AEP-NRC-2016-89, to Calculation MD-12-FLOOD-011-N, Flood Hazard Reevaluation Report for the Donald C. Cook Nuclear Plant

From kanterella
Jump to navigation Jump to search
to Calculation MD-12-FLOOD-011-N, Flood Hazard Reevaluation Report for the Donald C. Cook Nuclear Plant
ML16330A016
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/28/2016
From:
American Electric Power
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16330A010 List:
References
AEP-NRC-2016-89 MD-12-FLOOD-011-N, Rev. 1
Download: ML16330A016 (102)


Text

w JIMERICJIN' ElECTRIC D. C. COOK NUCLEAR PLANT POWER

,Whtmt'n°G'l~li/Jt11:1'l111/s/tr ..

CALCULATION/REPORT COVER SHEET DocumentNo. 1\IID-12-FLOOD-Oll..,N I RevNo._1_

I IZI Full Rev D D Status Change Addendum

Title:

Flood Hazai*d Reevaluation Report for the Donald C. Cook Nuclear Plant STATUS: 181 Approved 0 Superseded D Voided j D Information Only Doctunent Type/Class: I D Calculation 181 Report I D Class 1 o* Class2 IZI Class 3 QUALITY SYSTEM UNIT COMPUTER REVIEW METHOD:

CLASSIFICATION: CODE: NO.: MEDIA: 181 Detailed Review

~ Safety-Related DYes D Alternate Calculation D Non-Safety Related with 181 No 0 Other NAPL 12 Special Requirements 0 N/A- Status/Class Change Only D Non-Safety Related Do any assumption~ require later verification? DYes I IZI No If yes, Action No.

Description:

This report describes the approach, methods, and results from the reevaluation of extemal flood hazatds and provides information to support Phase I of the requested actions by the U.S. Nuclear Regttlatory Commission (NRC) staff in its 10 CFR 50.54(f) letter of March 12, 2014. This document is beyond-design-basis.

Th.is revision is updated due to the revision ofMD-12-FLOOD-008-N (AR 2016-9784-6), see Section 1.1.1. for further details.

If the Reviewer is the Preparer' s supervisor, the supervisor review is needed and is approved: IZI NIA Supervisor's Manager's Name Title Signature Date Qualification Matiix Verification

  • The responsible Engineering Supervisor/Manager approval signatm*e also serves to signify that the qualificatiqns oftl~e individual(s) assigned as Preparer(s) and Reviewer(s) and Independent Design Verifier(s) ,

were verified in the Plant Qualification Matrix,

  • Prepamtion & Review PREPARED BY: REVIEWED BY: *APPROVED BY:

Name: Michael Dschlda Coree11 McDonald ~ CoM~

Title:

Nuclear Engineer Sr. Nuclear Engineer Sr. 'h~E: S'~\~

Organization: DEM DES ~j:f.

SignatUl'e:  :~.....-v

-~ k::iL- v/!.-~-~--

~...__ .... ~mAd t=:-. (A_)

Date: I0/1"1/ ~O\(, I() J d-1 Ii. 0 I (p ,c .I ZJi'fl{t, D Sign~offs for additional Preparer(s) and Reviewer(s) on next page No11~AEP Preparation, Review & Approval If the P1*eparer, Reviewer and Approver are non~AEP individuals and the calculation was performed under the D.

C. Cook QA progmm, the appropriate~P Design Discipline Supervisor(s) approval is needed. IZI NIA AEP Design Discipline Supv:

Printed Name/Signature Date I This document includes the following pages: . see Table of Contents I Page 1 This fo11n was dedved fi'om 12-EHP-5040-DES-003 Data Sheet 1

AEP - D. C. Cook Nuclear Plant l'vID-12-FLOOD-O 11-N Revision 1 Page 2of101 Record of Revision Revision Pages/Sections/ Paragraphs No~ Changed Brief Description I Change Authorization 0 All Initial Issuance 1 All For a description of the changes, see Section 1.1.1.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 3of101 Overview This report describes the approach, methods, and results from the reevaluation of flood hazards at the Donald C.

Cook Nuclear Plant (CNP). It provides information to support Phase I of the requested actions by the U.S.

Nuclear Regulatory Commission (NRC) staff in its 10 CFR 50.54(f) letter of March 12, 2014 ("IO CFR 50.54(f) letter"), to reevaluate all appropriate external flooding sources for D.C. Cook. The flood hazards reevaluation in this report include the effects from local intense precipitation on the site, probable maximum flood (PMF) on stream and rivers, storm surges, seiches, tsunami, and dam failures. The rep01i also contains groundwater intrusion and combined effect flood, including one additional, unique, potential flood causing mechanism identified for CNP: flooding due to overflow or slope failure of the Infiltration Pond. The reevaluation applied present-day regulatory guidance and methodologies being used for early site permits and combined operating license reviews, including current techniques, software, and methods used in present-day standard engineering practice to reassess the flood hazards applicable to the plant site. If reevaluated flood hazards exceed the current design basis or result in potential vulnerabilities for the plant site, the reevaluated hazards information will be used in Phase II to complete an integrated assessment of the protection and mitigation capabilities of the plant.

Section 1 provides introductory information related to the flood hazard. The section includes background regulat01y information, scope, general method used for the reevaluation, assumptions, the elevation datum used throughout the report, and a conversion table to determine elevations in other common datum.

Section 2 describes detailed CNP site information, including present-day site layout, topography, and current design basis flood (CDB) protection and mitigation features. The section also identifies relevant changes since license issuance to the local area and watershed as well as flood protections.

Section 3 presents the results of the flood hazard reevaluation. It addresses each of the eight flood-causing mechanisms and a combined effect flood required by the NRC in the 10 CFR 50.54(f) letter. Groundwater intrusion and one additional, unique, potential flood causing mechanism identified for CNP: flooding due to overflow or slope failure of the Infiltration Pond (a natural pond) are also included. In cases where a mechanism does not apply to the CNP site, a justification is included. The section also provides a basis for inputs and assumptions, methods, and models used.

Section 4 compares the current and reevaluated flood-causing mechanisms. It provides an assessment of the current design basis flood elevation to the reevaluated flood elevation for each applicable flood-causing mechanism evaluated in Section 3.

Section 5 presents an interim evaluation and actions taken, or planned, to address those higher flooding hazards identified in Section 4 relative to the current design basis.

The repo1i also contains two appendices. Appendix A describes the software model FL0-2D used in the reevaluation, including the quality assurance criteria and a discussion of validation of model-derived results.

Appendix B provides time series plots for flood elevations at each potential flood-water-ently location.

Each report section is provided with independent reference section to facilitate review.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 4of101 Table of Contents Page COVER SHEET ......................................................................................................................................................... 1 RECORD OF REVISION .......................................................................................................................................... 2 OVERVIEW ............................................................................................................................................................... 3 TABLE OF CONTENTS ........................................................................................................................................... 4 LIST OF TABLES ..................................................................................................................................................... 7 LIST OF FIGURES .................................................................................................................................................... 8 ACRONYMS AND ABBREVIATIONS ................................................................................................................... 9

1.0 INTRODUCTION

...................................................................................................................................... 10 1.1 Purpose .......................................................................................................................................... 10 1.1.1 Revision 1.......................................................................................................................... 10 1.2 Scope .............................................. ;.............................................................................................. 10 1.3 General Approach .......................................................................................................................... 11 1.4 Assumptions .................................................................................................................................. 11 1.5 Elevation Values ............................................................................................................................ 12 1.6 References ..................................................................................................................................... 12 2.0 CURRENT FLOOD HAZARDS DESIGN BASIS ................................................................................... 13 2.1 Detailed Site Information ............................................... *............................................................... 13 2.1.1 Site Location and Layout .................................................................................................. 13 2.2 Current Design Basis Flood Elevations ......................................................................................... 13 2.3 Current Design Basis Flood Protection and Mitigation Features (CDB) ...................................... 13 2.3.1 Flood Causing Mechanisms ..........................................'***********************~**************************** 14 2.3 .2 Flood Protection and Mitigation............ ,. ........................................................................... 14 2.4 Design Basis Flood-Related and Flood Protection Changes ......................................................... 14 2.5 Watershed and Local Area Changes .............................................................................................. 14 2.5.1 Watershed Changes ........................................................................................................... 14 2.5.2 Local Area Changes .......................................................................................................... 15 2.6 Additional Site Details .................................................................................................................. 15

2. 7 References ..................................................................................................................................... 15 3.0 FLOOD HAZARD REEVALUATION ..................................................................................................... 22 3.1 Probable Maximum Precipitation .................................................................................................. 22 3.1.1 Site-Specific Probable Maximum Precipitation Methodology .......................................... 22 3.1.2 Results ............................................................................................................................... 26 3.1.3 Conclusions .............................. :........................................................................................ 26 3.1.4 References ......................................................................................................................... 26 3.2 Local Intense Precipitation ............................................................................................................ 31 3.2.1 Method .............................................................................................................................. 31

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 5 oflOl 3.2.2 Results ............................................................................................................................... 32 3.2.3 Conclusions ....................................................................................................... , ............... 33 3.2.4 References ......................................................................................................................... 33 3.3 Probable Maximum Flood: Flooding in Rivers and Streams ........................................................ 38 3.3.l Method .............................................................................................................................. 38 3.3.2 PMF Results ..................................................................................................................... .38 3.3.3 Conclusions ....................................................................................................................... 39 3.3.4 References ......................................................................................................................... 39 3.4 Dam Breaches and Failures ........................................................................................................... 46 3.4.1 Method .............................................................................................................................. 46 3.4.2 Results ............................................................................................................................... 47 3.4.3 Conclusions ....................................................................................................................... 47 3.4.4 References ......................................................................................................................... 47 3.5 Storm Surge and Seiche ................................................................................................................ 47 3.5.l Method ................................ :............................................................................................. 47 3.5.2 Results ............................................................................................................................... 53 3.5.3 Conclusions ....................................................................................................................... 54 3.5.4 References .......................................................................................................................... 55 3.6 Tsunamis ....................................................................................................................................... 65 3.6.1 Method .............................................................................................................................. 65 3.6.2 Tsunami Results ................................................................................................................ 65 3.6.3 Conclusions ....................................................................................................................... 68 3.6.4 References ......................................................................................................................... 68 3.7 Ice-Induced Flooding .................................................................................................................... 70 3.7.1 Method .............................................................................................................................. 70 3.7.2 Results ............................................................................................................................... 70 3.7.3 Conclusions ....................................................................................................................... 71

3. 7 .4 References ......................................................................................................................... 71 3.8 Channel Migration or Diversion .................................................................................................... 72 3.9 Groundwater Intrusion .................................................................................................................. 72 3.9.1 Method .............................................................................................................................. 72 3.9.2 Results ............................................................................................................................... 73 3.9.3 Conclusions ....................................................................................................................... 73 3.9.4 References .................................................................................................................... :.... 73 3.10 Combined Effect Flood ................................................................................................................. 74 3.10.1 Method .............................................................................................................................. 74 3.10.2 Results ............................................................................................................................... 75

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 6of101 3.10.3 Conclusions ....................................................................................................................... 76 3.10.4 References ............................................. :........................................................................... 76 4.0 FLOOD PARAMETERS AND COMPARISON WITH CURRENT DESIGN BASIS ............................ 80 4.1 Summary of Current Design Basis and Flood Reevaluation Results ............................................ 81 4.1.1 Local Intense Precipitation ................................................................................................ 81 4.1.2 Probable Maximum Flood on Rivers and Streams ............................................................ 82 4.1.3 Storm Surge & Seiche ....................................................................................................... 82 4.1.4 Dam Breaches and Failures ............................................................................................... 82 4.1.5 Tsunami ............................................................................................................................. 82 4.1.6 Ice-Induced Flooding ........................................................................................................ 82 4.1.7 Groundwater Induced Flooding ......................................................................................... 82 4.1.8 Channel Migration or Diversion ........................................................................................ 82 4.1.9 Combined Effect Flood ..................................................................................................... 83 4.2 Conclusions ................................................................................................................................... 83 4.2.1 References ......................................................................................................................... 83 5.0 INTERIM EVALUATION AND ACTIONS TAKEN OR PLANNED .................................................... 87 5.1 Actions Taken................................................................................................................................ 87 5.2 Actions Planned ............................................................................................................................. 87 5.3 References ..................................................................................................................................... 87 APPENDIX A: FL0-2D COMPUTER PROGRAM .............................................................................................. 88 APPENDIX B: LOCAL INTENSE PRECIPITATION FIGURES ........................................................................ 91

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 7of101 List of Tables Page Number Table 2-1: Applicable Site Changes That May Impact Site Flooding ..................................................................... 16 Table 3-1: List of Storms Used in the PMP/LIP Calculations ................................................................................. 28 Table 3-2: LIP Model Results: HHA Case 2 .......................................................................................................... 35 Table 3-3: Summary of Total Wave Components Used Versus Return Period ...................................................... 57 Table 3-4: Results for Combined Effect Categories Screening ............................................................................... 79 Table 4-1: Flood Elevation Comparison ................................................................................................................. 85 Table 4-2: LIP Flood Heights at Select Locations .................................................................................................. 86

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 8of101 List of Figures Page Number Figure 2-1: Site Location Map .......................... :..................................................................................................... 17 Figure 2-2: Site and Vicinity Aerial, Looking North .............................................................................................. 18 Figure 2-3: Site Topography ................................................................................................................................... 19 Figure 2-4: Site Layout with Major Features Significant to Flooding .................................................................... 20 Figure 2-5: CNP Plant Drainage Basin.................................................................................................................... 21 Figure 3-1: Extent of Storm Search Domain for CNP ............................................................................................. 29 Figure 3-2: Storm Locations Used for LIP/PMP Development in Relation to CNP .............................................. .30 Figure 3-3: FL0-2D Modeled Site Area ................................................................................................................. 36 Figure 3-4: CNP Critical Opening Locations .......................................................................................................... 3 7 Figure 3-5: Watershed Draining to CNP Critical Locations .................................................................................. .41 Figure 3-6: USGS Hydrography Dataset ................................................................................................................ .42 Figure 3-7: Thornton Valley Drain Flowpath ................................ :************************************************************************.43 Figure 3-8: Watershed Division Map (elevations less than 626 ft) ........................................................................ .44 Figure 3-9: Watershed Division Map (elevations greater than 626 ft) ................................................................... .45 Figure 3-10: ADCIRC Mesh Node Density ............................................................................................................ 58 Figure 3-11: ADCIRC Output Locations along the Banks of Lake Michigan ........................................................ 59 Figure 3-12: ADCIRC Save Point 615 proximity to CNP ...................................................................................... 60 Figure 3-13: Lake Michigan Water Surface Elevation ............................................................................................ 61 Figure 3-14: Surge and Seiche Magnitude Recurrence ........................................................................................... 62 Figure 3-15: ERDC/CHL Study Wave Gage Locations .......................................................................................... 63 Figure 3-16: Water Level and Water Level with Runup and Setup at Holland, MI Gage 9087031 ....................... 64 Figure 3-17: Natural Ponds Southeast from CNP ......................................... , .......................................................... 77 Figure 3-18: Natural Pond Flowpath Away from CNP ........................................................................................... 78 Figure B-1: Water Surface Elevation Over Time CLl (HHA Case 2) .................................................................... 92 Figure B-2: Water Surface Elevation Over Time CL2 (HHA Case 2) .................................................................... 93 Figure B-3: Water Surface Elevation Over Time CL3 (HHA Case 2) .................................................................... 94 Figure B-4: Water Surface Elevation Over Time CL4 (HHA Case 2) .................................................................... 95 Figure B-5: Water Surface Elevation Over Time CL5 (HHA Case 2) .................................................................... 96 Figure B-6: Water Surface Elevation Over Time CL6 (HHA Case 2) .................................................................... 97 Figure B-7: Water Surface Elevation Over Time CL7 (HHA Case 2) .................................................................... 98 Figure B-8: Water Surface Elevation Over Time CL8 (HHA Case 2) .................................................................... 99 Figure B-9: Water Surface Elevation Over Time CL9 (HHA Case 2) .................................................................. 100 Figure B-10: Water Surface Elevation Over Time CLIO (HHA Case 2) .............................................................. 101

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 9of101 Acronyms and Abbreviations Acronym/Abbreviation Description ANS American Nuclear Society ANSI American National Standards Institute ASCII American Standard Code for Information Interchange CFR Code of Federal Regulations cfs cubic feet per second CDB Current Design Basis CN Curve Number CNP Donald C. Cook Nuclear Plant DEM Digital Elevation Model DTM Digital Terrain Model HHA Hierarchical Hazard Assessment HMR Hydrometeorological Report ISG Interim Staff Guidance (NRC)

LiDAR Light Detection and Ranging LIP Local Intense Precipitation MSL Mean Sea Level NGVD29 National Vertical Datum of 1929 NOAA National Oceanic and Atmospheric Administration NRC U.S. Nuclear Regulatory Commission NRCS Natural Resources Conservation Service NTTF Near-Term Task Force PDF Project Design Flood PMF Probable Maximum Flood PMP Probable Maximum Precipitation SSPMP Site-Specific Probable Maximum Precipitation scs Soil Conservation Service SSCs Structures, Systems and Components UFSAR Updated Final Safety Analysis Report USA CE U.S. Army Corps of Engineers

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 10of101

1.0 INTRODUCTION

Following the Fukushima Daiichi accident on March 11, 2011, which resulted from an earthquake and subsequent tsunami, the U.S. Nuclear Regulatory Commission (NRC) established the Near-Term Task Force (NTTF) to review the accident. The NTTF subsequently prepared a report with a comprehensive set of recommendations.

In response to the NTTF recommendations, and pursuant to Title 10 of the Code of Federal Regulations, Section 50.54(f), the NRC has requested information from alJ operating power licensees (NRC, 2012). The purpose of the request is to gather information, in pmi, to re-evaluate flooding hazards at U.S. operating reactor sites.

The Donald C. Cook Nuclear plant (CNP), located on the eastern shore of Lake Michigan in Bridgman, MI, is one of the plants required to submit beyond-design-basis information.

The NRC information request relating to flooding hazards requires licensees to re-evaluate their sites using updated flooding hazard information and present-day regulatory guidance and methodologies and then compare the results against the site's current design basis (CDB) for protection and mitigation from external flood events.

1.1 Purpose This report satisfies Phase I of the 10 CFR 50.54(+/-) letter to reassess all flooding mechanism and submit a "Hazard Reevaluation Report".

1.1.1 Revision 1 This report, a one-time submittal to the NRC containing conclusions based on the condition of the site and plant as of a particular date, and was never intended to be updated if any physical changes were made to the plant.

However, the following error was identified after approval, requiring a revision to the report:

  • A discrepancy was found in calculation MD-12-FLOOD-008-N (CNP, 2016), which this repo1i uses as input. The discrepancy was found to directly impact the values listed in Section 3.9.2 of this report (tracked by AR 2016-9784-6).

Additional updates that are being made to this report:

11 As described in AEP-NRC-2015-105 (CNP, 2015), any appropriate instance of"licensing basis"/"CLB" shall be considered to be "design basis"/"CDB" throughout this report. This revision to the report shall accommodate this, and make the change throughout the document for further clarity. This is considered an administrative change, and was not marked with a revision bar.

  • In Section 3.9.1, an elevation value had been mis-typed (577.28 should be rounded to 577.3, not 576.3 as previously stated), and has been corrected; this change did not impact any evaluation. In Sectfon 3.10.2.3 the statement on the duration of the PMP was corrected, from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; this was found to have no impact on the evaluation. Both of these are considered typographical errors, but have been mm*ked with revision bars.

1.2 Scope This report satisfies Phase I of the 10 CFR 50.54(+/-) letter to reassess all flooding mechanisms and submit a "Hazard Reevaluation Report," a reevaluation of the flooding hazards at the plant site using updated flooding hazard information and present-day regulatory guidance and methodologies. The evaluations associated with the requested information in this letter do not revise the design basis of the plant.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 11of101 It addresses the eight flood-causing mechanisms and a combined effect flood, identified in Attachment 1 to Enclosure 2 of the 10 CPR 50.54(:f) letter (NRC, 2012). Groundwater intrusion and one additional, unique, potential flood causing mechanism were identified for CNP: flooding due to overflow or slope failure of the Infiltration Pond (a natural pond).

Each of the reevaluated flood causing mechanisms and the potential effects on the CNP plant is described in Sections 3 and 4 of this report.

1.3 General Approach This rep01i follows the Hierarchical Hazard Assessment (HHA) approach, as described in NUREG/CR-7046:"Design-Basis Flood Estimation for Site Characterization at Nuclear Power Plants in the United States of America" (referred to in this repo1i as NUREG/CR-7046"(NRC, 2011 ), NRC Interim Staff Guidance (ISG)

(NRC, 2012a and NRC, 2013), as appropriate, and their supporting reference documents.

A HHA consists of a series of stepwise, progressively more refined analyses to evaluate the hazard resulting from phenomena at a given nuclear power plant site to structures, systems, and components (SSCs) important to safety with the most conservative plausible assumptions consistent with the available data. The HHA starts with the most conservative, simplifying assumptions that maximize the hazards from the maximum probable event. If the assessed hazards result in an adverse effect or exposure to any SSCs important to safety, a more site-specific hazard assessment is performed for the probable maximum event.

The HHA approach was carried out for each flood-causing mechanism, with the controlling flood being the event that resulted in the most severe hazard to the SSCs impo1iant to safety at CNP. The steps involved to estimate the design-basis flood typically included the following:

1. Identify flood-causing phenomena or mechanisms by reviewing historical data and assessing the geohydrological, geoseismic, and structural failure phenomena in the vicinity of the site and region.
2. For each flood-causing phenomenon, develop a conservative estimate of the flood from the corresponding probable maximum event using conservative simplifying assumptions.
3. If any SS Cs important to safety are adversely affected by flood hazards, use site-specific data and/or more refined analyses to provide more realistic conditions and flood analysis, while ensuring that these conditions are consistent with those used by Federal agencies in similar design considerations.
4. Repeat Step 2 until all SSCs important to safety are unaffected by the estim~ted flood, or if all site-specific data and model refinement options have been used.
  • Section 3 of this report provides additional HHA detail for each of the flood-causing mechanisms evaluated.

Due to use of the HHA approach, the results (water elevation) for any given flood hazard mechanism may be significantly higher than results that could be obtained using more refined approaches. Where initial, overly conservative assumptions and inputs result in water elevations bounded by the CDB, no subsequent refined analyses are required to develop flood elevations that are more realistic or reflect a ce1iain level of probability.

1.4 Assumptions

. Assumptions used to support the flood reevaluation are described in Section 3 and its subsections, and depend on the mechanism being evaluated. Details relating to assumption justifications are discussed fmiher in referenced supporting documentation.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 12of101 1.5 Elevation Values Elevation values cited in this report are based on National Geodetic Vertical Datum of 1929, referred to as NGVD29 or mean sea Level (MSL). To determine elevations in another datum in references, use the conversion table below (NOAA 2013a. and b.).

To:

Datum (ft) IGLG 85 NGVD29 NAVD 88 IGLD85 0 +0.936 +0.504 s0 NGVD29 -0.936 0 -0.432 i..

~ NAVD88 -0.504 +0.432 0 Where:

IGLD 85 International Great Lakes Datum of 1985 NGVD29 National Geodetic Vertical Datum of 1929 NAVD 88 North American Vertical Datum of 1988 1.6 References CNP, 2015. Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Additional Information for NRC Audit of Flood Hazard Reevaluation Conducted in Response to March 12, 2012, NRC Request for Information Regarding Fukushima Near-Term Task Force Recommendation 2.1: "Flooding", October 27, 2015, AEP-NRC-2015-105 CNP, 2016. Flooding Due to Groundwater Level Increase, Cook Nuclear Plant Flood Hazard Re-evaluation, September 22, 2016, MD-12-FLOOD-008-N Rev. 1 NOAA, 2013a. National Oceanic Atmospheric Administration, National Geodetic Survey, VERTCON, North American Vertical Datum Conversion. Website: http://www.ngs.noaa.gov/TOOLSNertcon/vertcon.html; accessed June 24, 2013.

NOAA, 2013b. National Oceanic Atmospheric Administration, National Geodetic Survey, IGLD 85 Height Conversion. Website http://www.ngs.noaa.gov/cgi-bin/IGLD85/IGLD85.prl; Accessed June 24, 2013.

NRC, 2011. U.S. Nuclear Regulatory Commission "NUREG/CR-7046: Design-Basis Flood Estimation for Site Characterization at Nuclear Power Plants in the United States of America", Springfield, VA, National Technical Information Service, 2011 (ADAMS Accession No. ML11321A195).

NRC, 2012. U.S. Nuclear Regulatory Commission, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(+/-) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review oflnsights from the Fukushima Dai-Ichi Accident," March 2012 (ADAMS Accession No. ML12053A340).

NRC, 2012a. U.S. Nuclear Regulato1y Commission, Japan Lessons-Learned Project Directorate, "JLD-ISG-2012-05, Guidance for Performing the Integrated Assessment for External Flooding, Interim Staff Guidance,"

Revision 0, 2012. (ADAMS Accession No. ML12311A214)

NRC, 2013. U.S. Nuclear Regulatory Commission, Japan Lessons-Learned Project Directorate, JLD-ISG-2012-

06. Guidance for Performing a Tsunami, Surge, or Seicl1e Hazard Assessment. Interim Staff Guidance, Revision
0. January 2013 (ADAMS Accession No. ML12271A036).

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 13of101 2.0 CURRENT FLOOD HAZARDS DESIGN BASIS 2.1 Detailed Site Information The CNP site is located near the town of Bridgman, Michigan. The site is situated among lake-shore sand dunes.

The site consists of about 650 acres along the eastern shore of Lake Michigan, with approximately 4,350 ft of lake frontage, and extends an average of about one and one quarter miles eastward from the lake (CNP, 2013).

2.1.1 Site Location and Layout "Figure 2-1: Site Location Map" shows the general location of the site on the southeastern shore of Lake Michigan. "Figure 2-2: Site and Vicinity Aerial, Looking North" shows the local drainage basin and the site location along the lake shore bounded by forested sand dunes. "Figut'e 2-3: Site Topography" shows local topography in relation to the plant. "Figure 2-4: Site Layout with Major Features Significant to Flooding" shows the layout of site structures, including those important features related to flood modeling.

In general, the site is on a flat area above the Lake Michigan shoreline at about elevation 609 ft for most of the Protected Area. Near the lake, site grade in the Protected Area falls to about 594 ft for the area west of the Screenhouse and Turbine Building. A sheetpile wall at the head of the lake beach retains the site grade at the west edge of the Protected Area. The lake beach level west of the sheetpile wall is between about elevations 584 to 577 ft. To the north and south of the Protected Area are sand dunes with elevations up to about 650 ft.

2.2 Current Design Basis Flood Elevations The plant grade and the design bases offeatures related to plant safety were established to consider the coincidence of maximum seiches postulated for the site with the highest recorded lake level. According to the Updated Final Safety Analysis Rep01i (CNP, 2013), to determine the plant elevation necessary to protect the plant from flooding due to seiches, the characteristics of the lake shore at the plant, historical meteorological conditions, and mathematical modeling were used to determine a maximum seiche of 11 ft. This equates to a plant elevation of 594.6 ft above mean sea level.

The plant is flood protected from the maximum (monthly mean) high lake water level; however, a design basis seiche occurring when the lake is at its maximum recorded level will cause flooding in the Turbine Building Screen-house. Safety-related components located in the Turbine Building Screen-house have been evaluated for the condition and flood sensitive components have been protected. Thus, protection has been provided for safety-related equipment from flooding, waves, ice storms and other lake related hazards.

2.3 Current Design Basis Flood Protection and Mitigation Features (CDB)

The CDB for flooding protection at CNP is described in CNP, 2013. Flooding results from a weather-driven seiche on Lake Michigan with a maximum height of 11 ft above record high lake level: a flood elevation of 594.6 ft. Flood mitigation features include:

  • Inherent protection of the Auxiliary and Containment Buildings is provided by the structural integrity of those structures themselves.
  • A PVC 40 mil thick membrane on the outside of the Containment Building and Auxiliary Building foundations extending up at least 5 ft above the maximum known groundwater level.
  • In addition, the elevation of the Protected Area, including the area around the Containment and Auxiliary Buildings is at an approximate elevation of about 609 ft, over 14 ft above the seiche flood elevation.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 14of101

  • Flooding of the Turbine Building is prevented by elevated access from the Screenhouse; a check-valve in the Turbine Building discharge sump and the sump access cover; embedment in concrete of pipe penetrations from the Screenhouse to the Turbine Building, and asphalt berms at rollup doors and entrances on the west side of that building.
  • The stmctural integrity of the foundation concrete grade beam of the west side of the Turbine Building (CDB supporting element).
  • All vital safety-related equipment housed at lower elevations within the Turbine Building and Auxiliary Buildings are suitably protected against a flood elevation of 594.6 ft by building walls, and/or permanent flood protection barriers.
  • Essential Service Water Pumps and their motor controls are vital safety systems components located inside the Screenhouse. Pump motors and all vital controls are installed above elevation 594.6 ft, the maximum flood elevation.

The CNP UFSAR (CNP, 2013) in Section 2.4.3 states, "Infiltration ofrainfall into the sandy surficial soils at the site is ve1y rapid and flooding conditions are non-existent."

All flood protection features at CNP were evaluated in the November 2012 submittal to NRC (CNP, 2012).

2.3.1 Flood Causing Mechanisms A seiche is the only mechanism accounted for in the CNP plant CDB. The requirement to evaluate the worse-case phenomena is given in the UFSAR, Section 1.4.1, Criterion 2 (CNP, 2013).

2.3.2 Flood Protection and Mitigation Flood protection features are fully described in CNP, 2012. For the CDB, protection is provided against flooding of the Screenhouse and Turbine Building as a result of seiche flooding from Lake Michigan and against groundwater intrusion.

2.4 Design Basis Flood-Related and Flood Protection Changes No new flood protection enhancements or mitigation measures have been installed or enacted at CNP since its initial licensing (CNP, 2012).

2.5 Watershed and Local Area Changes CNP is contained in a small watershed depicted by the dotted line in "Figure 2-5: CNP Plant Drainage Basin".

No major changes that would affect plant flooding have occurred in the watershed since plant construction. Local changes are detailed below.

2.5.1 Watershed Changes The site is located within the Grand Marais Embayment drainage basin which is separated from the St. Joseph River drainage basin to the east by a glacial moraine known as Covert Ridge (CNP, 2013). Changes to the watershed that might affect the plant site have been limited to those within the local area of at the plant itself as described in the following section.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 15of101 2.5.2 Local Area Changes Changes to the local area surrounding the plant site have been minimal since plant operation began. Changes to the plant site since initial plant operation have included a number of new structures, security barriers and area paving. "Table 2-1: Applicable Site Changes That May Impact Site Flooding" summarizes the specific site areas and plant structures involved.

2.6 Additional Site Details Per Item La.vi ofrequested information in Enclosure 2 of the 10 CFR 50.54(f) letter, the results from the 2012 Flood Walkdown are included here. A total of 19 walkdown flood protection features that included 30 attributes were reviewed during the walkdown completed at CNP in 2012 (CNP, 2012). Of the total flood protection features 13 were defined as passive-incorporated; 0 as passive-temporary; 1 as active-incorporated; 0 as active-temporary; and 5 as external passive.

CNP flood protection features included incorporated active and passive features as defined in the NEI Report 12-07 [Rev 0-A],"Guidelines for Performing Verification Walkdowns of Plant Protection Features" (NEI, 2012);

there are no temporary flood protection features, either active or passive, for the plant and there are no CDB credited operator actions. Incorporated Barrier/Features are engineered passive or active flood protection features that are permanently installed in the plant that protect safety related systems, structures and components from inundation and static/dynamic effects of external flooding.

Engineered passive or active flood protection features external to the immediate plant area and credited as part of the CDB that protect SSCs important to safety from inundation and static/dynamic effects of external floods.

Examples Include levees, dikes, flap gates, and pump stations (NEI, 2012).

The walkdown scope included evaluation of flood protection features with respect to design specifications and capacity to withstand CDB flood elevations. None of the flood protection features reviewed was determined to be non-functional (CNP, 2012). However, several of the features were inaccessible or had restricted access (CNP, 2012). All observations that did not meet the walkdown acceptance criteria were entered into the plant's corrective action program (CAP) and an operability determination associated with the observation was made. All observations entered into the CAP have subsequently been dispositioned (CNP, 2012). As a result, there are no planned corrective actions (CNP, 2012).

2. 7 References CNP, 2012. Flooding Walkdown Report In Response To The 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.3: Flooding for the D.C. Cook Nuclear Power Plant, November 13, 2012, MD FLOOD-002-S (ADAMS Accession No. ML12340A444).

CNP, 2013. "D.C. Cook Nuclear Plant Updated Final Safety Analysis Report (UFSAR)," Docket Nos. 50-315 and 50-316, Revision 25, September 9, 2013. (AREVA Doc. No. 38-9210897-000).

NRC, 2012. U.S. Nuclear Regulatory Commission, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review oflnsights from the Fukushima Dai-lchi Accident," March 2012 (ADAMS Accession No. ML l 2053A340).

NEI, 2012. NEI Report 12-07 [Rev 0-A], Guidelines for Performing Verification Walkdowns of Plant Protection Features, May 2012 [NRC endorsed May 31, 2012; updated and re-issued June 18, 2012].

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 16of101 Table 2-1: Applicable Site Changes That May Impact Site Flooding Construction of Fire Protection Water Storage Tanks Construction of Fire Pumphouse Construction of Fish Deterrent House Construction of Auxiliary Boiler House Construction of a Drain Trom!:h Added at the Auxiliary Building Roll-up Doors Construction of Fabrication Warehouse Construction of Maintenance Outage Facility Construction of Supplemental Diesel Generators and adjacent 4KV switchgear Construction of Office Building Addition and Service Building Extension and related fencing Construction of a trough drain added at the Screenhouse rollup door Construction of Auxiliary Boiler Fuel Oil storage area Construction of Training Center Construction of Radiological Materials Building Construction of Neutralization Tank and Chemical Truck unloading pad Construction oflndependent Spent Fuel Storage Installation (ISFSI)

Construction of double security fencing along the lake front Construction of guard towers (BREs)

Construction of Technical Support Office Center (TSOC)

Construction of Security Post Construction of Sewage Treatment Plant Placement of Jersey security barriers Construction of Delay Barrier encircling the Protected Area Construction of FLEX Storage Building Paving of the northeast parking area (Ontario lot)

Paving of the east parking expansion lot areas (Michigan, Huron, Erie lots)

Paving of Training Center parking lot Paving of Radiological Materials Building parking area Paving of a new par)<ing area south of the plant entrance road (Superior lot)

Paving of Units 1 and 2 Refueling Water Storage Tank yard

AEP - D. C. Cook Nuclear Plant l\ID-12-FLOOD-O 11-N Revision 1 Page 17 of 101 Figure 2-1: Site Location Map

AEP - D. C. Cook Nuclear P lant MD- 12-FLOOD-Ol J-N Revision l Page l 8 of J0 l Figure 2-2: Site and Vicinity Aerial, Looking North

AEP - D. C. Cook Nuclear Plant MD-1 2-FLOOD-0 11 -N Revision I Page 19of 101 Figure 2-3: Site Topography Legend

- - Roads/Sidewalks/Curbs

,.,.-rn- Ditch

= Lake Michigan Shore

- - Buildings/Walls/Tanks "11111 Concrete Barriers


-- Fencing 4--'--t Railways

- - 20 foot Contours 100 150 200 Meters

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision I Page 20 of IOI Figure 2-4: Site Layout with Major Features Significant to Flooding

AEP - D . C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 21of101 Figure 2-5: CNP Plant Drainage Basin

<....---- 9

AEP - D. C. Cook Nuclear Plant l\ID-12-FLOOD-011-N Revision 1 Page 22of101 3.0 FLOOD HAZARD REEVALUATION This section details the evaluation of the eight flood causing mechanisms and a combined effect flood for CNP as detailed in Attachment 1 to Enclosure 2 of the 10 CFR 50.54(f) letter (NRC, 2012) as well as the flooding mechanism due to groundwater intrusion as described in the CNP USF AR, and one additional, unique, potential flood causing mechanism due to overflow or slope failure of the Infiltration Pond (a natural pond). Flooding from that pond was evaluated as part of the combined effect flood evaluation.

3.1 Probable Maximum Precipitation This section summarizes the evaluation for the potential impact of a Probable Maximum Precipitation (PMP).

Validation of all design inputs, assumptions, software, etc. is in the full evaluation (AREVA, 2014). Analysis for PMP evaluates a maximum potential for regional rainfall flooding and provides an input for a Local Intense Precipitation (LIP) analysis.

3.1.1 Site-Specific Probable Maximum Precipitation Methodology The PMP was first developed based on Step 1 of the HHA process described in Section 2 ofNUREG/CR 7046, (NRC, 2011) using NOAA HMR 51 and HMR 52 (NOAA, 1980 and NOAA, 1982) data. A conservative estimate of the LIP generated flood was developed based on Step 2 of the HHA process. Based on Step 3 of the HHA process, and because SSCs imp01iant to safety were found to be adversely affected by the conservative LIP generated flood from Step 2, use of site-specific data to provide more realistic conditions was warranted:

Thus, a Site-Specific Probable Maximum Precipitation (SSPMP) was performed to avoid inappropriate conservatism provided for the site by use of NOAA HMR 51 and HMR 52 (NOAA, 1980 and NOAA, 1982) and to determine appropriate, data-based, and physically possible LIP/PMP values for the site. HMR 51 is a generalized study that provides PMP estimates for all of the United States east of the 105th meridian, a large and climatologically diverse area. The developers ofHMR 51 recognized that it is possible to analyze smaller, more site-specific regions within the large area covered by HMR 51. Improved analysis procedures, and technology advances such as new computer models, weather radar, and geographic information system (GIS) software now exist to analyze depth-area-duration data. PMP reductions from site specific studies have been provided for long duration storms (Tomlinson & Kappel, 2009; Tomlinson et al., 2008). This approach produced site-specific all-season LIP/PMP values for CNP that were less than those provided by using HMR 52 (NOAA, 1982).

Major steps in the SSPMP included development of an updated storm database (i.e. to those used in HMR 51 and HMR 52, NOAA, 1980 and NOAA, 1982) and explicit evaluation of storms that are directly transpositionable to the CNP site. Trans positioning is the transfer of a storm from where it occurred to a location that is meteorologically and topographically similar (NOAA, 1980,). In addition, understanding of the meteorology of these events has advanced significantly since HMR 51 (NOAA, 1980) was published. The storm-based approach utilized actual data from rainfall events which have occurred over the site and in regions transpositionable to the CNP site location.

The basic methods used to develop the SSPMP were those used in the development of rainfall in HMR 51 (NOAA, 1980) and HMR 52 (NOAA, 1982). The methods are consistent with guidelines provided in NUREG/CR-7046 (NRC, 2011) as well as the World Meteorological Organization (WMO) manual for PMP determination (WMO, 2009). The approach includes a process of Storm Maximization, increasing rainfall associated with a historical observed extreme storm under the potential condition that additional moisture could have been available to the storm for rainfall production. That process used the HYSPLIT trajectory model (Draxler, R.R ..and G.D. Rolph, 2010). HYSPLIT is an interactive online interface provided by the Air Resource Laboratory division of NOAA.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 23of101 Once each storm is maximized in-place, it is transpositioned from its original location to the CNP site. The transpositioning process provides a way to quantify how much rainfall the storm would have produced over the CNP site had it occurred there instead of its original location. In this transposition process, differences in moisture and elevation between the original location and the site are accounted for and quantified. "Figure 3-1:

Extent of Storm Search Domain for CNP" provides the domain for the storm search locations for CNP and "Figure 3-2: Storm Locations Used for LIP/PMP Development in Relation to CNP" provides the boundaries for the geographic extent storms considered in the assessment of PMP for CNP. The domain is defined by evaluating existing documentation on the storm as well as plotting and evaluating initial precipitation gauge data on a map.

The analysis domain is defined to include as many hourly recording gauges as possible given their importance in timing. The domain must include enough of a buffer to accurately model the nested domain of interest. Given radar data an area with a minimum of about 30 stations can adequately provide reliable radar-precipitation intensity relationships.

Excel spreadsheets were developed for each storm used in the SSPMP assessment. Spreadsheets incorporate relevant storm information, calculate appropriate adjustment factors, and compute the adjusted site-specific values for each storm. These adjusted values then become the basis for determining the PMP and LIP input values. The storm spreadsheet calculates an in-place maximization factor (IPMF), a moisture transposition factor (MTF), and finally the total adjustment factor (TAF). The TAF is a product of the IPMF and MTF and produces a value that represents what the amount of rainfall would have been for a given storm had it occurred over the site instead of its original location. This TAF was applied to the observed storm rainfall values to provide the final adjusted values for the maximized and transpositioned storm rainfall for a given storm. The largest of these total adjusted values then becomes the site-specific LIP.

Basic to the analysis are results from the program Storm Precipitation Analysis System (SPAS). SPAS is a state-of-the-science hydrometeorological tool used to characterize the magnitude, temporal, and spatial details of precipitation events. SPAS processes and analyzes data following the same procedures used by the USACE and NWS in the development of rainfall data used to derive PMP information in the HMRs. This process is outlined in USWB, 1946. SPAS followed these guidelines so the analyzed events would be consistent with the data used in HMR 51 and HMR 52 (NOAA, 1980 and NOAA, 1982). SPAS data has been extensively peer reviewed and explicitly accepted for use in determining PMP values by the FERC, several state dam safety offices, the NRCS, the USACE, the Bureau of Reclamation, and is under review by the NRC. The SPAS program has gone through and been accepted under the NRC Appendix B certification and validation process.

SPAS utilizes precipitation gauge data, base maps and radar data (where available) to produce gridded precipitation at time intervals as short as 5-minutes, at spatial scales as fine as 1 km2. Hourly precipitation data is generated from direct readings and using Next Generation Radar (NEXRAD) data, improving data reliability over historical precipitation rates. Detailed SPAS-computed precipitation data allow for production of accurate model runoff from basins, particularly when the precipitation is unevenly distributed over the drainage basin or when rain gauge data is limited or not available. The increased spatial and temporal accuracy of precipitation estimates has eliminated the need for commonly made assumptions about precipitation characteristics (such as uniform precipitation over a watershed), thereby greatly improving the precision and reliability of hydrologic analyses compared to prior methods.

Quality control measures are taken throughout the SPAS analysis. These-include:

  • A QC-methodology is used to ensure the timing of precipitation at all gauges is consistent with nearby gauges.
  • Gauge elevations are checks to eliminate erroneous longitude and/or latitude values.
  • Accuracy for all co-located gauges is assured by use of the highest precipitation values and any large discrepancies between any co-located gauges are investigated and conservatively resolved.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 24of101

  • SPAS results produced for projects referenced for this PMP analysis (A WA, 2013 and Tomlinson et al, 2008) were validated within each analysis using either another code or a hand check.

SPAS has been used to analyze over 300 US extreme precipitation events for PMP derivation, runoff model calibration/validation, and storm reconstructions. SPAS incorporates quality control algorithms, utilizes real-time rain gauge observations and the highest resolution NEXRAD radar data. Using a climatological "basemap" approach, SPAS produces gridded rainfall at a spatial resolution of 1/3rd-square mile and a temporal resolution of 5-minutes (with radar).

Assumptions made for this work were all verified. They are:

  • An appropriate set of storm events has been identified, analyzed, and maximized specific to the site, to represent the meteorological environment associated with the I- and 6-hour, I-square mile PMP accumulations for the site. This assumption is validated by including a large enough set of PMP-type storms to ensure no storms which could have potentially affected PMP values after all adjustments were applied were left out of the analysis. In the analysis for the CNP location, only one storm controlled the value for 1-hour and only one storm controlled the value for 6-hours. However, 2I PMP-type storm events were considered. Several of the other storm events were of similar magnitude, providing support to the calculated values.
  • Storms transposed to the CNP location could have occurred over the area under similar meteorological conditions. This decision is made using scientific judgment related to the storm type, season of occurrence, similarity of topography between the two locations, and experience analyzing past storms.
  • For storms where no I-hour, I-square mile data exist, HMR 52 (NOAA, 1982) ratios were assumed to be appropriate to convert the 6-hour, I 0-square mile values to I-hour, I-square mile values for several storms during the LIP/PMP development. HMR 52 (NOAA, I982) provides PMP ratios for 5-, I5-, and 30 - 60 minute rainfall depths for watersheds under 200-square miles.
  • HMR, USA CE, and SPAS data are valid and HYSPLIT functions as required.
  • The atmospheric air masses that provide moisture to both historic storms and the PMP storm are assumed to be saturated through the entire depth of the atmosphere and to contain the maximum moisture possible based on the surface dew point. This assumes moist pseudo-adiabatic temperature profiles for both the historic storms and the PMP storm. This is a conservative assumption because it is unlikely that the atmosphere is completely saturated through the entire atmospheric column. Therefore, assuming that the air is saturated in such a manner serves to maximize the precipitation capacity of the storm.
  • If additional atmospheric moisture had been available, the storm would have maintained the same efficiency for converting atmospheric moisture to rainfall. The ratio of the maximized rainfall amounts to the actual rainfall amounts would be the same as the ratio of the precipitable water (the total atmospheric water vapor contained in a vertical column of unit cross-sectional area extending between any two specified levels in the atmosphere) in the atmosphere associated with each storm. This assumption is conservative, yielding the highest amount of rainfall possible.
  • The climatological maximum dew point is assumed for a date I5 days towards the warm season from the date that the storm actually occurred is applied in the storm maximization process. This procedure assumes that the storm could have occurred 15 days earlier or later in the year when maximum dew points (and moisture levels) are higher. This assumption follows HMR guidance and is consistent with procedures used to develop PMP values in all the current HMR documents (e.g., NOAA, 1980 and NOAA, 1999), as well as all AWA PMP studies (AWA, 2013).

AEP - D. C. Cook Nuclear Plant l\ID-12-FLOOD-O 11-N Revision 1 Page 25 of 101

  • Storm efficiency is assumed not to change if additional atmospheric moisture is available. For this analysis, the assumption of no change in storm efficiency is accepted, mirroring the HMR 52 (NOAA, 1982) and World Meteorological Organization assumptions (WMO, 2009).
  • Changes in climate that will occur in the region are assumed to be adequately accounted for by the rarity.

of the resulting PMP and LIP values. Fmther, changes in climate which have occurred during the past 100 years are captured in the storm record and rainfall data used in this analysis therefore represent any changes that would be expected during the useful lifetime of the values (i.e., 30 to 50 years). Therefore, no adjustment is made to account for potential changes in climate during the useful lifetime of the values (i.e., 30 to 50 years).

  • Cool-season rain-on-snow flooding is assumed to not control the PMP/LIP flood. Storms from all 12 months of the year were considered for this PMP analysis based on prior studies (NRC, 2011, AREVA, 2014). Also considered pertinent was that substantial snow melt will not occur during the relatively brief period (6-hour) of the LIP event.

Key inputs for the SSPMP analysis are:

  • Cooperative Summary of the Day TD-3200/TD-3206 through 2014. These data are published by the National Climatic Data Center (NCDC) (AREVA, 2014).
  • Hourly weather observations published by NCDC (NCDC, 2012), U.S. Enviromnental Protection Agency, and Forecast Systems Laboratory (now National Severe Storms Laboratory) (AREVA, 2014).
  • Hydrometeorological Repo1ts (NOAA, 1980 and NOAA, 1982). From these sources, the "6-hour 10-square mile" and "1-hour I-square mile" values are used for the storms listed in AREVA, 2014.
  • U.S. Army Corps of Engineers (USACE) storm studies (AREVA, 2014).
  • Applied Weather Associates (A WA) storm analyses (AREVA, 2014).

The initial step in the development of the PMP values was to identify a set of storms which represents rainfall events that are PMP-type storms which would produce an LIP local storm event. This included storms where extreme rainfall accumulated over short durations and small area sizes with extreme intensities. Storm types included thunderstorms and intense rainfall associated with Mesoscale Convective Complexes (MCC). This procedure is similar to what is described in HMR 52, Section 6 (NOAA, 1982). The differences are that several more st01ms have been added to the storm database from which to develop PMP values. And, only storms explicitly transpositionable to the CNP site were used in this analysis. Influence of storms not transpositionable to the site was not allowed. Transpositioning is the hypothetical relocation of a storm, from the location where they occurred to another area where it could occur. The transposition process requires a binary answer: a storm is either transpositionable to a location or not. For a given storm to be considered transpositionable there must be similar meteorological/climatological and topographical characteristics at its original and new locations. This is a qualitative determination based on the meteorological judgment using conse1vative limits. The determination regarding transposition for storms was consistent with that used in HMR 52 (NOAA, 1982).

An evaluation was done for all storms used in previous LIP and PMP studies in the region considered transpositionable to the CNP site to develop a list of storms needed for proper evaluation and determination of the LIP/PMP values. All LIP/PMP-type rainfall events in the region were evaluated to ensure storms with the highest accumulation of rainfalls over sh01t durations and small area sizes were analyzed. Emphasis was placed on storm events which produced high intensity rainfall over short durations (6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or less). The storm search domain included a region from southern Canada through the Central and Southern Plains and from the western boundary of the Central Plains to the west side of the Appalachian Mountains, east/west for locations within +/-1,000 ft of the site elevation ("Figure 3-1: Extent of Storm Search Domain for CNP").

AEP - D. C. Cook Nuclear Plant l\ID-12-FLOOD-011-N Revision 1 Page 26of101 Each storm chosen for final evaluation was included because its 1- and/or 6-hour rainfall values were of a magnitude where after all adjustments were applied could potentially influence the LIP values. In addition, storms used in HMR 51 (NOAA, 1980) and/or HMR 52 (NOAA, 1982) which were of this magnitude were included. The storms which are important for LIP development at the CNP site are known from previous storm analyses and storm maximization completed in the region (AREVA, 2014). This resulted in 21 events being evaluated for use in PMP calculations at the site ("Figure 3-1: Extent of Storm Search Domain for CNP" and "Table 3-1: List of Storms Used in the PMP/LIP Calculations"). Thi1ieen of these storms were previously analyzed in HMR 33 (NOAA, 1956) and HMR 51 by the NWS and USACE. The remaining eight storms were analyzed using AWA's SPAS (AREVA, 2014) during previous PMP/LIP work. Each of the previous PMP/LIP calculations have been submitted through standard NRC review processes.

3.1.2 Results Extreme rainfall events that can produce 1-and 6-hour, I-square mile LIP/PMP values were evaluated for the SSPMP. Those storms were maximized in place, then transpositioned to the CNP site. The largest of these events defined the LIP/PMP values.

3.1.3 Conclusions Conclusions of the SSPMP analysis are as follows:

  • The all-season PMP is the controlling PMP for evaluating Local Intense Precipitation flooding at CNP site.
  • The 6-hr PMP depth for application to the Local Intense Precipitation is 20.2 inches (AREVA, 2014).
  • The 1-hr PMP depth for application to the Local Intense Precipitation is 12.8 inches (AREVA, 2014).
  • The 30-min PMP depth for application to the Local Intense Precipitation is 9.8 inches (AREVA, 2014).
  • The 15-min PMP depth for application to the Local Intense Precipitation is 6.8 inches (AREVA, 2014).
  • The 5-min PMP depth for application to the Local Intense Precipitation is 4.3 inches (AREVA, 2014).

3.1.4 References AREVA, 2014. "Site-Specific Probable Maximum Precipitation (PMP) for Cook Nuclear Plant Flood Hazard Re-evaluation," AREVA Document No.: 32-9226859-000, CNP Document No.: MD-14-FLOOD-012-N, Revision 0.

AWA, 2013. Statewide Probable Maximum Precipitation Study for Ohio, Applied Weather Associates, March 2013.

Draxler, R.R. and G.D. Rolph, 2010. HYSPLIT Model access via NOAA ARL READY Website NOAA Air Resources Laboratory, Silver Spring, MD, http://ready.arl.noaa.gov/HYSPLIT_traj.php, Accessed March 2014.

NCDC, 2012. National Climatic Data Center (NCDC), TD-3200 and TD-3206 Datasets - Cooperative Summary of the Day.

NOAA, 1956. "Seasonal Variation of the Probable Maximum Precipitation East of the 105th Meridian for Areas from 10 to 1000 Square Miles and Durations of 6, 12, 24, and 48 Hours", Hydrometeorological Repo1i No.33 (HMR 33), NOAA & US NRC, 1956.

NOAA, 1980. Probable Maximum Precipitation Estimates - United States East of the 105th Meridian",

Hydrometeorological RepmiNo. 51(HMR51) by US Depmiment of Commerce & USACE, August 1977, Reprinted August, 1980.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 27of101 NOAA, 1982. "Application of Probable Maximum Precipitation Estimates- United States East of the 105th Meridian", NOAA Hydrometeorological Report No.52 (HMR 52) by US Department of Commerce & USA CE, August 1982.

NOAA, 1999. "Probable Maximum Precipitation for California", Hydrometeorological Rep01i No.59 (HMR 59),

NOAA & USACE, 1999.

NRC, 2011. U.S. Nuclear Regulatory Commission "NUREG/CR-7046: Design-Basis Flood Estimation for Site Characterization at Nuclear Power Plants in the United States of America", Springfield, VA, National Technical Information Service, 2011 (ADAMS Accession No. ML11321A195).

NRC, 2012. U.S. Nuclear Regulatory Commission, "Request for Information Pursuant to Title IO of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review oflnsights from the Fukushima Dai-Ichi Accident," March 2012 (ADAMS Accession No.

Tomlinson et al, 2008. Nebraska Statewide Probable Maximum Precipitation (PMP) Study, Applied Weather Associates. http://www.appliedweatherassociates.com/uploads/113/8/1/1381075 8/nebraska-pmp-paper-7 08. pdf Tomlinson & Kappel, 2009. "Revisiting PMPs," Tomlinson, E. M., and W.D. Kappel, October 2009, Hydro Review, Vol. 28, No. 7, 10-17.

USWB, 1946. Manual for Depth-Area-Duration analysis of storm precipitation. Cooperative Studies Technical Paper No. 1, U.S. Department of Commerce, Weather Bureau, Washington, D.C., 82pp.

WMO, 2009. World Meteorological Organization (WMO), Manual for Estimation of Probable Maximum Precipitation, Operational Hydrology Report No. 1045, Geneva 2009.

AEP - D. C. Cook Nuclear Plant

MD-12-FLOOD-O 11-N Revision 1 Page 28of101 Table 3-1: List of Storms Used in the PMP/LIP Calculations Cook Total Adjustment I Cook 1-hour lmi' Cook Max 6hr lmi2 Storm Name State Lat Lon Year Month Day Factor PMP PMP Precipitation Source AURORA COLLEGE IL 41. 7500 -8""'8.""'33'-"3"-3-+---'1~9;.c96'--!---7'--+-"-16-'--+---"'-'1.'--36'----i---'-8."'-24~r---"-19'""'.'--56c_--;l_ _ _--'S=P=-A=S~l,..,28...,6_ 1 BEAULIEU MN 47.3000 -95.9000 1909 7 18 1.17 I 8.46 11.55 i UMV 1-llA BOYDEN IA -- --43.1900 -96.0100 1926 9 17 1.05 I 10.92 14.90 MR4-24 COOPER MI:::: --42.3764 -85.6103 1914 8~ _ __.:.1.::::.36-=----!-!_..::_ll:.:;.8:.:l_ _;..._...::1.::.6.,_,_l..::.l_-+-!_ _ _ _ _....:G=-:L=-2=-*-=-16'-t DUBUQUE 1 IA 42.4400 -90.7500 2011 7-i---27! 1.05 ' 4.31 11.13 I SPAS 1220 DUMONT IA 42.7519 -92.9755 1951 6 25 I 1.26 7.99 8.57 i UMV 3-29 EDGERTON .5125 1965 7 18 1.22 i 4.49 14.36 , SPAS 1183 FALL RIVER KS 37.6300 -96.0500 2007 6 30 1.17 5.34 10.37 ' SPAS 1228 i-;:F';:O;;-RE;:;:S;;-;T;;-C;;:;I;;;:TY~---t--;:MN~-j--;4-;:5."'23"'9'""4+-:_9c':4"-::57 40;c4-j--7.19'"'8:;:-3-t--;6--j--;2:..,:0--;r----;1-;.47 1----r-i--;5;-;-;.1 11.77 i SPAS 1035 l-"G'-"RA~N'-"T-'T'-"O'-'WN'-'-'-'S"-H"-'IP,__-+-"N-'"'E"--+-'4-"'2..=o24"-'0"'0+-'*9:..e6::::.5~90::..::0-+~19:.:4'"-0--+--"-6-+--.:c.3_Jf----"1'-".2"'7---+I_.;_1=1.3 15.52 i MR4-5

_H_O_KAH _ _* * * - - - - MN _4_3_.8_l~_ill.36'1?__ 2007 8 18 ________!l_7______ _L_~_l--~_10.58 __ J_______ _§_P_,'\§_!048 HOLT MO 39.4528 , -94.3422 1947 6 18 1.06 i 12.72 12.72 MR 8-20 KELSO MO 37.1906 -89.5495 1952 8 11 1.14 I 10.21 13.93 UMV 3-30 LARRABEE IA 42.8608 -95.5453 1891 9 JO 1.10 7.88 10. 75 MR 4-2 MINNEAPOLIS MN 44.8890 -93.4021 1987 7 23 1.13 5.62 12.57 SPAS 1210 MOUNDS OK 35.8770 -96.0610 1943 5 16 1.17 12.82 18.95 SW 2-21 NEOSHOFALLS KS 38.0820 -95.7010 1926 9 12 1.26 I 11.63 17.14 SW2-I NEWCOMERSTOWN OH 40.2723 -81.6060 1935 1_ _,8'---+---"6-+--*--1=*=19_ _--+!----+7."""'87_--+--"13"".4_5_ ___,_ _ _ _~0=R_9,...-l,..,l,... 1 STANTON NE 41.8670 -9'7.0500 I 1944 6 10 1.30 12.00 20.15 MR 6-15 WOODBURN IA 41.0120 -93.5991 1903 8 24 1.19 5.66 7.72  ! MR 1-10 WOOSTER OH 40.9146 -81.9729 1969 7 4 1.27 i 5.87 11.19 I SPAS 1209

AEP - D. C. Cook N uclear Plant MD-12-FLOOD-O 11-N Revision l Page 29of101 Figure 3-1: Extent of Storm Search Domain for CNP Stom1 Search Domain ook Nuclear Plant

  • N

'N

<rN

AE P - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 30of101 Figure 3-2: Storm Locations Used for LIP/PMP Development in Relation to CNP Locations of LIP Storm Events Donald C. Cook uclcar Power Plant

...... ...,., WW

~s,11..,.

-c:=--=::::11----=====-----====::::iMlles 0 100 200 300 400 500

~Co.i.,~C:-

ow- MOM~a-19U

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 31 oflOl 3.2 Local Intense Precipitation This section summarizes the evaluation for the potential flooding impact of a local intense precipitation (LIP) event (AREVA, 2015). The LIP event is a distinct flooding mechanism that consists of a short-duration, locally heavy rainfall centered upon the plant site itself. Validation of all design inputs, assumptions, software, etc. is in the full evaluation (AREVA, 2015). Local intense precipitation analysis addresses the potential for an extreme amount of water fall2014ing in the immediate vicinity of the site. Analysis for PMP evaluates a maximum potential for regional rainfall flooding and provides an input for an LIP analysis. LIP analysis addresses the potential for an extreme amount of water falling in the immediate vicinity of the site, usually taken as the one-square-mile PMP.

3.2.1 Method A FL0-2D (FL0-2D, 2013) two dimensional rainfall to rnnoff model is the basis of the LIP Calculation (AREVA, 2015). The FL0-2D model applies the Site-Specific Probable Maximum Precipitation (SSPMP)

(AREVA, 2014b) to grid-based site topography and provides time dependent output in terms of the resulting water surface elevation and flow velocity at locations throughout the CNP site.

A LIP flood is evaluated for CNP consistent with the Hierarchical Hazard Assessment (HHA) approach of NUREG/CR-7046 (NRC, 2011).

With respect to LIP, the analysis, following the HHA used the following steps:

1. Define FL0-2D model limits for LIP. analysis,
2. Develop the FL0-2D computer model with site features,
3. Develop LIP/PMP inputs,
4. Pe1form flood simulations in FL0-2D and estimate maximum water surface elevations at CNP,
5. Analyze results for a "Case 3" and evaluate need for "Case 2" as defined in NUREG/CR-7046, Appendix B,
6. Analyze a "Case 2" as a final result.

Local Intense Precipitation was evaluated for the CNP site using the program FL0-2D (AREVA, 2015). FLO 2D is a physical process model that routes flood hydrographs and rainfall-runoff over unconfined flow surfaces or in channels using the dynamic wave approximation to the momentum equation. The watershed applicable for the LIP Analysis was computed inter~ally within FL0-2D based on a digital terrain mod~l (DTM).

As prescribed in NUREG/CR-7046 (NRC, 2011) the HHA process was followed to provide representations for both a Case 3 and a Case 2 in order to provide more realistic results while still using conservative site-specific inputs.

The LIP parameters for Case 3 were defined using HMR 51 and HMR 52; (NOAA, 1980 and NOAA, 1982) as prescribed in NUREG/CR-7046, Section 3.2 (NRC, 2011). The LIP parameters for Case 2 were defined using input from site-specific calculation (AREVA, 2014b) as prescribed for in NUREG/CR-7046 (NRC, 2011 ). LIP results for this report are those from Case 2.

The FL0-2D model for LIP flooding analysis at CNP utilizes 2013 topographic mapping results done using LiDAR to generate ground elevations and associated flood water surface elevations. The model ground elevations for each grid cell were derived from the site survey LiDAR points within the FL0-2D software. Model was obtained from the ground elevations in the 2013 aerial LiDAR site survey (AREVA, 2013).

Rainwater infiltration into natural sands in the area (dune sand) was derived from US Soil Conservation Service information (USDA, 1986). No evaporation losses were considered.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 32of101 The CNP Storm Drain System (yard drainage) is considered to be operational at 25% capacity- consistent with NUREG/CR-7046 Appendix B.2 Case 2: Fully Functional Site Grading and Partially Blocked Drainage Channels (NRC, 2011).

Buildings within the watershed are considered to be solid and impervious (as in HHA Case 3). Security barriers, consisting of both concrete Jersey barriers and heavy steel fencing are considered pervious where they might block water from access to the site (upstream) and impervious where they might allow flow off site (downstream).

Rooftop drains are considered to be plugged with debris or otherwise overwhelmed and ineffective for Case 3.

Runoff from the building roofs is generally directed to adjacent ground surface cells within the FL0-2D model.

Locations of critical areas (where LIP runoff could negatively impact SSCs important to safety) were identified based on general site and plant configuration and plant walkdowns. The 10 "Critical Locations" identified in the 2012 walkdown (CNP, 2012) are identified to be locations of potential SSC vulnerability, that is, where predicted flood elevations exceed surveyed threshold elevations (allowing water to potentially enter critical areas) are considered to be an adverse condition.

The model computational area ("Figure 3-3: FL0-2D Modeled Site Area") is defined by a 10 foot by 10 foot model grid over the 0.22 square mile contributing watershed ("Figure 2-5: CNP Plant Drainage Basin") to define the computational area for the FL0-2D model.

Assumptions made for this work were all verified:

  • Watershed surfaces are assigned a realistic site-specific Soil Conservation Service (SCS) Curve Number (CN) based on soils type, vegetation, and land use.
  • Runoff from the rooftop of parapet style building roofs is allowed to flow to an internal storm drain within the building, then offsite - not to adjacent ground surface cells (AREYA, 2015).
  • Security barriers on the upstream edges of the model are not considered to block incoming storm water and are omitted from the model (as in HHA Case 3).
  • Jersey Barriers on the downstream edges of the site are considered impervious (as in Case 3).
  • Delay Barriers on the downstream edges of the Protected Area are assumed to be 50% porous (AREVA, 2015).
  • The CNP Protected Storm Drain is considered to be operational at 25% capacity - consistent with NUREG/CR-7046 Appendix B.2 Case 2: Fully Functional Site Grading and Partially Blocked Drainage Channels (NRC, 2011). The combined outfall section is adequate to convey inflow from all trench drains.
  • Use of Site-Specific PMP (AREVA, 2014b) as described in Section 3.1. This assumption is appropriate because NUREG/CR-7046 (NRC, 2011) indicates that an HHA Case 2 analysis is supported by site-specific hydrometeorological data (NRC, 2011).
  • No evaporation losses were considered. Buildings within the watershed are considered to be solid and impervious.

3.2.2 Results Overland flow in the Protected Area initiates both in situ and into the Protected Area from 1) the east, traveling paiiicularly from paved areas along the plant access road and 2) off of sand dunes that rise from neai* Protected Area grade (about 594 to 609 ft) to as high as elevation 650 ft no1ih and south of the Protected Area. Security ba11"iers, consisting of both concrete Jersey barriers and heavy steel fencing, significantly influence overland flow of rainwater.

AEP - D. C. Cook Nuclear Plant IvID-12-FLOOD-011-N Revision 1 Page 33of101 Maximum ponding ofrainwater at critical locations (shown in "Figure 3-4: CNP Critical Opening Locations")

for Case 2 is shown in "Table 3-2: LIP Model Results: HHA Case 2". Additional figures are provided in AREVA, 2015. Appendix B provides water surface elevation over time for critical locations. These drawings include: "Figure B-1: Water Surface Elevation Over Time CLl (HHA Case 2)", "Figure B-2: Water Surface Elevation Over Time CL2 (HHA Case 2)", "Figure B-3: Water Surface Elevation Over Time CL3 (HHA Case 2)", "Figure B-4: Water Surface Elevation Over Time CL4 (HHA Case 2)", "Figure B-5: Water Surface Elevation Over Time CL5 (HHA Case 2)", "Figure B-6: Water Surface Elevation Over Time CL6 (HHA Case 2)", "Figure B-7: Water Surface Elevation Over Time CL7 (HHA Case 2), "Figure B-8: Water Surface Elevation Over Time CL8 (HHA Case 2)", "Figure B-9: Water Surface Elevation Over Time CL9 (HHA Case 2)" and Figure B-10: Water Surface Elevation Over Time CLIO (HHA Case 2)".

Debris loading and transportation during the LIP scenario is not considered a hazard for SSCs important to safety at CNP.

3.2.3 Conclusions The flood height above critical threshold elevation from the FL0-2D model runs at the 10 Critical Locations is summarized in "Table 3-2: LIP Model Results: HHA Case 2". The following is a summary of the results of the LIP Calculation:

1. Turbine Building. HHA Case 2 LIP flood height above the critical threshold elevation at the northwest entrance roll up door is 0.0 ft, the southwest roll up door is 0.8 ft, the northeast roll up door is 0.8 ft, and the southeast roll up door is 0.2 ft.
2. Valve Sheds. The Unit 1 tanks (north) valve sheds show 1.5 ft of water above critical threshold elevation, and the south sheds have 0.6 to 1.2 ft of water above their critical threshold elevations for the HHA Case 2LIP.
3. Auxiliary Building. The north roll up door for the Auxiliary Building has a maximum 1.0 ft of flood height above threshold elevation in the HHA Case 2 LIP.

3.2.4 References AREVA, 2013. "Donald C Cook FHE Aerial Mapping Validation Report", AREVA Document No. 38-9207275-001, September 2013.

AREVA, 2014b. "Site-Specific Probable Maximum Precipitation (PMP) for Cook Nuclear Plant Flood Hazard Re-evaluation," AREVA Document No.: 32- 9226859-000, CNP Document No.: MD-14-FLOOD-012-N, Revision 0.

AREVA, 2015. "Site-Specific Local Intense Precipitation (SS LIP) for D.C. Cook Nuclear Plant," AREVA Document No.: 32- 9221898-001, CNP Document No.: MD-14-FLOOD-014-N, Revision 1.

CNP, 2012. Flooding Walkdown Report In Response The 50.54(+/-) Information Request Regarding Near-Term Task Force Recommendation 2.3: Flooding for the D.C. Cook Nuclear Power Plant, November 13, 2012, MD FLOOD-002-S (ADAMS Accession No. ML12340A444).

FL0-2D, 2013. "FL0-2D Pro Reference Manual", FL0-2D Software, Inc., Nutrioso, Arizona (www.flo-2d.com), 2013.

NOAA, 1980. Probable Maximum Precipitation Estimates - United States East of the 105th Meridian",

Hydrometeorological Report No. 51 (HMR 51) by US Department of Commerce & USA CE, August, 1977, Reprinted August, 1980.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-O 11-N Revision 1 Page 34of101 NOAA, 1982. "Application of Probable Maximum Precipitation Estimates - United States East of the 105th Meridian", NOAA Hydrometeorological Report No.52 (HMR 52) by US Department of Commerce & USA CE, August 1982.

NRC, 2011. U.S. Nuclear Regulatory Commission "NUREG/CR-7046: Design-Basis Flood Estimation for Site Characterization at Nuclear Power Plants in the United States of America", Springfield, VA, National Technical Information Service, 2011 (ADAMS Accession No. ML11321A195).

USDA, 1986. "Urban Hydrology for Small Watersheds", United States Department of Agriculture, National Resources Conservation Service, Conservation Engineering Division, TR-55, June 1986.

AEP'-D. C. Cook Nuclear Plant MD-12-FLOOD-011-N I Revision 1 Page 35of101 Table 3-2: LIP Model Results: HHA Case 2 Critical Computed Inundation Elevation Water Surface Depth (Feet) (feet)

Critical Location FL0-2D Cell HHACase2 (feet)

CLl 1-DR-TUB201 8478 594.8 594.8 0.0 CL2 2-DR-TUB220 4710 595.2 596.0 0.8 CL3 2-DR-TUB260 7718 609.0 609.2 0.2 CL4 Valve-shed RWST 1-TK-33 16301 608.4 609.9 1.5 CL5 Valve-shed PWST/CST 1 16964 608.4 609.9 1.5 CL6 Valve-shed RWST 2-TK-33 13002 608.9 609.5 0.6 CL7 Valve-shed PWST/CST 2 13962 608.4 609.6 1.2 CL8 Su plemental Diesel Generators 17333 609.0 609.6 0.6 CL9 1-DR-TUB253 13300 609.0 609.8 0.8 CLIO 12-DR-AUX381 17167 608.9 609.9 1.0 Note: The Supplemental Diesel Generators at CL8 are not important to safety; that location is included for commercial information only.

AEP - D . C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 36of101 Figure 3-3: FL0-2D Modeled Site Area Computational Area

AEP - D . C. Cook Nuclear Plant MD-12-FLOOD-Ol l-N Revision 1 Page 37 of JOI Figure 3-4: CNP Critical Opening Locations

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 38of101 3.3 Probable Maximum Flood: Flooding in Rivers and Streams This section summarizes the potential flooding impact of a Probable Maximum Flood (PMF) evaluation (AREYA, 2014). PMF analysis addresses the applicable drainage area for potential flooding in streams and rivers adjacent to a site that may result in flooding at the site.

3.3.1 Method A PMF is evaluated for CNP consistent with the Hierarchical Hazard Assessment (HHA) approach of NUREG/CR-7046 (NRC, 2011).

3.3.1.1 Site Hydrology CNP is located within a series of heavily wooded sand dunes on the eastern shore of Lake Michigan. Ground elevation throughout the site (and surrounding dunes) ranges from about elevation 580 to 650 ft (CNP, 2013).

Drainage in the area is generally westward toward Lake Michigan, and portions of the sand dunes in this area are characterized by poorly developed drainage systems with small lakes and swampy areas. The only nearby S)lrface water channel, river, or stream to the site is the Thornton Valley Drain (AREVA, 2014). Keelo Creek, which is on the east side ofI-94 is the next closest surface water channel, river or stream to the CNP site. At its closest point, Keelo Creek is 2 miles east from the CNP SSCs.

The basin draining to the CNP protected area was generated by tracing high points on the surrounding dunes to delineate the divide between the site watershed and areas flowing to the Thornton Drain to the east (AREYA, 2014). "Figure 3-5: Watershed Draining to CNP Critical Locations" shows the CNP protected area drainage basin. No intermittent streams were found on the western draining portion of the CNP property.

The watershed for CNP is depicted in "Figure 3-5: Watershed Draining to CNP Critical Locations" and drains directly to Lake Michigan (AREVA, 2014). The watershed contains all of the CNP safety related Structures, Systems, and Components (SSCs) which are relevant to the flooding hazard reevaluation due to the potential for floods to enter plant structures.

No assumptions were made for this analysis (AREVA, 2014).

3.3.2 PMF Results 3.3.2.1 Thornton Valley Drain Topography and Hydrology An investigation of the United States Geologic Survey's National Hydrography Dataset (USGS NHD, 2013),

shows no perennial or intermittent streams that would have the potential to impact the critical locations of the CNP site. "Figure 3-6: USGS Hydrography Dataset" shows the rivers and streams near the CNP site from the USGS NHD. The eastern portion of the CNP property is characterized by large coalescing sand dunes, some up to 150 ft tall. Precipitation falling on this portion of the property runs off to the Thornton Valley Drain ("Figure 3-5: Watershed Draining to CNP Critical Locations") which is, at its closest point, approximately Yi mile east of the CNP Protected Area watershed boundary (area which drains to the Protected Area and the CNP SSCs). The drainage area of the Thornton Valley Drain watershed, as it passes along the eastern part of the CNP property is approximately 1.9 square miles. The Thornton Valley Drain flows northward to the Grand Mere Lakes and ultimately discharges surface water runoff to Lake Michigan approximately three miles north of the CNP Protected Area. "Figure 3-7: Thornton Valley Drain Flowpath" shows the flow path of the Thornton Valley Drain along I 94 and through the Grand Mere Lakes to Lake Michigan.

The Thornton Valley Drain is not adjoining the portion of CNP containing SSCs important to safety which are addressed in the flooding hazard reevaluation. These locations are in the western drainage basin, not in the

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 39of101 Thornton Valley Drain watershed (the SSCs are at least 1,700 ft west from the Thornton Valley Drain watershed boundary).

3.3.2.2 Watershed Division The formation of the dunes and topography of the CNP site results in two distinct drainage basins within the CNP property. Two figures ("Figure 3-8: Watershed Division Map (elevations less than 626 ft)" and "Figure 3-9:

Watershed Division Map (elevations greater than 626 ft)") are presented to render ground elevation from the detailed site topography (AREVA, 2013). Figure 3-8 and Figure 3-9 show a clear division between the eastern (draining to the Thornton Valley Drain) and western (draining directly to Lake Michigan) watersheds. Figure 3-8 shows the topographically lower portions of the CNP property (below the 626 foot level) which receive water from the higher portions of the property and discharge either to Lake Michigan on the west or the Thornton Valley Drain to the east. The CNP Protected Area and all safety related SSCs are located in the lowest part of the western watershed. Figure 3-9 shows the higher portions of the property (above 626 ft) and the north-south watershed divide.

The separation of colored areas in the lower elevation map (Figure 3-8) provides a visual demarcation of the two watersheds. Colored areas which are separated in Figure 3-8 (lower than 626 ft) but connected in Figure 3-9 (above 626 ft) indicate that the minimum basin division elevation (at the entrance road) is 626 ft. The watershed basin delineation is achieved by tracing the highest elevations in Figure 3-9 through the separated areas in Figure 3-8.

3.3.3 Conclusions No surface water channels, rivers, or streams are present within or adjacent to drainage paths which contribute surface water runoff to the CNP Protected Area or the critical locations.

There are no surface hydrologic features identified by the USGS NHD as a perennial or intermittent stream in the vicinity of the CNP. The Thornton Valley Drain is the only nearby channel, and a preliminary screening dismisses the need for a PMF of this drainage feature since it is not adjoining, adjacent to, nor does it reside in the same drainage basin or watershed as the CNP SSCs important to safety.

Local topography defines a watershed basin division between the Thornton Valley Drain and the CNP critical location watersheds. There is no indication that a PMF event on the Thornton Valley Drain watershed would present a flooding hazard to CNP critical locations. As a result, Probable Maximum Flooding on Rivers and Streams is not a flood mechanism with potential to impact CNP SSCs important to safety.

3.3.4 References AREVA, 2013. "Donald C Cook FHE Aerial Mapping Validation Report", AREVA Document No. 38-9207275-001, September 2013.

AREVA, 2014. "Probable Maximum Flood (PMF) for Cook Nuclear Plant Flood Hazard Re-evaluation,"

AREVA Document No.: 51-9214479-000, CNP Document No.: MD-14-FLOOD-009-N, Revision 0, April, 2014 CNP, 2013. "D.C. Cook Nuclear Plant Updated Final Safety Analysis Report (UFSAR)," Docket Nos. 50-315 and 50-316, Revision 25, September 9, 2013. (AREVA Doc. No. 38-9210897-000).

NRC, 2011. U.S. Nuclear Regulatory Commission "NUREG/CR-7046: Design-Basis Flood Estimation for Site Characterization at Nuclear Power Plants in the United States of America", Springfield, VA, National Technical Information Service, 2011 (ADAMS Accession No. ML 11321Al95).

USGS NHD, 2013. "United States Geologic Survey National Hydrography Dataset. Michigan high definition NHD basemap data Sept, 2013. http://viewer.nationalmap.gov/viewer/nhd.html?p=nhd&b=base2&x=-

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 40of101 9632765.844079624&y=5 l 57692.2263 78171&l=13&v=NHD%3A1 %3B2%3B3%3B4%3B5%3B6%3B8%3B9

%3Bl0%3Bl 1%3Bl2%3B13%3Bl4, accessed November 6, 2013

AEP - D . C. Cook Nuclear Plant MD-1 2-FLOOD-O11-N Revision 1 Page 4 1 of 10 I Figure 3-5: Watershed Draining to CNP Critical Locations

I s

Overlays Selection cart Active Toot: None (H*p N*vlg*tlon)

Reorder Layers

  • _ * *Ji US Topo Av11ilabtlity
  • _
  • w :a Geographic Names (GNIS)
  • _ ""' ;..a : : . Structure~
  • -J * ""' Ji Tra nsportetion
ii Governmental Unit Boundaries
. Map Indices "!'j a'Q' c

Land Cove r "'I

~

  • _. * "" :ii Eleva tion Av a ilability (;,j I &;
iii Elevation Contours
  • Small Scale  ?:' "ti
  • _ * ~ ::. lmaoery e00 t:i Ji Reference Polyoons ()

~

00 ()

0 0

'< ~

Q.

=

"'I zc:

0 (")

aQ  ?:i 0

"'I to:> < 0 ..,

"O v;* """ti

'< =- :i

~

[

to:>

to:>

V>

~

Natural Hazards other Featured 0.,ta U$er Added Content Favontes

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revi sion l Page 43of101 Figure 3-7: Thornton Valley Drain Flowpath Nf ,*

Grand Mere Lakes 'l.'

I)1

AEP - D. C. Cook N uclear Plant MD-12-FLOOD-O 11-N Revi sion I Page 44 of IOI Figure 3-8: Watershed Division Map (elevations less than 626 ft)

.t:{> Elevation (ft) 626 618.5 611 603 595.5 588 580

AEP - D . C. Cook Nuclear Plant MD-1 2-FLOOD-011-N Revision I Page 45 of 101 Figure 3-9: Watershed Division Map (elevations greater than 626 ft)

Elevation (ft) 761 738.5 716 693.5 671 648.5 626

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 46of101 3.4 Dam Breaches and Failures Analysis for dam breaches and failures addresses the potential for flooding at a site due to all manner of relevant dam or lock failures including multiple failures.

3.4.1 Method The flood mechanism of dam. breaches and failures on rivers or streams is not applicable to CNP. No dams exist on rivers or streams that might cause flooding of the CNP site. Potential failure of the Great Lakes lock system is described below.

Various channel ways connect the five Great Lakes, forming one system. Water is continually flowing from the headwaters of Lake Superior via the St. Mary's River, to Lake Huron and the remainder of the lake system. Lake Huron and Lake Michigan are connected by the deep Straits of Mackinac and are considered to be one lake hydraulically, having a common water level (USACE 1999).

Outflow from Lake Superior is controlled near the twin cities of Sault Ste. Marie, Ontario and Sault Ste. Marie, Michigan, by three hydropower plants, five navigation locks and a 16-gated controlled structure, called the Compensating Works. Outflows on Lake Superior have been regulated since completion of the Compensating Works in 1921. The locks at Sault Ste. Marie allow ships to travel between Lake Superior and the lower Great Lakes. Hence, the locks are essentially navigation structures and not water barriers. Outflow from Lake Superior is adjusted monthly in order to maintain the lake levels on Lake Superior and Lakes Michigan and Huron. Prior to man-made controls, a rock ledge at the head of the St. Mary's Rapids provided natural control for Lake Superior outflows. Evidence suggests that water levels on Lake Michigan and Lake Huron were 5 ft higher within the last 1,000 years, than they have been since the recording of lake levels in 1865 (USACE, 1999).

There are five locations on the Great Lakes where water is diverted into, out of, or between lake basins. The Long Lac and Ogoki diversions divert water into Lake Superior. These diversions take water from the Hudson Bay watershed and augment natural flows for hydropower plants in the no1ihern part of Lake Superior. The nearest man-made water diversion to CNP is the Lake Michigan diversion at Chicago, known as the Chicago Sanitary and Ship Canal. The Chicago Sanitary and Ship Canal links Lake Michigan to the Mississippi River. Lake water has been diverted at Chicago since 1848 for various reasons, including water supply, sewage disposal and navigation.

The Welland Canal is a navigational waterway between Lakes Erie and Ontario that allows ships to bypass the Niagara River's falls and rapids. This diversion also provides water for hydropower generation. The smallest of the five diversions is the New York State Barge Canal which draws water from the Niagara River and returns diverted water to Lake Ontario. The impact on the Great Lakes from the five man-made diversions has been determined to be insignificant compared to natural forces. For example, it has been determined that there is no measurable effect on the water level of Lakes Michigan and Huron from the cumulative impacts of all five diversions (USACE 1999).

Assumptions for this analysis were conservatively based on existing physical conditions. Although there are no dams, per se, on the Great Lakes (Superior, Michigan, Huron, Erie and Ontario), since the water level in Lake Michigan depends in pati on discharge from Lake Superior through a lock system, the analysis conservatively assumed that the entire lock system between Lake Superior and Lakes Michigan and Huron fails along with man-made water diversion structures, simultaneously contributing to a rise in the level of Lake Michigan at the CNP site.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 47of101 3.4.2 Results 3.4.2.1 Failure of Locks and Diversions The CNP plant, specifically safety-related structures, systems and components (SSCs), is protected from lake flooding to elevation 594.6 ft. The CNP CDB uses a maximum lake elevation of 583 .6 ft as a component of a maximum flood height. A conservatively assumed 5 ft increase due to dam failure on Lake Michigan would result in a flood elevation of 588.6 ft, 6 ft below the CDB elevation ..

3.4.3 Conclusions Based on conservative assumptions, potential breaches of the up-gradient locks and water diversion structures on the Great Lakes would not impact SSCs important to safety at CNP considering the following:

  • The failure of the five, man-made water diversion structures on the Great Lakes have an insignificant impact on the water level of Lake Michigan.
  • If the entire Sault Ste. Marie lock system fails and the water level of Lake Michigan instantly increases by 5 ft to its presumed natural level within the last 1,000 years (i.e., pre man-made alterations on the Great Lakes and lake tributaries), and the 5 ft is added to the high lake level used for the CDB, a margin of 6 ft would exist between the lake's water level and the CDB elevation.

3.4.4 References USACE, 1999. Living with the Lakes: Understanding and Adapting to Great Lakes Water Level Changes, U.S.

Army Corps of Engineers Detroit District and Great Lakes Commission, 1999.

3.5 Storm Surge and Seiche This section summarizes the evaluation of the potential flooding impact of a storm surge and meteorologically-induced seiche (AREVA, 2014). Validation of all design inputs, assumptions, software, etc. is in the full evaluation (AREVA, 2014). The Surge and Seiche analysis addresses flooding from an adjacent water body due to a meteorological event including an increase in water elevation and wave runup.

3.5.1 Method A storm surge and seiche flood is evaluated for CNP consistent with the Hierarchical Hazard Assessment (HHA) approach ofNUREG/CR-7046 (NRC, 2011).

The evaluation of the Probable Maximum level of Lake Michigan caused by flooding due to storm surge or seiche (Probable Maximum Surge and Seiche event (PMS&S)) was determined for the CNP site. The evaluation uses recent work by the US Army Corps of Engineers (Melby, 2012; Scheffner, 2008; Scheffner, 1999a) and is based on a statistical analysis of the high water levels resulting from 150 historic storm events on Lake Michigan. The Empirical Simulation Technique (EST) is recommended to determine storm surge return periods for extra-tropical storms (NRC, 2013).

The U.S. Army Corps of Engineers (USACE) Coastal and Hydraulics Laborato1y (CHL) of the Engineer Research and Development Center (ERDC) in Vicksburg, MS has recently completed a major study of the impact of historic storm events on Lake Michigan (Jensen, 2012; Melby, 2012; Nadal-Caraballo, 2012). This study was performed for the Federal Emergency Management Agency (FEMA) using the ADvanced CIRCulation (ADCIRC) long wave hydrodynamic model for the simulation of historic events impacting Lake Michigan. The 2012 USACE ADCIRC model (Melby, 2012; Scheffner, 2008; Scheffner, 1999a) is the most current and

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 48of101 extensive resource available for studying surge and seiche on Lake Michigan and was selected as the basis for the CNP evaluation.

The storm and surge combination with an exceedance of lxl0-6 is considered as an acceptable risk level goal and is considered to envelope the Probable Maximum Surge and Seiche (PMS&S) (AREVA, 2014). Surge and seiche results at more frequent (higher) recurrence levels (1,000-yr and 10,000-yr) have higher confidence (lower uncertainty) are considered along with the lxl0-6 extrapolated surge and seiche magnitude.

Assumptions for this analysis were all verified:

  • The storm and surge combination with an exceedance of lxl0- 6 is.considered to be an acceptable risk level goal and is considered to envelope the PMS&S (NRC, 2011). Surge and seiche results at more frequent (higher) recurrence levels (1,000-yr and 10,000-yr) have higher confidence (lower uncertainty) and are considered and presented along with the lxl0-6 extrapolated surge and seiche magnitude.
  • Future storm events will be statistically similar in magnitude and frequency to past events (Scheffner, 1999a).
  • Maximum drawdown caused by surge and seiche is equal to maximum peak of PMS&S.

e For HHA Step 1, the surge and seiche combine with a peak base Lake Michigan water surface level and wave runup and setup.

  • Each storm event has an equal probability within the EST (storm consistency with past events)

(Scheffner, 1999a).

  • Considering the similarity of the beach profiles and the proximity of Holland MI to CNP, the wave runup and setup results from the ERDC/CHL study at the Holland gage was assumed to represent wave runup and setup for CNP (AREVA, 2014).

3.5.1.1 Computer Models The USACE ADCIRC model application, (Jensen, 2012) represents a comprehensive study of Lake Michigan wave and water level modeling. The ADCIRC model utilizes a computational grid with 385,000 elements and 197,000 nodes to define the Lake Michigan study domain. The Lake Michigan model is part of a larger ADCIRC model (including Lake Huron) which has 778,000 elements and 409,000 nodes (Jensen, 2012). "Figure 3-10:

ADCIRC Mesh Node Density" shows the ADCIRC node density near the CNP site; node spacing is about 1,000 to 1,500 ft on the shoreline by CNP. Results of the Jensen, 2012 wave and water level study are available at the output nodes shown in "Figure 3-11: ADCIRC Output Locations along the Banks of Lake Michigan." "Figure 3-12: ADCIRC Save Point 615 proximity to CNP" shows the location of ADCIRC model output node ("Save Point" 615) which was used for the statistical analysis described in this calculation.

Acceptable methods for computation of storm surge water levels are introduced in Section 3.3.3 of JLD-ISG-2012-06 "Guidance for Performing a Tsunami, Surge, or Seiche Hazard Assessment Interim Staff Guidance" (referred to as "JLD-ISG-2012-06") (NRC, 2013) which states: "Storm surge models developed by Federal agencies, such as USACE or academic and research institutions, that are currently being used in standard engineering practice are adequate for storm surge hazard analysis." ADCIRC is the first model described in the JLD-ISG-2012-06 (NRC, 2013). ADCIRC's ability to simulate tidal circulation and storm-surge propagation over large computational domains (NRC, 2013) is an important feature for use in computing surge related water levels.

The EST computer program was used to extrapolate historic data to low probabilities to provide an extended simulation of storm surge and seiche response. The EST approach was developed by the USACE as a procedure for simulating multiple life-cy~le sequences of nondeterministic multi-parameter systems such as storm events

' )

AEP - D. C. Cook Nuclear Plant l\ID-12-FLOOD-O 11-N Revision 1 Page 49of101 (Scheffner, 1999a). The EST was utilized in this calculation at CNP. Use of the EST technique enhanced the USACE, 2012 ADCIRC dataset with a diverse set of storms based on historic observations.

3.5.1.2 Approach Two approaches for evaluating the potential for and degree of extreme flood inundation at a specific location are described in NUREG/CR-7046 (Section 4 ofNRC, 2011 ), a deterministic approach and a stochastic or probability approach involving the analysis of past events at a specific location. Due to the complicated nature and multiple driving functions of surge and seiche phenomena (wind direction and speed, storm intensity and storm track, pressure deficit, etc.) a singular, specific, and formulaic deterministic approach has not been developed for predicting Probable Maximum Surge and Seiche. The JLD-ISG-2012-06 guidance (NRC, 2013) considers the Empirical Simulation Technique (EST) "an option for a combined deterministic-probabilistic methodology" (NRC, 2013).

The USACE has developed and utilized stochastic procedures to understand storm events and their corresponding environmental impacts for complicated nondeterministic multi-parametric hazards such as storm events and their associated environmental impacts (Scheffner, 1999a). More than 14 US Army Corps of Engineer sponsored studies including the Brunswick Nuclear Generating Station (Scheffner, 1999b) have used the proposed EST methodology of applying combined or probabilistic methods to numeric models (i.e. ADCIRC) to quantify risk due to water surface elevation hazards. The JLD-ISG-2012-06 recommends using the Empirical Simulation Technique to determine return periods for extra-tropical storms (NRC, 2013).

The USACE's EST was utilized in this calculation to determine PMS&S for the CNP site. The EST is typically used for determining frequency of occurrence relationships by statistical resampling of historic data to develop joint probability relationships using various measured storm parameters. The EST resampling scheme generates large populations of data from limited historic datasets. With the expanded dataset the EST can simulate multiple time series of storm activity many times (Scheffner, 1999b). Very low probability (i.e. lxl0-6) surge and seiche elevations (which are assumed to envelope the PMS&S) can be quantified by extrapolating final EST results and confidence intervals.

3.5.1.3 Storm Surge Determination of a maximum storm surge and seiche water surface elevation for the CNP site requires a three part computation; peak base water level, storm surge and seiche, and wave runup/setup. Consistent with Step 1 of the NRC's HHA Process, the severe design storm event is assumed to occur at a time when the lake is at a historically high elevation or peak base water surface elevation. Over 150 years of data of water surface elevation data are available for Lake Michigan (USA CE, 2012). Computation of a peak base water surface elevation for the lake is achieved using a rank ordering frequency computation technique. This procedure produces a long term design lake elevation on the order of hundreds of years. A stochastic frequency analysis based on the 150 historic severe storm events of the USACE, 2012 study was superimposed on the peak base lake water surface elevation to determine the peak base water surface elevation plus storm surge and seiche. Finally, a wave runup/setup component is added to the total. Required computations include those for 1) the peak base water surface elevation, 2) the stochastic storm surge, and 3) the wave runup and setup.

Peak Base Water Surface Elevation Estimates of frequency-of-occurrence for the peak base water surface level begin with the calculation of a probability distribution function (PDF), using a procedure that makes use of the probability defined by the data and does not incorporate any prior assumptions concerning the probability relationship. Frequency-of-occurrence relationships are obtained by linear interpolation of stage from the PDF associated with the calculated return period (AREVA, 2014).

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision I Page 50of101 For the Lake Michigan data used in the ERDC/CHL study (USACE, 2012), over 150 years of monthly average water level ( 1860-2010), are available from the National Oceanic and Atmospheric Administration - NOAA, (Melby, 2012). The average long-term Lake Michigan lake levels are presented for nine locations (Melby, 2012, Figures 5 through 13). The record lengths of the nine gages vmy so the results are difficult to compare or quantify. However, all values are in very close agreement leading to the statement that: "The record length does not have much of an impact on the average or the standard deviation of the average lake levels" (Melby, 2012).

The calculated average of the mean monthly lake levels is 580.02 ft, with a maximum mean of monthly averages value of 580. l ft at Milwaukee, Kewaunee, and P01t Inland and a minimum mean of monthly averages of 579.8 ft at Calumet Harbor. Although the time periods of the data vmy, the mean of monthly averages are in excellent agreement (within 0.3 ft).

3.5.1.4 Storm-induced Water Elevations - Storm Surge and Seiche The EST storm surge magnitude was developed for addition to the peak long term average annual water level of Lake Michigan (defined above and shown in "Figure 3-13: Lake Michigan Water Surface Elevation").

150 severe extra-tropical events impacting Lake Michigan water surface elevations have identified (Melby, 2012).

"The storm events were selected based on analysis of water level, wave and wind at ten long-term water level stations around Lake Michigan" (Melby, 2012). Each of these events was used to generate input data to the ADCIRC model (Jensen, 2012) over the domain shown in "Figure 3-11: ADCIRC Output Locations along the Banks of Lake Michigan"; For a given storm, input parameters consisted of a spatial distribution of wind speed, direction, and pressure deficit at each of the 385,000 elements of the model grid for the temporal duration of the storm event.

3.5.1.5 Empirical Simulation Technique (EST) Approach to Frequency Estimates The EST is a technique that simulates life-cycle sequences of cyclic multi-parameter systems such as storm events and their corresponding environmental impacts. The generalized approach is applicable to any cyclic or frequency-related phenomena (Scheffner, 1999a). The EST is based on a bootstrap resampling-with-replacement, interpolation, and subsequent smoothing technique in which random samplings of a finite length data base are used to generate a larger database. The EST's internal bootstrap resampling methodology builds on limited sets of observations (150 observed st01m surge/seiche levels on Lake Michigan in this case) by varying input or driving parameters (wind speed, pressure deficit, and storm direction) to determine new responses (storm surge/seiche level). This approach is used to increase the number of surge events which can be used to extrapolate magnitudes of very low recurrence surge and seiche.

The EST begins with an analysis of historical storm events that have impacted a specific region. The ERDC/CHL study (Jensen, 2012; Melby, 2012; Nadal-Caraballo, 2012) is based on a selection of 150 historical extra-tropical events that have impacted the CNP site during the fifty year (1960-2009) wave magnitude period of record. The fifty yem* wave magnitude period of record began in 1960 when wave measurements were initially recorded for Lake Michigan. Each event was simulated with ADCIRC and the results were archived as previously described. The selected database of events was then parameterized to define:

  • Descriptive characteristics of the event, and
  • Response impacts of the event For the CNP study, the response vector of interest is st01m induced water surface elevation forced by the wind and pressure distribution of each of the 150 events. These data were then used as a basis for generating life cycle simulations of storm event activity with the EST. Details of the approach follow.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 51 of 101 Once a set of historical events has been defined with each event represented by an appropriate input and response vector set, the EST can generate life cycle simulations. The EST process can be summarized as:

Given rile hisrorical data wirl1 input and response vectors for eacli srorm Produce N simulations oj a T-year sequence oj evenrs, each with tl1eir associared inout vectors and resoonse vectors.

Two criteria are required of the T-year (Tis the number of years) sequence of events. The first criterion is that the individual events must be similar in behavior and magnitude to historical events, i.e., the inter-relationships among the input and response vectors must be realistic. The second criterion is an assumption that the frequency of storm events in the future will remain the same as the past. The following sections describe how these two criteria are preserved.

The criterion for the first major assumption in the EST (that future events will be similar to past events) is maintained by insuring that the input vectors for simulated events are similar to those of past events and have similar joint probabilities to those historical or historically-based events of the training set. The simulation of realistic events is accounted for in the nearest-neighbor interpolation bootstrap re-sampling technique developed by Scheffner, 1999a.

The basic technique can be described in two dimensions as follows. Let Xi, X2 , X 3, *** , Xn be n independent, identically distributed random vectors (storm events), each having two components [Xi= {xi(l), xi(2)}; i=l,n].

Each event Xi has a probability Pi as l/n; therefore, a cumulative probability relationship can be developed in which each storm event is assigned a segment of the total probability of 0.0 to 1.0. If each event has an equal probability (a basic assumption to the EST), then each event is assigned a segment si such that Sj <Xi. Therefore, each event occupies a fixed portion of the 0.0 to 1.0 probability space according to the total number of events in the training set. If each event has an equal probability, then each event is assigned a segment sj such that Sj ~Xi and has probabilities defined by the following conditions:

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 52 oflOl A random number from 0 to 1 is selected to identify a storm event from the total storm population. The procedure is equivalent to drawing and replacing random samples from the full storm event population.

The EST is not simply a re-sampling of historical events technique, but rather an approach intended to simulate the input and response vector distribution contained in the training set database population. The EST approach is to select a sample storm based on a random number selection from 0 to 1 and then perform a random walk from the event Xi with xl and x2 response vectors to the nearest neighbor vectors. The walk is based on independent uniform random numbers (-1, 1) and has the effect of simulating responses that are not identical to the historical events but have reasonable combinations of driving factors and will enhance the historic dataset of similar to events which have occurred (Scheffner, 1999a).

The second criteria to be satisfied is that the total number of storm events selected per year must be statistically similar to the number of historical events that have occurred per year at the focus location. Given the mean frequency of st01m events for a particular region, a Poisson distribution is used to determine the average number of expected events in a given year (Scheffner, 1999a). For example, the Poisson distribution (Pr(s;~)) can be written in the following form:

As -A Pr(s;'A)=-~-

s.

where for s" events per year, ~ is the historically based number of events per year.

3.5.1.6 Wave Runup/Setup A required additional component of a total water elevation level analysis for CNP is the addition of wave induced runup and setup. The computed wave runup and setup is added to the Lake Michigan peak long term average annual water level and the computed storm surge.

The ERDC/CHL study computed estimates of combined wave runup and setup using data from nine NOAA water level gages on Lake Michigan. "Figure 3-15: ERDC/CHL Study Wave Gage Locations" shows the location of the wave and water level gages used in the ERDC/CHL study.

The Holland, MI water level gage is located 57 miles north from CNP (at 42.767 N Latitude and 86.200 W Longitude). This gage (NOAA wave gage #9087031) is the closest water level recording gage to the CNP site along an extent of comparable shoreline. Considering the similarity of the beach profiles and the proximity of Holland MI to CNP, the wave runup and setup results from the ERDC/CHL study at the Holland gage was assumed to represent wave runup and setup at CNP (AREVA, 2014).

AEP - D. C. Cook Nuclear Plant l\ID-12-FLOOD-011-N Revision 1 Page 53 of 101 3.5.2 Results 3.5.2.1 Peak Base Lake Level Historic data for average annual Lake Michigan water levels is available online from the National Oceanic and Atmospheric Administration Great Lakes Environmental Research Laboratory (AREVA, 2014) for the period 1860-2012. An average of the average annual lake levels of the NOAA record of 1860-2012 data set yields an average Lake Michigan water surface elevation of 580.3 ft. The NOAA 1860-2012 lake level data are in good agreement with the long-term average of mean monthly average values for Lake Michigan reported by ERDC/CHL of 579.08 ft (AREVA, 2014). The NOAA average annual lake level data is slightly higher than the ERDC/CHL level (580.27 ft- 580.02 ft= 0.25 ft higher). Since the available NOAA average annual lake level data is in good agreement with the ERDC/CHL long term lake level study (Melby, 2012), the NOAA average annual lake level dataset was selected for the frequency analysis to determine a representative high lake level for the basis of the PMS&S calculation (AREVA, 2014).

Following the frequency calculation procedures described above with the NOAA 1860-2012 data, an average annual water surface elevation versus return period curve for Lake Michigan was calculated and is presented as "Figure 3-13: Lake Michigan Water Surface Elevation". The trend oflake level data versus return period was manually extended using a line to visually fit the observations and extrapolate average annual lake levels to peak base lake levels at very low recurrence levels. A Lake Michigan peak base lake level of 582.3 ft was determined to have a return period on the order of 1,000,000 years.

3.5.2.2 Storm Surge The USACE's ADCIRC model generated water surface fluctuation results at each model node. Model surface elevation, atmospheric pressure, and directional wind velocity (U and V) results were then stored at each of the 916 save points for the 150 storm events. The nearest ADCIRC model output location to CNP is "Save Point" 615 which is located at 41.98024 N latitude, 86.56919 W longitude.

ADCIRC output at "Save Point" 615 for the 150 events in the ERDC/CHL study was used to compute long term storm surge estimates for the PMS&S calculation using the EST approach described above. The EST computes a mean value of surge and seiche magnitude versus recurrence for the 100 stage-frequency results of the EST analysis and a standard deviation. The mean and plus or minus one standard deviation EST output at CNP were plotted to define the storm surge and seiche frequency of occurrence relationship shown in "Figure 3-14: Surge and Seiche Magnitude Recurrence". The standard deviation is computed as a measure of variability and not for any specific quantitative purpose within the calculation. Use of one standard deviation to represent the variability of EST results is consistent with applications for standard use of the EST technique (Scheffner, 1999a). The surge and seiche magnitude trend was extrapolated fitting a power function trend through the last 10 points of the curve to determine a 6.9 foot PMS&S at a lxl0"6 recurrence level (a 7.1 foot surge and seiche would include 1 standard deviation in the PMS&S recurrence analysis).

3.5.2.3 Wave Runup The ERDC/CHL study utilized the Stockdon equation to estimate wave runup and setup elevations on beach profiles based on deepwater wave parameters (Nadal-Caraballo, 2012).

Frequency estimates for both still water (surge only) and total water level (still water plus wave runup and setup) were obtained from the USACE (Scheffner, 2013) for beach profiles influenced by deep water wave conditions at the Holland gage. "Figure 3-16: Water Level and Water Level with Runup and Setup at Holland, MI Gage 9087031" shows the still water level and water level with runup and setup recurrence plots for the Holland, MI water level gage. At a 1-year recurrence level, the runup and setup curve is 2.5 ft higher than the still water curve (583.1-580.6=2.5 ft), and at a 1,000-year level the difference is 2.7 ft (586.2 - 583.5 = 2.7 ft). Considering this

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 54of101 trend for water elevation data plotted against time on a logarithmic scale, (Figure 8 in AREVA, 2014), a conservative 3.0 foot difference at the 1,000,000-year level represents the difference between surge water level and surge water level plus wave runup and setup. Since the beach profiles are similar and due to the proximity of the Holland Gage to CNP, wave runup and setup in the vicinity of CNP is considered to be similar to the Holland Gage or 3.0 ft.

3.5.2.4 Uncertainty The magnitude of a surge and seiche event is dependent on many driving factors including ambient lake level, wind speed and direction, pressure deficit, etc. The USACE has developed and utilized stochastic methods including the EST to evaluate environmental impacts for complicated nondeterministic events, such as surge and seiche.

From NUREG/CR-7046 (NRC, 2011), probabilistic techniques may be subject to uncertainty in estimated hazard magnitudes since historical data for extreme events are limited by the extent of the observed record. To bracket this uncertainty, the EST output plus one standard deviation value was plotted in "Figure 3-14: Surge and Seiche Magnitude Recurrence". The extension of plus and minus one standard deviation were fixed at the 200-year standard deviation based on a non-expanding trend in the standard deviation results from the EST.

3.5.3 Conclusions The goal of the storm surge and seiche component of the CNP evaluation was to determine the potential for and severity of extratropical storm surge and seiche flooding at the CNP site. This goal was accomplished by evaluating three components: peak base Lake Michigan water level, surge and seiche magnitude, and wave runup and setup. The peak base Lake Michigan water surface elevation was calculated using historic data from NOAA (NOAA, 2012). The surge and seiche and wave runup and setup were derived from data developed by the USACE in their comprehensive ADCIRC study of water levels in Lake Michigan (Jensen, 2012; Melby, 2012; Nadal-Caraballo, 2012). Combining a lxl0- 6 exceedance peak base lake elevation of 583.24 ft with a 6.9 ft to 7.1 ft surge and seiche (including 1 standard deviation), and a 3.0 ft wave runup and setup, results in a peak PMS&S water surface elevation of 593 .3 ft.

This study indicates a PMS&S water elevation of 593.3 ft considering a peak base lake level of elevation 583.2 ft.

If the calculated surge and seiche is added to the design-basis maximum monthly mean water elevation of 583.6 ft (AREVA, 2014), the PMS&S water elevation would be 593. 7 ft. This elevation is lower than the seawall protecting CNP from Lake Michigan, which has a minimum elevation of 594.0 ft (CNP, 2013). Since the calculated PMS&S level is lower than the seawall protection elevation, the calculation ends with the first step of the HHA (if the site is not inundated by floods from the calculated storm surge and seiche to an elevation critical for safe operation of the SSCs, no further flood hazard assessment is required - Section 2 ofNRC, 2011).

The potential for Surge and Seiche related drawdown of lake levels is assumed to be the same as the peak PMS&S (10.1 ft). Section 3.6 Tsunamis indicates 15.96 ft of margin between the historic minimum Lake Michigan water level and the required submergence water level for the Essential Service Water pumps. The margin is 5.9 ft greater than the 10.1 ft maximum potential PMS&S drawdown.

The JLD-ISG-2012-06, Sections 5.5 - 5,7 (NRC, 2013), indicates that hydrostatic and hydrodynamic forces and the effects of debris, water-borne projectiles, and sediment erosion and deposition should be determined when storm surge or seiche flood levels impinge on flood protection or safety-related SSCs. The computed PMS&S elevation of 593.3 ft NGVD29 is below the current lakeside seawall elevation of 594.0 ft (CNP, 2013). No flood protection, safety related SSCs, or foundation materials will be impinged upon by the PMS&S.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 55of101 The results of this evaluation, a PMSS&S flood level elevation of 593.3 ft including 1 standard deviation in the PMS&S recurrence, indicate a Probable Maximum Surge and Seiche lower than the lowest plant grade elevation and the plant seawall (594.0 ft).

r 6

Combining a lxl0- exceedance peak base lake level of 583.2 ft with a 6.9 to 7.1 foot surge and seiche (including 1 standard deviation) yields a storm surge elevation of 590.3 ft. Adding the 3 .0 foot wave run up and setup, results in a peak PMS&S water surface elevation of 593.3 ft. Results are summarized in "Table 3-3: Summary of Total Wave Components Used Versus Return Period".

3.5.4 References AREVA, 2014. Surge and Seiche, Cook Nuclear Plant Flood Hazard Re-evaluation, AREVA Document 32-9208453-000, CNP Doc. No. MD-12-FLOOD-006-N.

FEMA, 2014. "Guidelines and Standards for Flood Hazard Mapping Partners: FEMA Great Lakes Coastal Guidelines, Appendix D.3 Update, Federal Emergency Management Agency, January, 2014 Jensen, 2012. Jensen Robert E., Cialone Maiy A., Chapman, Raymond S., Ebersole, Bruce A., Anderson Mary, and Thomas Loenette, Lake Michigan Storm: "Wave and Water Level Modeling, Technical Report ERDC/CHL TR-12-26, USACE Research and Development Center (ERDC), Vicksburg, MS, November 2012.

Melby, 2012. Melby, Jeffery A., Nadal-Caraballo, Norberto C, Pagan-Albelo, Yamiretsy, and Ebersole, Bruce, "Wave Height and Water Level Variability on Lakes Michigan and St Clair," Technical Report ERDC/CHL TR-12-23, USACE Research and Development Center (ERDC), Vicksburg, MS, October 2012.

Nadal-Caraballo, 2012. Nadal-Caraballo, Norberto C., Melby, Jeffery A., and Ebersole, Bruce A., "Statistical Analysis and Storm Sampling Approach for Lakes Michigan and St Clair, Technical Repo1i ERDC/CHL TR 19, USA CE Research and Development Center (ERDC), Vicksburg, MS, September 2012.

NOAA, 2012. Great Lakes Water Level Observations, National Oceanic and Atmospheric Administration, Great Lakes Environmental Research Laboratory, Lake Michigan Average Annual Lake Level by year. Data is Average Annual 1860 to 2012. Website Accessed Dec. 2, 2013.

http://www.glerl.noaa.gov/data/now/wlevels/lowlevels/plot/data/mhu.csv.

NRC, 2011. U.S. Nuclear Regulatory Commission "NUREG/CR-7046: Design-Basis Flood Estimation for Site Characterization at Nuclear Power Plants in the United States of America, Springfield, VA, National Technical Information Service, 2011 (ADAMS Accession No. ML11321A195).

NRC, 2013. U.S. Nuclear Regulato1y Commission, Japan Lessons-Learned Project Directorate, JLD-ISG-2012-

06. Guidance for Performing a Tsunami, Surge, or Seiche*Hazard Assessment. Interim Staff Guidance, Revision
0. January 2013 (ADAMS Accession No. ML12271A036).

Scheffner, 1992. Scheffner, N.W, Borgman, L., "Stochastic Time-Series Representations of Wind Data." J.

Waterway, Pmi, Coastal, Ocean Eng. 1992, 118:337-351.

Scheffner, 1999a. Scheffner, Norman W., Clausner, James E., Militello, Adele, Borgman, Leon E., Edge, Billy L., and Grace, Peter E., "Use and Application of the Empirical Simulation Technique: Users Guide, Technical Report CHL-:*99-21, USACE Waterways Experiment Station (WES), Vicksburg, MS, December 1999.

Scheffner, 1999b. Scheffner, Norman W., Mark, David J., Lin, Lihwa, Brandon, Willie A., and Miller, Martin C., "Development of Water-Surface Elevation Frequency-of-Occurrence Relationships for the Brunswick, North Carolina Nuclear Power Plant Site, Technical Report CHL- 99-12, USACE Waterways Experiment Station (WES), Vicksburg, MS, December 1999.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-O 11-N Revision 1 Page 56of101

  • Scheffner, 2008. Scheffner, N.W. 2008. "Water Levels and Long Waves." In: Demirbilek, Z., Coastal Engineering Manual, Part II, Coastal Hydrodynamics Chapter 5-6 , Engineer Manual 1110 2 1100, USACE, Washington, D.C.

Scheffner, 2013. Lake Michigan Water Surface at 9087031 Holland Michigan Gage. Lake Level and Total Water Level with Runup and Setup Plots which were pmt of the ERDC/CHL Study, 2012 but not included in the USACE, 2012 report. Personal Communication between N. Scheffner and USACE, July 2013.

USACE, 2012. "Wave Height and Water Level Variability on Lakes Michigan and St Clair," ERDC/CHL TR-12-23, Great Lakes Coastal Flood Study, 2012 Federal Inter-Agency Initiative, U.S. Army Corps of Engineers, Engineer Research and Development Center Coastal and Hydraulic Laboratory, October 2012.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 57of101 Table 3-3: Summary of Total Wave Components Used Versus Return Period Return period 10 100 1,000 10,000 1,000,000 Long term lake level ft, 581.11 581.89 582.07 582.13 582.30 IGLD85 Storm Surge and Seiche -ft 4.80 6.25 6.46 6.62 6.90 Wave setup/runup ft 2.60 2.60 2.70 2.80 3.00 TOTAi ft, IGLD85 588.51 590.74 591.23 591.55 592.20 Total NGVD 29 589.45 591.68 592.17 592.49 593.14 Design Basis Lake Level Plus 1 STDev Plus 1 STDev S&S Return period 1,000,000 1,000,000 Long term lake level ft, 582.30 582.66 IGLD85 Storm Surge and Seiche -ft 7.10 7.10 Wave setup/runup ft 3.00 3.00 TOTAL ft, IGLD85 592.40 592.76 Total NGVD 29 593.34 593.70

AEP - D. C. Cook Nuclear P lant MD- I 2-FLOOD-O I 1-N Revision 1 Page 58of 101 F igure 3-10: ADCIRC Mesh Node Density

. . ...I**:::

  • **I*.*.

.. I I I I I I I I I I I I I I I I I I I

  • I 1 I I
  • 1
  • * * * * * * * * * *
  • JI:

I I I I I I I I I : I I.-.*.* I

. . . ... . . I I I I I I I I I a I I I,', I :I*;

1 1 1 I I I 1 I 1 I 1 I 1 1 1 1 1 1 1 1 I I I I I I I I I I I I I'* I I I I I I I I **::-.-:::*:

I I I I I I I I

  • I I *
  • I I I*

I I I * *

  • I I I IJ

... .......... ....*.. .. ........ .*.. *::::::.*:*=*:

Any illegible text is not pe1tinent to the figure.

AEP - D. C. Cook Nuclear Plant MD-I2-FLOOD-OI I-N Revision I Page 59 of IOI Figure 3-11: ADCffiC Output Locations along the Banks of Lake Michigan Typical spacing of output locations ~

5,000 to 10,000 ft apart

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 60of101 Figure 3-12: ADCffiC Save Point 615 proximity to CNP Any illegible text is not pertinent to the figure.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision l Page 61of101 Figure 3-13: Lake Michigan Water Surface Elevation 0

0 0

0 0

I 0 I

I 0 c:

Cl) co

J iO I ~

0 I LL ~ 0 0

s..... 0 z C?.

0 I 0 0 0 N

0 c:

I <D CX) 0

'iii

..... c:

I QJ co Cii x Wo I

.c 0

C'CI I

I 0

0 z

~

.;: c:

QJ

i oli::

I QJ c:: ::J g 0 0

o_

0 Cl>

Cl>

I

  • I ...ca Ill u I

~ Q)

I I Cl)

I "C

~ 0 0

0 't

c C'CI en

'I C?.

..... Q)

Q.

...c:::s

cu ....

Q) i 0::

Cl>

~

Cl

~ 0 0

Cl>

en .....

~

Cl>

Cl e

'~ ~'

~

en c 0

~

0 .....

('")

CX)

N CX) 0

<X>

-- --- - ~

l.O l.O l.O (S80191 D) - uoneAa13 a>1e1 a6eJaAV

9 I N

I

'T1 t""'

8 0 0

t:JI 0

- ------- -- z

=Q) 7 6

.--~--- -

- - ----- "!rj a'Q"

=

ti>

~

c:

0 5 I

rJ'J >

j (1Q

.,= tTi "d

  • EST Storm Surge ti>

Q)

!>:> t:J Qi Q) 4 - - EST Curvefrt Projection =

Q.

()

00 ()

.s::. ti> 0

()

  • EST Storm Surge +1 SDEV  ;:;* 0 "i ='

7'"

Cl) I - - EST +1 SDEV Curvefrt Projection ti> zc "C 3 ~ ~ 0 0Pl c I

  • EST Storm Surge -1 SDEV

!>:> (1) v; * ..,

ns

-==-*

(1Q Q) I o* "d Cl I -

  • EST - 1 SDEV Curvefrt Projection Q.
0

[

s 2 ti>

Cl) ,:;

I ti>

n I .,.,

=

ti>

1 =n ti>

0 1 10 100 1,000 10,000 100,000 1,000,000 Return period {years) 0

AEP - D. C. Cook Nuclear Plant MD-1 2-FLOOD-011-N Revision 1 Page 63 of I 01 Figure 3-15: ERDC/CHL Study Wave Gage Locations Figure 1. Locations of NOAA water level gages (three wavy lines). wave rider buoys (inverted teardrop) and meteorological (met) stations (flag) on Lake Michlian.

Station Station ID Latitude Longitude Hourly Records Mackinaw City 9075080 45 .777 N 84.725 w 1970 - 2010 Ludington, Ml 9087023 43 .947 N 86.442 w 1970 - 2010 Holland, Ml 9087031 42.767 N 86.200 w 1970 - 2010 Calumet Harbor, IL 9087044 41.728 N 87.538 w 1970 - 2010 Milwaukee, WI 9087057 43.002 N 87.887 w 1970- 2010 Kewaunee, WI 9087068 44.463 N 87.500 w 1973 - 2010 Sturgeon Bay, WI 9087072 44.795 N 87.313W 1970 - 20 10 Green Bay, WI 9087079 44.540 N 88.007 w 1970 - 2010 Pott Inland, MI 9087096 45.968 N 85.870 w 1970 - 2010 Any illegible text is not pertinent to the figure.

AEP - D. C. Cook N uclear Plant MD-12-FLOOD-011-N Revision 1 Page 64 of IOI Figure 3-16: Water Level and Water Level with Run up and Setup at Holland, MI Gage 9087031 (Reference 3.5.4.13)

Lake Michigan - 9087031 Holland, Ml GPO (Nyr5 =51, N5 tm=58, A.=1 .1) [RMS 1=0.10 ft; RMS 10 = 0.25 ft) 590 588 i .... t

~

9 586 ***=-.

~

l584 1.

.. ;.. !. ***O* **I*

  • -------- ~----~-:-. ~~-:-~------~ -----~-~---- ~~ ~----- ~---~-- ~-----l.

II 582 t i;

. ~ . i

i. - :

~

II  :  ;

580 SSQ.6 t. t**t *i*i ' ... ?

~ ..-~~~~~~~~

- GPO fit (FSS)

  • Empirical (FSS) 578 0 10 101 102 Return Period (years)

Lake Michigan - 9087031 Holland, Ml GPO (Nyrs=50, Nstm=64, A.=1.3) [RMS 1=0.09 ft; RMS 10 = 0.17 ft]

i 590

~ i :

9 l i

"'- 588 *** ..

f*

  • t i

~  ! :

  • j**1 i- _____ . ;. ___ L__... ,:__ ~...:-~l!~---------~--~-~--lJ_~ _~-----~---;..--:-.:_.;_:

l !

D.

j 586

.. .... , ~ ' .. .

i !s,s~.2 1  ; : I.: :

II 584 {.. *'**t 1**f**\

t  :  :  : :

§

~ 582 i

] sso .. -~ . -~-

! 578 0 10 101 GPO fit (CSS-150, s50/r50)

Empirical (CSS-150, s50/r50) 102 Return Period (years)

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 65of101 3.6 Tsunamis This section summarizes the evaluation for the potential flooding impact of a tsunami (AREVA, 2013). Tsunami analysis assesses the potential for site flooding due to seismic activity affecting an adjacent water body.

3.6.1 Method A potential tsunami flood is evaluated for CNP consistent with the Hierarchical Hazard Assessment (HHA) approach ofNUREG/CR-7046 (NRC, 2011). Analysis for tsunami hazard was performed based on NUREG/CR-6966 "Tsunami Hazard Assessment at Nuclear Power Plant Sites in the United States of America" (NRC, 2009) and JLD-ISG-2012-06 (NRC, 2013) related guidance.

A single assumption made for this analysis is that the amplitude of the drawdown from a tsunami-like wave is no larger than that of the runup (9 ft) for CNP.

3.6.2 Tsunami Results A study was done to provide a basis for screening of a tsunami for the CNP site, following the hierarchical-hazard assessment (HHA) approach described in NRC, 2009 and related guidance, NRC, 2013.

With respect to tsunamis, the HHA is considered as a series of three tests or steps:

1. Is the site region subject to tsunamis?
2. Is the plant site affected by tsunamis?
3. What are the hazards posed to safety of the plant by tsunamis?

The first step is a regional screening test. If the site region is not subject to tsunamis, no further analysis for tsunami hazards is required. If the answer is yes, or undetermined based on available information, an analysis of the tsunami hazard is required in the second step.

The second step is a site screening test. The step determines whether structures, systems and components (SSCs) important to safety of the plant are exposed to hazards from tsunamis. If the answer is no, then no further action is required; If the answer is yes, however, then an additional analysis of the tsunami hazard is required in the third step.

The third step is a refined assessment, in which site-specific analyses are carried out to determine hazards posed by the Probable Maximum Tsunami (PMT) to the SS Cs important to safety of the plant and to determine whether any protection is required. The step involves postulation of PMT source mechanisms, estimation of PMT source characteristics, initiation of the PMT wave, propagation of the PMT wave from the source toward the site, and estimation of tsunami hazards at the site.

3.6.2.1 Regional Survey The Lake Michigan region was evaluated for the potential for tsunami occurrence. A regional survey and assessment of tsunamigenic sources was performed to determine the potential that a tsunami may pose a hazard to the CNP site. The regional survey was performed in four parts: 1) Review the Global Historical Tsunami Database, maintained by the National Oceanic Atmospheric Administration's National Geophysical Data Center (NGDC); and assessment of the mechanisms likely to cause a tsunami: 2) earthquake, 3) landslide, and 4) volcano.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 66of101 3.6.2.2 NGDC Database Review As an inland site, CNP need only consider the possibility of a tsunami-like wave in water bodies in the region (NRC, 2009). As a result, the regional survey based on a tsunami database (NOAA, 2013a) considered tsunami-like waves in the area around the Great Lakes.

Seven events in or near the Great Lakes are listed in the results of the regional survey (NOAA, 2013a). Two of the events on or near the Great Lakes (1823 and 1929) were confirmed as caused by emihquakes, two by meteorological conditions (1952 and 1954), one by a landslide (1912), and the two remaining unknown (1755 and 1884). The maximum event water height increase (1954) was nearly 10 ft. (3.00 m) in Lake Michigan and was related to a meteorological event. The maximum event water height related to an earthquake was 9 ft. (2.74 m) in.

Lake Erie (1823).

The seven events in the survey region produced 15 runup events, i.e., locations where tsunami-like effects occurred due to the tsunami source event (NOAA, 2013a). The 1811 runup was caused by an earthquake that occurred well outside the region (AREVA, 2013). As a result, the 1811 event was not part of the regional survey results. The most common landslide mechanism is an earthquake (NRC 2009).

3.6.2.3 Earthquakes To generate a major tsunami, a substantial amount of slip and a large rupture area is required. Consequently, only large emihquakes with magnitudes greater than 6.5 generate observable tsunamis (NRC 2009).

The CNP Updated Final Safety Analysis Report indicates that seismicity of the CNP region is low (CNP, 2013).

Only three recorded earthquakes with epicentral Modified Mercalli Intensities (MMI) of V or greater have OCC(urred within approximately a 100-mile radius of the CNP site (CNP, 2013). The largest earthquake within 200 miles of the site had a maximum MMI of VII-VIII, and occurred 165 miles from the CNP site, equivalent to a magnitude of 6.0 to 7.0 (USGS, 2013b).

Updated seismological information for neighboring states south of and relevant to CNP is presented in the Safety Evaluation Rep01i (SER) for the Exelon Generation Company Early Site Permit (ESP) application (NRC, 2006).

The ESP site is located at the existing Clinton Power Station in east-central Illinois, about 170 miles southwest from CNP. The SER describes that region as one of moderate to large seismicity. Historical and estimated centers oflarge prehistoric earthquakes have occurred but well south and southeast of the ESP site (NRC, 2006, Figure 2.5.1-4). That study indicates that the largest regional seismic event was a magnitude 6.5, nearly 200 miles south of the CNP site (NRC, 2006).

Seismic activity outside the region was also considered because it could also produce tsunami like waves within the region (USGS, 2013a); for example, seismic waves from the Alaska earthquake of 1964 caused water bodies to oscillate at many places in North America. Favorable conditions for seismic seiche generation include thrust faults and locations controlled by structural uplifts and basins (USGS 2013a). The Lake Michigan region,.

however, lacks such features.

3.6.2.4 Landslides Two broad categories of landslides exist: (1) subaqueous that are initiated and progress beneath the surface of the water body, and (2) subaerial that are initiated above the water and impact the water body during their progression or fall into the water body. In addition, landslide-generated tsunami-like waves have a very strong directivity in the direction of mass movement. Therefore, the outgoing wave from the landslide source propagates in the direction of the slide (NRC, 2009).

AEP --D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision I Page 67 of 101 Also, the amplitude of the outgoing wave from a landslide is affected by the terminal velocity of the movement, which in turn is a function of the repose angle, i.e., the slope angle (NRC 2009). The steeper the slope angle, the greater the tenninal velocity, and vice versa.

For Lake Michigan, the range of glacial soils present is enveloped by those described by (Evans, 1995) (very fine to very coarse: clays to sand and gravel). His condusions are summarized as follows:

"The limiting slope angle in the clays is estimated to be 15.7 degrees (1 in 3.6) above 6.5 m below the natural seabed and 36.9 degrees (1 in 1.3) below this depth. For a cohesive submarine slope the limiting slope angle is between 27 degrees (1 in 2) and 29 degrees (1 in 1.8).

In the absence of external forces the limiting angle for the sands and gravels will be the friction angle, cp, i.e., 32.5 degrees (1 in 1.6) to 36 degrees (1 in 1.4)."

These cited slope angles provide a benchmark for slopes with failure potential in a seismic event. Based on Evans 1995, it is conservatively concluded that the angles ofrelevant subaqueous slopes present in Lake Michigan of less than 10 degrees do not approach sufficient steepness to provide an unstable slope condition that would result in a slope failure having a terminal velocity sufficient to produce a tsunami-like wave.

Additionally, the potential mass of a landslide is considered. The mass is a function of the bathymetric or topographic relief and the scale of the relief correlates directly with the mass. The larger the relief the more mass available and the smaller the relief the less mass available. Relevant conditions are described in subsections below.

3.6.2.5 Subaqueous Landslide - Lake Michigan Bathymetry Studies considered the bathymetry of three areas of Lake Michigan: 1) the Chippewa Basin and the region to the north, 2) the Mid Lake Plateau, and 3) the South Chippewa Basin (NOAA 2013b & c).

The Chippewa Basin extends northward from the Two Rivers Ridge almost to the outflow point of the now-submerged Mackinac Channel (AREVA, 2013). Depths in excess of 275m (900 ft) are reached near the southern end of the basin. There are numerous ridges throughout the basin with the potential to produce a subaqueous landslide. However, the ridge locations, directional trending, and slopes make it unlikely that observable tsunami-like waves would be generated. The trending of ridges in the southern end of the basin is similar, with orientations that direct given a subaqueous landslide away from CNP. The only E-W trending ridge, the Door-Leelanau Ridge, has a slope ofless than 2 degrees, a configuration judged unlikely to generate an observable tsunami-like wave.

The Mid Lake Plateau (AREVA, 2013) is a broad, relatively flat-topped ridge, which has lake depths of less than 90m (295 ft) and extends upward to minimum depths of 40-60m (131 to 197 ft). The steepest gradients occur on the n01ihwest portion of the plateau abutting the Milwaukee Basin. The maximum slope in these gradient areas is about 2 degrees (AREVA, 2013). A subaqueous landslide in the area would be directed westward or eastward away from CNP.

The South Chippewa Basin, unlike the Chippewa Basin and Mid Lake Plateau, is characterized by linear bathymetry with-uniform gradients. The maximum slope of gradients is in the SW portion of the basin, where the gradients trend NNE-SSW. Thus, a potential landside would be directed ESE toward CNP. However, the steepest slope in the area is less than 2 degrees and has a relief of only lOm (33 ft). Thus any landslide would be unlikely to generate an observable tsunami-like wave.

3.6.2.6 Volcanoes The Global Historical Volcano Database, also maintained by the NGDC, was used to conduct a regional survey to determine if volcanic activity could be a mechanism to produce a tsunami or tsunami-like wave (NOAA 2013a).

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 68of101 The database survey area reviewed was the same as for the tsunami regional survey. No data were found (NOAA 2013a).

3.6.3 Conclusions Based on historical records and the information above, the following conclusions are made:

  • As an inland site, the CNP site is not subject to oceanic tsunamis; however, tsunami-like waves (seiches) have occurred in the Great Lakes region. Most of the reported waves were caused by meteorological conditions, but two were related to ea1ihquakes and one to a landslide.
  • Tsunami-like waves generated from:

o an earthquake are limited because the required level of seismic activity for development of a tsunami, i.e., an earthquake with a magnitude greater than 6.5, is essentially absent within a l 00-mile radius of the CNP site; 0 a subaqueous landslide is unlikely to generate an observable tsunami-like wave due to the limited bathymetric relief of ridges and their respective slopes and orientation; and o a subaerial landslide around the west, nmih, and east perimeter of the Lake Michigan is unlikely to affect CNP because topographic trends would direct any resultant tsunami-like wave away from the site. The exception is the southwest lake perimeter, where the topography is oriented such that a landslide and resultant tsunami-like wave, if it occurred, would be directed toward CNP. However, given a landside, it would cause little, if any, effect to the CNP site because of the limited topographic relief and slope angles.

Notwithstanding the occurrence of tsunami-like waves, the potential effects on the CNP site (wave runup, drawdown, and other effects assessed) are negligible because there is sufficient physical margin to protect SSCs important to safety. The margin is based on the maximum recorded tsunami-like wave resulting from an eaiihquake in the Great Lakes region occurring coincident with the maximum and minimum lake levels as it applies to the tsunami-like wave runup and drawdown, respectively. The study indicates a tsunami water elevation of 592.3 ft considering a peak base lake level of elevation 583.3 ft. If the derived tsunami elevation is added to the design-basis maximum monthly mean water elevation of 583 .6 ft (AREVA, 2014), the tsunami water elevation would be 593.7 ft. This elevation is lower than the top elevation of the seawall protecting CNP from Lake Michigan, of 594 ft.

3.6.4 References AREVA, 2013. Tsunami Hazard Assessment at Cook Nuclear Plant Site, AREYA Document No.: 51-9210054-000, CNP Document No.: MD- 12 -FLOOD-003-N, Revision 0.

AREVA, 2014. Surge and Seiche, Cook Nuclear Plant Flood Hazard Re-evaluation, AREYA Document 32-9208453-000, CNP Doc. No. MD-12-FLOOD-006-N CNP, 2013. D.C. Cook Nuclear Plant Updated Final Safety Analysis Repmi (UFSAR), Docket Nos. 50-315 and 50-316, Revision 25, September 9, 2013. (AREVA Doc. No. 38-9210897-001)

Evans, 1995. Stability of Submarine Slopes, Geotechnical Engineering Office, Civil Engineering Department GEO REPORT No. 47, extracted from GEO Special Project Report No. SPR 4/94, Evans, N. C., June 1995.

NOAA, 2013a. National Oceanic Atmospheric Administration, National Geophysical Data Center, Tsunami Database; Available at: http://www.ngdc.noaa.gov/hazard/tsu_db.shtml; Accessed June 19, 2013.

NOAA, 2013b. National Oceanic Atmospheric Administration, National Geophysical Data Center, Bathymetry Website: http://www.ngdc.noaa.gov/mgg/greatlakes/greatlakes.html; Accessed June 18, 2013.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 69 oflOl NOAA, 2013c. National Oceanic Atmospheric Administration, National Geophysical Data Center, Lake Michigan Bathymetry Website: http://www.ngdc.noaa.gov/mgg/greatlakes/lakemich_ cdrom/html/geomorph.htm; Accessed June 18, 2013. (See AREVA, 2013TS, Figures 3 - 5).

NRC, 2006. U.S. Nuclear Regulatory Commission, NUREG-1844, Safety Evaluation Report for an Early Site Permit (ESP) at the Exelon Generation Company, LLC (EGC) ESP Site, Section 2.5, Geology, Seismology, and Geotechnical Engineering, May 2006 (ADAMS Accession No. ML061210203).

NRC, 2009. U.S. Nuclear Regulatory Commission, NUREG/CR-6966, Tsunami Hazard Assessment at Nuclear Power Plant Sites in the United States of America, March 2009. (ADAMS Accession No. ML091590193).

NRC, 2011. U.S. Nuclear Regulatory Commission NUREG/CR-7046: Design-Basis Flood Estimation for Site Characterization at Nuclear Power Plants in the United States of America", Springfield, VA, National Technical Information Service, 2011 (ADAMS Accession No. ML11321A195).

NRC, 2013. U.S. Nuclear Regulatory Commission, Japan Lessons-Learned Project Directorate, JLD ISG-2012-

06. Guidance for Performing a Tsunami, Surge, or Seiche Hazard Assessment. Interim Staff Guidance, Revision
0. January 2013, ADAMS Accession No. ML12271A036).

USGS, 2013a. U.S. Geological Survey, Seismic Seiches, Website:

http://earthquake.usgs.gov/learn/topics/seiche.php; Abridged from Earthquake Information Bulletin, January-February 1976, Volume 8, Number 1; Accessed June 18, 2013.

USGS, 2013b. U.S. Geological Survey, Modified Mercalli Intensity Scale, Website:

http://www.geo.mtu.edu/UPSeis /mercalli.html; Accessed June 19, 2013.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 70 of 101 3.7 Ice-Induced Flooding This section addresses the potential impact of ice-induced flooding at CNP (AREVA, 2014a). Ice-induced flooding analysis addresses the potential for flooding due to ice accumulation, forces and blockages.

3.7.1 Method A potential ice-dam induced flood is evaluated for CNP consistent with the Hierarchical Hazard Assessment (HHA) approach ofNUREG/CR-7046 (NRC, 2011). Further, NUREG/CR-7046 notes that at this time it is not possible to predict a probable maximum ice jam or dam accurately and, therefore, recommends that historical records of ice jams and dams be searched to determine the most severe historical event in the vicinity of the site.

Conditions warranting attention for this evaluation include:

  • There are no perennial streams on the CNP site (CNP, 2013) or nearby (USGS, 2011) where ice could accumulate.
  • The CNP plant has no history of ice-induced flooding (CNP, 2014).

Per the HHA, Step 1, Lake Michigan is assessed based on the conservative assumption that ice formation might result in site flooding. Relative to ice-flooding issues, NUREG/CR-7046 notes that at this time it is not possible to predict a probable maximum ice jam or dam accurately and, therefore, recommends that historical records of ice jams and dams be searched to determine the most severe historical event in the vicinity of the site. The historical record is thus assumed as a basis for this report.

3.7.2 Results 3.7.2.1 Local and Regional Screening There are no perennial streams on the CNP site (CNP, 2013) or nearby (USGS, 2011) where ice could accumulate.

Seasonal surface ice formation is typical on Lake Michigan. Surface ice formation typically proceeds from the shore outwards toward the center of the lake. Depending on the duration and intensity of freezing conditions on and around the lake, the extent of the ice cover can vary widely, depending on the severity of freezing conditions during the winter months. The extent of the ice cover on Lake Michigan is monitored in terms of the percentage of the surface area of the lake that is covered by ice.

While conditions exist for the formation of frazil ice along the Lake Michigan shoreline at the site and ice commonly forms* along the lake shore in winter, neither that condition nor the potential for frazil ice is judged to provide a configuration that could promote site flooding. The elevation difference between the lake and Protected Area grade is 10 to 17 ft below the lowest area of plant grade at CNP at elevation 594 ft based on historical lake levels (NOAA, 2013). Thus the Protected Area grade is too far removed above the lake elevation to promote flooding due to ice formation on the lake or along its shoreline. Since no streams exist on the CNP site, damming of streams by ice is not a credible event.

3.7.2.2 Review of Historical Ice Events Historical records of ice formation were reviewed for both Lake Michigan and local tributaries to the lake. Lake Michigan surface ice is common during winter and can vary over most of the lake's surface from 10% or less to 90% or more, with the surface ice cover forming from the shore outwards toward the center of the lake. But

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 71of101 because the lake surface is well below the lowest elevation of plant grade, surface ice on the lake is not likely to provide any flooding impact on the CNP SSCs important to safety.

There are no perennial streams close to the site that would provide the potential of ice induced flooding at the CNP site. The nearest historical ice jams data on record in the site vicinity occurred on the St. Joseph River (AREVA, 20 l 4a), more than 10 miles by water north of the site and thus impact on flooding for the CNP plant is not possible due to icing there.

The CNP plant has no historical records of flooding issues due to lake ice affecting the plant (CNP, 2014).

3.7.3 Conclusions

  • Because the lake surface is well below the lowest elevation of plant grade, there is negligible risk that surface ice will result in any flooding impact on the CNP plant.
  • There are no perennial streams close to the site that would contribute to the potential of ice induced flooding at the CNP site. Surface runoff is minor, and is restricted to a small intermittent stream that traverses the eastern portion of the site and discharges into Lake Michigan via Thornton Valley and the Grand Marais Lakes.
  • Any potential for ice flooding at CNP, related to Lake Michigan, can inherently understood to be significantly bounded by flooding due to Storm Surge (AREVA, 2014b). As described in Sec. 3.8 of NUREG-7046 (NRC, 2011 ), such a condition eliminates fmiher need for analysis for the ice-induced flood.
3. 7.4 References AREVA, 2014a. Ice Induced Flooding at the D.C. Cook Nuclear Power Plant Units 1 and 2, AREVA Document No.: 51- 9208865-000, CNP Document No.: MD-12 -FLOOD-007-N, Revision 0.

AREVA, 2014b. Surge and Seiche, Cook Nuclear Plant Flood Hazard Re-evaluation, AREVA Document 32-9208453-000, CNP Doc. No. MD-12-FLOOD-006-N.

CNP, 2013. "D.C. Cook Nuclear Plant Updated Final Safety Analysis Report (UFSAR)," Docket Nos. 50-315 and 50-316, Revision 25, September 9, 2013. (AREVA Doc. No. 38-9210897-001).

CNP, 2014. Lake Ice-Induced Flood History, AEP Design Information Transmittal DIT-B-03579-00, February 7, 2014 (AREVA Doc. No. 3 8-92193 80-000).

NOAA, 2013. Great Lakes Water Level Dashboard Data Download Portal, Lake Michigan-Huron, National Oceanogi*aphic and Atmospheric Administration, date accessed August 12, 2013, http://www.glerl.noaa.gov/data/now/wlevels/dbd/GLWLDDataDownloads2.html.

NRC, 2011. U.S. Nuclear Regulatory Commission "NUREG/CR-7046: Design-Basis Flood Estimation for Site Characterization at Nuclear Power Plants in the United States of America", Springfield, VA, National Technical Information Service, 2011 (ADAMS Accession No. ML11321A195).

USGS, 2011. Bridgman Michigan Topographic Quadrangle Map, Michigan-Berrien County, 7.5 Minute Series, 1:24,000, US Geological Survey.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 72of101 3.8 Channel Migration or Diversion Cooling water canals and channels are not part of the CNP plant design; therefore, this mechanism was not evaluated.

3.9 Groundwater Intrusion This section addresses the potential flooding impact of at CNP due to groundwater intrusion (AREVA, 2014a).

Groundwater analysis evaluated the potential for flooding due to an increase in groundwater level as a result of a site flood.

Groundwater intrusion into safety related structures is not considered a credible source during flooding events for CNP due to the inclusion of a water-proofing membrane on the exterior of subsurface foundations of the containment and auxiliary building structures. The effectiveness of that membrane waterproofing design is evaluated for this condition.

The portion of the containment building which is below the ground water table (GWT) has been waterproofed by means of a PVC 40 mil plastic membrane; the top of the membrane is at elevation 606 ft. Because of seasonal fluctuations in GWT, the membrane was applied well above the highest known GWT elevation (CNP, 2013a Section 5.2.2.6). The membrane placed under the mat extends up and around the walls and is taped to the membrane placed on the outside of the walls, thus providing a continuous waterproof surface (CNP, 2013a Section 5.2.2). This membrane extends at least 5 ft above the maximum known GW level. The water-proofing used provides adequate protection against flooding of areas located below the highest GW level (CNP, 2013a).

3.9.1 Method Potential flooding due to groundwater level increase is evaluated for CNP consistent with the Hierarchical Hazard Assessment (HHA) approach ofNUREG/CR-7046, Section 2 (NRC, 2011).

The method used to address this issue, by means of a beyond-design-basis (BDB) maximum groundwater level is to:

1. Review plant design documents and flooding walkdown results to determine if historical groundwater leakage with potential to impact safety-related plant structures has occurred or is anticipated to occur.
2. Estimate a BDB maximum groundwater level at the site based on existing groundwater monitoring data and related historic lake levels.
3. Compare designed groundwater protection features to BDB maximum groundwater levels at the site.

CNP does not have any site drainage or dewatering system that is relied upon to control the groundwater level.

An increase in the groundwater elevation at the site is conservatively assumed for this analysis to be due to a depth of precipitation from the Local Intense Precipitation (LIP) event (25.5 inches) that was computed based on HMR 51 and HMR 52 and thus a value larger than the LIP level based on the site-specific PMP discussed in Section 3.1 of this report. All rainfall is assumed to infiltrate and raise the groundwater table by a proportional amount, modified for porosity percentage (43%). The membrane waterproofing is assumed to be functioning per design. A groundwater level at the shoreline of Lake Michigan is assumed to be equal to a probable maximum lake elevation of 583.24 ft (AREVA, 2014b).

A review of the groundwater protection program at CNP (CNP, 2012) interpolated a groundwater surface contour map for the site based on the site groundwater monitoring well network. Based on monitoring well data, the groundwater elevation at CNP site monitoring well MW-27 was 594.2 ft (CNP, 2012) in November 2012 had a mean Lake Michigan water level of 577.28 ft (NOAA, 2013), rounded to 577.3 ft. The November 2012 mean lake level is 6.0 ft lower than the probable maximum lake level of 583.24 ft (AREVA, 2014b).

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 73 oflOl Assumptions for this analysis were all verified:

e The increase in the groundwater elevation at the site is assumed to be equal to increases to the lake level consistent with standard groundwater behavior in porous soils.

  • The depth of precipitation from the Local Intense Precipitation (LIP) event is assumed to infiltrate and raise the groundwater table by a proportional amount, modified for porosity percentage.
  • The porosity of the dune sand water-bearing unit at CNP is assumed to be the arithmetic mean of porosity values for fine sands indicated in NUREG-3332 Table 4.3 (NRC, 1983). This value is 43%.
  • The membrane waterproofing is assumed to be functioning per design.
  • A groundwater level at the shoreline of Lake Michigan is assumed to be equal to a probable maximum lake level of 582.3 ft IGLD85. This is based on the Surge and Seiche, Cook Nuclear Plant Flood Hazard Re-evaluation calculation (AREVA, 2014b).

3.9.2 Results Based on the conservative assumption that the maximum groundwater level varies directly with lake level, the maximum groundwater level at CNP can be inferred to be 600.2 ft NGVD29:

594.2 ft+ 6.0 ft= 600.2 ft elevation Therefore, total infiltration of the LIP rainfall is inferred to increase the potential MW-27 groundwater elevation by 4.95 ft to 605.2 ft (LIP depth divided by porosity).

25.5 inches I 0.43 = 59.3 inches I 12 inches/ft= 4.95 ft 600.2 ft+ 4.95 ft= 605.2 ft elevation A groundwater elevation of 605.2 ft is considered to be a potential maximum groundwater level at MW-27, which also represents a potential maximum groundwater level in the vicinity of safety-related plant structures.

Based on the potential BDB maximum groundwater elevation of 605.2 ft at monitoring well MW-27, safety-related structures at CNP have a minimum margin of 0.8 ft from the minimum membrane waterproofing protection elevation of 606 ft (CNP, 2013 b).

Membrane Elevation 606 ft- Groundwater Elevation 605.2 ft= Margin 0.8 ft 3.9.3 Conclusions Evaluation of the potential beyond design basis maximum groundwater elevation with respect to the minimum elevation of membrane waterproofing of safety-related structures indicates a minimum 0.8 ft physical margin.

3.9.4 References AREVA, 2014a. Flooding Due to Groundwater Level Increase, Cook Nuclear Plant Flood Hazard Re-evaluation, CNP Document No.: MD-12 -FLOOD-008-N, Revision 1.

AREVA, 2014b. Surge and Seiche, Cook Nuclear Plant Flood Hazard Re-evaluation, AREVA Document 32-9208453-000, CNP Doc. No. MD-12-FLOOD-006-N.

CNP, 2012. "Hydrogeologic Review of Groundwater Protection Program", Donald C. Cook Nuclear Power Plant, Environmental Resources Management, December 2012. (AREVA Doc. No. 38-9217180-000).

CNP, 2013a. "D.C. Cook Nuclear Plant Updated Final Safety Analysis Report (UFSAR)," Docket Nos. 50-315 and 50-316, Revision 25, September 9, 2013. (AREVA Doc. No. 38-9210897-001).

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 74of101 CNP, 2013b. Containment and Auxiliary Building Exterior Waterproofing, AEP Design Information Transmittal, DIT-B-03572-00, December 17, 2013. (AREVA Doc. No. 38-9217092-000).

NOAA, 2013. "Great Lakes Water Level Dashboard", National Oceanic and Atmospheric Administration, http://www.glerl.noaa.gov/data/now/wlevels/dbd/, accessed December 6, 2013.

NRC, 1983. U.S. Nuclear Regulatory Commission, NUREG-3332, "Radiological Assessment; A Textbook on Environmental Dose Analysis", September 1983 (ADAMS Accession No. ML091770419).

NRC, 2011. U.S. Nuclear Regulatory Commission "NUREG/CR-7046: Design-Basis Flood Estimation for Site Characterization at Nuclear Power Plants in the United States of America, Springfield, VA, National Technical Information Service, 2011 (ADAMS Accession No. ML11321A195).

3.10 Combined Effect Flood This section summarizes the Combined Effect Flood evaluation (AREVA, 2014a). All combined effect flood scenarios are evaluated and relevant combined-effects are addressed and quantified. Combined effect flood that is for a combination of flood causing mechanisms, is defined in NUREG/CR-7046, (NRC, 2011). In addition to those listed in NRC, 2011, additional plausible combined events are considered on a site specific basis and should be based on the impacts of other flood causing mechanisms and the location of the site.

3.10.1 Method A potential combined effect flood is evaluated for CNP consistent with the Hierarchical Hazard Assessment (HHA) approach ofNUREG/CR-7046 (NRC, 2011). Based on Section 3.9 and Appendix H ofNRC, 2011 a screening for potential combinations of flooding hazards was made.

Dependent events such as wind waves, precipitation, snowpack, high tides, and storm surges (Appendix H of NRC, 2011) can occur concurrently. The five sets of Combined-Effect Floods potentially pertinent to CNP and listed in NRC, 2011 were evaluated:

  • H.1 Floods Caused by Precipitation Events (on Rivers and Streams)
  • H.2 Floods Caused by Seismic Dam Failures
  • H.3 Floods along the Shores of Open and Semi-Enclosed Bodies of Water
  • H.4 Floods along the Shores of Enclosed Bodies of Water
  • H.5 Floods Caused by Tsunamis Guidance also provides for analysis of local or site-specific flooding hazard combinations; in that case the Infiltration Pond (a natural pond) on the site was evaluated for overflow and pond bank stability in an LIP event.

Due to the location of CNP on the Lake Michigan shoreline and the absence of any perennial streams or rivers in its vicinity, only item H.4, Floods along the Shores of Enclosed Bodies of Water, and a site-specific issue of a precipitation causing :flooding from the Infiltration Pond (a natural pond) on site were addressed.

Assumptions made for this work were all verified. They are:

  • For CNP, 2013, General Notes: Elevations Indicate U.S.G.S. Datum". CNP Vertical Datum (U.S.G.S Datum) is assumed to be equivalent to NGVD29.
  • For CNP, 1986, elevations are assumed to be consistent with other site drawings (in NGVD29 Vertical Datum).

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 75of101 3.10.2 Results Results for combined effect flood categories screening are presented in "Table 3-4: Results for Combined Effect Categories Screening". The two relevant scenarios were addressed in detail.

3.10.2.1 H.4, Floods along the Shores of Enclosed Bodies of Water CNP is located along the shore of an enclosed body of water (Lake Michigan). NRC, 2011, Section H.4 defines potential combined effects for a shore location as a combination of:

  • Probable maximum surge and seiche with wind-wave activity
  • The lesser of the 100-year or the maximum controlled water level in the enclosed body of water.

From the CNP Surge and Seiche Calculation (AREYA, 2014b), the Probable Maximum Surge and Seiche is 6.90 ft. Probable Maximum Wave Runup and Setup (wind-wave activity) is 3.0 ft (AREVA, 2014b).

The 1x10-6 exceedance Lake Michigan elevation, which is higher than the 100-year water level, is 583.24 ft.

Adding the Probable Maximum Surge and Seiche and Probable Maximum Wave Runup and Setup with the Probable Maximum Lake level yields a combined effect flood level of elevation 593.3 ft.

The computed combined-effects surge and seiche, wind-wave activity, and Probable Maximum Lake level (elevation 593.3 ft) is lower than the lowest elevation of site grade at the CNP seawall, which was built at an elevation of 594.0 ft and lower than the CDB for flooding at CNP, elevation 594.6 ft.

3.10.2.2 Site-Specific Combined-Effects: Infiltration Pond Site-specific combined-effects were evaluated for the Infiltration Pond (a natural pond) on the CNP site. The topography surrounding CNP is unique in that the undulating sand dunes on the east shore of Lake Michigan provide a disconnected topography which is characterized by hills and valleys occasionally forming isolated surface water bodies.

Distinctive topography and drainage patterns of the sand dunes in the vicinity of CNP results in a series of natural ponds located southeast from the CNP Protected Area. "Figure 3-17: Natural Ponds Southeast from CNP" shows the natural ponds in relation to the southern portion of the CNP Protected Area. The closest natural pond, shown in "Figure 3-18: Natural Pond Flowpath Away from CNP" is located approximately 500 ft southeast from the Protected Area at an elevation of 617 .1 ft. The pond is used by the plant for the infiltration of clean plant discharge and is termed the Infiltration Pond.

The combined-effect investigated is an LIP leading to overflow from the Infiltration Pond or potential failure of the embankment separating the Infiltration Pond from the Protected Area. Such an overflow or failure could add to surface runoff to the Protected Area.

The following conditions exist for the Infiltration Pond shown in "Figure 3-17: Natural Ponds Southeast from CNP" and "Figure 3-18: Natural Pond Flowpath Away from CNP":

  • A typical water surface elevation in the nearest natural pond is elevation 617 .1 ft.
  • The overflow drain at the southeast corner of that natural pond is at an elevation of 618 .4 ft.
  • The topographic saddle or lowest high point separating the natural pond from the CNP Protected area has an elevation of647.0 ft.
  • Overflow for the pond is away from the Protected Area

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 76of101 3.10.2.3 Infiltration Pond Capacity Considering the topography surrounding the Infiltration Pond, a PMP event producing 20.2 inches of rain in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> would not begin to challenge the maximum capacity of the pond nor would it come close to raising the Infiltration Pond water surface level to the crest of the 40 ft tall embankment which separates the Infiltration Pond from the CNP Protected Area. Overflow away from the CNP Protected Area towards the next natural pond (water surface elevation 611.6 ft, AREVA, 2014a) in a southeasterly direction begins at a pond elevation of 618.4 ft when the overflow becomes inundated.

3.10.2.4 Dune Slope Stability A distance of 138 ft from the 647.0 ft elevation of the saddle (top of embankment) to the 612 ft elevation at the bottom of the hill southeast from the Supplemental Diesel Generators leads to a dune slope of 14 degrees on the plant side of the hill separating the nearest natural pond and the CNP Protected Area.

Slope= dy/dx = (647.0 ft-612.0 ft)/138 ft= 0.25 or 14° An unvegetated dune slope of 14 degrees is considered to be stable since it is only half as steep as the minimum 30° angle ofrepose (the point at which natural sediment embankments begin to become unstable) of the non-cohesive sandy material tested by the U.S. Department of Transportation Federal Highway Administration in their Highways in the River Environment guidance (USDOT, 2001 ).

3.10.3 Conclusions CNP is not susceptible to the H.4.1 Combined-Effect flooding hazard as the combined effect flood is lower than both the lowest site grade and the CDB for seiche flooding.

CNP is not susceptible to a flooding hazard resulting from overflow or slope failure of the natural pond used for infiltration at the south side of the CNP site (AREVA, 2014a).

3.10.4 References AREVA, 2014a. Combined Effects Flooding, Cook Nuclear Plant Flood Hazard Re-evaluation, AREVA Document 32-9221721-000, CNP Doc. No. MD-12-FLOOD-010-N.

AREVA, 2014b. Surge and Seiche, Cook Nuclear Plant Flood Hazard Re-evaluation, AREVA Document 32-9208453-000, CNP Doc. No. MD-12-FLOOD-006-N.

CNP, 1986. "Topographic Survey March 1986 Sheet 4 of9" (Status Approved). CNP Document No. 12-3000C, Revision 0.

CNP, 2013. "D.C. Cook Nuclear Plant Updated Final Safety Analysis Report (UFSAR)," Docket Nos. 50-315 and 50-316, Revision 25, September 9, 2013. (AREVA Doc. No. 38-9210897-000).

NRC, 2011. U.S. Nuclear Regulatory Commission "NUREG/CR-7046: Design-Basis Flood Estimation for Site Characterization at Nuclear Power Plants in the United States of America, Springfield, VA, National Technical Information Service, 2011 (ADAMS Accession No. ML 11321Al95).

USDOT, 2001. "River Engineering for Highway Encroachments - Highways in the River Environment", U.S.

Department of Transportation, Federal Highway Administration, Richardson, E.V., Simons, D.B., Lagasse, P.F.

Publication No. FHWA NHI 01-004, December 2001.

AEP - D. C. Cook uclear Plant MD-12-FLOOD-01 1-N Revision I Page 77 of IOI Figure 3-17: Natural Ponds Southeast from CNP

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011 -N Revision 1 Page 78of101 Figure 3-18: Natural Pond Flowpath Away from CNP Any illegible text is not pertinent to the figure.

AEP - D. C. Cook Nuclear Plant l\ID-12-FLOOD-011-N Revision 1 Page 79 of 101 Table 3-4: Results for Combined Effect Categories Screening Screened as Applicable Not Applicable and Addressed in Calculations B.1 Floods Caused by Precipitation Events (River Flooding)

H.1 Alternative 1 not streamside NIA H.1 Alternative 2 not streamside NIA waves not an issue, snowpack addressed with LIP H.1 Alternative 3 not streamside NIA waves not an issue, snowpack addressed with LIP B.2 Floods Caused by Seismic Dam Failures H.2 Alternative 1 H.2 Alternative 2 I no dams NIA no dams NIA B.3 Floods Along the Shores of Open and Semi-Enclosed Bodies of Water H.3.1 Shore Location not on Open Body of Water NIA H.3.2 Streamside Location Alt 1 not on Open Body of Water NIA H.3.2 Streamside Location Alt 2 not on Open Body of Water NIA H.3.2 Streamside Location Alt 3 not on Open Body of Water NIA H.3.2 Streamside Location Alt 4 not on Open Body of Water NIA B.4 Floods Along the Shores of Enclosed Bodies of Water

' H.4.1 Shore Location Applicable and addressed H.4.2 Streamside Location Alt 1 not streamside NIA H.4.2 Streamside Location Alt 2 not streamside NIA H.4.2 Streamside Location Alt 3 not streamside NIA B.5 Floods Caused by Tsunamis H.5.1 Shore Location Inland Site Tsunami NIA H.5.2 Streamside Location Alt 1 Inland Site Tsunami NIA H.5.2 Streamside Location Alt 2 Inland Site Tsunami NIA H.5.2 Streamside Location Alt 3 Inland Site Tsunami NIA H.5.2 Streamside Location Alt 4 Inland Site Tsunami NIA Site Specific Combined-Effects Natural Ponds l Applicable and addressed

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 80of101 4.0 FLOOD PARAMETERS AND COMPARISON WITH CURRENT DESIGN BASIS The current design basis (CDB) for CNP only considers a seiche flood (Section 2.3 of this report). The following flood mechanisms were addressed in response to the 10 CFR 50.54(+/-) letter (NRC, 2012a):

LIP PMF Dam Breaches or Failures Storm Surge and Seiche Tsunamis Ice-Induced Flooding Channel Migration or Diversion Groundwater Intrusion Failure of an onsite pond (Infiltration Pond)

Combined Effect Flood All of the above flooding mechanisms were determined to be either screened out (not applicable) or below the CDB flood elevation of 594.6 ft with the exception of LIP. The findings from Enclosure 4 of the 50.54(+/-) letter (i.e., Recommendation 2.3 flooding walkdowns) support this determination. Details are provided in Section 4.1. ofthelO CFR 50.54(+/-) letter requests the licensee to perform an integrated assessment of the plant's response to the reevaluated hazard ifthe reevaluated flood hazard is not bounded by the CDB (NRC, 2012a). This section provides comparisons with CDB flood hazard and applicable flood scenario per Section 5.2 of JLD-ISG-2012-05 (NRC, 2012b), LIP:

1. Flood event duration parameters (per Figure 6 ofNRC, 2012b, shown below,)
a. Warning time (may include information from relevant forecasting methods (e.g., products from local, regional, or national weather forecasting centers) and ascension time of the flood hydrograph to a point (e.g. intermediate water surface elevations) triggering entry into flood procedures and actions by plant personnel).
b. Period of site preparation (after entry into flood procedures and before flood waters reach site Protected Area grade).
c. Period of inundation.
d. Period ofrecession (when flood waters completely recede from site and plant is in safe and stable state that can be maintained).
2. Plant mode(s) of operation during the flood event duration.
3. Other relevant plant-specific factors (e.g. waterborne projectiles).

AEP - D. C. Cook Nuclear Plant

MD-12-FLOOD-011-N Revision 1 Page 81 oflOl flood event duration 1 ":,~=,:,,!~~ 1  ;~i:~u":n 1.:::S::,,"~1e 1 Conditions are met Arrival offload Water begins to Water completely for entry into flood waters on site recede from site receded from site.

procedures or and plant in safe notification of and stable state impending flood thatcan be maintained indefinitely Illustration of Flood Event Duration (from Figure 6 ofJLD-ISG-2012-05 NRC, 2012b)

Per Section 5.2 of JLD-ISG-2012-05 (NRC, 2012b), flood hazards do not need to be considered individually as pati of the integrated assessment. Instead, the integrated assessment should be performed for a set(s) of flood scenario parameters defined based on the results of the flood hazard reevaluations. In some cases, only one controlling flood hazard may exist for a site. In this case, licensees should define the flood scenario parameters based on this controlling flood hazard. However, sites that have a diversity of flood hazards to which the site may be exposed should define multiple sets of flood scenario parameters to capture the different plant effects from the diverse flood parameters associated with applicable hazards. In addition, sites may use different flood protection systems to protect against or mitigate different flood hazards. In such instances, the integrated assessment should define multiple sets of flood scenario parameters. If appropriate, it is acceptable to develop an enveloping scenario (e.g., the maximum water surface elevation ;md inundation duration with the minimum warning time generated from different hazard scenarios) instead of considering multiple sets of flood scenario parameters as part of the integrated assessment. For simplicity, the licensee may combine these flood parameters to generate a single bounding set of flood scenario parameters for use in the integrated assessment.

4.1 Summary of Current Design Basis and Flood Reevaluation Results This section compai*es the current and reevaluated flood-causing mechanisms. It provides a comparison of the CDB flood elevation to the reevaluated flood elevation for each applicable flood-causing mechanism. A comparison of the CDB elevations and the reevaluated flood elevations is provided in "Table 4-1: Flood Elevation Comparison".

4.1.1 Local Intense Precipitation Flood hazai*d due to local intense precipitation was not evaluated as part of the CDB; therefore no comparison can be made with the present day LIP results at CNP. "Table 4-2: LIP Flood Heights at Select Locations" gives LIP flood elevations at select locations. LIP reevaluation analysis is provided in AREVA, 2015. The LIP elevations at some locations are above the CDB elevation of 594.6 ft.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 82of101 4.1.2 Probable Maximum Flood on Rivers and Streams Flood hazard due to probable maximum flood on rivers and streams was not evaluated as part of the CDB; and is not applicable to the present day site. Justification, including basis for inputs and assumptions, methodologies and other pertinent data, is provided in AREVA, 2014b.

4.1.3 Storm Surge & Seiche Flood hazard from a weather-driven seiche (seiche) on Lake Michigan with a maximum height of 11 ft above record high lake level: a flood elevation of 594.6 ft is given in the CDB. The flood hazard reevaluation determined that a storm surge of 7.1 ft at a lxl0- 6 recurrence level elevation of 590.3 ft is the controlling coastal event. PMS&S reevaluation analysis is provided in AREYA, 2014c. The reevaluated PMS&S elevation is below the CDB flood elevation of 594.6 ft.

4.1.4 Dam Breaches and Failures Flood hazard due to dam breaches and failures was not evaluated as part of the CDB. The flood elevation due to dam breaches was conservatively determined to be 588.6 ft, 6 ft below the CDB elevation of 594.6 ft.

4.1.5 Tsunami A flood hazard elevation due to a tsunami was not evaluated as part of the CDB. The flood elevation due to a tsunami was conservatively determined to be 593.7 ft (Section 3.6.3) which is below the CDB elevation of 594.6 ft.

4.1.6 Ice-Induced Flooding Flood hazard due to ice-induced flooding was not evaluated as part of the CDB. Any potential for ice-induced flooding at CNP, related to Lake Michigan, would be significantly bounded by flooding due to Storm Surge (AREVA, 2014d); therefore, the flood elevation due to ice-induced flooding is below the CDB elevation of 594.6 ft.

4.1. 7 Groundwater Induced Flooding

  • Potential for flooding due to groundwater intrusion was recognized for the original plant design and waterproofing membrane is installed on subgrade foundation walls of major structures extending at least 5 ft above the maximum known GW level (approximately elevation 585 ft). Groundwater induced flooding reevaluation is provided in AREVA, 2014e and indicates that groundwater is below the membrane waterproofing of SSCs important to safety; therefore no SSCs important to safety will be impacted by groundwater induced flooding.

4.1.8 Channel Migration or Diversion Flood hazard due to channel migration or diversion was screened as part of the CDB and the Flood Hazard Reevaluation at CNP. No channels or diversions exist at the CNP site.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 83 of 101 4.1.9 Combined Effect Flood Flood hazard due to a combined effect flood was not evaluated as part of the CDB. Based on the reevaluation, the 1 x 10-6 exceedance Lake Michigan elevation, which is higher than the 100-year water level, is 583.24 ft. Adding the Probable Maximum Surge and Seiche and Probable Maximum Wave Runup and Setup with the Probable Maximum Lake level yields a combined effect flood level of elevation 593.3 ft.

The combined-effects surge and seiche, wind-wave activity, and Probable Maximum Lake level (elevation 593.3 ft) is lower than the lowest elevation of site grade at the CNP seawall, which was built at an elevation of 594.0 ft and lower than the CDB elevation of 594.6 ft. Combined Effects reevaluation analysis is provided in AREVA, 2014f.

The guidance for a combined effect flood assessment includes an evaluation of any other possible unique or site-specific flood mechanisms not included in the standard categories. For CNP, this includes the evaluation of a natural pond used for groundwater infiltration (Infiltration Pond) by the plant. The pond was determined to not be a source of flooding for the plant (AREVA, 2014f).

4.2 Conclusions Flooding reevaluation for CNP found surge/seiche flooding at a lower elevation compared with the CDB flood elevation. The evaluation for LIP, not done for the design basis, was found to result in adverse conditions at nine locations at:

  • Four rollup doors in the Turbine Building;
  • A rollup door on the north side of the Auxiliary Building; and
  • In the Unit 1 and 2 valve sheds associated with the RWST, PWST and CST tanks.

Reevaluated LIP flood water levels are above existing flood protection features or SSC elevations at the locations listed above. Per the results of this flood hazard re-evaluation for CNP, an Integrated Assessment will be required for LIP flooding only.

A CDI (Configuration Document Impact Assessment) was not performed for this revision to the report, as an existing CDI (AR 2016-9784-3) has already identified all impacted documents.

4.2.1 . References AREVA, 2014b. "Probable Maximum Flood (PMF) for Cook Nuclear Plant Flood Hazard Re-evaluation,"

AREVA Document No.: 51-9214479-000, CNP Document No.: MD-14-FLOOD-009-N, Revision 0, April, 2014.

AREVA, 2014c. Surge and Seic11e, Cook Nuclear Plant Flood Hazard Re-evaluation, AREVA Document 32-9208453-000, CNP Doc. No. MD-12-FLOOD-006-N AREVA, 2014d. Ice Induced Flooding at the D.C. Cook Nuclear Power Plant Units 1 and 2, AREVA Document No.: 51- 9208865-000, CNP Document No.: MD-12 -FLOOD-007-N, Revision 0.

AREVA, 2014e. Flooding Due to Groundwater Level Increase, Cook Nuclear Plant Flood Hazard Re-evaluation, CNP Document No.: MD-12 -FLOOD-008-N, Revision 1.

AREVA, 2014f. Combined Effects Flooding, Cook Nuclear Plant Flood Hazard Re-evaluation, AREVA Document 32-9221721-000, CNP Doc. No. MD-12-FLOOD-010-N, Revision 0.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 84of101 AREVA, 2015. "Site-Specific Local Intense Precipitation (SS LIP) for D.C. Cook Nuclear Plant," AREYA Document No.: 32- 9221898-001, CNP Document No.: MD-14-FLOOD-014-N, Revision 1.

NRC, 2012a. U.S. Nuclear Regulatory Commission, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(+/-) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review oflnsights from the Fukushima Dai-lchi Accident," March 2012 (ADAMS Accession No. ML12053A340).

NRC, 2012b. U.S. Nuclear Regulatory Commission, Japan Lessons-Learned Project Directorate, "JLD-ISG-2012-05, Guidance for Performing the Integrated Assessment for External Flooding, Interim Staff Guidance,"

Revision 0, 2012. (ADAMS Accession No. ML12311A214).

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 85of101 Table 4-1: Flood Elevation Comparison Mechanism CDB Flood Height Reevaluated Flood Height Difference Local Intense Precipitation Not evaluated for CDB Various across the site above CDB Installed Feature (see Table 4-2)

Pl\1F on Rivers and Streams Not evaluated for CDB Screened NA Dam Breaches and Failures Not evaluated for CDB 588.6 ft 6 ft below CDB Installed Feature Storm Surge Not evaluated for CDB 590.3 ft 4.3 ft below CDB Installed Features Seiche 594.6 ft MSL or NGVD29 590.3 ft 4.3 ft below CDB Installed Feature Tsunami Not evaluated for CDB 593.7 0.9 ft below CDB Installed Feature Ice-Induced Flooding Not evaluated for CDB <Storm Surge of 590.3 ft >4.3 ft below CDB Installed Feature Channel Migration or Not evaluated for CDB Screened NA Diversion Combined Effect Flood New Hazard Condition Stability and flood Not evaluated for CDB Screened NA potential for site's natural pond Storm surge, w/wave Not evaluated for CDB 593.3 ft 1.3 ft below run-up and set-up (i.e. CDB wind-wave activity) Installed Feature NA: Not Applicable

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 86of101 Table 4-2: LIP Flood Heights at Select Locations Critical Threshold Elevation Elevation Location Designation Location Description (NGVD 29 ft)

CLI Turbine Building Unit 1 West Rollup Door Low point of berm 594.81 CL2 Turbine Building Unit 2 West Rollup Door Low point of be1m 595.20 CL3 Turbine Building Unit 2 East Rollup Door Finish floor at tracks 608.95 CL4 Valve-shed Approximate finish floor 608.37 CL5 Valve-shed Approximate finish floor 608.40 CL6 Valve-shed Approximate finish floor 608.88 CL7 Valve-shed Approximate finish floor 608.43 CL9 Turbine Building Unit 1 East Rollup Door Finish floor near tracks 609.00 CLIO Auxiliary Building North Rollup Door Finish floor near tracks 608.91

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N Revision 1 Page 87of101 5.0 INTERIM EVALUATION AND ACTIONS TAKEN OR PLANNED Cases where the current design basis flood elevations do not bound the reevaluated hazards for all flood hazard mechanisms also require interim actions, taken or planned to address the reevaluated hazard prior to completing the Integrated Assessment. The following summarizes the interim evaluations and actions taken or planned.

5.1 Actions Taken As described in Section 4, flooding from a local intense precipitation (LIP) event is not bounded by CNP's current design basis flood elevations. The hydrologic study, as part of the application for the initial construction of the plant, found that rainfall into the sandy surficial soils at the site was rapid and flooding conditions were non-existent. The CNP flood hazard design basis does not include precipitation flood elevations or precipitation flood protection features such as water-tight doors and hatches near grade elevation.

As described in Section 3 .1, the site-specific probable maximum precipitation (PMP) analysis concluded that the 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> PMP depth is 20.2 inches, the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> PMP depth is 12.8 inches and the 30 minute PMP depth is 9.8 inches.

Review of historical rain records concluded the maximum recorded rainfall in the state of Michigan is 9.78 inches in a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period. This value was recorded in Bloomingdale, Michigan in 1914 (AREVA, 2014).

As described in Section 3.2, the peak water levels at critical locations (locations identified as the main flood ingress points) on the plant structure perimeter are greater than the threshold elevations. Considering the doors and hatches are not designed to be water-tight and the inundation levels are above the respective threshold elevations, water could intrude into the plant structures through doors and/or hatches near grade elevation during a LIP event.

Actual rain water infiltration of the plant due to precipitation has occurred at the site. Rain water had previously been observed to enter the Auxiliary Building through near grade doors and hatches. The intruding rain water moved to below-grade elevations of the Auxiliary Building, and into the Auxiliary Building interior floor drain system. As a result of this previous rain water intrusion, physical changes were implemented to reduce rain water intrusion into the Auxiliary Building. An exterior trench drain with connection to the yard drainage system was installed at the Auxiliary Building roll-up door (CL-9). This trench drain functions to collect and divert rainwater prior to it entering the Auxiliary Building through the roll-up door (CNP, 2011).

5.2 Actions Planned Additional interim evaluations and actions planned to address the reevaluated flood hazard prior to completion of the Flood Hazard Integrated Assessment as required by the 10 CFR 50.54(£) letter, Enclosure 2, Item l.d are described in the NRC transmittal letter for this Flood Hazard Reevaluation Report.

5.3 References AREVA, 2014. "Calculation of LIP Sensitivity Analyses , Cook Nuclear Plant Flood Hazard Re-evaluation,"

AREVA Document No.: 51-9227505-000, CNP Document No.: MD-14-FLOOD-013-N, Revision 0 CNP, 2011. "Auxiliary and Turbine Building Station Drainage Upgrades, CNP Document No.: EC-0000050971, AREVA Document No.: 38-9234603-000.

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-O 11-N I Revision 1 I Page 88of101 Appendix A APPENDIX A: FL0-2D COMPUTER PROGRAM A.1 FL0-2D for LIP Simulations The example LIP calculation presented in Appendix B ofNUREG/CR-7046 (NRC 2011) used HEC-HMS and HEC-RAS, developed by Hydrologic Engineering Center of US Army Corps of Engineers. The hydrologic paii of the calculation was performed within HEC-HMS, whereas the hydraulic part of the calculation was performed within HEC-RAS. In this flood reevaluation study, FL0-2D was selected for calculation of the LIP-induced PMF at CNP. For the LIP calculation, rainfall runoff in the site area was calculated internally by FL0-2D and translated into overland flow within FL0-2D.

This appendix was prepared as per Section 5.3 ofNUREG/CR-7046 (NRC, 2011).

A.1.1 Software Capability The FL0-2D computer program was developed by FL0-2D Software, Inc., Nutrioso, Arizona. FL0-2D is a combined two-dimensional hydrologic and hydraulic model that is designed to simulate river and overbank flows as well as unconfined flows over complex topography and variable roughness, split channel flows, mud/debris flows and urban flooding.

FL0-2D is a physical process model that routes rainfall-runoff and flood hydrographs over unconfined flow surfaces using the dynamic wave approximation to the momentum equation. The model has components to simulate riverine flow including flow through culverts, street flow, buildings and obstructions, levees, sediment transport, spatially variable rainfall and infiltration and floodways. Application of the model requires knowledge of the site, the watershed (and coastal, as appropriate) setting, goals of the study, and engineering judgment. This software was used to simulate the LIP to establish LIP-induced maximum water surface elevations at CNP.

The major design inputs to the FL0-2D computer model ai*e digital terrain model of the land surface, inflow hydrograph and/or rainfall data, Manning's roughness coefficient and Soil hydrologic properties such as the SCS curve number. The digital terrain model of the land surface is used in creating the elevation grid system over which flow is routed. The specific design inputs depend on the modeling purpose and the level of detail desired.

The following executable modules compose the FL0-2D computer program:

.exe File Size FLOPRO.exe 11.3 MB GDS PRO.exe 6.6 MB Mapper PRO.exe 3.25 MB FLOPRO.exe is the model code that performs the numerical algorithms for the aforementioned components of the overall FL0-2D computer model.

GDS PRO.exe graphically creates and edits the FL0-2D grid system and attributes and creates the basic FL0-2D data files for rainfall - runoff and overland flow flood simulation. Mapper PRO.exe enables graphical viewing of model results and inundation mapping.

A description of the major capabilities of FL0-2D which will be used for this project is provided in Section A.1.2 below.

AEP - D. C. Cook Nuclear Plant l\fil-12-FLOOD-011-N Revision 1 Page 89of101 Appendix A A.1.2 Model Components A.1.2.1 Overland Flow Simulation This FL0-2D component simulates overland flow and computes flow depth, velocities, impact forces, static pressure and specific energy for each grid. Predicted flow depth and velocity between grid elements represent average hydraulic flow conditions computed for a small time step. For unconfined overland flow, FL0-2D applies the equations of motion to compute the average flow velocity across a grid element (cell) boundary. Each cell is defined by 8 sides representing the eight potential flow directions (the four compass directions and the four diagonal directions). The discharge sharing between cells is based on sides or boundaries in the eight directions one direction at a time. Atnmtime, the model sets up an array of side connections that are only accessed once .

during a time step. The surface storage area or flow path can be modified for obstructions including buildings and levees. Rainfall and infiltration losses can add or subtract from the flow volume on the floodplain surface.

A.1.2.2 Rainfall - Runoff Simulation Rainfall can be simulated in FL0-2D. The storm rainfall is discretized as a cumulative percent of the total. This discretization of the storm hyetograph is established through local rainfall data or through regional drainage criteria that defines storm duration, intensity and distribution. Rain is added in the model using an S-curve to define the percent depth over time. The rainfall is uniformly distributed over the grid system and once a certain depth requirement (0.01-0.05 ft) is met, the model begins to route flow.

A.1.2.3 Hydraulic Structures Hydraulic structures including bridges and culverts and storm drains may be simulated in FL0-2D Pro. Storm drains are modeled using the EPA SWMM Model (AREVA, 2014b). FL0-2D Pro is linked to the EPA SWMM Model at runtime to exchange surface water and storm drain conveyance. FL0-2D Pro computes the surface water depth at grid elements prescribed with storm drains and then passes discharge inflow along to the storm drain system based on input storm drain geometry. The EPA SWMM model then computes the pipe network flow distribution and potential return flow to the surface.

A.1.2.4 Levees This FL0-2D component confines flow on the floodplain surface by blocking one or more of the eight flow directions. A levee crest elevation can be assigned for each of the eight flow directions in a given grid element.

The model predicts levee overtopping. When the flow depth exceeds the levee height, the discharge over the levee is computed using the broad-crested weir flow equation with a 3.1 coefficient. Weir flow occurs until the tailwater depth is 85% if the headwater depth. At higher flows, the water is exchanged across the levees using the difference in water surface elevations.

A.1.3 FL0-2D Model Theory Governing equations and solution algorithm are presented in details in FL0-2D Reference Manual (FL02D, 20 l 3a). The general constitutive fluid equations include the continuity equation and the equation of motion (dynamic wave momentum equation) (FL0-2D, 2013a, Chapter II):

  • ah a1rv .

-+--= 1 at ax ah v av 1 av Sf= So---- - - - -

ax g ax g ot

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N I Revision 1 I Page 90of101 Appendix A where h = flow depth; V = depth averaged velocity in one of the eight flow directions; x =one of the eight flow directions; i =rainfall intensity; S1 = friction slope based on Manning's equation; So = bed slope g = acceleration of gravity The partial differential equations are solved with a central finite difference numerical scheme, which implies that final results are approximate solutions to the differential equations. Details on the accuracy ofFL0-2D solutions are discussed in FL0-2D Validation Report (FL0-2D, 2011).

A.1.4 Model Inputs and Outputs Inputs to FL0-2D are entered through a graphical user interface (GUI), which creates ASCII text files used by the FL0-2D model (FL0-2D, 2013b). The ASCII text files can be viewed and edited* by other ASCII text editors such as Microsoft W ordPad.

Calculated results from FL0-2D simulations are saved in the ASCII text format in a number of individual files.

The results can be viewed with the post-processor programs as follows:

  • Mapper PRO to view grid element results such as elevation, water surface elevation, flow depth and velocity, to create contour maps and to generate shape files that can later be used by GIS mapping software such as ArcMap.

A.1.5 Conclusions FL0-2D is a FEMA-approved software (FL0-2D, 2011). The model validation report prepared for FEMA and the FL0-2D software certification prepared for this Flood Reevaluation Project (AREVA, 2014a) has demonstrated its modeling capabilities and numerical accuracy. It is therefore judged to be an appropriate modeling tool for the CNP LIP flood reevaluation study where 2-dimensional overland flow is predominant.

A.1.6 References A.1.6.1 AREVA 2014a. AREVA Document No. 38-9225054-000, Computer Software Certification -

FL0-2D Pro Build No. 14.03.07, Alden, 2014.

A.1.6.2 AREVA 2014b. AREVA Document No. 38-9228225-000, SWMM Version 5.0.022 Computer Program Ce1iification Report, Alden, 2014.

A.1.6.3 FL0-2D, 2013a. FL0-2D Pro Reference Manual, FL0-2D Software, Inc., 2013.

A.1.6.4 FL0-2D, 2013b. FL0-2D Data Input Manual, FL0-2D Software, Inc., 2013.

A.1.6.5 FL0-2D, 2011. FL0-2D Model Validation for Version 2009 and up prepared for FEMA, FL0-2D Software, Inc., June 2011.

A.1.6.6 NRC, 2011. U.S. Nuclear Regulatory Commission "NUREG/CR-7046: Design-Basis Flood Estimation for Site Characterization at Nuclear Power Plants in the United States of America",

Springfield, VA, National Technical Information Service, 2011 (ADAMS Accession No. ML 11321Al95).

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-O 11-N I Revision 1 I Page 91of101 AppendixB APPENDIX B: LOCAL INTENSE PRECIPITATION FIGURES

AEP - D. C. Cook Nuclear Plant MD- 12-FLOOD-011 -N I Revision l I Page 92 of 101 Appendix B Figure B-1: Water Surface Elevation Over Time CLl (HHA Case 2) 596.0 595.5

.2 QI QI c

595.0 594.5 Critical Threshold Elevation = 594.8 (nearby ground elevation 594.6) 594.0 LU QI 593.5 u

't:

s V> 593.0 QI

~"' 592.5 592.0 591.5 591 .0 0 2 4 6 8 10 12 14 Time (hours)

AEP - D. C. Cook Nucl ear Plant MD-12-FLOOD-011-N I Revision 1 I Page 93 of 101 Appendix B Figure B-2: Water Surface Elevation Over T ime CL2 (HHA Case 2) 602 601

-... 600

.2 Q)

Q) c 599 ta 598 w

Q) u 597

~

s V) 596 Q) * * * * * * * * * * *

~

ta 595 ---------------------------

594 Critical Threshold Elevation =595.2 (nearby ground elevation 593.2) 593 592 0 2 4 6 8 10 12 14 Time (hours)

AEP - D. C. Cook Nuclear Plant MD-1 2-FLOOD-O11-N I Revision I I Page 94 of 10 I Appendix B Figure B-3: Water Surface Elevation Over Time CL3 (HHA Case 2) 612.0 611.5 cu 611.0

-.2c

.!! 610.5 fV 610.0 cu w

cu u

609.5 fV

't

J Cl) 609.0

...cu a..

fV 608.5

~

608.0 607.5 Critical Threshold Elevation =609.0 (nearby ground elevation 608 .8) 607.0 0 2 4 6 8 10 12 14 Time (hours)

AEP - D. C. Cook Nuclear Plant MD- 12-FLOOD-O11 -N I Revision l I Page 95 of 101 Appendix B Figure B-4: Water Surface Elevation Over Time CL4 (HHA Case 2) 612.0 611.5

-... 611.0

.2 cu cu c

610.5 610.0 w

cu 609.5

't

"':::s * * * * * * * * * *

...cu V> 609.0 * * ** * * * * * * *

~"' 608.5 608.0 Critical Threshold Elevation = 608.4 (nearby ground elevat ion 607.7) 607.5 607.0 0 2 4 6 8 10 12 14 Time (hours)

AEP - D. C. Cook Nuclear Plant MD- 12-FLOOD-O l 1-N I Revision l I Page 96 of I 01 Appendix B Figure B-5: Water Surface Elevation Over Time CLS (HHA Case 2) 612.0 611.S 611.0 GJ GJ c

.2 ftl 610.5 610.0 GJ iij GJ 609.5 u

~:J * * * * * * * * * *

...GJ V) 609.0

~

ftl 608.5

  • 608.0 Critical Threshold Elevation = 608.4 (nearby ground elevation 607.9) 607.5 607.0 0 2 4 6 8 10 12 14 Time (hours)

AEP - D. C. Cook N uclear Plant MD-12-FLOOD-011-N I Revision 1 I Page 97 of 101 Appendi x B Figure B-6: Water Surface Elevation Over Time CL6 (HHA Case 2) 612.0 611.5

-... 611 .0

.2 c

G.I G.I 610.S

"' 610.0 UJ u 609.5

't:

~ ***

V> 609.0 G.I

"' 608.5 Critical Threshold Elevation =608.9 (nearby ground elevation 608.5)

~

608.0 607.5 607.0 0 2 4 6 8 10 12 14 Time (hours)

AEP - D . C. Cook Nuclear Plant MD-12-FLOOD-O 11-N I Revision l I Page 98 of 101 AppendixB Figure B-7: Water Surface Elevation Over Time CL7 (HHA Case 2) 612.0 611.5 GI 611.0

-.2c 610.5

... 610.0 w

GI 609.5 u

"'::::J

't: * * * * * * *** *

  • 609.0

...GI Cl)

~

CD 608.5

-~-

608.0 Critical Threshold Elevation = 608.4 (nearby ground elevation 608.4) 607.S 607.0 0 2 4 6 8 10 12 14 Time (hours)

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N I Revision I I Page 99of101 Appendix B Figure B-8: Water Surface Elevation Over Time CL8 (HHA Case 2) 612.0 611.5 QI 611.0

-.2

~

c 610.S

...ca 610.0

-w QI QI u 609.5

~j 609.0 V')

QI ** * * * * **

  • 3:"' 608.5 Critical Threshold Elevation =609.0 (nearby ground elevation 608.1) 608.0 607.5 607.0 0 2 4 6 8 10 12 14 Time (hours)

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-011-N I Revision 1 I Page 100 of 101 Appendix B Figure B-9: Water Surface Elevation Over Time CL9 (HHA Case 2) 610.5 609.5 +--=

  • 610.0 ,___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___,

. - - ---:;;.;;--- - - - - - - - - - - - - - - - - - - - - - - i l . i 609.0 * * ** * * ** *

  • 608.5 _,___ _ _ _ _ _ _ _ _ _ _ _ __

Critical Threshold Elevation = 609.0 (nearby ground elevation 608.8) 608.0 +---------------------------------------------~

607.5 607.0 +------~------~-----~------~------~-----~------

0 2 4 6 8 10 12 14 Time (hours)

AEP - D. C. Cook Nuclear Plant MD-12-FLOOD-O 11-N I Revision I I Page 101of101 Appendix B Figure B-10: Water Surface Elevation Over Time CLlO (HHA Case 2) 612.0 611.5

-.. 611.0

.2 Cl.I GI c

ftl 610.5 610.0 w

GI 609.5 u

ftl

't:

J * *

~

II)

GI ftl 609.0 608.5 Critical Threshold Elevation =608.9 (nearby ground elevation 608.5) 608.0 607.5 607.0 0 2 4 6 8 10 12 14 Time (hours)

Enclosure 4 to AEP-NRC-2016-89 Compact Disk Containing Adobe Files for Donald C. Cook Flood Hazard Reevaluation Report Supporting Calculations MD-12-FLOOD-008-N, Revision 1, "Flood Due to Groundwater Level Increase, Cook Nuclear Plant Flood Hazard Re-evaluation,"

and MD-12-FLOOD-010-N, Revision 1, "Combined- Effect Floods, Cook Nuclear Plant Flood Hazard Re-evaluation"