ML12340A443

From kanterella
Jump to navigation Jump to search
Enclosure 2 to AEP-NRC-2012-86 - Flooding Walkdown Report
ML12340A443
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/26/2012
From: Bellini F, Gerlits D
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
References
AEP-NRC-2012-86 MD-12-FLOOD-002-S, Rev 0
Download: ML12340A443 (2)


Text

Enclosure 2 to AEP-NRC-2012-86 Flooding Walkdown Report

D. C. COOK NUCLEAR PLANT CALCULATION/REPORT COVER SHEET Document No. MD-12-FLOOD-002-S v N.

0 Full Rev El Addendum SRev No.O j0 Ir1 Status Change

Title:

Externally Sourced Flooding Walkdown Report in Response to a 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.3 STATUS:

M Approved El Superseded El Voided I Information Only Document Type/Class:

Fi Calculation Z Report Li Class 1 E] Class 2 [D Class 3 QUALITY SYSTEM UNIT COMPUTER REVIEW METHOD:

CLASSIFICATION:

CODE:

NO.:

MEDIA:

[

Detailed Review Li Safety-Related Li Yes Li Alternate Calculation Li Non-Safety Related with NAPL 12 E No EL Other Special Requirements Li N/A - Status/Class Change Only

[

Non-Safety Related Do any assumptions require later verification?

Li Yes

[ No If yes, Al No.

==

Description:==

This report is prepared in response to an NRC request for regarding recommendations of the Near-Term Task Force review of insights from the Fukushima Dai-Ichi accident. Information contained herein verify that the flood protection features relied up in D. C. Cook's Current Licensing Basis is functional in the event of an externally sourced flood.

A CDI is not required, as this is an end-use only document, and it is know to not impact any other documents.

If the Reviewer is the Preparer's supervisor, the supervisor review is needed and is approved:

0 N/A Supervisor's Manager's Name Title Signature Date Qualification Matrix Verification

  • The responsible Engineering Supervisor/Manager approval signature also serves to signify that the qualifications of the individual(s) assigned as Preparer(s) and Reviewer(s) and Independent Design Verifier(s) were verified in the Plant Qualification Matrix.

Preparation & Review PREPARED BY:

REVIEWED BY:

  • APPROVED BY:

Name:

David Gerlits / F. X. Bellini J. H. Snooks C. A. Fasano

Title:

Principal Scientist / Advisory Advisory Scientist Technical Manager Scientist Organization:

AREVA AREVA AREVA Signature:

See attached report.

See attached report.

See attached report.

Date:

LI Sign-offs for additional Preparer(s) and Reviewer(s) on next page Non-AEP Preparation, Review & Approval If the Preparer, Reviewer and Approver are non-AEP individuals and the calculation was performed under the D.

C. Cook QA program, the appropriate AEP Design Discipline Supervisor(s) approval is needed. Z N/A AEP Design Discipline Supv: 0AfZ

/./o,!w a"t Printed Name/Signature Date This document includes the following pages:

See Table of Contents in attached vendor report.

Page i ofi This form was derived from Data Sheet 1 of 12-EHP-5040-DES-003, Calculations and Reports