ML12340A443

From kanterella
Jump to navigation Jump to search
Enclosure 2 to AEP-NRC-2012-86 - Flooding Walkdown Report
ML12340A443
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/26/2012
From: Bellini F X, Gerlits D W
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
References
AEP-NRC-2012-86 MD-12-FLOOD-002-S, Rev 0
Download: ML12340A443 (2)


Text

Enclosure 2 to AEP-NRC-2012-86 Flooding Walkdown Report D. C. COOK NUCLEAR PLANT CALCULATION/REPORT COVER SHEET Document No. MD-12-FLOOD-002-S v N. 0 Full Rev El Addendum SRev No.O j0 Ir1 Status Change Title: Externally Sourced Flooding Walkdown Report in Response to a 50.54(f) Information Request Regarding Near-Term Task Force Recommendation

2.3 STATUS

M Approved El Superseded El Voided I Information Only Document Type/Class:

Fi Calculation Z Report Li Class 1 E] Class 2 [D Class 3 QUALITY SYSTEM UNIT COMPUTER REVIEW METHOD: CLASSIFICATION:

CODE: NO.: MEDIA: [ Detailed Review Li Safety-Related Li Yes Li Alternate Calculation Li Non-Safety Related with NAPL 12 E No EL Other Special Requirements Li N/A -Status/Class Change Only[ Non-Safety Related Do any assumptions require later verification?

Li Yes [ No If yes, Al No.Description:

This report is prepared in response to an NRC request for regarding recommendations of the Near-Term Task Force review of insights from the Fukushima Dai-Ichi accident.

Information contained herein verify that the flood protection features relied up in D. C. Cook's Current Licensing Basis is functional in the event of an externally sourced flood.A CDI is not required, as this is an end-use only document, and it is know to not impact any other documents.

If the Reviewer is the Preparer's supervisor, the supervisor review is needed and is approved: 0 N/A Supervisor's Manager's Name Title Signature Date Qualification Matrix Verification

  • The responsible Engineering Supervisor/Manager approval signature also serves to signify that the qualifications of the individual(s) assigned as Preparer(s) and Reviewer(s) and Independent Design Verifier(s) were verified in the Plant Qualification Matrix.Preparation

& Review PREPARED BY: REVIEWED BY: *APPROVED BY: Name: David Gerlits / F. X. Bellini J. H. Snooks C. A. Fasano Title: Principal Scientist

/ Advisory Advisory Scientist Technical Manager Scientist Organization:

AREVA AREVA AREVA Signature:

See attached report. See attached report. See attached report.Date: LI Sign-offs for additional Preparer(s) and Reviewer(s) on next page Non-AEP Preparation, Review & Approval If the Preparer, Reviewer and Approver are non-AEP individuals and the calculation was performed under the D.C. Cook QA program, the appropriate AEP Design Discipline Supervisor(s) approval is needed. Z N/A AEP Design Discipline Supv: 0AfZ /./o,!w a"t Printed Name/Signature Date This document includes the following pages: See Table of Contents in attached vendor report. Page i ofi This form was derived from Data Sheet 1 of 12-EHP-5040-DES-003, Calculations and Reports