ML23088A121

From kanterella
Jump to navigation Jump to search
Attachment 1: Marked-Up Technical Specification Pages
ML23088A121
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/29/2023
From:
Ameren Missouri, Union Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23088A118 List:
References
ULNRC-06751
Download: ML23088A121 (1)


Text

Attachment 1 to ULNRC-0675 1 Page 1 of4 ATTACHMENT 1 MARKED-UP TS PAGES to ULNRC-0675 1 Page 2 of 4 Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air LCO 3.8.3 The stored diesel fuel oil, lube oil, and starting air subsystem shall be within limits for each required diesel generator (DG).

APPLICABILITY: When associated DG is required to be OPERABLE.

ACTIONS NOTE Separate Condition entry is allowed for each DG.

CONDITION REQUIRED ACTION COMPLETION A. One or more DGs with fuel A.1 Restore fuel oil level to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> level < 80900 gal and

> 69,800 gal less than a 7 day within limits.

supply and greater than a 6 day supply in storage tank.

B. One or more DGs with lube B.1 Restore lube oil 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> oil inventory < 750 gal and > 686 gai less than a 7 day supply and inventory to within limits.

greater than a 6 day supply.

C. One or more DGs with C.1 Restore fuel oil total 7 days stored fuel oil total particulates within limit.

particulates not within limit.

D. One or more DGs with new D.1 Restore stored fuel oil 30 days fuel oil properties not within properties to within limits, limits.

(continued)

CALLAWAY PLANT 3.8-22

Attachment I to ULNRC-0675 1 Page 3 of 4 Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION E. One or more DGs with two E.1 Restore two starting air 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> starting air receivers in receivers with pressure service with pressure 435 psig.

< 435 psig and 250 psig.

OR OR One or more DGs with only E.2 Restore one starting air 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> one starting air receiver in receiver with pressure service with pressure 610 psig.

< 610 psig and 300 psig.

F. Required Action and F.1 Declare associated DG Immediately associated Completion inoperable.

Time not met.

OR One or more DGs diesel fuel oil, lube oil, or starting air subsystems not within limits for reasons other than Condition A, B, C, D, or E.

CALLAWAY PLANT 3.8-23 to ULNRC-0675 I Page 4 of Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.3.1 Verify each fuel oil storage tank contains 80,900 In accordance a 7 day supply of fuel. with the Surveillance Frequency Control Program SR 3.8.3.2 Verify lubricating oil inventory is 750 gaLa In accordance 7 day supply. with the Surveillance Frequency Control Program SR 3.8.3.3 Verify fuel oil properties of new and stored fuel oil are In accordance with tested in accordance with, and maintained within the the Diesel Fuel Oil limits of, the Diesel Fuel Oil Testing Program. Testing Program SR 3.8.3.4 Verify pressure in two starting air receivers is 435 In accordance psig or pressure in one starting air receiver is 610 with the psig, for each DG starting air subsystem. Surveillance Frequency Control Program SR 3.8.3.5 Check for and remove accumulated water from each In accordance fuel oil storage tank. with the Surveillance Frequency Control Program SR 3.8.3.6 Not used.

CALLAWAY PLANT 3.8-24