Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22101A2826 May 2022Regulatory Audit Summary Related to the Review of License Amendment Regarding Revising the Flood Hazard Protection Scheme
ML21172A26713 August 2021Regulatory Audit Summary Related to the Review of LAR to Revise 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to Reflect an Alternative Seis
ML20329A3817 December 2020Regulatory Audit Summary Regarding License Amendment Request to Adopt Risk Informed Completion Times Technical Specification Task Force-505, Rev. 2, Provide Risk-Informed Completion Times (EPID L-2019-LLA-0218High winds
Internal Flooding
Probabilistic Risk Assessment
FLEX
Large early release frequency
ML18282A22414 November 2018Regulatory Audit Summary Regarding License Amendment Requests to Adopt 10 CFR 50.69Internal Flooding
Probabilistic Risk Assessment
FLEX
ML16138A05024 May 2016Audit Report - Application For Amendment Shearon Harris Nuclear Power Plant, Unit 1 - The Proposed License Amendment Revises The As-Found Lift Setting Tolerance For Main Steam Line Code Safety Valves In Technical Specifications (TAC No. MF7195)
ML15321A10216 December 2015Audit of the Licensee'S Management of Regulatory CommitmentsCyber Security
Through Wall Leak
ML15083A02414 April 2015Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
Spent Fuel Pool Instrumentation
Battery sizing
GOTHIC
ML13364A21412 February 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Frazil ice
Battery sizing
Earthquake
ML09029032710 March 2009Regulatory Audit in Support of the License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program as Allowed by Title 10 of the Code of Federal Regulations, Paragraph 50.48(c) Fire ProtectionSafe Shutdown
Probabilistic Risk Assessment
Operator Manual Action
Multiple Spurious Operation
Fire Protection Program
ML08206019029 July 2008Audit of the Licensee'S Management of Regulatory Commitments (Tac No. MD8759)Safe Shutdown
Weld Overlay
Past operability
Operability Determination
Fire Protection Program
ML08065042029 May 2008Fire Probabilistic Risk Assessment Pre-Submittal AuditHot Short
Safe Shutdown
High Radiation Area
Fire Barrier
Probabilistic Risk Assessment
Multiple Spurious Operation
Incorporated by reference
Locked High Radiation Area
Large early release frequency
Continuous fire watch
Fire Protection Program
Fire Watch
ML08080024326 March 2008Audit Summary Regarding the License Renewal Application for the Shearon Harris Nuclear Power Plant, Unit 1Safe Shutdown
Boric Acid
Non-Destructive Examination
Stroke time
Weld Overlay
Internal Flooding
Hydrostatic
Coatings
Temporary Modification
VT-2
Locked High Radiation Area
Aging Management
Local Leak Rate Testing
Foreign Material Exclusion
Flow Accelerated Corrosion
Stress corrosion cracking
Integrated leak rate test
Eddy Current Testing
Operability Determination
Moisture barrier
License Renewal
Biofouling
Pressure Boundary Leakage
Through-Wall Leak
Fire Protection Program
Dissimilar Metal Weld
Power Uprate
Thermography
Thermal fatigue