Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
AEP-NRC-2020-40, Calculation PRA-QNT-009, Rev. 0, Evaluation of Risk Significance of Short-Term ILRT Extension | 22 May 2020 | Calculation PRA-QNT-009, Rev. 0, Evaluation of Risk Significance of Short-Term ILRT Extension | High winds Internal Flooding Probabilistic Risk Assessment Large early release frequency |
ML20132A202 | 29 April 2020 | Annual Radioactive Effluent Release Report Including Off-site Dose Calculation Manual Changes | Boric Acid Grab sample Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
AEP-NRC-2018-35, Annual Radioactive Effluent Release Report - Off-Site Dose Calculation Manual | 30 April 2018 | Annual Radioactive Effluent Release Report - Off-Site Dose Calculation Manual | Grab sample Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
ML18024A447 | 19 January 2018 | Enclosure 2 - Technical Support Center Loss of Coolant Accident Radiological Analysis | |
AEP-NRC-2016-89, to Calculation MD-12-FLOOD-011-N, Flood Hazard Reevaluation Report for the Donald C. Cook Nuclear Plant | 28 October 2016 | to Calculation MD-12-FLOOD-011-N, Flood Hazard Reevaluation Report for the Donald C. Cook Nuclear Plant | Hydrostatic FLEX Fukushima Dai-Ichi Frazil ice Earthquake |
ML16287A610 | 11 October 2016 | Calculation PRA-QNT-007, Calculation of Regulatory Guide 1.177 Risk Parameters for Potential One-Time Emergency Technical Specification Completion Time Change for Unit 1 and Unit 2 Train B Reserve Feed. | Mission time Internal Flooding Probabilistic Risk Assessment Large early release frequency |
AEP-NRC-2016-23, Calculation RWA-1313-001, Rev. 1, AST Radiological Analysis Input Parameter Development. | 12 February 2016 | Calculation RWA-1313-001, Rev. 1, AST Radiological Analysis Input Parameter Development. | Stroke time |
ML15154B048 | 29 May 2015 | Risk Analysis to Support Response to Requests for Additional Information Regarding One Time Emergency License Amendment Request to Revise Tech Spec Section 3.8.1 to Permit Extending the Completion Time. (RAI-APLA 2 Through 8) | Probabilistic Risk Assessment Temporary Modification Emergency Lighting Large early release frequency Fire Protection Program |
ML15154B050 | 29 May 2015 | Risk Analysis to Support Response to Requests for Additional Information Regarding One Time Emergency License Amendment Request to Revise Tech Spec Section 3.8.1 to Permit Extending the Completion Time. (RAI-APLA 1) | Internal Flooding Probabilistic Risk Assessment Large early release frequency |
AEP-NRC-2015-49, Emergency License Amendment Request to Extend the Allowed Outage Time for an Emergency Diesel Generator | 28 May 2015 | Emergency License Amendment Request to Extend the Allowed Outage Time for an Emergency Diesel Generator | Safe Shutdown High winds Ultimate heat sink Mission time Fish deterrent system Anticipated operational occurrence Internal Flooding Past operability Probabilistic Risk Assessment FLEX Large early release frequency Turbine Missile Offsite Circuit Continuous fire watch Hourly Fire Watch |
AEP-NRC-2015-14, Response to March 12, 2012, Request for Information, Enclosure 2, Recommendation 2.1: Flooding, Required Response 2, Hazard Reevaluation Report | 6 March 2015 | Response to March 12, 2012, Request for Information, Enclosure 2, Recommendation 2.1: Flooding, Required Response 2, Hazard Reevaluation Report | Hydrostatic FLEX Fukushima Dai-Ichi Frazil ice Earthquake |
ML14071A436 | 5 March 2014 | Enclosure 3 to AEP-NRC-2014-09, Calculation, PRA-ILRT, Rev. 2, Risk Impact Assessment for Permanently Extending Containment Type a Test Interval | High winds Mission time Internal Flooding Probabilistic Risk Assessment Large early release frequency Fire Protection Program |
ML12340A443 | 26 November 2012 | Enclosure 2 to AEP-NRC-2012-86 - Flooding Walkdown Report | Fukushima Dai-Ichi |
ML080920393 | 28 March 2008 | Submittal of Annual Radioactive Effluent Release Report, January 1, 2007, Through December 31, 2007. Pages A3.0-1, Off-Site Dose Calculation Manual, PMP-6010-OSD-001, Revision 22 Through End | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
ML043640141 | 11 March 2005 | License Amendment, Request to Use Yield Strength Determined from Measured Material Properties for Reinforcing Bar in Structural Calculations for Control Rod Drive Missile Shields | |
ML041120498 | 26 March 2004 | Drawing 2C93, Unit No. 2 Containment Bldg Missile Shield | |
ML041120489 | 26 March 2004 | Drawing 1C93, Unit No. 1 Containment Bldg Missile Shield | |
ML040340095 | 24 November 2003 | Calculation ST-452, Rev. 0, Structural Evaluation of the D.C. Cook Unit 1 Sgla Closures. | Exemption Request |