Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23206A22425 July 2023Corrected Proposed Technical Specification 5.5.16 Changes (Markup)
ML23206A22525 July 2023Corrected Proposed Technical Specification 5.5.16 Changes (Clean Pages)
ML23093A09510 May 2023Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage
ML23088A12229 March 2023Attachment 2: Revised (Clean) Technical Specification PagesSurveillance Frequency Control Program
ML23088A12129 March 2023Attachment 1: Marked-Up Technical Specification PagesSurveillance Frequency Control Program
ML22251A3458 September 2022Attachment 2: Retyped TS Pages for TS 3.6.8
ML22242A12629 August 2022Attachment 2 to Enclosure 1 - Revised Clean Technical SpecificationsSurveillance Frequency Control Program
ML22242A12529 August 2022Attachment 1 to Enclosure 1 - Marked-Up Existing Technical SpecificationsSurveillance Frequency Control Program
ML21294A39921 October 2021Attachment 5 - Cross-Reference of TSTF-505 and Callaway Technical SpecificationsUltimate heat sink
Offsite Circuit
ML21294A41221 October 2021Enclosure 12 - Risk Management Action ExamplesHigh winds
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Fire Protection Program
ML21294A41021 October 2021Enclosure 10 - Program ImplementationProbabilistic Risk Assessment
ML21294A41121 October 2021Enclosure 11 - Monitoring ProgramProbabilistic Risk Assessment
Large early release frequency
ML21294A40921 October 2021Enclosure 9 - Key Assumptions and Sources of UncertaintySafe Shutdown
High winds
Mission time
Internal Flooding
Probabilistic Risk Assessment
FLEX
TORMIS
Tornado Missile Risk Evaluator
ML21294A40821 October 2021Enclosure 8 - Attributes of the Real Time Risk ModelHigh winds
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
ML21294A40721 October 2021Enclosure 7 - PRA Model Update ProcessHigh winds
Probabilistic Risk Assessment
ML21294A40621 October 2021Enclosure 6 - Justification of Application of At-Power PRA Models to Shutdown Modes
ML21294A40521 October 2021Enclosure 5 - Baseline Core Damage Frequency (CDF) and Large Early Release Frequency (LERF)High winds
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
ML21294A40421 October 2021Enclosure 4 - Information Supporting Justification of Excluding Sources of Risk Not Addressed by the PRA ModelsSafe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Earthquake
Turbine Missile
ML21294A40321 October 2021Enclosure 3 - Information Supporting Technical Adequacy of PRA Models Without PRA Standards Endorsed by Regulatory Guide 1.200, Revision 2
ML21294A40221 October 2021Enclosure 2 - Information Supporting Consistency with Regulatory Guide 1.200, Revision 2High winds
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
ML21294A40121 October 2021Enclosure 1 - List of Revised Required Actions to Corresponding PRA FunctionsSafe Shutdown
High winds
Ultimate heat sink
Mission time
Stroke time
Anticipated operational occurrence
Probabilistic Risk Assessment
Offsite Circuit
ML21294A40021 October 2021Attachment 6 - Description and Assessment Specific to TSTF-439Offsite Circuit
ML21294A39721 October 2021Attachment 3 - Revised Technical Specification PagesHigh Radiation Area
Ultimate heat sink
Surveillance Frequency Control Program
Offsite Circuit
ML21294A39621 October 2021Attachment 2 - Proposed Technical Specification Changes (Mark-Up)High Radiation Area
Ultimate heat sink
Surveillance Frequency Control Program
Offsite Circuit
ML21294A39521 October 2021Attachment 1 - Description and AssessmentProbabilistic Risk Assessment
Large early release frequency
ML20070R12110 March 2020Technical Specification Page Markup
ML20070R11410 March 2020Description and Assessment of the Proposed ChangeSafe Shutdown
ULNRC-06433, License Amendment Request for Emergency Action Level (EAL) Changes4 September 2018License Amendment Request for Emergency Action Level (EAL) ChangesSafe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Emergency Lighting
FLEX
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Power change
ULNRC-06264, Revision of TS 2.1.1.1 and 5.6.5 to Remove Uncertainties from the DNBR Safety Limit and Adopt Approved WCAP-14565-P-A Methodology9 November 2015Revision of TS 2.1.1.1 and 5.6.5 to Remove Uncertainties from the DNBR Safety Limit and Adopt Approved WCAP-14565-P-A MethodologyFuel cladding
ML15062A0526 March 2015NRC-Callaway-TS-renewed LicenseTime of Discovery
Shutdown Margin
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Nondestructive Examination
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Pressure Boundary Leakage
Offsite Circuit
Power change
Unidentified leakage
ULNRC-05832, Revision of Technical Specification 3.3.8, TAC No. ME517313 December 2011Revision of Technical Specification 3.3.8, TAC No. ME5173Surveillance Frequency Control Program
ML1130706943 November 2011Attachment 5 - Control Building Room Locations and P&ID Excerpts
ML1130706833 November 2011Attachment 1 - Technical Specification Page Mark UpUltimate heat sink
Fire Barrier
Surveillance Frequency Control Program
Continuous fire watch
Hourly Fire Watch
ML1130706813 November 2011Enclosure Page 1 of 22, Evaluation of the Proposed ChangeShutdown Margin
Fire Barrier
Anticipated operational occurrence
Internal Flooding
Earthquake
Continuous fire watch
Hourly Fire Watch
ULNRC-05804, Facility Operating License NPF-30 - Proposed Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, (License Amendment Request LDCN 09-0025)30 June 2011Facility Operating License NPF-30 - Proposed Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, (License Amendment Request LDCN 09-0025)Ultimate heat sink
Fuel cladding
ULNRC-05793, Application for Amendment to Facility Operating License NPF-30 (LDCN 10-0036) Revision of Technical Specification 3.3.8,16 June 2011Application for Amendment to Facility Operating License NPF-30 (LDCN 10-0036) Revision of Technical Specification 3.3.8,Safe Shutdown
Stroke time
Safe Shutdown Earthquake
ULNRC-05682, Application for Amendment, Revision of Technical Specification 3.3.94 March 2010Application for Amendment, Revision of Technical Specification 3.3.9Shutdown Margin
ULNRC-05560, Revision of Technical Specifications 3.8.4 and 3.8.5, Application for Amendment to Facility Operating License NPF-30 (LDCN 08-002)29 December 2008Revision of Technical Specifications 3.8.4 and 3.8.5, Application for Amendment to Facility Operating License NPF-30 (LDCN 08-002)Earthquake
ML08246024124 November 2008Issuance of Amendment No. 187, Revise Technical Specification 5.5.8, Inservice Testing Program, Testing FrequenciesIncorporated by reference
ULNRC-05494, Application for Amendment to Facility Operating License NPF-30 OL1283 - Revision of Technical Specifications 3.3, 3.7, and 3.83 June 2008Application for Amendment to Facility Operating License NPF-30 OL1283 - Revision of Technical Specifications 3.3, 3.7, and 3.8High winds
Anticipated operational occurrence
Tornado Missile Protection
B.5.b Mitigating Strategies
Earthquake
Offsite Circuit
ML07068035021 March 2007License and Technical Specification Pages - Amendment No. 182 Revision to Technical Specifications for Use of Beacon Power Distribution Monitoring System
ML06328018517 November 2006Callaway - Proposed Revision to Technical Specification 3.9.2 Unborated Water Source Isolation Valves and Associated Revisions to Technical Specification 3.3.9 Boron Dilution Mitigation System (Bdms) (License Amendment Request OL 1238)Boric Acid
Shutdown Margin
Post Accident Monitoring
ULNRC-05345, Proposed Revision to Technical Specification 3.9.2 Unborated Water Source Isolation Valves and Associated Revisions to Technical Specification 3.3.9 Boron Dilution Mitigation System (Bdms).17 November 2006Proposed Revision to Technical Specification 3.9.2 Unborated Water Source Isolation Valves and Associated Revisions to Technical Specification 3.3.9 Boron Dilution Mitigation System (Bdms).Boric Acid
Post Accident Monitoring
ULNRC-05314, Exigent Request for Revision to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation.19 July 2006Exigent Request for Revision to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation.Safe Shutdown Earthquake
Fuel cladding
Pressure Boundary Leakage
ULNRC-05301, Proposed Revision to Technical Specification TSs 3.7.10, 3.7.11 and 3.7.137 June 2006Proposed Revision to Technical Specification TSs 3.7.10, 3.7.11 and 3.7.13Safe Shutdown
Anticipated operational occurrence
Earthquake
Offsite Circuit
ULNRC-05297, Proposed Revision to Technical Specifications for Use of Beacon Power Distribution Monitoring System25 May 2006Proposed Revision to Technical Specifications for Use of Beacon Power Distribution Monitoring SystemShutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
ULNRC-05269, Proposed Revision to Technical Specification 3.9.2 Unborated Water Source Isolation Valves and Associated Revisions to Technical Specification 3.3.9 Boron Dilution Mitigation System (Bdms) (License Amendment Request OL 1238)28 March 2006Proposed Revision to Technical Specification 3.9.2 Unborated Water Source Isolation Valves and Associated Revisions to Technical Specification 3.3.9 Boron Dilution Mitigation System (Bdms) (License Amendment Request OL 1238)Boric Acid
Shutdown Margin
Anticipated operational occurrence
Post Accident Monitoring
Power change
ULNRC-05206, License Amendment Request OL 1258 Revision to Technical Specification 3.7.3, Main Feedwater Isolation Valves (Mfiv'S)9 September 2005License Amendment Request OL 1258 Revision to Technical Specification 3.7.3, Main Feedwater Isolation Valves (Mfiv'S)Stroke time
Safe Shutdown Earthquake
Earthquake
ML0506903188 March 2005Technical Specification Pages Re Elimination of Requirements to Provide Monthly Operating Reports & Annual Occupational Radiation Exposure ReportsShutdown Margin
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Process Control Program
ULNRC-05117, Technical Specification Revisions Associated with the Steam Generator Replacement Project11 February 2005Technical Specification Revisions Associated with the Steam Generator Replacement ProjectGOTHIC