Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17265A76630 June 19991999 Rept of Facility Changes,Tests & Experiments Conducted Without Prior NRC Approval for Jan 1998 Through June 1999, Per 10CFR50.59.With 991020 LtrUltimate heat sink
Tornado Missile
Earthquake
Fuel cladding
ML17265A29831 December 19971998 Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval for Aug 1996 Through Dec 1997 Under Provisions of 10CFR50.59.Safe Shutdown
Ultimate heat sink
Post Accident Monitoring
Temporary Modification
ML17264A77231 July 19961996 Rept of Facility Changes,Tests & Experiments Conducted Without Prior Approval for Aug 1995-Jul 1996,Under Provisions of 10CFR50.59.Safe Shutdown
Fire Barrier
Stroke time
Met Tower
Temporary Modification
Control of Heavy Loads
Turbine Missile
Scaffolding
ML17264A30231 July 19951995 Rept of Facility Change,Tests & Experiments Conducted Without Prior Approval for Aug 1995 - Jul 1995 Under Provisions of 10CFR50.59.Safe Shutdown
Boric Acid
Non-Destructive Examination
Tornado Missile
Post Accident Monitoring
Coatings
Nondestructive Examination
Temporary Modification
Tornado Missile Protection
Design basis earthquake
Turbine Missile
Scaffolding
Flow Induced Vibration
ML17263A94615 February 1995Re Ginna Nuclear Power Plant Simulator Four Yr Certification Rept. W/950215 LtrBoric Acid
Fuel cladding
ML17309A56531 July 19941994 Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval for Aug 1993 - Jul 1994. W/941216 LtrSafe Shutdown
Boric Acid
High Radiation Area
Fire Barrier
Stroke time
Tornado Missile
Safe Shutdown Earthquake
Operating Basis Earthquake
Temporary Modification
Rod Drop Event
Earthquake
ML17309A53231 July 19931993 Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval for Aug 1992 - Jul 1993. W/ 931203 LtrSafe Shutdown
Boric Acid
Loop seal
Fire Barrier
Safe Shutdown Earthquake
Hydrostatic
Met Tower
Temporary Modification
Zebra Mussel
Tornado Generated Missile
Battery sizing
Earthquake
ML17309A50631 July 19921992 Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval for Aug 1991 Through Jul 1992. W/921218 LtrSafe Shutdown
Boric Acid
Shutdown Margin
Fire Barrier
Safe Shutdown Earthquake
Hydrostatic
Temporary Modification
Zebra Mussel
Design basis earthquake
Earthquake
Offsite Circuit
ML17262B14331 July 1992Corrected 1992 Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval for Aug 1991 Through Jul 1992.Safe Shutdown
Boric Acid
Shutdown Margin
Fire Barrier
Safe Shutdown Earthquake
Temporary Modification
Zebra Mussel
Design basis earthquake
Earthquake
Offsite Circuit
ML17262A70831 July 1991Annual Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Commission Approval for Aug 1990 - Jul 1991.W/911218 Ltr
ML17309A45231 July 1990Annual Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Commission Approval, Covering Aug 1989 to Jul 1990. W/901217 LtrSafe Shutdown
Boric Acid
High winds
High Radiation Area
Grab sample
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Post Accident Monitoring
Hydrostatic
Operating Basis Earthquake
Temporary Modification
Earthquake
Scaffolding
ML17309A43431 July 19891989 Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval for Aug 1988 - Jul 1989. W/891219 LtrSafe Shutdown
Boric Acid
Loop seal
High Radiation Area
Fire Barrier
Safe Shutdown Earthquake
Hydrostatic
Temporary Modification
Test box
Earthquake
Control of Heavy Loads
Scaffolding
ML17309A41231 July 19881988 Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval for Aug 1987 - Jul 1988. W/881216 LtrSafe Shutdown
Boric Acid
Fire Barrier
Stroke time
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Emergency Lighting
Earthquake
ML20234C35631 July 19871987 Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval for Aug 1986 - Jul 1987Safe Shutdown
Boric Acid
Loop seal
Fire Barrier
Hydrostatic
Earthquake
Control of Heavy Loads
ML17251A89011 December 19861986 Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval.Safe Shutdown
Boric Acid
Loop seal
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Temporary Modification
Hemyc
Earthquake
Control of Heavy Loads
Turbine Missile
Backfit
ML20091R76431 December 1983Annual Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval & Challanges to Primary & Secondary Sys PORVs & Safety Valves for 1983Safe Shutdown
Boric Acid
High Radiation Area
Fire Barrier
Safe Shutdown Earthquake
Hydrostatic
Locked High Radiation Area
Earthquake
ML20084N09420 May 1983Annual Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval & Challenges to Primary & Secondary Sys PORVs & Safety Valves,1982Safe Shutdown
Fire Barrier
Post Accident Monitoring
Earthquake
ML20084N08620 May 1983Annual Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval & Challenges to Primary & Secondary Sys PORVs & Safety Valves,1981Fire Barrier
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Tornado-Generated Missile
Earthquake
Power change
ML19350D74529 April 1981Annual Operating Rept,1980.Boric Acid
Fire Barrier
Hydrostatic
Nondestructive Examination
Emergency Lighting
ML19351F88830 January 1981Annual Operating Rept Number 15 of Re Ginna Nuclear Power Station,1979.Boric Acid
ML17244A79731 December 1978Annual Operating Rept 1978Boric Acid
Shutdown Margin
Fire Barrier
Hydrostatic
Backfit