48.37 1293 48.37 1294 48.37 1295 48.37 1296 48.37 1297 48.37 1298 48.37 1299 48.37 1300 48.37 1301 48.37 1302 48.37 1304 48.37 1305 48.37 1306 48.37 1307 48.37 1308 48.37 1309 48.37 1310 48.37 1311 48.37 1312 4-8 .3-7 1313 48.37 1314 48.37 1315 48.37 1316 48.37 1317 48.37 1318 48.37 1319 48.37 1320 48.37 1322 48.37 1323 48.37 1324 48.37 1325 48.37 1326 48.37 1327 48.37 1328 48.37 1329 48.37 1330 48.37 1331 48.37 1332 48.37 1334 48.37 1335 48.37 1336 48.37 1337 48.37 1338 48.37 1339 48.37 1340 48.37 1341 48.37 1343 48.37 1344 48.37 1345 48.37 1346 48.37 1347 48.37 1348 48.37 1349 48.37 1351 48.37 1352 48.37 1353 481.37 1354 48.37 1355 48.37 1356 48.37 1358 48.37 1359 48.37 1360 48.37 1361 48.37 1362 48.37 1364 48.37 1365 48.37 1366 48.37 1367 48.37 1368 48.37 1370 48.37 1371 48.37 1372 48.37 1373 48.37 1374 48.37 1376 48.37 1377 48.37 1378 48.37 1379 48.37 1381 48.37 1382 48.37 1383 48.37 1384 48.37 1386 48.37 1387 48.37 1388 48.37 1389 48.37 1391 48.37 1392 48.37 1393 48.37 1394 48.37 1396 48.37 1397 48.37 1398 48.37 1400 48.37 1401 48.37 1402 48.37 1404 48.37 1405 48.37 1406 48.37 1408 48.37 1409 48.37 1410 48.37 1412 48.37 1413 48.37 1414 48.37 1416 48.37 1417 48.37 1418 48.37 1420 48.37

Automated CALCULATION SHEET Page: AB-33 of AB-38 jU Engineering Cale. No.:

Z -L ý Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes N] No [Ii Date: 04/14/2010 1421 48.37 1422 48.37 1424 48.37 1425 48.37 1426 48.37 1428 48.37 1429 48.37 1431 48.37 1432 48.37 1433 48.37 1435 48.37 1436 48.37 1438 48.37 1439 48.37 1441 48.37 1442 48.37 1443 48.37 1445 48.37 1446 48.37 1448 48.37 1449 48.37 1451 48.37 1452 48.37 1454 48.37 1455 48.37 1457 48.37 1458 48.37 1460 48.37 1461 48.37 1463 48.37 1464 48.37 1466 48.37 1467 478-.37 1469 48 .37 1470 48.37 1472 48.37 1473 48.37 1475 48.37 1476 48.37 1478 48 .37 1480 48.37 1481 48.3-7 1483 48.37 1484 48.37 1486 48.37 1487 48.37 1489 48.37 1491 48.37 1492 48.37 1494 48.37 1495 48.37 1497 48.37 1499 48.37 1500 48.37 1502 48.37 1504 48.37 1505 48.37 1507 48.37 1509 48.37 1510 48.37 1512 48.37 1514 48.37 1515 48.37 1517 48.37 1519 48.37 1521 48.37 1522 48.37 1524 48.37 1526 48.37 1528 48.37 1529 48.37 1531 48.37 1533 48.37 1535 48.37 1536 48.37 1538 48.37 1540 48.37 1542 48.37 1544 48.37 1545 48.37 1547 48.37 1549 48.37 1551 48.37 1553 48.37 1555 48 .37' 1557 48.3.7 1558 48.37 1560 48.37 1562 48.37 1564 48.37 1566 48.37 1568 48.37 1570 48.37 1572 48.37 1574 48.37 1576 48.37 1578 48.37 1580 48.37 1582 48.37 1584 48.37 1586 48.37 1588 48.37 1590 48.37 1592 48.37 1594 48.37 1596 48.3.7 1598 48.37 1600 48.37 1602 48.37 1604 48.37 1606 48.37 1608 48.37 1610 48.37 1613 48.37 1615 48.37 1617 48.37 1619 48.37 1621 48.37 1623 48.37 1625 48.37 1628 48.37 1630 48.37 1632 48.37 1634 48.37 1636 48.37 1639 48.37 1641 48.37 1643 48.37 1645 48.37 1647 48.37 1649 48.37 1652 48.37

Automated CALCULATION SHEET Page: AB-34 of AB-38 Engineering Calc. No.:

Services Corp.

PBNP-994-21-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 04/14/2010 1654 48.37 1656 48.37 1658 48.37 1660 48.37 1662 48.37 1664 48.37 1667 48.37 1669 48.37 1671 48.37 1673 48.37 1675 48.37 1677 48.37 1679 48.37 1682 48.37 1684 48.37 1686 48.37 1688 48.37 1690 48.37 1692 48.37 1694 48.37 1697 48.37 1699 48.37 1701 48.37 1703 48.37 1705 48.37 1707 48.37 1709 48.37 1711 48.37 1714 48.37 1716 48.37 1718 48.37 1720 48.37 1722 48.37-1724 48.37 1726 48.37 1728 48.37 1731 48.37 1733 48.37 1735 48.37 1737 4-8.37 1739 48.37 1741 48.37 1743 48.37 1745 48.37 1747 48.37 1749 48.37 1752 48.37 1754 48.37 1756 48.37 1758 48.37 1760 48.37 1762 48.37 1764 48.37 1766 48.37 1768 48.37 1770 48.37 1772 48.37 1775 48.37 1777 48.37 1779 48.37 1781 48.37 1783 48.37 1785 48.37 1787 48.37 1789 48.37 1791 48.37 1793 48.37 1795 48.37 1797 48.37 1800 48.37 1802 48.37 1804 48.37 1806 48.37 1808 48.37 1810 48.37 1812 48.37 1814 48.37 1816 48.37 1818 48.37 1820 48.37 1822 48.37 1824 48.37 1826 48.37 1828 48.37 1830 48.37 1833 48.37 1835 48.37 1837 48.37 1839 48.37 1841 48.37 1843 48.37 1845 48.37 1847 48.37 1849 48.37 1851 48.37 1853 48.37 1855 48.37 1857 48.37 1859 48.37 1861 48.37 1863 48.37 1865 48.37 1867 48.37 1869 48.37 1871 48.37 1873 48.37 1875 48.37 1877 48.37 1880 48.37 1882 48.37 1884 48.37 1886 48.37 1888 48.37 1890 48.37 1892 48.37 1894 48.37 1896 48.37 1898 48.37 1900 48.37 1902 48.37 1904 48.37 1906 48.37 1908 48.37 1910 48.37 1912 48.37 1914 48.37 1916 48.37 1918 48.37 1920 48.37 1922 48.37 1924 48.37 1926 48.37

& Automated CALCULATION SHEET Page: AB-35 of AB-38 Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

1HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 04/14/2010 1928 48.37 1930 48.37 1932 48.37 1934 48.37 1936 48.37 1938 48.37 1940 48.37 1942 48.37 1944 48.37 1946 48.37 1948 48.37 1950 48.37 1952 48.37 1954 48.37 1956 48.37 1958 48.37 1960 48.37 1962 48.37 1964 48.37 1966 48.37 1968 48.37 1970 48.37 1972 48.37 1974 48.37 1976 48.37 1978 48.37 1980 48.37 1982 48.37 1984 48.37 1986 48.37 1988 48.37 1990 48.37 1992 48.37 1994 48.37 1996 48.37 1998 48.37 2000 48.37 2000 48.37 F max = 67.08 at time = 15.93 seconds.

F min = 48.37 at time = 2000 seconds.

A.B.4.4 Summary of results The maximum temperature for the SBR (Volume 135) is 111F at 13.71s due to the influx of the HELB mass and energy for the Turbine Building via the Duct connecting it to Room 321 resulting from the pressure differential. After this time, the temperature returns essentially to its initial value of 102F after which it remains relatively constant due to leakage from the Control Building which is caused by a lower pressure in the Turbine Building due to condensation.

The temperature behavior in the SGR (Volume 136) is different for the following reasons even though the air flow behaves similarly to that in the SBR. The initial in surge of the HELB mass and energy results in the temperature increasing to about 11 3.3F in the first 100 sec, after which the temperature increases at a very slow rate. The initial temperature rise and slow temperature increase are due to the fact that the heater in Room 323 which is 10 BTU/sec balances the enthalpy difference between the cooler air entering from the Control building and the air leaving and going into the Turbine Building.

The relative humidity in the SBR follows the trend of the temperature in that room. The maximum value is 67.08% at 15.93s and decreases to a minimum value of 48.37% at the end of the simulation time (2000s).

A.B.5 Copy of References

Automated CALCULATION SHEET Page: AB-36 of AB-38 Engineering Cale. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes EIl No Eli Date: 04/14/2010 A.B.5.1 Copy of Reference A.B.2.2 Original Message -----

From: Tom George <Tom.George@numerical.com>

To: Rckem@aol.com Cc: Jim Harrell <Jim.Harrell@numerical.com>; harv.hanneman@nexteraenergy.com; harv.hanneman@nexteraenergy.com; CHUCK.RICHARDSON@nexteraenergy.com Sent: Fri, Mar 19, 2010 5:36 pm

Subject:

Re: FW: Point Beach GOTHIC Models Rick, The model is susceptible to some momentum loops where the flow keeps going faster and faster. Once it gets started the solution will fail. Because it is on the edge, small changes to the model can trigger the loop. For example, I noticed that some of the volumes were set to 1.0e9 ft3. This is outside of the recommended range of large to small volume ratio. Also, I noted a loss factor of le209 for one of the connectors (looks like a typo). I don't think this is causing a problem but we never tried anything that large. Changing these altered the behavior but did not eliminate the momentum loop.

The momentum loop is in Volume 10. 1 couldn't tell for sure without knowledge of the actual geometry, but it may be that the flow paths were oriented without particular regard to the geometry. When I redirected the connections so that the flow was toward a wall, the momentum loop was eliminated.

Tom Jim Harrell wrote:

Harv Hanneman (EPU Project Manager and NextEra employee) contacted me via phone authorizing NAI to look at Dick's models to assess if they were related to a GOTHIC code issues (and, therefore, covered under the NextEra GOTHIC maintenance agreement) or if they were related to user/input issues and required a contract from AES (Dick isworking for AES who is working for NextEra) or Point Beach/NextEra to resolve the issue. Dick uploaded the files to Sharefile.

Jim Harrell, P.E.

Vice President Numerical Applications, Inc.

Suite 202 1210 SE Maynard Road Cary, NC 27511 919.465.7230 ext. 227 (voice) 919.465.7231 (fax) 919.349.9038 (wireless)

Automated CALCULATION SHEET Page: AB-37 of AB-38

/Y /l W Engineering Calc. No.:

Services Corp. PBNP-994-2 1-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes W No D Date: 04/14/2010 From: rckernbaol.com [1]

Sent: Friday, March 19, 2010 12:50 PM To: jim. harrellanumerical.com

Subject:

Point Beach GOTHIC Models Jim, The GOTHIC models relating to the problem I'm having are:

PB-PAB-30IT2.GTH - This is the original model that works fine.

PB-PAB-30 1_T2-V 135.GTH - This is the model with the extra volume 135 and doesn't include anything else.

PB-PAB-301_T2-wsbr.GTH - This is the model with the extra volume with everything else that I want to include.

Note that when I removed Volume 135 from PB-PAB-30IT2-V135.GTH, the case ran fine again.

I'll FTP these models after you've provide me with the link.

Thanks in advance for your assistance.

Dick Richard C. Kern Nuclear Engineering Technology Corporation Office and Home 10043 Vista Court Myersville, MD 21773-8137 (301)293-1719 Rckern @aol.com A.B.5.2 Copy of Reference A.B.2.3

-- Message -----

---Original From: ESPER, TOM <TOM.ESPER@nexteraenergy.com>

To: Dan Henry <dhenry@aesengineering.com>; Dick Kern <rckem@aol.com>

Sent: Tue, Apr 6, 2010 10:51 am

Subject:

FW: Point Beach Revised HELB Calculation Dick,

Automated CALCULATION SHEET Page: AB-38 of AB-38 Engineering Caic. No.:

Services Corp. PBNP-994-21-13 Client: FP&L Energy Revision: 2 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.

Title:

HELB Reconstitution Program Task 13 - Building Recovery Reviewed By: CD Henry Safety Related Yes El No D Date: 04/14/2010 See the question below. Does Appendix B of the PBNP Temp calculation include both parts of the room - the battery room and switchgear/equipment room?


Original Message -----

From: Saravanan Makayee [2]

Sent: Tuesday, April 06, 2010 9:16 AM To: ESPER, TOM Cc: Loor, Joe; Hanneman, Harv

Subject:

RE: Point Beach Revised HELB Calculation Tom, The calc revision seems to be for 1E battery room (FZ 321) only? What about the switchgear room (FZ 323) where EQ equipments are installed?

Thanks Saravanan Makayee KCI Engineering (630) 515-2650 x23